{{#Wiki_filter:GRAND GULF NUCLEAR STATION

          ~,

ADMINISTRATIVE PROCEDURE 01-S-02-2 Revision: 122 Attachment VI Page 1 of 2 DIRECTIVE CANCELLATION FORM SECTION I Preparer: Richard Van Den Akker Directive #/TCN # 10-S-01-32 Revision # 1J03

Title:

Radioactive Material '/ Non-Radioactive Hazardous Material Transportation Accident Plan 08-5-08-6 DDS This directive is superseded by Directive # EN-RW-102 Revision # D~

Title:

EN-RW-102: Radioactive Shipping Procedure 08-5-08-6: Environmental Incident Response Reason for Cancellation: This procedure is no longer used at GGNS review, Date I / Regulato 7\ssurance Date OSRC Date (3) ,AI~ I (4) I Manager (dual approval) Date (6) Note: Signature should be routed as numbered. GGNS Document Conttgl CONTROLLED COPY

GRAND GULF NUCLEAR STATION ADMINISTRATIVE PROCEDURE 01-S-02-2 Revision: 122 Attachment VI Page 2 of 2 DIRECTIVE CANCELLATION FORM (Cont.) 50.59 required DYes (if yes, 50.59 must be transmitted to Document Control/Records Management with cancellation form as a separate record) ~No (if no, explain 10-S-01-32 in an Emergency Plan Implementing Procedure and is controlled by the 10 CFR 50.54 q process. } Cross discipline review required DYes (E]No Verified that other procedures do not reference the procedure being cancelled,. (&JYes DNo The preparer may use Nuclear Corporate Applications AUTONOMY to search for references as follows:

  • Go to Programs, Nuclear Corporate Applications (ESM), and start AUTONOMY (ENS).
  • Once AUTONOMY (ENS) loads, select LRS GGN SEARCH.
  • Select the box next to GRAND-GULF-SITE-PROCEDURES-{WORD}
    --INFORMATION-ONLY.
  • Conduct search for procedure references - use AUTONOMY help as needed.
  • List effective procedures and notify procedure owner of effective procedure.

N/A Verified that document being cancelled does not affect a Passport Task ~Yes DNo Verified ROB for changes which add or remove local instruments to Off-Normal Event Procedures (E]Yes DNo

                      ~ REVIEW~D       BY:

____~~~-=-~~_LZ.:..:oJtI'- _ IJ)iALS Technical Review - Responsible Section Management required for all s~rveillance procedures; otherwise, the appropriate technical reviewer's signature is required (Attachment I). Responsible Manager - As indicated by Approval Signature in matrix (Attachment I) Regulatory Assurance - Required for cancellation of directives that are used to meet requirements listed on the Requirements Cross-Reference List. Manager {Dual Approval} See Attachment III for appropriate signature. OSRC - For all procedures requiring OSRC approval. General Manager, Plant Operations- For all administrative-level procedures.

ATTACHMENT 9.1 10CFR50.54(q) SCREENING SHEET 1 oF4 Procedure/Document Number: 10-S-01-32 I Revision: 3 Equipment/Facility/Other: Grand Gulf Nuclear Station

Title:

Radioactive Material/ Non-Radioactive Hazardous Material Transportation Accident Plan Part I. Description of Activity Being Reviewed (event or action, or series of actions that may result in a change to the emergency plan or affect the implementation of the emergency plan): Procedure cancellation. Part II. Activity Previously Reviewed? DYES r8I NO Is this activity fully bounded by an NRC approved 10 CFR 50.90 submittal or 50.54(q)(3) Continue to Evaluation is next part Alert and Notification System Design Report? NOT required. Enter If YES. identify bounding source document number/approval reference and justification ensure the basis for concluding the source document fully bounds the below and complete Part proposed change is documented below: VI. Justification: D Bounding document attached (optional) Part III. Applicability of Other Regulatory Change Control Processes Check if any other regulatory change processes control the proposed activity.(Refer to EN-L1-100) NOTE: For example, when a design change is the proposed activity, consequential actions may include changes to other documents which have a different change control process and are NOT to be included in this 50.54(q)(3) ScreeninQ. APPLICABILITY CONCLUSION D If there are no controlling change processes, continue the 50.54(q)(3) Screening. D One or more controlling change processes are selected, however, some portion of the activity involves the emergency plan or affects the implementation of the emergency plan; continue the 50.54(q)(3) Screening for that portion of the activity. Identify the applicable controlling change processes below. D One or more controlling change processes are selected and fully bounds all aspects of the activity. 50.54(q)(3) Evaluation is NOT required. Identify controllina change processes below and complete Part VI. CONTROLLING CHANGE PROCESSES Part IV. Editorial Change DYES I:8l NO 50.54(q)(3) Continue to next Is this activity an editorial or typographical change such as formatting, paragraph Evaluation is part numbering, spelling, or punctuation that does not change intent? NOT required. Enter Justification: justification and complete Part VI. EN-EP-305 REV 3

AnACHMENT 9.1 10CFR50.54(q) SCREENING SHEET 2 oF4 Procedure/Document Number: 10-S-01-32 I Revision: 3 Equipment/Facility/Other: Grand Gulf Nuclear Station

Title:

Radioactive Material/ Non-Radioactive Hazardous Material Transportation Accident Plan Part V. Emergency Planning Element/Function Screen (Associated 10 CFR 50.47(b) planning standard function identified in brackets) Does this activity affect any of the following, including program elements from NUREG-0654/FEMA REP-1 Section II?

1. Responsibility for emergency response is assigned. [1] D
2. The response organization has the staff to respond and to augment staff on a continuing basis (24/7 D staffing) in accordance with the emergency plan. [1]
3. The process ensures that on shift emergency response responsibilities are staffed and assigned. [2] D
4. The process for timely augmentation of onshift staff is established and maintained. [2] D
5. Arrangements for requesting and using off site assistance have been made. [3] D
6. State and local staff can be accommodated at the EOF in accordance with the emergency plan. [3] D
7. A standard scheme of emergency classification and action levels is in use. [4] D
8. Procedures for notification of State and local governmental agencies are capable of alerting them of D the declared emergency within 15 minutes after declaration of an emergency and providing follow-up notifications. [5]
9. Administrative and physical means have been established for alerting and providing prompt D instructions to the public within the plume exposure pathway. [5]
10. The pUblic ANS meets the design requirements of FEMA-REP-1 a, Guide for Evaluation of Alert and D Notification Systems for Nuclear Power Plants, or complies with the licensee's FEMA-approved ANS design report and supporting FEMA approval letter. [5]
11. Systems are established for prompt communication among principal emergency response D organizations. [6]
12. Systems are established for prompt communication to emergency response personnel. [6] D
13. Emergency preparedness information is made available to the public on a periodic basis within the D plume exposure pathway emergency planning zone (EPZ). [7]
14. Coordinated dissemination of public information during emergencies is established. [7] D
15. Adequate facilities are maintained to support emergency response. [8] D
16. Adequate equipment is maintained to support emergency response. [8] 0
17. Methods, systems, and equipment for assessment of radioactive releases are in use. [9] D
18. A range of public PARs is available for implementation during emergencies. [10] D
19. Evacuation time estimates for the population located in the plume exposure pathway EPZ are D available to support the formulation of PARs and have been prOVided to State and local governmental authorities. [10]
20. A range of protective actions is available for plant emergency workers during emergencies, including D those for hostile action events.[10]
21. The resources for controlling radiological exposures for emergency workers are established. [11] D
22. Arrangements are made for medical services for contaminated, injured individuals. [12] D
23. Plans for recovery and reentry are developed. [13] D
24. A drill and exercise program (including radiological, medical, health physics and other program D areas) is established. [14]

EN-EP-305 REV 3

ATTACHMENT 9.1 10CFR50.54(q) SCREENING SHEET 3 OF4 Procedure/Document Number: 10-S-01-32 I Revision: 3 Equipment/Facility/Other: Grand Gulf Nuclear Station

Title:

Radioactive Material/ Non-Radioactive Hazardous Material Transportation Accident Plan

25. Drills, exercises, and training evolutions that provide performance opportunities to develop, D maintain, and demonstrate key skills are assessed via a formal critique process in order to identify weaknesses. [14]
26. Identified weaknesses are corrected. [14] D
27. Training is provided to emergency responders. [15] 0
28. Responsibility for emergency plan development and review is established. [16] D
29. Planners responsible for emergency plan development and maintenance are properly trained. [16] D APPLICABILITY CONCLUSION 0' If no Part V criteria are checked, a 50.54(q)(3) Evaluation is NOT required; document the basis for conclusion below and complete Part VI.

o If any Part V criteria are checked, complete Part VI and perform a 50.54(q)(3) Evaluation. BASIS FOR CONCLUSION This procedure describes the notification process for transportation accidents involving radioactive and non-radioactive hazardous materials shipped to or from GGNS. Reporting transportation accidents involving hazardous materials is not an Emergency Plan related function. This procedure was initiated many years ago as an Emergency Plan Procedure at a time when the EP department was responsible for SARA Title III hazardous material reporting. Since that time the Chemistry and Radwaste departments have taken over the responsibility for hazardous and radioactive waste shipping and reporting requirements. These departments have taken ownership of the program and have their own respective procedures. 10-S-01-32 has been superseded by the following procedures. All the information provided by 1O-S-O 1-32 has been incorporated into these other procedures:

  • EN-RW-102, Radioactive Shipping Procedure
  • 08-S-06-6, Environmental Incident Response This procedure does not contain any information related to EALs or the activation of the Emergency Plan and does not contain any information that impacts any of the 10 CFR 50.47(b) planning standard functions or program elements from NUREG-0654/FEMA REP-1 Section II. This procedure does not address any EALs or other emergency response tasks or responsibilities and is not described in the GGNS Emergency Plan.

The cancellation of this procedure will not affect any Emergency Preparedness planning standards or commitments and will not affect the GGNS Emergency Plan or EALs. EN-EP-305 REV 3

ATTACHMENT 9.1 10CFR50.54(q) SCREENING SHEET 4 oF4 Procedure/Document Number: 10-S-01-32 I Revision: 3 Equipment/Facility/Other: Grand Gulf Nuclear StatIon

Title:

Radioactive Material/ Non-Radioactive Hazardous Material Transportation Accident Plan Part VI. Signatures: Preparer Name (Print) Date: Richard Van Den Akker 7-/0-('/ (Optional) Reviewer Name (Print) R~r Name (Print) Date: 1b.J{ ~"'CA:/' Nuc ear EP Project Manager ApP~'fr N~me (Prlqt) IA / . uw 1'"?~oeWp. EP manager or designee

                             ~t'?

EN-EP-305 REV 3}}