LR-N14-0156, Response to Request for Additional Information Regarding the Core Operating Limits Report for Salem Unit 1 Cycle 23

From kanterella
(Redirected from ML14195A469)
Jump to navigation Jump to search

Response to Request for Additional Information Regarding the Core Operating Limits Report for Salem Unit 1 Cycle 23
ML14195A469
Person / Time
Site: Salem PSEG icon.png
Issue date: 07/10/2014
From: Jamila Perry
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N14-0156
Download: ML14195A469 (4)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 JUL 1 0 2014 LR-N14-0156 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Salem Generating Station Unit 1 Renewed Facility Operating License No. DPR-70 NRC Docket No. 50-272 PSEG lVudmrlLC T.S. 6.9.1.9

Subject:

Response to Request for Additional Information Regarding the Core Operating Limits Report for Salem Unit 1 Cycle 23

Reference:

Salem Nuclear Generating Station, Unit 1 - Request for Additional Information Regarding Core Operating Limits Report (TAG NO. MF2473)

The reference letter requested additional information concerning the Salem Unit 1 Cycle 23 Core Operating Limits Report (COLR). The purpose of this letter is to respond to this request.

The attachment to this letter provides Salem's response to the question contained in the reference letter.

There are no regulatory commitments contained in this letter.

If you have any questions or require additional information, please contact David Lafleur at (856) 339-1754.

Sincerely,

?a:;p

Site Vice President V Salem Generating Station : Response to NRC Request for Additional Information Salem Unit 1 Cycle 23 Core Operating Limits Report (COLR)

J\\Jb. 1 0 tOt4 Document Control Desk LR-N14-0156 Page 2 cc:

Mr. W. Dean, Administrator, Region I, NRC Mr. J. Lamb, Project Manager, NRC Mr. P. Finney, NRC Senior Resident Inspector, Salem Mr. A. Ziedonis, NRC Resident Inspector, Salem Mr. D. Lafleur, Salem Senior Compliance Engineer Mr. T. Cachaza, Salem Commitment Tracking Coordinator Mr. L. Marabella, Corporate Commitment Tracking Coordinator T.S. 6.9.1.9

LR-N14-0156 ATTACHMENT 1 RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION SALEM UNIT 1 CYCLE 23 CORE OPERATING LIMITS REPORT (COLR)

LR-N14-0156 Page 1 TS Section 3.1.1.4 3.1.3.5 3.2.1 3.2.2 3.2.3 3.9.1 Salem COLR RAI Question 1

1. Please identify which plant and cycle-specific parameters listed in Section 1.0 of the Salem, Unit 1, Cycle 23, COLR are supported by the approved analytical methods listed in Section 3.0 of the COLR.

Salem COLR RAI Question 1 Response:

The following table provides a correlation of the Salem Unit 1 Cycle 23 COLR section 1.0 parameters to the Section 3.0 approved analytical methods, and will be included in future Salem Unit 1 COLRs.

NRC Approved COLR Methodology Technical Specifications COLR Parameter Section (Section 3.0 Number}

Moderator Temperature Coefficient MTC 2.1 3.1, 3.6 Control Rod Insertion Limits Control Rod Insertion Limits 2.2 3.1, 3.6 Axial Flux Difference AFD 2.3 3.1' 3.2, 3.6 Heat Flux Hot Channel Factor -

Fa(Z)

Fa(Z) 2.4 3.1' 3.3, 3.4, 3.5, 3.6, 3. 7 Nuclear Enthalpy Rise Hot Channel Factor - FN H FNH 2.5 3.1' 3.5, 3.6, 3. 7 Boron Concentration Boron Concentration 2.6 3.1, 3.6