ML14176A079

From kanterella
Jump to navigation Jump to search
Letter Transmitting NRC Form 536, Operator Licensing Examination Data for Callaway Nuclear Plant
ML14176A079
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/04/2014
From: Harris D
Ameren Missouri
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC 6123
Download: ML14176A079 (2)


Text

WAmeren Callaway Plant MISSOURI June 4, 2014 ULNRC 6123 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:

OPERATOR LICENSING EXAMINATION DATA Enclosed is a NRC Form 536 for the Callaway Nuclear Plant, NRC Region IV.

If you need any additional information, please contact Mr. Daniel T. Harris (573) 239-0023.

Respectfully, Daniel T. Harris Senior Training Supervisor, DTH/mrw Enclosure PO Box 620 Fulton, MO 65251 AmerenMissouri.com :

NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09130/2014 (09-2011) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-EXAMINATION DATA mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Callaway Plant IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 16 CY 17 CY 19 CY ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 16 CY 17 CY 19 CY NUMBER OF REACTOR 1 4 3 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 7 4 5 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 3 2 2 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 PROPOSED DATES PRIMARY DATE 06/20/2016 11/13/2017 06/03/2019 ALTERNATE DATE 06/27/2016 11/27/2017 06/10/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 16 CY 17 PROPOSED _ .

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 12 CANDIDATES NRC FORM 536 (09-2011)