ML14170B115
| ML14170B115 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 06/18/2014 |
| From: | Annette Vietti-Cook NRC/SECY |
| To: | Norton W Yankee Atomic Electric Co |
| References | |
| Download: ML14170B115 (6) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION SECRETARY Wayne Norton President and Chief Executive Officer Yankee Atomic Electric Company 49 Yankee Road Rowe, MA 01367
Dear Mr. Norton:
WASHINGTON, D.C. 20555-0001 June 18, 2014 The U.S. Nuclear Regulatory Commission (NRC) is pleased that you will participate in a public Commission meeting on nuclear power plant decommissioning, on July 15, 2014, at 9:00a.m.
The meeting will be held in the Commissioners' Conference Room on the first floor of the NRC's Headquarters building at One White Flint North, Rockville, Maryland. The Commission is interested in hearing your views regarding lessons learned from prior decommissioning and currently decommissioned plant issues. I am enclosing a copy of the meeting agenda for your information (enclosure 1 ). My staff will keep you informed of any updates to the agenda.
To assist the Commission in preparing for the meeting, please e-mail any written material, including slides, to Ms. Rochelle Bavol and Ms. Sandy Joosten (rochelle.bavol@nrc.gov and sandy.joosten@nrc.gov) in the Office of the Secretary, by July 8, 2014, so that it can be distributed to the Commission for review in advance of the meeting. Enclosed are guidelines for slides, if you choose to use them (enclosure 2). PowerPoint is the preferred format, but other electronic presentation formats may be used. This Commission meeting will be webcast live at the Web address: www.nrc.gov, and materials provided for the meeting will be posted on the NRC public website prior to the meeting: http://www.nrc.gov/reading-rm/doc-collections/commission/tr/. If you have any questions, please contact Ms. Bavol at 301-415-1651.
Your presentation at the Commission meeting should be based on the assumption that Commissioners are familiar with the content of your written material. Please plan your oral presentation for 10 minutes, discussing the important points on which you wish to focus the Commission's attention. Please avoid the use of acronyms where possible. If you do use acronyms, please explain them during your presentation.
The NRC Headquarters building is located opposite the White Flint Metro Station on Rockville Pike and Marinelli Drive, Rockville, Maryland. The White Flint Metro Station is on the Red Line of the Washington area subway system. Reserved visitor parking for Commission guests is available. If you wish to use reserved parking, please notify Ms. Bavol in advance. If reserved parking has been arranged, please check-in with the security staff at the entrance to the NRC campus on Marinelli Drive when you arrive. A Security Guard will call for an escort. Please note that visitors will be screened through metal detectors, will have their packages x-rayed, and will be required to present a picture identification card prior to signing in at the registration desk.
Enclosures:
- 1. Draft Agenda
- 2. Briefing Visuals Guidance Sincerely, p:t[;J~
Annette Vietti-Cook Secretary of the Commission Final: 6/18/14
Title:
Purpose:
Scheduled:
Duration:
Location:
SCHEDULING NOTE BRIEFING ON NUCLEAR POWER PLANT DECOMMISSIONING (Public)
To provide the Commission with an overview of the nuclear power plant decommissioning process, status and issues related to the 4 units recently entering decommissioning.
July 15, 2014 9:00am Approx. 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> and 30 minutes Commissioners' Conference Room, 1st floor OWFN
Participants:
Presentation External Panel 60 mins.*
Kathleen Fox, Acting Assistant Administrator for National 10 mins.*
Preparedness, Federal Emergency Management Agency Topic:
Offsite emergency preparedness during transition to decommissioning Chris Recchia, Commissioner, Vermont Department of Public Service Topic:
State interface on decommissioning issues Ralph Andersen, Senior Director, Radiation Safety & Environmental Protection, Nuclear Energy Institute Topic:
Industry views on decommissioning process Daniel Stoddard, Senior Vice President-Nuclear Operations, Dominion Topic:
Recent experience of Kewaunee transition to decommissioning 10 mins.*
10 mins.*
10 mins.*
Wayne Norton, President and Chief Executive Officer of Yankee Rowe and 10 mins.
- Connecticut Yankee, Chief Nuclear Officer of Maine Yankee/
Decommissioning Plants Coalition Topic:
Lessons learned from prior decommissioning and currently decommissioned plant issues 1
David Victor, Chairman, San Onofre Community Engagement Panel Topic:
10 mins.*
Community engagement on decommissioning issues Commission Q&A 50 mins.
Break 5mins:
NRC Staff Panel 40 mins.*
Mark Satorius, Executive Director for Operations Drew Persinko, Deputy Director, Division of Waste Management and Environmental Protection, Office of Federal and State Materials and Environmental Management Programs Topics:
Decommissioning process and lessons learned from past decommissioning Louise Lund, Deputy Director, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation (NRR)
Topics:
Transitioning from operations to decommissioning and future process enhancements Mark Thaggard, Deputy Director, Division of Security Policy, Office of Nuclear Security and Incident Response Topics:
Security and emergency preparedness issues during decommissioning Robert Orlikowski, Chief, Materials Control, Independent Spent Fuel Storage Installation, and Decommissioning Branch, Division of Nuclear Materials and Safety, Region Ill Topics:
Decommission inspection discussion and issues Commission Q & A 50 mins.
Discussion - Wrap-up
- For presentation only and does not include time for Commission Q & A's Documents:
Staff background material due to SECY: June 30, 2014.
Slides due to SECY: July 8, 2014.
5 mins.
2
Use company/organization logo, and light background.
Slides should contain substantive information, including text, photos, and graphics and be easily readable.
Explain/spell out acronyms or include a separate slide with a list of acronyms.
Number pages.
Top and side margins should be 1 inch.
Bottom margin should be 2 inches to accommodate captioning for webcasting.
PRESENTATION TITLE (Arial Black 40)
Date of Briefing Name and Title of Presenter
{Arial Black 32)
-"' *-... c I
~ -.. *-
1-
~
-a *--tn
~
... *-.c
~
c 0
N