NLS2014052, Nebraska Public Power Districts Flood Hazard Reevaluation Interim Actions for Cooper Nuclear Station
| ML14167A340 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 06/04/2014 |
| From: | Limpias O Nebraska Public Power District (NPPD) |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NLS2014052 | |
| Download: ML14167A340 (2) | |
Text
SECURITY-RELATED INFORMATION-WITHHOLD UNDER 10 CFR 2.390 H
Nebraska Public Power District Always there when you need us NLS2014052 June 4, 2014 U.S. Nuclear Regulatory Commission Attn: Document Control Desk 11555 Rockville Pike Rockville, MD 20852
Subject:
Nebraska Public Power District's Flood Hazard Reevaluation Interim Actions for Cooper Nuclear Station Cooper Nuclear Station, Docket No 50-298, DPR-46
References:
- 1. NRC Letter, "Request for Information Pursuant to Title 10 ofthe Code of Federal Regulations 50. 54( f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 12, 2012
- 2. NPPD Letter to NRC, "Extension Request-Response to March 12, 2012, Request for Information, Enclosure 2, Recommendation 2.1, Flooding, Required Response 2, Flooding Hazard Reevaluation Report," dated February 26, 2014 (NLS20 14020}
- 3. NRC Letter to NPPD, "Cooper Nuclear Station-Transmittal of U.S. Army Corps of Engineers Flood Hazard Reevaluation Information (T AC No.
MF3035)," dated Apri14, 2014
- 4. NRC Letter to NPPD and OPPD, "Summary of May 9, 2014, Closed Meeting Between Representatives of the Nuclear Regulatory Commission, Omaha Public Power District and Nebraska Public Power District to Discuss the Flooding Analysis Associated with Fort Calhoun Station, Unit 1 and Cooper Nuclear Station (TAC Nos. MF3035 and MF3036)," dated May 29, 2014
Dear Sir or Madam:
On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Reference 1 to all power reactor licensees and holders of construction permits in active or deferred status. Enclosure 2 of Reference 1 requested that each licensee perform a reevaluation of external flooding sources and report the results in accordance with the NRC's prioritization plan. In Reference 2, Nebraska Public Power District (NPPD) submitted an extension request for the submittal of the flood THE ATTACHMENT TO THIS LETTER CONTAINS SECURITY-RELATED INFORMATION.
UPON SEPARATION FROM THE ATTACHMENT, THIS COVER LETTER IS DECONTROLLED.
COOPER NUCLEAR STATION P.O. Box 98 I Brownville, NE 68321-0098 Telephone: (402) 825-3811 I Fax: (402) 825-5211 www.nppd.com
SECURITY-RELATED INFORMATION-WITHHOLD UNDER 10 CFR 2.390 NLS2014052 Page 2 of2 hazard reevaluation (FHR) report for Cooper Nuclear Station (CNS). Reference 2 also contained a project schedule which outlined the activities required to complete the FHR. In Reference 3, the NRC provided the U.S. Army Corps of Engineers (USACE) portion of the CNS FHR.
On May 9, 2014 (Reference 4), the NRC and NPPD held a meeting to discuss potential interim actions for the FHR based on the USACE results in Reference 3.
The attachment to this letter contains interim actions that NPPD plans to take to address higher flooding hazards relative to the design basis until the full FHR for CNS is completed. The completion dates are based on time needed to fully implement the interim strategy (purchase equipment, develop procedure, and provide training). NPPD will not modify any of these interim actions or completion dates without notifying the NRC in advance.
This letter contains new regulatory commitments. Should you have any questions concerning the content of this letter, please contact David Van Der Kamp, Licensing Manager, at ( 402) 825-2904.
I declare under penalty of perjury that the foregoing is true and correct.
J clear and Chief Nuclear Officer
/bk
Attachment:
Flood Hazard Reevaluation Interim Action Commitments cc:
Regional Administrator, w/attachment USNRC - Region IV Director, w/attachment US NRC - Office of Nuclear Reactor Regulation Cooper Project Manager, w/attachment US NRC - NRR Project Directorate IV -1 Senior Resident Inspector, w/attachment USNRC-CNS NPG Distribution, w/o attachment CNS Records, w/attachment THE ATTACHMENT TO THIS LETTER CONTAINS SECURITY-RELATED INFORMATION.