ML14160B157
ML14160B157 | |
Person / Time | |
---|---|
Site: | Millstone, Surry, North Anna |
Issue date: | 06/05/2014 |
From: | Blasioli P Dominion, Dominion Nuclear Connecticut, Dominion Resources Services, Virginia Electric & Power Co (VEPCO) |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
14-249, RIS-14-005 | |
Download: ML14160B157 (6) | |
Text
Dominion Resources Services, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 iDomi nion June 5, 2014 U. S. Nuclear Regulatory Commission Serial No.: 14-249 Attention: Document Control Desk NLOS/vlh One White Flint North Docket Nos.: 50-336/423 11555 Rockville Pike 50-338/339 Rockville, MD 20852-2738 50-280/281 License Nos.: DPR-65 NPF-49 NPF-4/7 DPR-32/37 DOMINION NUCLEAR CONNECTICUT, INC. (DNC)
VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
MILLSTONE POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS I AND 2 SURRY POWER STATION UNITS I AND 2 NRC REGULATORY ISSUE
SUMMARY
2014-05 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS In response to NRC Regulatory Issue Summary 2014-05, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs).
No new commitments are intended by this letter. If you have any questions concerning this information, please contact Mr. Rick Wesley at (804) 273-2701.
Very truly yours, P. A. Blasioli, Director in Charge Nuclear Support Services Dominion Resources Services, Inc. for Dominion Nuclear Connecticut, Inc. and Virginia Electric and Power Company
Enclosures:
NRC Form 536 for Millstone, North Anna and Surry Power Stations cc: U. S. Nuclear Regulatory Commission Region I 2100 Renaissance Boulevard Suite 100 King of Prussia, Pennsylvania 19406-2713 U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, Georgia 30303-1257
&AOD'5
SN 14-249 Scheduling of Operator Licensing Examinations Page 2 of 2 Mr. M. Thadani United States Nuclear Regulatory Commission One White Flint North Mail Stop 08 B-1 11555 Rockville Pike Rockville, MD 20852-2738 Dr. V. Sreenivas United States Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station
NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30/2014 (09-2011) Estimated burden per response to comply with this voluntary information collection request. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T.5F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or byintemet e-EXAMINATION DATA mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMBcontrol number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Millstone U2 1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY 2017 CY 2018 CY 2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2016 CY 2017 CY 2018 CY 2019 NUMBER OF REACTOR 6 6 6 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 8/15/2016 8/21/2017 8/19/2019 ALTERNATE DATE 8/8/2016 8/28/207 8/26/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED _ '
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 0 0 0 0 0 0 CANDIDATES NRC FORM 536 (09-2011)
NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3`160-0131 EXPIRES: 0913012014 (09-2011) Estimated burden per response to comply with this voluntary Information collection request I hour. This Information collection Is used to plan budgets and resources for operator examinations, Send comments regardrrg burden estimate to the Information Services Branch OPERATOR LICENSING (-5 F53), U.S. Nuclear Regulatory Connmnolr, Weshington, DC 205510001, or by intrnet e-EXAMINATION DATA mal to lnfoclects,.Resou.e@.nr.gov, Regulatory Affaim, end tn the Desk Otficer, Officeof Information sod NEOB-10202, (3150-0131), Office ofManagement and Budget, Washington, DC 20503. Ifa means used to Impose an information coledtolon does sot display a currently validOMB control number, the NRC may notconduct or sponsor, and a person Is not required to respond to, the Information collection.
FACIUTY NRC RECGON Millstone U3 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY 2017 CY2018 CY 2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY 2019 NUMBER OF REACTOR OPERATORS 6 6 0 NUMBER OF SENIOR REACTOR 3 0 3 0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 3 0 3 0 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 9/5/2016 0 9/3/2018 0 ALTERNATE DATE 9/12/2016 0 9/10/2018 0 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 00 0 12 0 0 CANDIDATES NRC FORM 636 (O9-2011)
NRC FORM 636 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0913012014 (09-2D11) Estimated burden per response to comply wAe this *oluntay intonination collection request I howr. This Intonnatio collecfton is used to plan budgets and resources for operator OPERATORLIC GmSend comments regaring burden estimat to fe InfomlatIon Servfces Brandi OPERATOR LICENSING (-5 F53 U.S. Nudear Regulaury Commission, Waingion, DC 20555-0001, or by Intret e-EXAMINATION DATA mail to IntocalecL&e.rsoumaergov, nd to the Desk Officer, Office of Information and Regulatory Affairs, NEOB.1 02Z (3150-01131), Office of Management and Budget, Wasltgion, OC 20503, Ifa means used to imnpose an information coglectlon does not display a auarrely yald OMB control number, the NRC may not conduct or sponsor, and a person Isrot required to respond to, ft yliormation colleOon.
FACILITY NRC REGION North Anna Power Station 2 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY 2017 CY 2018 CY 2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 Cy 2017 CY 2018 CY 2019 NUMBER OF REACTOR 8 0 OPERATORS 0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 4 6 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 PROPOSED DATES PRIMARY DATE 6/6/2016 7/16/2018 ALTERNATE DATE 6/20/2016 7123/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 Cy 2017 PROPOSED _ *_1 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBEROF 0 0 0 0 11 0 0 0 CANDIDATES NRC FORM 53M(09-201)
NRC FORM 636 U. S. NUCLEAR REGULATORY COMMISSION -APPROVED BY OMB: NO. 3160-0131 EXPIRES: 0S130120114 ii1) EEstimated burden per Tespense to comply with this voluntary Infrnnation collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This hrtrnamln cokion is used to plan budgets and resources for ope=rt exarnnaltons. Send comments regarding burden estrmate to tneInformation Sewloes Branch OPERATOR LICENSING (-5 F53), U.S. Nuclear Regulalory Commission, Washington, DC 2f5-0001, or by Internet a-EXAMINATION DATA m,ob lnw ReSmse=wMcgoV, and to the Desk 0111m, Offie of Intormallon and Regulatry Affairs, NEOB-10202 (315D-0131), Offce of Management and Budget, Washington, DC02M0 Ifa mam used to UnpM an infiorantt ocm wanoes not OMpra orare* ny valid OMB contrnl number, the NRC may not conduct or sponsor, and a person Isnot reqred to respond to, the Informaton ooneclion.
FACQUTY NRC REGION Surry Power Station 2 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 8 8 0 8 OPERATORS NUMBER OF SENIOR REACTOR 3 3 0 3 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 2 2 0 2 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 09/19/2016 09/18/2017 09/16/2019 ALTERNATE DATE 09/26/2016 09/25/2017 09/23/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED _
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 11 1 CANDIDATES NRC FORM 636 (09-2011)