Category:Code Relief or Alternative
MONTHYEARML23142A1062023-05-24024 May 2023 Authorization and Safety Evaluation for Alternative Request No. ANO1-ISI-035 ML22073A0952022-04-0707 April 2022 Approval of Request for Alternative from Certain Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (EPID L-2021-LLR-0084) (NON-PROPRIETARY) ML21299A0032021-10-28028 October 2021 and Waterford Steam Electric Station, Unit 3 - Approval of Request for Alternative EN-20-RR-003 from Certain Requirements of the ASME Code ML21293A0962021-10-28028 October 2021 Relief ANO2-R&R-012 Concerning Proposed Alternative for Repair of Reactor Vessel Closure Head Penetration 46 ML21168A0562021-07-0909 July 2021 Approval of Request for Alternative from Certain Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML21118B0392021-05-19019 May 2021 Approval of Request for Alternative from Certain Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2020-08-12012 August 2020 Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) ML20121A1932020-05-0606 May 2020 Alternative Requests for the Fifth 10 Year Interval Inservice Testing of Low Pressure Safety Injection Pumps and Service Water Valves ML20119A0732020-04-29029 April 2020 Withdrawal of Requested Alternatives for the Fifth 10-Year Interval Inservice Testing of Service Water Pumps and Visual Examination of Snubbers ML20083J9682020-03-26026 March 2020 Approval of Request for Alternative ANO 2-PT-002 End-of-Internal System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 2CAN071902, Request for Alternative ANO 2-PT-002 End-of-Interval System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping2019-07-25025 July 2019 Request for Alternative ANO 2-PT-002 End-of-Interval System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping ML19184A5542019-07-15015 July 2019 Request for Relief ANO1-ISI-032 from the ASME Code Section XI Visual Examination Requirements for the Fourth 10-Year Inservice Inspection Interval ML19156A4002019-06-11011 June 2019 Request for Alternative ANO2-ISI-021 to Permit Continued Application of the 2007 Edition Through the 2008 Addenda of ASME Code CNRO-2019-00002, Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-01-31031 January 2019 Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 1CAN041801, Requests for Relief from American Society of Mechanical Engineers (ASME) Section XI Volumetric Examination Requirements Fourth 10-Year Interval, Second and Third Period2018-04-23023 April 2018 Requests for Relief from American Society of Mechanical Engineers (ASME) Section XI Volumetric Examination Requirements Fourth 10-Year Interval, Second and Third Period CNRO-2017-00022, Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 12017-11-17017 November 2017 Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 1 ML17174B1442017-07-12012 July 2017 Relief Request for EN-ISI-16-1 Regarding Use of Later Edition and Addenda of the ASME Code ML16130A4712016-12-0909 December 2016 Request for Alternative Test Plan to American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants (CAC Nos. MF7537 and MF7538) ML16237A0822016-08-29029 August 2016 Relief Request No. ANO1-ISI-025, Relief from American Society of Mechanical Engineers Section XI Table IWB-2500-1 Requirements ML16096A2692016-06-0606 June 2016 Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 CNRO-2015-00017, Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, D2015-06-0505 June 2015 Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, Division ML15070A4282015-03-16016 March 2015 Relief Request ANO2-ISI-017, Alternative to Utilize ASME Code Case N-513-4 for the Fourth 10-Year Inservice Inspection Interval ML15030A2392015-02-0909 February 2015 Correction to Relief Request ANO1-ISI-024 Issued December 23, 2014; Revises 10 CFR 50.55a Citations as a Result of Changes from Final Rule Effective December 5, 2014 ML14330A2072014-12-23023 December 2014 Relief Request ANO1-ISI-024, Alternative from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-1, Fourth 10-year Inservice Inspection Interval ML14282A4792014-10-29029 October 2014 Relief Request ANO1-ISI-023, Volumetric Examination Frequency Requirements, for the Fourth 10-Year Inservice Inspection Interval ML14150A1632014-06-0606 June 2014 Relief Request ANO2-ISI-004 - Alternative to Extend the Third 10-Year Inservice Inspection Interval for Reactor Vessel Weld Examinations ML14099A4522014-04-15015 April 2014 Relief Request ANO2-ISI-016, from ASME Code Case N-770-1 Successive Examination, for the Fourth 10-Year Inservice Inspection Interval ML13179A1162013-07-24024 July 2013 Request for Relief ANO1-ISI-022 from ASME Code Examination Requirements for Pressure-Retaining Welds in Piping; Fourth 10-Year Inservice Inspection Interval ML13179A1102013-07-16016 July 2013 Request for Relief No. ANO1-ISI-021, from ASME Volumetric Requirements for Full Penetration Welded Nozzles in Vessels - Inspection Program B; Fourth 10-Year ISI Interval ML13161A2412013-06-27027 June 2013 Relief Request ANO2-ISI-015, from Pressure Testing Requirements for Reactor Vessel Flange Seal Leak Detection Piping for the Fourth 10-Year Inservice Inspection Interval ML13071A6342013-03-22022 March 2013 Relief Request ANO2-ISI-014, from Volumetric and Surface Exam Requirements for Pressure Retaining Welds in Austenitic Stainless Steel, Third 10-Year Inservice Inspection Interval ML13071A6632013-03-21021 March 2013 Relief Request ANO2-ISI-010, from Volumetric and Surface Exam Requirements for Pressure Retaining Welds in Piping, Third 10-Year Inservice Inspection Interval ML13032A5732013-02-21021 February 2013 Relief Request Nos. ANO2-ISI-009, ANO2-ISI-011, and ANO2-ISI-012, ASME Code Volumetric and Surface Exam Requirements for Integral Attachment and Pressure-Retaining Welds, Third 10-Year Inservice Inspection Interval ML12319A3672012-11-27027 November 2012 Relief Request ANO2-ISI-007, Alternative to Use ASME Code Case N-770-1 Baseline Examination, Fourth 10-Year Inservice Inspection Interval 1CAN071202, Requests for Relief from American Society of Mechanical Engineers (ASME) Section XI Volumetric Examination Requirements, Fourth 10-Year Interval, First Period2012-07-25025 July 2012 Requests for Relief from American Society of Mechanical Engineers (ASME) Section XI Volumetric Examination Requirements, Fourth 10-Year Interval, First Period 2CAN111101, Use of Alternate ASME Code Case N-770-1 Baseline Examination Request for Alternative ANO2-ISI-0072011-11-30030 November 2011 Use of Alternate ASME Code Case N-770-1 Baseline Examination Request for Alternative ANO2-ISI-007 ML1117107982011-08-10010 August 2011 Relief, ANO1-R&R-016, Request for Use of Non-ASME Code Repair to Service Water Piping in Accordance with Generic Letter 90-05, Fourth 10-Year Interval. ME6107 ML1034301562011-01-10010 January 2011 Relief Request ANO1-R&R-013, Proposed Alternative to Requirements Associated with Repair of Components, for Duration of ANO-1 Spring 2010 Refueling Outage 1R22 ML1035005322011-01-0505 January 2011 Request for Alternative ANO2-ISI-006, Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-716 for the Fourth 10-Year ISI Interval ML1025001282010-09-23023 September 2010 Relief Request ANO2-ISI-005 to Extend the Inservice Inspection Interval for the Visual Examination of Accessible Interior to Reactor Vessel Attachment Weld, for Fourth 10-Year Interval ML1024506542010-09-21021 September 2010 Relief Request ANO2-ISI-004 to Extend Third Inservice Inspection Interval from 10 to 20 Years for Reactor Vessel Weld Examinations ML1009103502010-08-19019 August 2010 Request for Relief PRR-ANO2-2010-1, Relief from the Requirements of Operation and Maintenance Code Section ISTB-5221 and ITSB-5223 for the Service Water Pumps ML1011701272010-06-0202 June 2010 Request for Alternative ANO1-ISI-014, to Implement a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-716 ML1011701192010-05-0505 May 2010 Request for Relief Nos. ANO1-ISI-015, ANO1-ISI-016, ANO1-ISI-017, ANO1-ISI-018, ANO1-ISI-019, and ANO1-ISI-020, Relief from Requirements of the ASME Code, Section XI ML1009706592010-04-26026 April 2010 Request for Alternative ANO2-ISI-003 to Use 2001 Edition Through 2003 Addenda in Lieu of the 2004 Edition for Fourth 10-Year Inservice Inspection Interval 2CAN021002, Request for Relief PRR-ANO2-2010-1 from the Requirements of OM Code Section ISTB-5221 and ISTB-5223 for the Service Water Pumps2010-02-17017 February 2010 Request for Relief PRR-ANO2-2010-1 from the Requirements of OM Code Section ISTB-5221 and ISTB-5223 for the Service Water Pumps 2CAN011005, Supplement to Request for Alternative Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-7162010-01-28028 January 2010 Supplement to Request for Alternative Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-716 ML0923005512009-08-27027 August 2009 Request for Alternative ANO2-ISI-002 to 10 CFR 50.55a(g)(6)(ii)(D) Examination Requirements, for Remainder of Current 10-Year Inservice Inspection Interval and Fourth ISI Interval Until the Head Is Replaced 2023-05-24
[Table view] Category:Letter
MONTHYEARML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24017A1582024-01-17017 January 2024 Submittal of Emergency Plan Revision 50 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000313/20234052023-12-12012 December 2023 Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 ML23341A0832023-12-11011 December 2023 Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter ML23305A0922023-12-0707 December 2023 Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23325A1412023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000313/20230112023-10-10010 October 2023 Commercial Grade Dedication Inspection Report 05000313/2023011 and 05000368/2023011 IR 05000313/20230052023-08-21021 August 2023 Updated Inspection Plan for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2023005 and 05000368/2023005) - Mid Cycle IR 05000313/20243012023-08-14014 August 2023 Notification of NRC Initial Operator Licensing Examination 05000313/2024301 IR 05000313/20230022023-08-11011 August 2023 Integrated Inspection Report 05000313/2023002 and 05000368/2023002 and Notice of Violation ML23209A6022023-08-0909 August 2023 Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 ML23208A2132023-08-0303 August 2023 Regulatory Audit Summary Concerning Review of License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23188A1732023-07-12012 July 2023 Request for Withholding Information from Public Disclosure ML23142A2022023-06-29029 June 2023 Issuance of Amendment Nos. 279 and 332 Emergency Plan Staffing Requirements IR 05000313/20234032023-06-28028 June 2023 Security Baseline Inspection Report 05000313/2023403 and 05000368/2023403 ML23178A0892023-06-26026 June 2023 August 2023 Emergency Preparedness Program Inspection-Request for Information ML23166B0902023-06-21021 June 2023 Request for Relief ANO1 ISI 036 Regarding Volumetric Examination Requirements ML23180A1082023-06-20020 June 2023 ANO Unit 1 SAR Amendment 31, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report IR 05000313/20234012023-06-13013 June 2023 Cyber Security Inspection Report 05000313/2023401 and 05000368/2023401 ML23130A2972023-05-17017 May 2023 Notification of Inspection (NRC Inspection Report 05000313/2023003) and Request for Information ML23121A3012023-05-10010 May 2023 Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk - Informed Completion Times ML23114A3572023-05-10010 May 2023 Regulatory Audit Summary Concerning Review of Request for Alternative ANO-CISI-002 Regarding Containment Inservice Inspection Frequency ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000313/20230012023-05-0909 May 2023 Integrated Inspection Report 05000313/2023001 and 05000368/2023001 ML23118A3202023-05-0808 May 2023 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000313;05000368/2023010) IR 05000368/20233012023-05-0101 May 2023 NRC Examination Report 05000368/2023301 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23108A1362023-04-24024 April 2023 Approval of Request for Half-Nozzle Repair of Reactor Vessel Closure Head Penetration No. 46 ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G 2024-01-24
[Table view] Category:Safety Evaluation
MONTHYEARML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23142A2022023-06-29029 June 2023 Issuance of Amendment Nos. 279 and 332 Emergency Plan Staffing Requirements ML23166B0902023-06-21021 June 2023 Request for Relief ANO1 ISI 036 Regarding Volumetric Examination Requirements ML23142A1062023-05-24024 May 2023 Authorization and Safety Evaluation for Alternative Request No. ANO1-ISI-035 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML22342B1602023-01-10010 January 2023 Requests for Relief ANO2-ISI-023, -024, -025, -026, -027, and -028 to Permit Reduction of Inspection Area Due to Interference (EPIDs L-2022-LLR-0022,-0023, -0024, -0025, -0026, and -0027) ML22263A1912022-12-0909 December 2022 Issuance of Amendment No. 278 Revision to Technical Specifications 3.4.12 and 3.4.13 Based on Revised Dose Calculations (EPID L-2021-LLA-0181) - Non-Proprietary ML22236A5452022-08-26026 August 2022 Correction to Issuance of Amendment No. 331 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22138A4312022-06-23023 June 2022 Issuance of Amendment No. 277 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22083A1242022-04-28028 April 2022 Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2 ML22039A2822022-03-15015 March 2022 Issuance of Amendment Nos. 274 and 328 One-Time Change to Support Proactive Upgrade of the Emergency Cooling Pond Supply Piping ML22007A3172022-01-18018 January 2022 1, River Bend Station 1, and Waterford Steam Electric Station 3 - Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML21225A0552021-12-17017 December 2021 Issuance of Amendment No. 327 Addition of Technical Specification Limiting Condition for Operation 3.0.6 and Adoption of Safety Function Determination Program ML21341B2262021-12-13013 December 2021 Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specifications 3.4.12 and 3.4.13 Based on Revised Dose Calculations ML21313A0082021-12-0808 December 2021 Issuance of Amendments to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21208A4492021-09-20020 September 2021 Issuance of Amendment No. 325 Revise Loss of Voltage Relay Allowable Values and Number of Degraded Voltage Channels ML21132A2792021-05-19019 May 2021 Request for Approval of Change to the Entergy Quality Assurance Program Manual ML21088A4332021-04-14014 April 2021 Issuance of Amendment No. 324 Adoption of Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition ML21027A4282021-03-23023 March 2021 Issuance of Amendment No. 272 Replacement of Reactor Building Spray Sodium Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent ML21040A5132021-03-10010 March 2021 Issuance of Amendment No. 271 Revision to Loss of Voltage Relay Allowable Values ML20351A1532021-02-0808 February 2021 Issuance of Amendment No. 323 Technical Specification Deletions, Additions, and Relocations ML20288A8242020-11-16016 November 2020 Regulatory Audit Summary Concerning License Amendment Request to Replace the Reactor Building Spray Sodium Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent NUREG-1432, Issuance of Amendment No. 322 Technical Specification Changes Related to Revised Fuel Handling Accident Analysis and Adoption of Technical Specification Improvements Consistent with NUREG-14322020-10-30030 October 2020 Issuance of Amendment No. 322 Technical Specification Changes Related to Revised Fuel Handling Accident Analysis and Adoption of Technical Specification Improvements Consistent with NUREG-1432 ML20226A2722020-08-18018 August 2020 Request to Use a Provision of a Later Edition of the ASME BPV Code, Section XI ML20160A1472020-06-30030 June 2020 Issuance of Amendment No. 270 to Adopt TSTF 563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML20135H1412020-06-30030 June 2020 Issuance of Amendment Nos. 269 and 321 Request to Incorporate the Tornado Missile Risk Evaluator Into the Licensing Basis ML20121A1932020-05-0606 May 2020 Alternative Requests for the Fifth 10 Year Interval Inservice Testing of Low Pressure Safety Injection Pumps and Service Water Valves ML20107J3172020-04-23023 April 2020 Relief Request ANO1-ISI-033 Related to ASME Code Case N-729-4 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles ML20087L8032020-04-0808 April 2020 Issuance of Amendment No. 320 to Revise Control Element Assembly Drop Times ML20083J9682020-03-26026 March 2020 Approval of Request for Alternative ANO 2-PT-002 End-of-Internal System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping ML19231A2972020-01-29029 January 2020 Issuance of Amendment No. 318 Addition of Technical Specification Actions to Address Inoperability of the Containment Building Sump ML19220A9382019-09-27027 September 2019 Issuance of Amendment No. 266 Adoption of Technical Specifications Task Force Traveler TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19184A5542019-07-15015 July 2019 Request for Relief ANO1-ISI-032 from the ASME Code Section XI Visual Examination Requirements for the Fourth 10-Year Inservice Inspection Interval ML19156A4002019-06-11011 June 2019 Request for Alternative ANO2-ISI-021 to Permit Continued Application of the 2007 Edition Through the 2008 Addenda of ASME Code ML19098A9552019-05-22022 May 2019 Issuance of Amendment No. 264 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-425, Revision 3 ML19063B9482019-04-23023 April 2019 Issuance of Amendment No. 315 Adoption of Technical Specification Task Force Traveler TSTF-425, Revision 3 ML18337A2472019-01-17017 January 2019 Issuance of Amendment Nos. 263 and 314 Revision to Emergency Action Level Scheme ML18346A3142019-01-0707 January 2019 Relief Nos. ANO1-ISI-027, -028, -029, -030, and -031 from ASME Code, Section XI, Examination Requirements for Fourth 10-Year Inservice Inspection Interval (EPID L-2018-LLR-0063, -0064, -0065, -0066, -0067) ML18317A3822018-12-19019 December 2018 Issuance of Amendment No. 313, Revise Technical Specification 3.3.3.6, Post-Accident Instrumentation ML18298A0122018-11-27027 November 2018 Issuance of Amendment No. 311 Updating the Reactor Coolant System Pressure Temperature Limits ML18260A3392018-10-24024 October 2018 Issuance of Amendment No. 261 Revision to Technical Specification Bases Related to Emergency Feedwater Turbine-Driven Pump Steam Supply Valves ML18192A1042018-08-15015 August 2018 Alternative to Examination of Reactor Pressure Vessel Flange Threads ML18173A0192018-06-27027 June 2018 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule (CAC MG0244; EPID L-2017-LLL-0020) ML18115A2822018-06-19019 June 2018 Issuance of Amendment No. 260 Technical Specification Changes Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-412 Revision 3 (CAC No. MG0009; EPID L-2017-LLA-0267) ML18134A2532018-06-19019 June 2018 Issuance of Amendment No. 310 Technical Specification Changes to Provide Actions for Emergency Feedwater Pump Inoperability Consistent with NUREG-1432, Revision 4 (CAC No. MG0016; EPID L-2017-LLA-0268) ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 2024-01-24
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 6, 2014 Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802
SUBJECT:
ARKANSAS NUCLEAR ONE, UNIT 2 -AMENDED ALTERNATIVE REQUEST AN02-ISI-004, PROPOSING TO EXTEND THE THIRD 10-YEAR INSERVICE INSPECTION INTERVAL FOR CERTAIN REACTOR VESSEL WELD EXAMINATIONS (TAC NO. MF2319)
Dear Sir or Madam:
By letter dated April 24, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13115A015), as supplemented by letter dated November 11, 2013 (ADAMS Accession No. ML13316C078), Entergy Operations, Inc. (the licensee), proposed to add one additional weld to a previously approved reactor pressure vessel (RPV) examination alternative, AN02-ISI-004, at Arkansas Nuclear One, Unit 2 (AN0-2). The additional weld was inadvertently omitted from the licensee's original proposed alternative submittal dated October 29, 2009 (ADAMS Accession No. ML093030136). By letter dated September 21, 2010 (ADAMS Accession No. ML102450654), the U.S. Nuclear Regulatory Commission (NRC) staff authorized an alternative to the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Code (Code),Section XI, Paragraph IWB-2412, Inspection Program B, where volumetric examination of essentially 100 percent of the RPV pressure-retaining Examination Category B-A and B-D welds is required once during each 10-year inservice inspection (lSI) interval. In the letter dated September 21, 2010, the NRC staff authorized extension of the AN0-2 lSI requirements for the Category B-A and B-D RPV welds to once every 20 years.
The licensee's amended alternative request, AN02-ISI-004, dated April 24, 2013, proposed the addition of Weld Number 02-001, the RPV closure head-to-flange weld, to the previously approved alternative pursuant to Section 50.55a(a)(3)(i) of Title 10 of the Code of Federal Regulations (10 CFR). Weld Number 02-001 is a Category B-D weld that was not specifically addressed by the alternative authorized by the NRC's letter dated September 21, 2010.
The NRC staff has reviewed the licensee's updated proposed alternative AN02-ISI-004 and concludes that the plant-specific information provided by the licensee to include Weld Number 02-001 is bounded by the data in the Pressurized Water Reactor Owners Group's topical report WCAP-16168-NP-A, Revision 3, "Risk-Informed Extension of the Reactor Vessel In-Service Inspection Interval" (WCAP-16168). Additionally, the NRC staff concludes that the request meets all applicable conditions and limitations described in WCAP-16168 and that increasing the lSI interval for the additional Category B-D component from 10 years to 20 years shows no appreciable increase in risk. Therefore, the NRC staff concludes that the licensee
has demonstrated an acceptable level of quality and safety with the proposed alternative. The NRC staff further concludes that the amended alternative request, AN02-ISI-004, meets all of the regulatory requirements in 10 CFR 50.55a(a)(3)(i) and authorizes the extension of the examination interval for Weld Number 02-001, until the end of the third lSI interval at AN0-2, which is March 25, 2020, for the welds covered by AN02-ISI-004. The NRC staff notes that the examination of Weld Number 02-001 is scheduled to occur in 2018.
All other requirements of the ASME Code,Section XI for which relief was not specifically requested and approved in the subject request for relief remain applicable, including third-party review by the Authorized Nuclear lnservice Inspector.
The NRC staff's safety evaluation is enclosed and addresses Weld Number 002-01 only. The NRC staff's letter and safety evaluation dated September 21, 2010, which authorized the original alternative AN02-ISI-004, remains in effect regarding the originally requested welds.
If you have any questions, please contact Peter Bamford at (301) 415-2833 or via e-mail at Peter. Bamford@nrc.gov.
Sincerely, Michael T. Markley, Chief Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-368
Enclosure:
Safety Evaluation cc w/encl: Distribution via Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION AMENDED REQUEST FOR RELIEF AN02-ISI-004. REGARDING THE THIRD 10-YEAR INSERVICE INSPECTION PROGRAM INTERVAL ENTERGY OPERATIONS. INC.
ARKANSAS NUCLEAR ONE. UNIT 2 DOCKET NO. 50-368
1.0 INTRODUCTION
By letter dated April 24, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13115A015), as supplemented by letter dated November 11, 2013 (ADAMS Accession No. ML13316C078), Entergy Operations, Inc. (Entergy, the licensee),
proposed to add one additional weld to a previously approved reactor pressure vessel (RPV) examination alternative, AN02-ISI-004, at Arkansas Nuclear One, Unit 2 (AN0-2). The additional weld was inadvertently omitted from the licensee's original proposed alternative submittal dated October 29, 2009 (ADAMS Accession No. ML093030136). By letter dated September 21, 2010 (ADAMS Accession No. ML102450654), the U.S. Nuclear Regulatory Commission (NRC) staff authorized an alternative to the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Code (Code),Section XI, paragraph IWB-2412, Inspection Program B, where volumetric examination of essentially 100 percent of the RPV pressure-retaining Examination Category B-A and B-D welds is required once during each 10-year inservice inspection (lSI) interval. In the letter dated September 21, 2010, the NRC staff authorized extension of the AN0-2 lSI requirements for the Category B-A and B-D RPV welds to once every 20 years. The licensee's submittal dated April 24, 2013, identified that the previously approved alternative inadvertently omitted Weld Number 02-001, which is the RPV closure head-to-flange weld. As a result of this omission, the inspection interval extension for Weld Number 02-001 was not previously requested by the licensee. nor authorized by the NRC.
The licensee's amended alternative, AN02-ISI-004, dated April 24, 2013, proposed the addition of Weld Number 02-001 to the previously approved alternative pursuant to Section 50.55a(a)(3)(i) of Title 10 of the Code of Federal Regulations (1 0 CFR). The previous extension of the lSI interval was applicable to examinations of the AN0-2 RPV welds (Category B-A), as well as the nozzle-to-vessel welds and inner radius sections (Category B-D).
Weld Number 02-001 is a Category B-D weld that was not specifically addressed by the authorization dated September 21, 2010.
Enclosure
2.0 REGULATORY EVALUATION
2.1 Regulations and Guidance In accordance with 10 CFR 50.55a(g)(4), the licensee is required to perform lSI of ASME Code Class 1, 2, and 3 components and system pressure tests during the first 10-year interval and subsequent 10-year intervals that comply with the requirements in the latest edition and addenda of Section XI of the ASME Code, incorporated by reference in 10 CFR 50.55a(b),
subject to the limitations and modifications listed therein.
For the third 10-year lSI interval at AN0-2, the Code of record for the inspection of ASME Code Class 1, 2, and 3 components is the 1992 Edition of the ASME Code,Section XI. The 1995 Edition with the 1996 Addenda of the ASME Code,Section XI is applicable for ultrasonic testing.
The regulation in 10 CFR 50.55a(a)(3) states, in part, that the Director of the Office of Nuclear Reactor Regulation may authorize an alternative to the requirements of 10 CFR 50.55a(g). For an alternative to be authorized per 10 CFR 50.55a(a)(3)(i), the licensee must demonstrate that the proposed alternative would provide an acceptable level of quality and safety.
Regulatory Guide (RG) 1.99, Revision (Rev.) 2, "Radiation Embrittlement of Reactor Vessel Materials," May 1988 (ADAMS Accession No. ML003740284), describes general procedures acceptable to the NRC staff for calculating the effects of neutron radiation embrittlement of the low-alloy steels currently used for light-water-cooled RPVs.
RG 1.174, Rev. 1, "An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis," November 2002 (ADAMS Accession No. ML023240437), describes a risk-informed approach acceptable to the NRC staff for assessing the nature and impact of proposed licensing basis changes by considering engineering issues and applying risk insights.
2.2 Background The lSI of Categories B-A and B-D components consists of surface and volumetric examinations intended to discover whether flaws have initiated, whether pre-existing flaws have extended, and whether pre-existing flaws may have been missed in prior examinations. These examinations are required to be performed at regular intervals, as defined in Section XI of the ASME Code.
2.3 Summary of the Revised NRC Safety Evaluation for WCAP-16168-NP-A. Rev. 2 As described in Section 3.3 of the safety evaluation (SE) attached to the NRC's letter dated September 21, 2010, the prior authorized alternative for AN0-2 was based on WCAP-16168-NP-A, Rev. 2, "Risk-Informed Extension of the Reactor Vessel In-Service Inspection Interval," June 2008 (ADAMS Accession No. ML082820046). The original WCAP-16168-NP-A, Rev. 2 SEdated May 8, 2008 (ADAMS Accession No. ML081060045),
was published in 2008. That SE was superseded by a revised SE dated July 26, 2011 (ADAMS Accession No. ML111600303), to address the Pressurized Water Reactor Owners Group's (PWROG's) request for clarification of the information needed in applications utilizing
WCAP-16168-NP-A, Rev. 2. The NRC staff's conclusion in this latter SE indicated that the methodology presented in WCAP-16168-NP-A, Rev. 2 is consistent with RG 1.174, Rev. 1 and is acceptable for referencing in requests to implement alternatives to ASME Code inspection requirements for pressurized-water reactor (PWR) plants in accordance with the limitations and conditions in the SE. In addition to showing that the subject plant parameters and inspection history are bounded by the critical parameters identified in Appendix A in WCAP-16168-NP-A, Rev. 2, the licensee's application must provide the following plant-specific information:
(1) Licensees must demonstrate that the embrittlement of their RPV is within the envelope used in the supporting analyses. Licensees must provide the 951h percentile total through-wall cracking frequency (TWCFToTAL) and its supporting material properties at the end of the period in which the relief is requested to extend the lSI from 10 to 20 years. The 951h percentile TWCFTOTAL must be calculated using the methodology in NUREG-1874. The RTMAx-x and the shift in the Charpy transition temperature produced by irradiation defined at the 30 ft-lb energy level, t:.T3o. must be calculated using the methodology documented in the latest revision of RG 1.99 or other NRC-approved methodology.
(2) Licensees must report whether the frequency of the limiting design basis transients during prior plant operation are less than the frequency of the design basis transients identified in the PWROG fatigue analysis that are considered to significantly contribute to fatigue crack growth.
(3) Licensees must report the results of prior lSI of RPV welds and the proposed schedule for the next 20-year lSI interval. The 20-year inspection interval is a maximum interval. In its request for an alternative, each licensee shall identify the years in which future inspections will be performed. The dates provided must be within plus or minus one refueling cycle of the dates identified in the implementation plan provided to the NRC in PWROG letter OG-10-238 dated July 12, 2010 (ADAMS Accession No. ML11153A033).
(4) Licensees with Babcock and Wilcox (B&W) plants must (a) verify that the fatigue crack growth of 12 heat-up/cool-down transients per year that was used in the PWROG fatigue analysis bound the fatigue crack growth for all of its design basis transients and (b) identify the design bases transients that contribute to significant fatigue crack growth.
(5) Licensees with RPVs having forgings that are susceptible to underclad cracking and with RT MAX-Fo values exceeding 240 degrees Fahrenheit (°F) must submit a plant-specific evaluation to extend the inspection interval for ASME Code,Section XI, Category B-A and 8-D RPV welds from 10 to a maximum of 20 years because the analyses performed in WCAP-16168-NP-A are not applicable.
(6) Licensees seeking second or additional interval extensions shall provide the information and analyses requested in Section (e) of 10 CFR 50.61 a.
Eventually, WCAP-16168-NP-A, Rev. 3, which contains this latter SE for WCAP-16168-NP-A, Rev. 2, was issued in October 2011 (ADAMS Accession No. ML11306A084).
WCAP-16168-NP-A, Rev. 3 is used as the basis of evaluation for amended alternative request AN02-ISI-004, and is referred to as WCAP-16168 in the rest of this SE.
3.0 TECHNICAL EVALUATION
3.1 Description of Proposed Alternative In AN02-ISI-004, the licensee proposed to defer the ASME Code required inspections of Categories B-A and B-D welds until 2018. As identified in Section 3.1 of the SE attached to the NRC's letter dated September 21, 2010, this schedule is consistent with the information in PWROG letter OG-06-356 dated October 31, 2006 (ADAMS Accession No. ML082210245).
This date is also consistent with Item (3) in Section 2.3 above. In the amended request, the licensee proposes to add an additional weld to the previously authorized AN02-ISI-004.
3.2 Components for Which Relief is Requested The affected components for AN02-ISI-004 are the AN0-2 RPV and the interior attachments and core support structures. The following examination categories and item numbers from IWB-2500 and Table IWB-2500-1 of the ASME Code,Section XI, are addressed in this request:
Exam Category Item Number Description B-A B1.40 Head-to-Flange Weld (Weld Number 02-001) 3.3 Basis for Proposed Alternative The licensee's basis for the proposed alternative was provided in Section 5 of the attachment to the original proposed alternative dated October 29, 2009. As documented in Section 3.3 of the NRC's SEdated September 21, 2010, all of the critical parameters listed in Tables 1, 2, and 3 of the attachment to the licensee's request of October 29, 2009, are bounded by the WCAP-16168 pilot plant. By letter dated November 11, 2013, in response to a request for additional information (RAI) from the NRC staff dated October 9, 2013 (RAI Number 3; ADAMS Accession No. ML13282A360), the licensee confirmed that these requirements are still met with the inclusion of Weld Number 02-001.
3.4 Duration of Proposed Alternative The licensee's letter dated April 24, 2013, amended the previously approved alternative to the third lSI interval to include Weld Number 02-001 for AN0-2. The extension of the third lSI interval for this weld to 20 years corresponds to an end date of March 25, 2020, with the next ASME Category B-A and B-D RPV weld inspections for AN0-2 scheduled to occur in 2018.
3.5 NRC Staff Evaluation The NRC staff reviewed the licensee's submittal dated April 24, 2013. In Table 1 of the licensee's original alternative request dated October 29, 2009, the "Frequency and Severity of Design Transients" at AN0-2 were found to be bounded by WCAP-16168. Therefore, the NRC staff determined that the licensee had addressed plant-specific information item (2) satisfactorily and confirmed that, regarding design transients, the WCAP-16168 methodology is applicable to AN0-2. Also, the AN0-2 RPV has single-layer cladding on the inside consistent with the assumption used in the WCAP-16168 analysis. Considering these critical plant-specific parameters, the licensee performed TWCF calculations using the WCAP-16168 methodology in its address of plant-specific information item (1 ).
These TWCF calculations used inputs from Table 3 of the licensee's original alternative request dated October 29, 2009, and used RG 1.99, Rev. 2, Positions 1.1 and 2.1 when credible surveillance data were available to calculate ~T 30 for all RPV beltline materials for AN0-2. As stated in Section 3.4 of the NRC SE dated September 21, 2010, the licensee's TWCF calculations were verified independently via NRC staff calculations and the difference between the licensee's and staffs calculations were found to be insignificant. The NRC staff determined that the licensee addressed plant-specific information item (1) satisfactorily and confirmed that the embrittlement of the AN0-2 RPV is within the envelope used in the Westinghouse pilot plant analysis.
Table 2 of the licensee's original alternative request dated October 29, 2009, contains additional information pertaining to previous RPV inspections and the schedule for future ones. Table 2 was provided to address plant-specific information item (3). In addition, the licensee's amended alternative request dated April 24, 2013, stated that Weld Number 02-001 was last examined, one-third per outage, during the fall of 1992, spring of 1994 and spring of 1997 outages, and that no unsatisfactory indications were identified during those inspections. Further, by letter dated November 11, 2013, the licensee reported that there were no recordable service-induced indications observed on the subject weld from any of the previous exams in their response to RAI Number 1. The licensee's response to RAI Number 2 stated that examinations were not performed during the third 10-year lSI interval on Weld Number 02-001 and thus there were no further examination results to report.
The next RPV inspection for AN0-2 is scheduled in 2018. The NRC staff has reviewed the revised PWROG plan and finds that the proposed alternative matches the inspection plan for the PWR fleet.
In its letter dated November 11, 2013, the licensee further confirmed in its response to RAI Number 3 that the WCAP-16168 requirements are still met with the inclusion of Weld Number 02-001.
Based on the above evaluation, the NRC staff concludes that the licensee has addressed plant-specific information item (3) satisfactorily because the licensee demonstrated that the plant-specific flaw information for AN0-2 in AN02-ISI-004 is bounded by WCAP-16168, supporting the plant-specific applicability of the WCAP-16168 to AN0-2. These determinations apply to the evaluation of Weld Number 02-001, the subject of this amended request.
Plant-specific information items (4), (5), and (6) have not been addressed by the licensee because they do not apply to AN0-2. Specifically, item (4) applies only to B&W plants whereas AN0-2 is a Combustion Engineering-designed plant. Item (5) applies to plants with forgings in the beltline region of the RPV, whereas the AN0-2 RPV beltline region is made from plates.
Item (6) applies to second or additional extensions, whereas this is the first requested extension for AN0-2.
In summary, the NRC staff has reviewed the licensee's submittal dated April 24, 2013, as supplemented. Combined with the NRC staff's previous evaluation for alternative request AN02-ISI-004, as documented in the NRC staff's authorization dated September 21, 2010, the NRC staff concludes that the revised proposed alternative will provide an acceptable level of quality and safety and meet the guidance provided by RG 1.174, Rev. 1 for risk-informed decisions.
4.0 CONCLUSION
The NRC staff has completed its review of amended alternative, AN02-ISI-004, for AN0-2. The NRC staff concludes that including Weld Number 02-001 into the lSI interval that was increased from 10 to 20 years will result in no appreciable increase in risk. This conclusion is based on the fact that the plant-specific information provided by the licensee is bounded by the data in the WCAP-16168 and the request meets all the conditions and limitations described in the WCAP-16168. Therefore, amended alternative request AN02-ISI-004 provides an acceptable level of quality and safety, and the alternative, including Weld Number 02-001, is authorized pursuant to 10 CFR 50.55a(a)(3)(i), until March 25, 2020, which corresponds to the end of the third lSI interval for the subject welds at AN0-2. The examination for Weld Number 02-001 is scheduled to occur in 2018, and thus the NRC staff also concludes that the planned examination date for Weld Number 02-001 is acceptable.
All other requirements of the ASME Code,Section XI for which relief was not specifically requested and approved in the subject request for relief remain applicable, including third-party review by the Authorized Nuclear lnservice Inspector.
Principal Contributor: G. Stevens Date: June 6, 2014
ML14150A163 *via email memo OFFICE NRR/DORULPL4-1/PM NRR/DORLILPL4-1/LA NRR/DE/EVIB/BC* NRR/DORULPL4-1/BC NAME PBamford JBurkhardt SRosenberg MMarkley DATE 5/29/14 6/3/14 4/23/14 6/6/14