May 29, 2014

Mr. Jeremy Browning, Site Vice President

Arkansas Nuclear One

Entergy Operations, Inc.

1448 SR 333

Russellville, AR 72802-0967

SUBJECT:

ARKANSAS NUCLEAR ONE - NOTIFICATION OF INSPECTION

(NRC INTEGRATED INSPECTION REPORT 05000313/2014004 AND

05000368/2014004) AND REQUEST FOR INFORMATION

Dear Mr. Browning:

From July 7 through July 11, 2014, inspectors from the NRCs Region IV office will perform the

baseline biennial requalification inspection at Arkansas Nuclear One, Units 1 and 2, using NRC

Inspection Procedure 71111.11B, Licensed Operator Requalification Program. Experience

has shown that this inspection is a resource intensive inspection for both the NRC inspectors

and your staff. In order to minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

These documents have been divided into three groups. The first group (Section A of the

enclosure) identifies information to be provided prior to the inspection to ensure that the

inspectors are adequately prepared. The second group (Section B of the enclosure) identifies

the information the inspectors will need upon arrival at the site. The third group (Section C of

the enclosure) identifies the items which are necessary to close out the inspection and are

usually sent a few weeks after the team has left the site. It is important that all of these

documents are up-to-date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. Randal Martin of your training

organization. Our inspection dates are subject to change based on your updated schedule of

examination activities. If there are any questions about this inspection or the material

requested, please contact Thomas Farina, Unit 2 lead inspector, at 817-200-1117

(thomas.farina@nrc.gov), or Brian Larson, Unit 1 lead inspector, at 817-200-1172

(brian.larson@nrc.gov).

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD

ARLINGTON, TX 76011-4511

J. Browning

- 2 -

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRCs

document system (ADAMS). ADAMS is accessible from the NRC web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/ Chris Steely for

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket Nos.: 50-313, 50-368

License Nos.: DRP-51; NPF-6

Enclosure:

Biennial Requalification Inspection Document Request

cc: Electronic Distribution for Arkansas Nuclear One

Letter to Mr. Jeremy Browning, dated May 29, 2014

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRCs

document system (ADAMS). ADAMS is accessible from the NRC web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/ Chris Steely for

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket Nos.: 50-313, 50-368

License Nos.: DRP-51; NPF-6

Enclosure:

Biennial Requalification Inspection Document Request

cc: Electronic Distribution for Arkansas Nuclear One

ADAMS ACCESSION NUMBER: ML14149A462

SUNSI Review

By: TJFarina

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

Keyword: SUNSI

Review Complete

OFFICE

OE:OB

OE:OB

C:OB

NAME

TFarina/dch

BLarson

VGaddy

SIGNATURE

/RA/

/RA/

/RA/ CSteely for

DATE

5/19/2014

5/27/2014

5/ /2014

J. Browning

Electronic Distribution by RIV:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Steven.Reynolds@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Brian.Tindell@nrc.gov)

Resident Inspector (Matt.Young@nrc.gov)

Resident Inspector (Abin.Fairbanks@nrc.gov)

Branch Chief, DRP/E (Greg.Werner@nrc.gov)

Senior Project Engineer, DRP/E (Michael.Bloodgood@nrc.gov)

Project Engineer, DRP/E (Jim.Melfi@nrc.gov)

ANO Administrative Assistant (Gloria.Hatfield@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Peter.Bamford@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

ACES (R4ACES@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA: OEDO (Joseph.Nick@nrc.gov)

- 1 -

Enclosure

BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST

TO:

Randal Martin

Operations Training Superintendent, Arkansas Nuclear One

479-858-6844

FROM:

Thomas Farina

Operations Engineer, NRC RIV

817-200-1117

SUBJECT:

INFORMATION REQUEST TO SUPPORT JULY 7-11, 2014, LICENSED

OPERATOR REQUALIFICATION PROGRAM INSPECTION (IP 71111.11B)

A. The following information is requested in order to support inspection preparation

activities. These items are listed by section as they appear in the inspection module

(i.e., 2.02, 2.04, etc). Requested materials should be sent either electronically or

hardcopy in order to arrive at the Region IV office no later than June 27, 2013.

Since each unit will be inspected separately, please segregate your submittal by unit.

Electronically to: Thomas.Farina@nrc.gov

Brian.Larson@nrc.gov

Hardcopy to: U.S. Nuclear Regulatory Commission, Region IV

1600 E. Lamar Blvd

Arlington, TX 76011

ATTN: Thomas Farina

General Requests:

Index of the materials provided in response to this request.

List of licensed operators (SRO & RO) by crew (operating & staff).

Training and Operations Department organization charts (with qualified LOR

evaluators identified).

Procedures that identify process for revising and maintaining LO continuing training

program up to date.

List of outstanding LOR program changes.

List of plant events and industry operating experience incorporated into LOR

program since last BRQ.

Audits and/or self-assessment reports addressing the licensed operator

requalification training program.

Last two years of simulator review committee (or equivalent) meeting minutes.

Last two years of CRC (or equivalent) meeting minutes.

02.03: Biennial Requalification Written Examination Quality

The current and approved biennial written examination schedule.

The current requalification cycle written examination results for both SRO & RO that

have already been administered up to the week prior to the inspection team arrival

onsite, if any.

All written examinations that have been approved for administration up to and

including the week before the inspection team is onsite, if any. This will need to have

- 2 -

adequate password protection if e-mailed or double envelope protection if mailed via

regular mail per NUREG-1021.

The current requalification cycle examination methodology (sample plan).

02.04: Annual Requalification Operating Test Quality

The schedule for the operating tests (JPMs & scenarios) to be given the week of

July 7, 2014.

The operating tests (JPMs & scenarios) (password protected and provide separately

via telephone at later date) to be given the week of July 7, 2014.

Current requalification cycle operating tests (SRO & RO) and results up to the week

prior to the inspection team arrival onsite.

All of the previous years NRC required annual operating tests.

Current requalification cycle operating test methodology (sample plan).

All portions of the UFSAR that identify operator response times for time critical

operator actions.

02.05: Licensee Admin of Requalification Exams

All procedures used to administer the annual operating test.

All procedures used to assess operator performance.

All procedures that describe conduct of simulator training.

All procedures used to test, operate, and maintain the simulator.

An index for referencing the above procedures.

02.06: Requalification Examination Security

Submit any tracking tools that you use as a means to prevent excessive overlap on

the written examinations and also meet the intent of sampling all required topics on a

periodic basis.

Submit any tracking tools that you use as a means to prevent excessive overlap on

the operating tests and also meet the intent of sampling all required malfunctions

(including major events, instrument/component malfunctions, TS calls, etc.) on a

periodic basis.

All procedures that describe examination security, including procedures used to

develop the examinations that include guidelines on overlap between examinations

in current exam cycle tests and prior year examinations.

List of all condition reports since the last biennial requalification inspection related to

examination security and overlap.

02.07: Licensee Remedial Training Program

List of remedial training conducted or planned since last requalification exams

(includes training provided to operators to enable passing requalification exams and

training provided to correct generic or individual weaknesses observed during

previous requalification exam cycle).

Remediation plans (lesson plans, reference materials, and attendance

documentation).

02.08: Conformance with Operator License Conditions

All Procedures and Program documentation for maintaining active operator licenses,

tracking training attendance, and ensuring medical fitness of licensed operators.

All procedures and associated documentation that supports reactivation of any

SRO/RO license (operating or staff crew) since the last biennial inspection.

- 3 -

02.09: Simulator Performance

All Simulator Management and Configuration Procedures if not already provided for

in Section 02.05 above.

Simulator Discrepancy Report summary list for all open DRs For closed DRs,

summary list for those items closed between July 31, 2012, and July 30, 2014.

02.10: Problem Identification and Resolution

A summary report of all condition reports related to operator actions/errors in the

control room.

Any revised requalification training that was based on licensed operator performance

issues.

B. The following information is requested in order to support the onsite inspection

activities. Requested materials should be available to the inspection team, either

electronically or hardcopy, upon site arrival on July 7, 2014.

02.02: Exam Results / 02.03 and 02.04: Written Exam and Op Test Quality

All approved Operating Tests (JPMs & scenarios) not previously submitted.

All results up to the day the team leaves the site.

02.08: Conformance with Operator License Conditions

Access to licensed operators records (operating and staff crews).

Access to licensed operators training attendance records.

Access to licensed operators medical records.

02.09: Simulator Performance

Simulator discrepancies (DRs) from July 31, 2012 to July 30, 2014. This should

include all open DRs and DRs that have been closed, including the

documentation/justification for closure.

Acceptance test documentation, including hardware and software model revisions at

the time of acceptance (as available).

Documentation that validates current models, including the thermal-hydraulics and

neutronics models, to the actual plant.

All current model deficiencies, including FSAR vs. Design differences in the simulator

(any documentation on this).

Summary list of modifications from July 31, 2012, to July 30, 2014

Plant Modifications (both hardware and software) completed on the Simulator by due

date from July 31, 2012, to July 30, 2014.

Simulator Differences lesson plan used in training (current to June 7, 2014)

The complete book of all Simulator annual performance test packages (usually in a

single book, but may be electronic or in single test packages), complete with all

transient tests, steady state tests, and malfunction tests. This should also include

the test procedures for each test, the acceptance criteria, and results. For each

transient test, the reference chart should be included or an equivalent subject matter

expert review versus the simulator results with a write-up for any differences beyond

the ANSI 3.5 standard requirements.

All test packages used to verify core physics parameters (such as MTC, IRW). The

applicable reference graphs from the plant physics data book (electronic or other

- 4 -

means as available) should also be included, as well as the test procedures used

and the acceptance criteria with results.

All Simulator test, configuration management, and related documents available in the

room for inspectors to review. This includes training needs analysis packages,

simulator review committee meeting minutes, etc.

Current copy of ANSI 3.5 standard you are committed to for Simulator testing.

02.10: Problem Identification and Resolution

All condition reports related to operator actions/errors in the control room

C. Arkansas Nuclear One is required to send the final results summary and any

remaining exams and operating tests that have not been reviewed to the regional

office lead inspectors for final review and comparison against the Significance

Determination Tools in order to communicate the exit results for the inspection.