Text

U.S. NUCLEAR REGULATORY COMMISSION September 1997 OFFICE OF NUCLEAR REGULATORY RESEARCH Division I Draft 0G-1070 DRAFT REGULATORY GUIDE

Contact:

M.E. Mayfield (3011415.6690 U

J.P. Vora 1301)415-5833 L

DRAFT REGULATORY SAMPLING PLANS diI DEDICATING SIMPLE METALUC d CIAL GRADE ITEMS FOR USE INAft POWER PLANTS 0/1 alý2.1 IM9PPIPP; rigs no"" w" "M. "I *et i0sds laciio mwrolis the VAC in ow abwty gtsegofa" inv' cigpttme ,rimw cas siteeAt*My POO'0 on I%*is".

a hiss a tesivid VOgm1p" ts" gtf *,vw "n d&" noct ir~towS on oEI.oal MC staff pwotsto.

hafte w tow buir es.tod an "h 0011 *( Vail trcikd& Anl iiOowordtiton "hoe6Aw "n its asso d reqdatity 01%flli o vataft8 .SMmani. CowSIWeI shftM bo aW46-00"d by a~npntir %oqpa"~ d&1& Wm~tlui cewanws~t .w be ssbrietnutte o Ow &A"

&W 0 sisi a boit~ "S. Otffim at A4& vi ssboo. U.S. NAdoar AogaAsarve Cammiesspon. WoshnlwV a DC 205W Ctiv.. of tanwnw~ts em. sbe saww~rid usi.mtC Pwiii Ooaswanl Rowni. 2120 L Stromt W.. WosDhwv^ DC. Coevwrism *A b~meww W Aitii#"go~wd a"

by Oeember 1. 1997.

  • 10@11000 1 ~ shi Ofif i whcig 011111GM0 tci*.cU 0 be Ostse*.4If me(SO 0090woiti 60 o" buasia 54lotaea list owe009 cop"e ofet ft hiftei 'spof 10-i sheec be waftinwt" to the U.S. kN41os ftgust"s ComokisawL Ws*.tomitn OC MIS, *ttgsetan Anude Grpe w- Obe* ftwag so tangfaa 00114I5f 97100WQ 970930 OS. XXX ft POp

1 A. INTRODUCTION 2

3 The U.S. NucWea Regulatory Commission INRC) has promulgated regulations to provide 4 quality assuance requirements for nuclear power plants and fuel reprocessing plants for the 5 design, construclion. and operation of structures, systems, and components that prevent or 0 mitigatt the consequences of postulated accidents that could cause undue risk to the health 7 and safety of the public. Those specific regulations are set forth in Appendix B.. OurAily a Ausurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants," to 10 CFR Pan 50, 9 "Domesic Ucensing of Production and Utilization Facilities," in the U.S. Code of Federal 10 Regulations. Dedication Is an acceptance process undertaken to provide reasonable assurance II that a commercial grade item (CGI) to be used as a basic component of a nuclear power plant 12 will perform its intended safety function and is deemed equivalent to an item designed and 13 manufactured under a quality assurance program In accordance with Appendix B. Terms that 14 are used in this regulatory guide ate defined and interpreted in Appendix A to this guide.

15 This regulatory guide describes a method acceptable to the NRC staff for complying with 16 the NRC's regulations with regard to quality assurance requirements when using a sampling 17 plan for dedicating simple metallic CGIs for unrestricted use in nuclear power plants.

18 AMl relevant criteria of Appendix B to 10 CFR Part 50 must be satisfied for the dedication 19 of commercial grade items.

20 21 Criterion ill. "Design Control," of Appendix B requires. in part. that measures be 22 established for the selection and review for suitability of application of materials and 23 parts that are essential to the safety-related functions of structures, systems, and 24 components.

25 Criterion IV. "Procurement Document Control," requires. in part, that regulatory 28 requirements, design bases, and other requirements are included or referenced in 2? procurement documents.

28 Criterion V. instructions, Procedures. and Drawings,' requires, in part, that measures be 29 established to assure that activities affecting quality be accomplished in accordance with 30 written Instructions, procedures, and drawings.

31 Criterion VII, "Control of Purchased Material. Equipment. and Services." requires, in part.

32 that measures be established to assure that purchased material conform to procurement 33 documents.

3

1.. . Criterion XVII, "Guality Assurance Records,- requires, in part. that such records.

2 procedures, documented bases, and so forth, be maintained to furnish evidence of 3 activities affecting quality.

4 5 Regulatory guides are issued to describe and make available to the public such 6 Information as methods acceptable to the NRC staff for implementing specific parts of the 7 NAC's regulations. techniques used by the staff for evaluating specific problems or postulated 8 accidents, and guidance to applicants. Regulatory guides are not substitutes for regulations.

  • an compliance with regulatory guides is not required. Regulatory guides are issued In draft 10 form for public comment to Involve the public in the early stages of developing the regulatory 11 positions. Draft regulatory guides have not received complete staff review and do not represent 12 official NRC staff positions. However. if a licensee or its supplier elects to use or reference this 13 guide, the licensee or supplier must comply with certain provisions in the Regulatory Position of 14 this guide.

15 The information collections contained in this draft regulatory guide awe covered by the 16 requirements of 10 CFR Part 50. which were approved by the Office of Management and 17 Budget, approval number 3150.0011. The NRC may not conduct or sponsor, and a person is 18 not required to respond to, a collection of information unless it displays a currently valid OMB 19 control number.

20 21 8. DISCUSSION 22 23 This regulatory guide provides guidance on the use of sampling plans during commercial 24 grade dedication of simple metallic items for unrestricted use in nuclear power plants INPPs) 25 using Electric Power Research Institute (EPRI Method 1, -Special Tests and Inspections* lRef.

26 1). The use of sampling plans for dedicating these items is currently of particular concern 27 because items dedicated for unrestricted use could be used in applications with high safety 28 significance. Draft Regulatory Guide DG-1064. -An Approach for Plant-Specific. Risk-informed 29 Declsionmaking: Graded Quality Assurance" lRef. 21 proposes guidance on determining 30 whether an item Is of high or low safety significance. This Draft Regulatory Guide CG.1070 31 also contains specific instructions and cautions in the application of sampling plans for 32 commercial grade dedication. The guidance is limited to simple metallic CGIs with critical 33 characteristics that can be verified after their manufacture.

4

I This regulatory guide incorporates experience gained from inspections and a review of 2 irndusry programs and practices, knowledge of the theoretical and practical aspects of 3 Statistics. and practices of the melting mills, where metals are mixed, purified, and formed.

4 This experience was balanced against the need for a sampling methodology that will provide a 5 reasonable asuance that an item will perform its intended safety function and is equivalent to 6 an item designed and manufactured under a quality assurance program consistent with 7 Appendix 8 to 10 CFR Part 5O.

B Three important concepts are Incorporated in Qhis regulatory guide. The first concept is 9 traceability, or the ability to document the development, processing, or history of an item, 10 especially through markings or paperwork. The second concept is limiting the defect rate, the 11 frequency with which nonconformances. Imperfections, or flaws occur in a set of items. The 12 third concept Involves the variability of concentration of basic chemical elements that must be 13 used to verify the identity of metallic items. This regulatory guide provides guidance on these 14 topics to reasonably assure the consistent high quality of dedicated simple metallic CGls.

18 An underlying premise of this regulatory guide is that individual inspection lots should be 16 sampled in a way that will give a high confidence of a low defect rate. To satisfy this premise.

17 this regulatory guide provides sampling plans that result in at least 95 percent confidence that 18 lots with more than 5 percent defective items will be rejected. This level of sampling is called a 19 95105 plan, and this standard confidence level was chosen to control the consumer's risk,' that 20 is. the risk that an unacceptable lot is accepted. Other sampling plans, such as the EPRI NP.

21 7218 guideline (Ref. 31 are based on MIL-STC-105E IRAf.41 and call for sample sizes smaller 22 than those called for by this regulatory guide. In some cases, not all critical characteristics can 23 be verified at the dedicating entity. Consequently. plans based on a 95/05 plan involve higher 24 consumers' risk {the probability of accepting a lot with more than 5 percent defective items),

25 especially for lot sizes below 100. However, experience has shown that the assumptions in 26 MIL-STD-IOSE frequently are not appropriate for commerci,,l grade items. Unlike MIL-STD-27 105oe, this regulatory guide does not assume a continuous manufacturing process: therefore.

28 larger sample sizes are required to provide assurance of lot quality.

29 This criterion, 95 percent confidence that no more than 5 percent of the acceptable 30 items could have defects, was chosen as the appropriate level of assurance necessary to 31 maintain the current levels of component performance. The criterion establishes a standard

  • Note the distinCtbon between consumer's risk and pfvdef'S 14h; the I*o hold cotrary goals.

5

I statistical confidence interval and provides reasonable assurance that the lot of items meets its 2 acceptance criteria. Alternative sampling plans are available, for example, a double sampling 3 plan, but this regulatory guide does not address those alternative plans.

4 5 C. REGULATORY POSITION 6

7 This regulatory guide Is being developed to provide guidance, acceptance criteria, and 8 sampling tables that are acceptable to the NRC stalr for performing sampling for commercial 9 grade dedication of simple metallic items. Licensees' and suppliers' use of this guidance will 10 result In a more uniform application of sampling, improve overall confidence in the Industry's SI sampling process for the dedication of CGIs. provide additional supplier performance history to 12 the dedicating entity, and provide a reasonable assurance that the Item will perform its intended 13 safety function.

14 Dedication programs for simple metallic CG[s that are written according to this 15 regulatory guide must be based on a two-part process involving inspection and nondestructive 16 examination 4I&NOEI and destructive tests.

17 In some Instances, not all the CGIs' critical characteristics can be verified after receipt at 18 the dedicating entity. For these items, other methods of verification, such as a commercial 18 grade survey (EPRI Method 21. or source verification (EPRI Method 31, may be necessary.

20 Guidance on using these methods is not provided in this regulatory guide, but can be found in 21 other NRC guidance and other referenced documents.

22 Written Instructions nr procedures for commercial grade dedication programs that permit 23 the use of sampling should either include the generic documented technical basis for the 24 acceptance criteria and selected sampling plans or should include a requirement that such 25 documentation be provided for a given circumstance. Further. such instructions or procedures 26 should contain provisions for ensuring that the sampling plan selected provides adequate 27 controls to ensure conformance to purchaser-specific procurement document requirements.

28 applicable material specification requirements, and other requirements to which the Item must 29 conform.

30 6

L

1 1. ASSESSMENT OF SAFETY SIGNIFICANCE AND FUNCTION 2

3 This regulatory guide applies to simple metallic CGIs when their end use is not known or 4 when sampling has been determined to be necessary. No assessment of an itemns safety s significance or function Is necessary when using this guidance for dedication of en item for 5 unrestricted utility.

7 8 2. IDENTIFICATION OF CRITICAL CHARACTERISTICS, VERIFICATION METHODS, AND 9 ACCEPTANCE CRITERIA 10 11 12 For CGIs such as simple metallic products to be dedicated for unrestricted use in NPPs.

13 Inspections, tests, and analyses that are II) identified in the product description, 121 listed on 14 the certified material test report (CMTRI. and 43) required by the purchaser should be verified.

15 Inspections, tests, and analyses are. for example. heat number, heat code or lot, chemical IS constituents, physical attributes, microsiructure. mechanical properties le.g.. tensile strength.

17 hardness), and markings. The inspections, tests, and analyses, in general, provide critical 18 characteristics and need to be verified. The chemical constituents that should be verified during 19 the partial chemical test are: for carbon and alloy steels, chromium, copper, manganese, 20 molybdenum, nickel, silicon, phosphorus, and sulfur; for stainless steels, chromium.

21 molybdenum, and nickel; and for other metals and alloys, principal iloying elements and 22 commonly recognized impurities. For the full chemical analysis, all elements identified in this 23 guide In the Table of Product Analysis Tolerance's and in the material specifications should be 24 verified. Additionally, any element not identified in the table that is identified in the 25 manufacturer's certification should be verified. Requirements imposed by the purchaser should 26 also be considered for use when identifying critical characteristics. Further guidance or the 27 selection of critical characteristics can be found in Generic Letter 89-02 (Ref. 51. Generic Letter 28 91-05 (Ref. 61. Information Notice 95-12 (Ref. 7). Supplement 1 to Information Notice 92-68 29 (Ref. 81. Information Notice 96-40 MRef. 91. Supplement 1 to Information Notice 96-40 (Rea.10).

30 and NRC Inspection Procedure 38703 (Ref. 111.

31 Verification methods should be chosen on the basis of their accuracy. precision. and 32 ability to verify the critical characteristics in question. Accordingly, the accuracy and precision 33 of these methods, as well as their appropriateness for the material in question, should be 34 evaluated before they are designated for use. For example, an alloy separator Is capable of 7

1 distinguishing between differing families of steels. However. it cannot identify the material's 2 chemical constituents, and therefore, would not be capable of reliably identifying 3 nonconforming or defective items. Similarly, a spark test. where one observes the color and 4 shape of spaks generated when a metallic item is subject to grinding, iS capable of Identifying 6 the presence of elements in a material, but it is not a quantitative process and, therefore. would S not be suitable for verifying the concentration of elements In the material, In contrast. a mass 7 spectrometer can accurately identify the presence of and quantity the chemical composition of a a metallic item.

9 The acceptance criteria for chemical elements are the same for both the partial (part of 10 the I&NDEI and full chemical tests (part of the destructive tests) and are given below in the II Table of Product Analysis Tolerances and associated Figures 1 through 3. The table and figures 12 must be used to build acceptance criteria for both the partial chemical (part of the I&NOEI and 13 the full chemical tewts (part of the destructive tests). The tolerance given in the figures and 14 tables bracket the values listed on the CMTR and are a subset of the material specification is range and Its tolerance. Therefo-e. if the tolerances given in the material specification are more 16 liUniting. the tolerances given in the material specification should be used. Additionally, If the 17 table or figures are not applicable to the element or material in question, the tolerances IS contained In the material specificatinn should be used. For nonchemical properties (e.g., yield, 19 tensile, impact strength, fracture toughness), the results may be listed on the CMTR. The 20 measured value should be within

  • 15 percent of each value listed on the CMTR and should 21 meet the limits and tolerances given by the purchase order or material specification, whichever 22 value is more restrictive. For hardness, tolerance limits do not apply; the measured hardness 23 should meet the hardness value in the material specification or the customer's specification.

24 8

TAKA OF PA.cMXT AwL TMgaWaS

?n MC RQIMf- PrPAMWf!rf!

TYK or EumEw ELwvtd NAwc %TcLAsA.um I. 9

~rwm CMTR vD4Lt CAYifd SnE FcAAr I U"OGAKSCScaFG~m 2 SALCON Sce Fcu't 3 It ALLI#Awea____________ __

12 Emacwtu repCiLL NCKIL*10%

CASO ADOD TO MAAE

&kxvgmtj*10%

CARMON AND LOW 14 SAW. ALLOT SICEL TewADKAA 25%

___ __ __ __tm 17

  1. 12% '

I S RESnoU, FLMEIWS at CAMW*%

Femmac Eavmws rw~ Snccof *125%

12 *AV ADDE TO YALE Cv*0w *10%

UMNWP~1C SIAD&&SS STHlL Mcxymmima 15%

12 ___ __

_ ___ __ ___ _ MGA04JPSE t3%

14 Ausuv.Tc ELuw'os ivcauv S4.ctu 0125%

15 SmAWIu ME0 TO LUAE C'aovc t1 .25%

S1UL3 STAOU" STEEL MOcMAMvtaa 25%

27 U£1oWUc f2%

____ ______ ___ ___ ____ __ ___ ___ ___ t¶0 30 AuPOINuAM. To k~ Spccor'Lo TO EW SP'cCW11 31 OTHER~ MCALS SICOWAMV.0£0 air VI( CUSTOvVR e1 "~ CLJSowc i~

Ae nrvte Pro mt, rflpft ___________ ______________

32 ID Xv"fk am w6 awW gi w~w ows"wonfCM~TX) Wm.m ow ew~ hrw Aw-I

-1w CMT vaeof sm ow 010 md w nO00~2

.*~, v4% Woixo 9.

FWMar I Product Anaysis Talsance for Cartbon inCMo ad Low AfyBbwbiSI

.°. . . ... ,l .* .. . ...-......

o.07- o * ..*.........!.....-- . " ....' " ......-. ""

...... I. ... .........

0.080.10 0.2 0.3 A CA0.0 0.7 0. 00.00*.o CMTR Wt% Carbon Ca - Low A*l, Figure 2 - Prouc Anal VOM TOIIume ftr -'s! 1U I I Cabon mad Low ANOV6O~d 2.

CMTR Wt% Manganese asl Figure 3 - Product Analysis Tokmmw* fr $Neonw In Cubm~

&Wd Low Aft Oftasi 0.048-0.030

  • -0.020 0.013- u 0.02 0.06 0.18 0.00 CMTR Wt% Silicon KO1iE 86"1 - - sereI*.-ko an 10

1 3. LOT FORMATION 2

3 The forming of inspection lots should incorporate the following practices. items from 4 different production runs, different models. or different manufacturers should not be included in 5 the inspection lot. Proper lot formation must have evidence of traceability such as (1) original 6 manufactum malkings on each Item. (21 originsl manufacturer certifications. 13) original 7 CMTRs. or (4) original packing slips from the receiving inspection. Combining dissimilar lots to 8 form a larger lot for sampling purposes is not permitted; the destructive testing requirements 9 we applicable only to homogeneous inspection lots. Lots with different pedigrees should be to dedicated independently. Finally, any suspected nonconforming items should be removed from I1 the nsM ilon lot before sampling. The Inspection lot should be kept as "clean" as possible; 12 that is, Inspection lots should be segregated so that the risk of cross-contamination is 13 minimized.

14 15 4. SELECTION OF SAMPLING PLANS FOR INSPECTION AND NONDESTRUCTIVE 16 EXAMINATION 17 16 19 Two I&NDE sampling plans that are acceptable to the stall are described In this section 20 for CGI dedication. The first plan. SPI. allows lot sampling for the I&NDE portion of the 21 dedication but mandates that the accepted lot be sent to the purchaser without being 22 subdivided. The size of the samples is based on lot size, and the table in Appendix B shows the 23 sample size needed to meet the 95105 criterion. The second plan, SP2. specifies 100 percent 24 sampling for the I&NOE portion of the dedication. However, it allows large lots to be dedicated 25 and distributed in a piecewise manner. In both plans, the I&NDE verifies all the critical 28 characteristics, such as dimensions, hardness, partial chemistry. manufacturer's markings, heat 27 number or code. without rendering the items unusable.

I* The I&NDE sampling plans SPI and SP2 are designed for situations In which high confidence in the inherent quality of the inspection lot is needed. For example, SPI Is used if 30 the dedicating entity wants to dedicate one lot of CGIs and send that lot to a licensee to satisfy 31 a purchase order. The Inspection lot size and acceptance number is determined and the sample 32 size read from Table Al In Appendix B. The sample should be randomly drawn using either of 33 the methods given in Regulatory Position 5 or a similar method. The critical characteristics of 34 the sample are then verified using I&NDE. l1 the number of defective items in the sample is less 35 than or equal to the acceptance number. c, the lot is provisionally accepted pending the results II

I of the destructive tests. If the number of defective items in the sampie is larger than c. the 2 dedicating entity may switch to SP2. Otherwise, the inspection lot Is rejected. The flowchart 3 in Figure 4 summarizes the general process.

4 Figure 4 - Summary of the Overall CGI Dedication Sampling Methodology 6 Note that SPI does not allow inspection lots to be sampled, accepted, and then divided and 6 shipped to different purchasers. The dedicated lot must be sent in its entirety to the purchaser.

7 This ensures that the quality of individual shipped lots meets or exceeds the 95105 criterion.

SP2 may be used to dedicate a full inventory of a specific item and subdivide for 9 shipment to vrious purchasers, or SP2 may be used it the inspection lot was rejected by SPI.

10 As in SPI. the inspection lot must be from the same heat or production run and must have 11 traceability to the original manufacturer, original manufacturer's certifications, and CMTRs.

12 However, this plan requires 100 percent sampling for the I&NDE portion of the dedication. The 13 acceptance number for this plan is based on an acceptable defect rate of 5 percent. To 14 calculate the acceptance number. c, for SP2. multiply the inspection lot size by 0.05, rounding 15 up to the nearest whole number. If. during the 100 percent I&NDE, the number of defective 12

I Items is greater than c, the entire lot is rejected. If the number of defective items is less than c, 2 the lot Is provisionally accepted pending the results of the destructive tests. In either case, the 3 detective Items must be discarded or segregated from future inspection lots.

4 In summery. SPI allows sampling of larger inspection lots, as long as the entire 5 dedicated lot is shipped to satisfy a purchase order. SP2 requires 100 percent I&NDE of the 6 items In the Inspection lot. However, only one set of destructive tests is required regardless of 7 lot size. When the SP2 sampling Is completed satisfactorily. the dedicated lot can be subdivided 8 and shipped as separate lots without further Inspection or testing.

9 1o 5. SAMPLE SELECTION

!1 12 The samples selected for the I&NOE should be chosen in a random manner without any 13 bias for or against any portion of the lot. For example, either of the following two methods 14 could be used to select samples for the I&NDE The items can be spread out one layer deep on 15 a large table. The items should be picked at rat Jom from the table, without bias toward any 16 side or corner. In another method, a set of random numbers from a random number generator S 17 or a table of random numbers is used. The number of random numbers chosen should be equal 1i to the sample size and their values should be no larger than the inspection lot size. The items 19 in the inspection lot are then numbered consecutively, setting aside the items whose numbers 20 match the generated random numbers. The second method is preferable but is not required.

21 The dedicating entity should establish criteria, standard practices, and procedures for the 22 storage and treatment of samples that have been selected and for the segregation of the 23 remaining items. Areas where these items are stored should be clearly marked for ready 24 identification.

25 28 6. INSPECTiON AND NONDESTRUCTIVE EXAMINATION 27 28 Once the sample items have been selecteo, each of the critical characteristics identified 29 is verfied on every Item in the sample. An item that fails to meet the acceptance criteria for 30 one oa more critical characteristics counts as one reject against the previously chosen 31 acceptance number. Regardless of whether an inspection lot was accepted or rejected.

S 32 defective items must be removed and discarded, destroyed, or controlled so they are not used 33 for safety-related applications. Rejected items must not be included in future inspection lots.

13

1 7. DESMT CTIVE TESTING 2

3 Destn"ctive tests are performed only if the inspection lot was accepted by I&NDE.

4 Therefore, the Items to be destructively tested are assumed to represent the inspection lot for 5 the propertles tosed (full chemical properties. material properties, and other properties that 6 cannot be inspected or measured nondestructively). These tests may require that more than 7 one Item be subjected to destructive tests If the item Is too small to be used as a test specimen 8 for al the required tests. Examples of destructive tests are full chemical tests, tensile tests, 9 Impact tests, ductility tests (percent elongation, reduction In area), and microstructural 10 examinations.

11 With regard to verification of the concentration of chemical elements, the destructive 12 tests should verify, at aeminimum, all the elements listed on the Table of Product Analysis 13 Tolerances In this guide. Any additional elements required by the material specification or 14 purchase order must also be verified to meet the tolerances provided in the material 15 specflication or purchase order, whichever is smaller.

16 Regardless of whether SPI. SP2, or another sampling plan is used, the results of the 17 destructive tests must be acceptable for an Inspection lot to be dedicated. For full chemical 18 analyses, the test results for all required elements are compared with the values documented In 19 the manufacturer's or supplier*s certifications. If any result varies by more than the value 20 allowed by the acceptance criteria or does not meet the requirements of the purchase order and 21 material specification, the lot is unacceptable and must be rejected.

22 For nonchemical properties, if any result varies by more than the acceptance criteria but 23 meets the limits and tolerances given by the purchase order or material specification and the 24 items are accepted. a documented engineering evaluation providing the rationale must be 25 provided to the purchaser Ithe customer). This technical evaluation must be provided as part of 26 the certification package for the dedicated material. If the destructive test results do not meet 27 the acceptance criteria, the purchase order, or the material specification, the lot must be 218 rejected.

29 14

I a. DOCUMENTATION OF RESULTS 2

3 Putsuant to Appendix B to 10 CFR Part 60. the CG! dedication process must be 4 documented. Appendix B contains criteria for the necessary elements of a quality assurance 5 program. The following is a list of information that typically is provided for documentation.

6 7

  • Reference number 8
  • Purchase order number (customer's and dedicating entity's) 9
  • Manufacturte's certification number and date lwhen applicablel to 1 Description of lot (e.g., serial numbers, unique characteristics) 11 Critical characteristics sampled (with tolerances usedl 12
  • Sample size selected 13
  • Verification methods 14 a Acceptance criteria Is
  • Results of I&NDE 16 0 Results of OTs 17
  • Comparison of I&NDE and destructive test results with acceptancu criteria 18
  • Lot disposition (accepted. rejected. 100 percent examinedl 19 , Sampling plans used (give reference or description) 20
  • Measurement and test equipment 21
  • Technical evaluations 22 23 D. IMPLEMENTATION 24 25 The purpose of this section is to provide information to applicants and licensees 26 regarding the staff's plans for using this regulatory guide.

27 This draft guide has been released to encourage public participation in its development.

26 Except In those cases in which an applicant or licensee proposes en acceptable alternative 29 method for complying with specified portions of the NRC's regulations, the methods to be 30 described In the active guide reflecting public comments will be used in the evaluation of 31 sampling plans and processes used for the dedication of simple metallic commercial grade 32 Items.

33 15

2 3 1. Electric Powee Research Institute. 'Guideline for the Util~zation of Commercial Grade 4 Items in Nuclear Safety-Related Applicalions." NP-5652. Palo Alto. California, June 6 1988. Ptoprietary information. Not publicly avallable.

7 2. U.S. Nuclear Regulatory Commission. 'An Approach for Plant-Specific. Risk-informed 8 Decisionmaking: Graded Quality Assurance.' Draft Regulatory Guide DG-1064. June 9 1997.'

10 11 3. Electric Power Research Institute, NP-7218. 'Guideline for the Utilization of Sampling 12 Plans for Commercial-Grado Item Acceplance.'Palo Alto. California. June 1992.

13 Proprietarylntonmauion. Nor publicly available.

14 15 4. U.S. Department of Defense. MIL-STD-105E. 'Sampling Procedures and Tables for 16 Inspection by Attributes.' 1989.

17 18 5. U.S. Nuclear Regulatory Commission. Generic Letter 89-02. 'Actions to Improve the 19 Detection of Counterfeit and Fraudulently Marketed Products,' March 1989.2 20 21 8. U.S. Nuclear Regulatory Commission, Generic Letter 91-05, Licensee Commercial-Grade 22 Procurement and Dedication Programs.' April 19911.2 23 24 7. U.S. Nuclear Regulatory Commission. Information Notice 95-12. OPotentially 25 Nonconforming Fasteners Supplied by A&G Engineering II, Inc..' 1995.,

26 27 8. U.S. Nuclear Regulatory Commission, Information Notice 92-68. Supplement 1.

28 ,Potentially Substandard Slip-on. Welding Neck. and Blind Flanges,0 September 1996.,

29 30 9. U.S. Nuclear Regulatory Commission. Information Notice 96-40. *Deficiencies In Material 31 Dedication and Procurement Practices and In Audits of Vendors.' July 1996.2 32 33 10. U.S. Nuclear Regulatory Commission. Information Notice 96-40. Supplement 1, 34 "Deficiencies in Material Dedication and Procurement Practates and in Audits of 35 Vendors." October 1996.2 36 37 11. U.S. Nuclear Regulatory Commission. 'Commercial Grade Oedicatlion." Inspection 38 Procedure 38703. April 1996.'

'Aequests to s&eincopes of draft or active efeito'y guides (whch may be ieproducedi or for ptacem, we an Autom6tic diStrobation list for single copies of Iultse draft gudes in specdac drvtions shotid be made in writng to the U.S. Nucdat Rei*u.tory Commisson. Washington. DC 20555-0001. Attention: PW*miOn.

Graptcs and Distribtion Branch. o by tax to (3011415.5272, Copies ate avidab&e for pection or copvag for a fee from the NRC Pubkc Documat Room at 2120 L Street NW.. Washington. DC. the POR's maihn addren is Mai Stoo LL*4. Washngton. DC 20555; telephone 1202)634.3273; lax 1202)834.3343.

'Copies &a evata for inspection oa copydng for a fee trom the NRC Pubbc 0Docunent Room at 2120 LStret.

NW.. WaShington. DC. the PORs me., ng address is Mad Stop LL.6. Wamhngton. DC 20555: teephon.e 12021834-3273; fox (2021634-3343.

16

APPENDIX A 2 GLOSSARY 3

4 5 This glossary discusses terms used in this regulatory guide and provides some formal 6 and some working definitions and Interpretations.

7 8Basic Component- When applied to a nuclear power plant licensed pursuant to 10 CFR 9 Pat 50, a structure, system. component, or part thereof that affects a safety function 10 necesay to ensure one of the following:

II The Integrity of the reactor coolant pressure boundary 12

  • The capability to shut down the reactor and maintain it in a safe shutdown 13 condition.

14

  • The capability to prevent or mitigate the consequences of accidents that could 15 result In potential of fsite exposures comparable to those referred to in 10 CFR 16 100.11.

17 18 Commerca Grade Item -- When applied to nuclear power pants licensed pursuant to 10 CFR 19 Part 50. a structure. system. component, or part thereof that affects its safety function and 20 that was not designed and manufactured as a basic component. Commercial grade items do 21 not Include items for which the design and manufacturing process many in.process inspections 22 and verifications to ensure that defects or failure: to comply are identified and corrected 1I.e.,

23 one or more of the item's choice critical characteristics cannot be verfied).

24 25 Certificate of Compliance - A written statement, signed by a qualified party, attesting that the 26 associated items or material is in accordance witl the specified requirements and accompanied 27 by additional Information to substantiate the statement.

28 29 Certfifed Material Test Report - A document attesting that the associated material is in 30 accordance with the specified requirements, Including chemical analyses, tests, and 31 exaninations of the heat of steel, preferably from a test sample obtained during the pouring of 32 the steal. When required chemical analyses (heat analyses), heat treatment, tests, 33 exeminations, or repairs are subcontracted, the subcontractor's certification for the operations 4-4 performed Is furnished as an attachment to the original certified material test report.

35 36 Crtcal Chawcterutics - When applied to nuclear power planis licensed pursuant to 10 CFR 37 Part 50, those Important design, material, and performance characteristics of a commercial 38 grade Item that, once verified, will provide reasonable assurance that the item will perform its 39 Intended safety function.

40 41 Dedication - When applied to nuclear power plants licensed pursuant to 10 CFR Part 50. an 42 acceptance process undertaken to provide reasonable assurance that a commercial grade Item 43 to be used as a basic component will perform its intended safety function. In this respect, the 44 Item is deemed equivalent to an item designed and manufactured under a quality assurance 45 program that conforms to Appendix 8 of 10 CFA Part 50. This assurance is achieved by 46 inspectIons, tests, or analyses performed by the purchaser or thirdi-porty dedicating entity after 47 delivery, supplemented as necessary by one or more of the following: commercial grade 48 surveys, product inspections or a witness at hold points at the manufacturer's facility, and 49 analysis of historical records for acceptable performance. In all cases, the dedication process

I must be eLnducted in accordance with the applicable provisions of Appendix 8 to 10 CFR Part 2 50. The procass Is considered complete when the item Is designated for use as a basic

.3 component.

4 5 Dedicat*ng Entity - When applied to nuclear power plants licensed pursuant to 10 CFR Pan 50.

a the organization that Implements the dedication process. Dedication may be performed by the 7 manufacturer of an Item, a third-pary dedicating entity, or the licensee lany of these may also

  • be called a dedicatorl. Pursuant to 10 CFR 21.21(c), the dedicating entity is responsible for 9 Identifying and evaluating deviations, reporting defects in and failures to comply for the 10 dedicated Item, and maintaining auditable records of the dedication process.

11 12 Destructlve Test - Any process of verification of a commercial grade item's critical 13 characteristics whereby the item is substantially altered or changed in a way that would fender 14 It unusable for Its Intended purpose.

15 1A Inspection Lot - A batch or lot of items specifically formed for the purpose of being dedicated 17 for use as a basic component in a nuclear power plant.

t8 19 MalMlarl Manufacturer - An organization that performs or directly controls one or more of the 20 operations required by the material specifications that affect the material's mechanical 21 properties and issues the certified material test report for the material.

22 23 Nondestructive Examination -- Any process of verification of a commercial grade item's critical

  • 24 characteristics whereby the item Is nor substantially altered or changed in a way that would 25 render it unusable for its Intended purpose.

20 27 Product Analysis - A chemical analysis of the semifinished or finished product, usually for the 28 purpose of derermintng conformance to the specification requirements. The range of the 29 specified composition applicable to the product analysis is normally greater than that applicable 30 to host analysis in order to take into account deviations associated with analytical 31 reproducibility and the heterogeneity of steel. (American Society of Mechanical Engineers.

32 ANSI/ASME SA-751. "Specification for Test Methods. Practices, and Terminology for Chemical 33 Analysis of Steel Pboducts," Now York. 1992.)

34 35 Product Analysis Tolerances - A permissible variation over the maximum limit or under the 35 minimum limit of a specified element and applicable only to product analyses, not cast or heat 37 analyses. (ANSI/ASME SA-751) 38 39 Safety-Related - When applied to equipment in nuclear power plants licensed pursuant to 10 10 CFR Part 50, relied on to remain functional during and following design basis events to 41 ensure IIl the Integrity of the reactor coolant pressure boundary. 121 the capability to shut 42 down the reactor and maintais) it in a safe shutdown condition, and (3) the capability to 43 prevent or mitigate the consequences of accidents that could result in potential offsite 44 exposures comparable to those referred to in 10 CFR Part 100. Design basis evenms are 45 defined as conditions of normal operation, including anticipated operational occurrences, 46 design basis accidents, external events, and natural phenomenoa for which the plant must be 47 designed to ensure functions (1) through 13) of this paragraph.

48 A-2

I Unmrstwctsd UOe - Use that is either safty-related or non-safety-reiated, or not restricted to a 2 SpecIfic rIsk-significance level of category in a nuclear power plant.

A-3

1 Appendix 8 2 Sampling Tables with instructions 3

The sampling table in this appendix is to be used to determine the correct sample size 6

for the Inspection and nondestructive examination portion of sampling plan SPI. The table 6 should be used as follows.

7

1. Determine the Inspection lot size. m. This probably will be the purchase order quantity.

9 plus one destructive test item, plus the number of allowable defective items from the 10 sample plan.

S 11 2. Choose the appropriate sample plan. There may be son'" iteration with Step 1 to 12 determine the final Inspection lot size.

13 3. Choose the maximum number of defective items. c. allowable in the semple.'

14 4. Follow the selected column for c down to the corresponding inspection lot size m, and 15 record the sample size n.

16 5. Draw a random sample of size n from the m items In the lot and inspect each.

17 6. Accept the lot if the number of nonconforming items In the sample does not exceed c.

Reject the lot if the number of nonconforming Items exceeds c.

19 20 NOTE that for lot sizes greater than 1000, which is the largest lot size in Table 1, the sample 21 sizes should correspond to a lot size of 999. The example on the following page illustrates the 22 use of Table I for SPI In this appendix.

DThe mnmmimui number ol defeClive smingr the sample. C. has assocuted wth f a SaRVIO $ile 0a rask of meecion imthe ikwpMer;On lot is of acetable quahty. The srrWe the value of c. the smane the samp4e sue WiA the retrthe risk of rejection. Increasong the value of c, however. wif cost the ded~caung emity mote tine to exwhin a Ws mple. sometikmes eppawo0i the inspect ion lot Wem. The tradeofl bt~#eeti the risk of rejction and comt of essminaion is left to the dedicating etvy. it the inspection lOt sue nsosthan 20. the only aCc ai. value of Cis c - 0. Otherwve. here isatways mote than one acceptable value of C,that s.

no Mten Se-a , P la;ie sample site.

B-I

Mlus4athny OhW Use of Table I for SPI

&4""M tatadedicaftinfettywantstoglanwoder for100 sfmle nmetalic Rtems. SPI Is chosen for this application. Furthe, suppose the ddicating entity chooses to allow at moat I defective Item in the ,osale, (I.o., C31) wnd since the item Isr*atvoely lrge, I

."destructive test Item Is required. From Step 1, the Inspection lot SlIzesthusma100+I +1-02. From Tabl l, rowl02and column cwz 1.find the sample size of 67. Thus, a random sample of 67 Items from the inspection lot must be examined. If no morn than

" of the 67 Items Is nonconforming, the lot Is accepted as being no

..-mor than 5 perceM defective with at least 95 percent confidence.

The destructive tests awe performed if the lot isacceptable after the Inspection and nondestructive examination. If the destructive tests e'reacceptable, the dedicating entity sends the 100 items to the purch ser In aacordance with the purchase order.

SNothat tf the sample of67 has 2 defective or nocnforming Items (mom Ohwn the acceptable number). the dedicating entity may choose to implement SP2 and inspec the remaining 35 iem Ma Woere not sampled (100 percent Inspection). After discarding all defedhie Items, the dedicating entity Is 100 percent confident that all of the remaining items In the inspection lot are acceptable for the chftaceristics examined. However, if 6 or more defective items are fotund, the entire lot must be rejected because it contained more

-than 5 percent defective items.

0-2

  • * ** it ci to Lw st U

uI *

  • K S sc K St
  • as9 LB to Put K cc KC
    • " " ** 09 99B 0[9 O ct as ** *
  • B IC Z K t
  • *
  • 09 Lw 0 *
  • it It
  • i so & L9 * *
  • K c it
  • wso a evo w P
  • c cS
    • ** ** 09ci9 *
  • if £9 59 OP 0oP P $9 6 ** * ** c S[ Si V- qSE P9
  • U eC,
    • *
  • 00:9 ci09 . Kv1rM LB0 61 oL 4c9
  • * * *
  • ccI 0

995 59 09 eS 09 09

  • * " U is S) 09 aC *
  • 6s cc
  • *
  • if PO £P 59 *
  • 0 01 01
  • IPc cc ci PS ~ * * "
  • 01 g
    • £9SS C1O IS OP CIS C *, ** *
  • " a$ * "* 01 a
  • 09 of OP * * *
  • Sz Si
  • .* s09 OP 65 0S * *
  • P S
  • *
  • ow Ip SC OP * " * * " £1
  • 1P' 5) 55[ OP1 * * *
  • ci
  • 0 5)' 99 55* Li * * * *
  • 11 I
  • * * *" 8OS S* KC cc OP cs ** ** ** *" *
  • 01 o 01 6
  • PP P K* Pt * * "
  • 3 B
  • * *

CS * * *

  • ILt
  • "
  • a.cit CC cI * * "
  • B h
  • "a 0 OP a iw * * *
  • pt.
  • O9 O c a " * * " EP
  • " *
  • K K 06 * *
  • 1,
    • * "* K SC " * " *
  • C 0IIIillp I Ki I I0 Iti I

Ov 0 v uwpmo gjm we 44pws we SR 9sgm 't "iP

pIv SUI P Pt o0; 00

  • Lo0 to 9 IL ig1
    • 6,1 CPir VI PIi* 00

£5 Pr CL OP O1' CII C*ir **

  • 9at Ot 90I. Ueo 01 0 rP LP 40o 90l.
  • IL1 EU E8s L OP 101 M
  • PCI to G 69 i sot

" 0 O 12 CCI CO OP Ott £09 M0 VO at to&

  • Ott a011,9, iIs Ott **
  • 19 £9 90 9i? c£0at 60 l , 001 0 6 to K l.
  • OZL so 6L ts9 *
  • 001 C rI /

i01 P

  • 60 0*

al £9 DI W1

  • 00Es as to 001,
  • Z*. 96 CS. *
  • 06 09 US CS G
  • Oil o £0 St C gi M96 *
  • S UC1LBC; CC M
  • M 68 aL 1s £6 aS a
  • CI CI~t so 96.6 0. 19 19 C.

tICI *

  • 98 so SOS go Ul 1 -L 0909; 96

.6

    • iL to PS 5£ " IS9 01t PS £3 s 0. 61, '

PCI CO GS67il * £08 1t OS O C:O

  • Ce £3 69 OP to 61t*1 M C CtLZ 60 M0
  • to a g9 or to ao 6uw 10 CS 00 a0 to 19 £0 P Do0
  • *t ** 511 911l 10 0*

06 uL CL C.L 3irl*t 6v Oc*

SUI ** 69 so 006 0* £3 in otL

  • 6 Lo 6G
  • 93l 991 96 9i0 80
  • 911 00 IL OP CCl C
  • t3 05 99 9I £0
  • - I OS go 0L LS MCI
  • 6 6£ u 9r O9 69
  • a * £0 aC i Ot *L 0P1 9I1
  • II1 96 t CS lit *
  • 19 to C to
  • 911 Ul CS £19 O t 109 T 09 CO Do
  • 911 P6 SL CD 911 *
  • liL 0g CO OL
  • *
  • tit is8 VL to Mi *
  • i LLow 8

" £1 C,, 95L 19 011 " *

  • 51 19+ 60p 9.
  • Oa Ot01 i 06 CL.

CL 609 01 *1 t11 *aPI * .

  • CrL 35 09 9

so 5.0 I9£ so So Q, o t . , u CO t CL 01 v 1m 09W L P1 09wI 0

uwswoa gmg " Apsmw 01 Pqrbmj s~ soegd -tqqWJ.

oil £61 M6 001 Pt 9 9tL 1t1 K Is £01 u as 0Go ILE ILL DPI to ss apt 90 P 9 9 0 OLt "tB so& 5 so f&Z S iul MD 901 £1 96 OLt Or VOL M1 tot £6 K 0 OLt Cil CDL LIIL go0 gCI £6 ss fit ca1 tr1 Lot cc vs pC LLl Ml cot 991 90& to is air 0

sit ILL DPI sot vs SAL 911t DCI MC £61 £0.

0$9IS&OB 991 901 to ts S amL 16t sot so& to cs 'O&

0 U9L 691 OCL LCI C0L 10 09 Ut got Oa1 D"t got to CS 0

£91 Kt 00t uL at SOL M9 MC 99 CS 0 0U& UL ML Es 90L ts Oil cot VOL as CS tot 0

viI cat. NS a 0 lot SOL Oct 23 691 VLL at as 1DB cot 0S ES 0 got Irt got at as 0 WI DMI 001 as CLI t91 SIL 0tt lt U£ as WE 0

So1 POI 56 IC 991 "kI 90% St 1 0 VL CCL DO It is 6SL Kt 101 to I is 0 tot V91 US 9L tit QPI eat go 95 0 CoI MC to SLI 091

  • cot tat Ott go01 09 SO 0 U 068 111
  • cot it1 HI DI C 901, S 061 CLt 96 9o tot 05 0Lo M9 Lot CS 59 S 061 eat soI vs SOL got cc 29 0 09L QCt Pot 66L 961 CCI WI St e61 SOL got £6 vs VOL.

0

£81 iKt £61 I51 VIL "tI got to vs WI&

S Psi KL to&

cot6 CDI 60 S L toU 161 S

OL PIs tot HI 1s' CS 061 S

6L ES CIs Zvi HIt WS CS 661 0

961 CU Oct It PC 191 £61 OR Cs Olt is CLI CwI cat 0S £6 0 CII CCI 001 St as 111 Ct got

" Ott VOL 09 Is Lot 0

III . ICI SO O0 091 KtI tI at II got 691 CCI t0t at as sot 0

  • Lit iIt 001 It is Pot W1 US LL 1 StL 09 tot Oct 00ct St i c31 0

Lot Ott go us MC so u Is S If ta[L go AIf

  • tit tot set 8 L isI u S 19K CI z t 0 vS3?~P1 L v z 0 ~S10mP (0) 01' "- *4M P- A*W . uoao~duq 1) MSiq il 30m O u*PS04 u0IIq* 2"9 "6 Ajim OJ F" pimflbe SON *&m SWqJL

.., I I

osz tic Pit 0tt so is SO lI 601, 9; &sz Zia tiI Pit Ott 9% OSE go? 011 Cst G0t ell is 0re e91 Oft 'ge £01 COEOtS 951 001 O& to etc tst sot Co 1 fu? li? an OL *Lo to L1?

M9 got 10? 611 *01 to Ott tit got cot to 19 Ste 1M lot to £5 Coe Ca? to 19 51a set "t got am 10C 051 zat to Cs SOL 0* ot01 to CS tse ow? 091 LII' Oc1 L 901 Is 951 MI so onE Liz so Cs am1 951 ell 099 M5 at& Sea gS Sea M5 at& so 05 Sea Si1 tit go 09 Pea At0 O 901 19C 0tc 01?

SS& MI ca sO? C0I M1 9S fee go? 01? SS& M1 kLa C3 rat Ott 5 is to so 9£ Sc? Ce 99 CC?

IS1 M1 an 00S 06101* is tit s0t pg 0 £5? to es1 001' Sea set 15t 001 ap all 601 95? sea M9 so1 0et OWL 4L0L 50 05 OLE 001go CI 1 CS on?

ast IQZ Oft Lot 50 051 AO1 IZZ 099 01? 611 SOL to CS "B& W&P S PS Sea Ift sot uso 08131 *01 Lu as sea an L0? at1 sot to CS "a1 OLE fee 51? on at1 CI M5 atz so 06L U&1 10 99 95E am6 IL zet Est1 Ott Cot so

.96 &at so or Lot Ott 011 Ott so os1 t11 so is Ole it&l £31

'gt 1 Oft1sot C0O1 Oat 551 111 so IRS oat &L 01 go r51 ti1 0??

"I1 M1 a8 09 6Be

£91 Ott to so 01 - L sp a L 0 ON "l1 01 L IF z t a ON W1 wuisio MS wAp qj~nm hS8I

=mLsoma2q ~1

LSI tiI so Is OK 90 SS VIC I.E Lit LS 90E pIt 993L Ol pg is Oit Ot Go OKc Oee

m. 9Ei 09t 91 60 LS ISE pit 6991 Ott Pg tot sit Is LS Ise p"E Pt tot sit go Is 6% caE CO OiL got 911 a9 £1 WE B, s 99 0 I, 09 Oda cii EIf tit1 .9 Lit 19t *Ipt Le OS liZ 191 P11 90 "a LEa 191 M1 Lo K9 MES OiL 091 P11 £9 tit pct Got SIC 094. et LI Of ISE OLE OZI* 091 $1Ct £9 SLE iti WE £9 O's 091 CIt Le go OK LE 09& ElI 99 cit:

091 Cit so 9 ROK U 95 Etc LIZ OZZ esti t&l so sx Mi 99 1eIc Oai 691 Eit so 65 Ow LIe es1 til OS 9S Ca IK Els ti t9 g 9 sw OlE. O5 tit U 991 Lit so SS 9K Sea 9,

£51t t11 so 95 VVC MOE go agE Lit SS 99 S'S I51 t11 so COC cot Oct Ott so ps SI 961 0il .9 . CK toe LIE 991 011 to SU1 Ott . ps WEz Eli PSI 60Go .9 SOC Oea SEE tot sit so LS aiw IZ a "tS 01~ P. 10£

£01 811 so LS atL GSi £0 99 Cot 511 go £5 etc ORE £0 968 Set 60C Si £91 8st 901 Lit

£0 We SLE E tot fit 29 LS mL L"E SIE £51 III .96 tot t11 L9 95 Ow 60 ca im 191 011 ti £ 9 6 Lee £9 Oft tit Lo 95 got LI '9 See get 61te M9 CtI 091 CiI aO 99 I.E £9 ta Sit 690 tit go 95 toe £0 LeE OaL Ott 8%1 Eit 99 96, Est OS 99 U Ein 991 tit sO S S Ise SS WLE Oet 2% tit so 69 ZCC toE U LIE99 S1 iI 96 06 ON LIt M5 tiI so SS ON tit 968 t iI 99r LaE Pet M5 tit so is See Sir S. 009 toE OLE 961. it& so SS 82 tit 901 011 S. anE 01 Z 61 a 0 MOM 01 11 v 9 0 q9 w1 (3 P qmMU N$4M3 pf4 (3 W91 U W1 WfNWM O~w iupqi gjm " 4mg 0j. psqnbst ong 9O *1q4j A1*1101

991 91.1 SO P9 on1 6R Is 96£ 19L SU4 to 9% on go Ls VOC "1 91.1 so 9% got 2Zz C91 s11 to PCK gel ocz git sie. SO 9 6&1 LU £9& 911 In su 611 M9 911. Le 99 09 9s tot

£91 til is 09 SIP £1 £91 U11 L2 99

£11 Eft. pit 10 va ga USL tit Le 99 GOK 961911 III. V1 iL9 C 911 £9L 111 to 99 911 SZZ ZO1 USI IS aq OLE SU[ Lgt tit LA 9*1 LU 969 VIC 191 CII go ss let Illz ai Ill 911 M.1 01, go 99 SIl go M6 PU 191 CO M

sea£ 091 USI. 9o 95 go 99

£11511 091 MI 90 99 lIP so 95 OR 911 a9 L III 61 LS OLE WZ* 691 111 go 95 CRE 901. Ott 111 691

  • t Oo 111L USL anl Ott tit as is 011 SLE s1 9; 1on OCE 991. 111 6s LS 611 so Ls 161 M~ S9L W11 61 ILs 911 va go Ou l~ SOL. 911 Go £9S &Z a9& 9Lt at is atc on1 s99. 9&t. L5 tit 611 99t 91& so LS tit 66w I M11 S&L SO is LtO 6m We1 101 SOL W1 SL9 so Ls 92 Ott OR ~ M~g St& 99 6PP so Ls 19 Sa Cot 911. to 99 at SLC

£9a c9t M19 SO Os all ga £91 S11 IS es PLC C91 #1.1 IS OS Sa co1 O1t a9 9s; £41 M&1 Ott1 LI 99 lPO 91 US1 pit aI £9 UtC ZGL P11 49 Os LUZ £91. 91 ze 9S 191 111. 95 COW 111 tot 119 to e0t 11m 191 ti1 LA go 19ot tit1 go 99 Le SOK Cu 9CU S91 MI so 99 t01 mlz 19 OtU it 00 tit Sm* cot 09 Ot sit tit LK 091. CI go 9s il 091 t11 go 091 t11 a 99 oft ca go GOIC lu 691 tit. so 95 GOE 111 6M ask go 96 NC Oct 091 Z11 SO 99 £41 011 691 111 so 55 Lot Oct SO1L I 66t a s COK W1 69S sit $I 9; got tit as Ls MC 58 Cu Ott1 I91 111 tot Got. 911 a1 AS OLE IIt tiI so 01 L. 0 E L 0 4SW1 at 0m. t 0 "S w1 uwwoaq) gIg 0i Apms ol. Pwpibmmm 00=9 *&zu sq

w! &M sg9 SL1 99 99 16z 1£! g9t sit 99 95 SOw ro! &C to1 tot 514 Si, Le

/A 95 ve 06Z 0£! t91 5it 69 96 16t oca P91 P91 514 P11 Le

£9 9s 9s O6R 0£! "1 S1t 29 91W M6 0£Z

£91 P14 £9 9s on! orz tot 511 12 95 6PP on! CZ 0055 29z 6!! £91 Ott Le vs POP OK c 691 Got 914.

911 05 06 H Is 661P 91! 9!! co1 Ott LO ctO W8 09& Ott 015 15 In! 9!! cot P1t ZOO 99 wC atk Ott 05 LS tog IIZ tot VLL ow OU on! 1! tot £11 L9t L4I 68 LS OR! 991 OR! 0 05 es M6 M£ PVG 96! 5£! SOL. 91 La mZ 68 is itl Is*.

Lo9 Lot, LLL ML as Its cafP sa6 P t! £ VI IS on! PC! relp PSM PC! Lot Al 69 9p, 56! PC Lgot Ott I s ts Is 95, talk £9! CC! 194. £1 is 9U! KZ 06t £69 MC 90& MI 69 tot 911 99 £5 SOL Ott at 06 aft me! got Ott91 me caZ W91 914 ja 9s SIP' lea SOL5991.1.

"M 1£a in, 16! IC! SOL 9Ott 16! 1£ oft OR! IC! s0t 9tt 29 99 t6P ma ice POR 51t 06 9s so on ocC tat 511 99 Ho! it! m 6w! 6ea M. 5&& 95 OR6! 291 51M Go aS eft $91 6ea "t1 51 95

£91 P14 £3 95 La! 9!! C91 lpt

£91 P14 £9 9s Z" £3a 9!! £91 P1. L2 955 on!K SOL Ott, 00 L an! sa NZ 1!! V&LP1 As 95 ac am! 6g1 914 05 65 LfP 59! 1!! MD P1 Ls 0"P 991 114 05 95 58! 9!! ZDI E&L es 0" $a! S&P vu! to 191 I 91 £IM 61s Is P0! 5! 91. EL&

95 U'P PC! KC! L1 811 00 0PP Est £91 INC £1 t! CC! £91 Bt1 1£?

cca 09g 914 69 15 0LP ME' got I M0 69 0£,

091, 914 619 £ 16! CC 901& t1 Be ILS m£ ca!  !£ 59l got 9&

Ot as 9

go is AtS L5 06! 1£! g01 911 .£5 PC,

!6! 1£ UIP D6u tcC s91 911 toP 0& IL a 1 0 Zs wl 01 L. v z 0 IS2P9W uw~is cSs "a 4qs oj.pg~nbeaj sq sugdu , w

[

Ot1 Ot,1 06 9; C SK9 S6t £9 099 Ott O911 06 is 6CC 0tt 611 06 69t si 06 1s *VL9 6cC Ott Ott 06 691 Ot, 06 iS LOK 9CC 691 9oi1 00 LES 601 M1 06 1.5 KZ 69$ Ott 05 KS loc az 0914, oil as is its 06 9S Its 00C G%[

ot Ott 00C ila 1" 991 Ott 05 ont Li Go is 66C 9 o~t Li t 63 Oat NZ 099 9cz " Lit. is

.91 Lit 60 is 60 UCS LoB. W1 as is s a ti Lit ta KE M* lit GO gIt 61! O9; La: GT.* Mg Lit as 95 NIS 9ft Ott 9&t IS 99 99 90 va ot *Ott of f o~t Mt Be 95 its W4 991 9&.1 a9 99 ff st sit is uCs S9t S1t 99 99 099 SuC so oe got itt go S5S LI: 91Z got. 611 as 99 096 sat Mt Prs 696 IS 0O.1 611 06 IS is 01.t 6W1 0 090 096S tea pot Sit is UCS a": Ke 01.1 911 tr* pot itt Le as9 99 ou 06 95 99 Got 94 06 Is M1 st t91 Ott 0a Mi 06 oes LU LCC 691 got Ott Mf 06 Go0 as IS 691 911 00 is 'SS OOC ass 9C 09& 9ll 06 (99.

Oft 01t Wt 60 0e Is IS ri 9 t 1t1 Css 06 99 wee KZ 90t I11 99t lilt 60 is 681 Sw UPS 991 6%C £1 PIS L0t Lit 6a is Sa. Lagt Lit Lo~t Ott as I Sce Lot It&

099 LI: 60 99 99t 91. SO 99 KC St Ott Oks eft Ott Be 96 ORC Go OR: so 605 SO& Ott go as C" E got Ott sat to 90S sat gtt S91 St 099 9S C Sol £11 9' 09%

SRI s1t 99 99 a0 W90 atL *. z t 0 em WI1 01 Z L 0 mm p M pe405 aM Nmm ~esl (3 O 1SAM 0AW M cmV uOIJeD m19 044 Aspm 01 m4ftv~ gzmg 60sdiw 't owl

on an 591 9tt so Is ME£ MCP Is 56£ Oct "E P01. 511 LS m6 99Z WE V99I 51.1 a9 V aEP 99 Is NCo tot In C9& sit to 99 OP. of 99 EeL ORz $a cot ti1 at 99 i&P In 1WC ORtai CDI P11 to 09 sa tot tit Le 09 O6£ UIZ In Cot ti1 tI vs SELE £9 t51 95 SOC PI9 va Ott OLE SEE ml m SEE Cot £11 to SK MBI tit 99 ZZ SEE 191 MI go giS SEP liE as 09 SIC L91 CLL g0 9 0i lIE Lca VEZ 091 t*L £11.

tLt SO 95 got 0OR ctI go SS LEE 09t tit go vs SIC 09t. EIt go iS WE EE OR ELL so 99 ml L91 £11 69 £5 so SS Cit L61Z c M91 £11 61 L5 RZ 6S& ELL so Ss EUL got It& at LS L&P so Ss 13£ Sol 9tt GO IS COE an 951 t11 Go Ss OIL ter e SOL Ott1 61 LS 0&P amE S91 S&L LS GiL SOL. 9LL SO is 60P en S91 OIL as Is ILC WIE Itn M9 S&L SO is GOP StE

$aE tg9 Ott Is ZLE M9 s11 So 09 tOv LEE P91 Ott 29 Is cot 511 SO 9S Ott In Cot S&i go cot S&L SO 09 WE WEZ cot Sit vPLC C91 Ot1 £9 O's siP SIX SEE tot S&L LCi on OLEE tot P11 £9 09S Is 09 E£c Cot OtII 911 i 9 10, VLE SEE 19R Ott 95 LIL 191 M1 to 09 NCV ca to tit to 09 OiL lot CII go 09 lit SIE 1A 09 OK£ VIC ICE got CII so if Lit ZEE 09t tit So O'9 we£ 091 CUI so Sf OSZ ZZZ 091 £t1 a 88 tIC LIZ SEE Ot1 lit so SS CIE lEE 651 Eli go 5; got 651 ELL go 55 pg lEE M5 tit go 5$ SK 60% lit so SS lIZ £51 111 so WK£ SOL £11 as £5S so NC g91 itt 59IS£ se Ss ZCK "t1 Ott 6o L5 li I.St Lit 51 Ss 10£ at L fp z amw01 IZ1L v a t mm "I u0mo 1"~J emG45sR3 OJL P**vft 009*

ems au w

I ON1 s12 L9 99 GO 99 VOL SL1 Le 99 Be 95 LOP on ORE 6Z ME "I*

tat S&L sit1 go 96 tog 95 g9, CM ti1 LO 96 1009 68Z 62Z EN1 51 Le ow 0CZ Lo 95 69L sit 06 as 065 Le O's Le 9A sop 99t Ott as L LOP Le Ss m9, ON 911 06 £5 w SS £5, C60, Ni LE ilgl L 06 05 Lii sci £01, LII 68 £S Sw SCE 391 911. 08 is Lu~c M I.

LI9 68 LS 961, as LS 1gL gg91 LIL BL 69 so £.5 LS 69 is let as LS Isr MI 911 as is ou tot* ti la" m PEZ £9L. £It Go LS ISV got oil SO LSS Go LS N9Z Ke 9LL zu 991 Olt Be LS SRI S9& 9191. Be £5 9s Lii ItE got. sit 20 Is NZ VCU SO& Si* 99 6to Ow SmC ttE VCZ S9&

to O9t Ut go of mv ORE C" en ocz VOL 511 Re Ol9 me a P91I. 511. £9 99 £9, go 95 1Pp sE Gat rot M1 £9 99 lu ca Lot L14 LiiK C94I. pt'I aO aS Le 99 tcESE C914 Ott a SS Lo 99 UP OttP.1 LO 99S ow m LOW 9e Sw LU t 96 ow wE 9L O91 M11 06 0a 99 SE L2Z Z9. P11L Le go 55 lot Pon E UP Pm Oi 191. £11 go 55 SC" 99&. 311. 06 Is oni Mc "a SEE 191. Et& go SS oni mc 29&, MI so LS 00P PCE PCZ £91 91.1 0N 99 icr so, as LS iii SU got £11 as is so Ls UEP mD WI icE 11 62 L5 Pc, SO& 911 SO 9S 60 Is CC?

Go Ls ORi itz 991 91.1 GO L9 01 1 0 a 0 mmS)O1 01 L v z 0 mw Uwsiiwo sis "q Asps O1 pwftvwm oun *~

tgE

  • m.

1 0

.oc POC 6z Ott OLI Otl 06 m9 u. OSl 641. to as 015 COC 6"i Ott 911 Do Is r'is teL PoZ 6tC Olt Oil 06 iOc ege Go9 91, 00 IS PIS Ze 06 as G91 Ott 06 IS tog 00 Its 6Go Ott 06 iS UgS us Ott Ott si 06 es ooc ZOE Li Kc 891 9 11 0o Is iUs 159 LC" 691 Ott USE 90C oft 39t It& do IS Mi 00 is l9o Itt 69 IS e0a is 8o9 Lt 68 IS K*Z 69$ Ott 69 is 00C %I 591 £11 60 /iS 0OC L91 Wi as is a" so Is OCS Lot 111 6 Is o9n 00C Oft stc 981 Ot1t 9 am Go is GIs 99 SOS O&

LOt KZ Ott g9t 9tt of Of oo£ M got 9L& off is goc t. S91 Ott so 99 LWS aso SO* iCE tLC 691 got 811 Ott. so 99 on set Si1 S9 99 too go COS 9gZ 99i iCC I"Z 99 lillf go 95 P,9 ONl 91 SC M'&

S1i 99 Oil 6Ot t6 S ORC UCS

  • OC Olt Ott Ott 06 Is SuC tot Li NIZ lit 99 as Ott Ott1 06 V SOC See e9 La " Ot1 Ott 06 Is V6Z MCE pot sil.

6SS e'M Lot, A$I roc Ott 601 811 00 is SS9 Wi tot OCZ Sol M1 00 as 00 lot S6C L"Z 691 Ott 00 is DCC ca*

6%1 got 811 06 949 sit 06 9g9 sit Go is Iss ts' iCE 691 911 is s15 got 111 60 aS 06 is lo1 It$1 go is 166 959 KZ at 5i& 61 £ dos 00C IS "S see 891 W1 68 is UIS is1 9t1 as is its SOR 6o IS 119 go9 9Ot go as of0 Ou Go GIs 99 KZ sips go 609 s iet c got 911. go 99 to 905 M91 se1 991, 911 91 511i 9 89 991 99 or 9 cps set axC Sot 911 os LOS C's CC 901 911 as on c 90* 911 98 99 tips EtC991 91 99 SOS SOS at L v a 1 0 oftI0 01 .5.

L v E 0 4218wl uwewSmp swe"j 01pSpqiibj esZ?9A t SWJ+/-

  • iss

691 ISi as I.5 "Tg '0C 6o OiL 911 06 is U19 tOE KE 691, 91 Be IS 019 6a* SO& Ott 06 Is 60 69g Lit a0 Is au? 691 011 63 is 091 291, £1L l11 61 80 iS5 is ZOE K* 991 8LII 69 is "I LLt WE OU Ls 909 0G I.5 got Lit LOC 02 tO*

WE £5 99L ill a6 99 Do ,LEE 091 LII 60 Is 00C 00C tot Lit at is 909 o" 06e DTE £91 LII POO

£I1 911 SO 95 00C 6o is C09 UL Ot t 8 es 65Z s0 99 90C De m LEV ve 0G 99 cog soc Ole 9ow 99 too SEE 991 911 009 K Lz" iLL M1 06 95 gog 10C "K O LW L. O611 06 e. 90C OM? tot LPt Oil 811 61 S6 99 66S Oi 61t 06 es K19 90£ 09 16 SOC W o1,[

OWE Oil sit 06 IS Soc It? ILl 611L 06 to aS 0cu1 W1 06 is ic. 96s Mg M LE SL 991 £11L ML 06 95 691 911 06 ia EcO ce 06 Got 916 to is is 'as SOC Ovz 69t 311 so Zxx 9s

£5 K~g 06 Is tag ZED c0c Mp O.IL Wz 06 OesS d mX OU 991 L£ 69 iS sLo toe K? £1* ELI, got ittl 61 is OS WEc La M* Lit Go is5 tep 60 as PEg IOK loo Sz W0 Ott, 69 Is

£9L LiI 60 99 LOm gK,g as £5 45 LK DEE 00C 6s Is I" 00C EOK ot tt? £91 91t 29 99 S0C o Lo£ 91t 01 95 Oil 60? 61 s6 toe La*

PCE lot Ott 99 99 6w OM Ott Got 9l9 eLL O91 0e 10C u.kI 001 to eS D9? 06? 99 10£ ice WLI Oki 16 es ow* 9s "MOt Iii 611 16 9 9s Los

£6Z go at 99 1)? 11.1 611 0I,1 Olt 06 es Sl, SOC to 915 Oil 61 06 e5 Pig 06 Oil 911 06 Is VOC us5 0, 1 0 0 ss P0 o0 z v, z t W1 UWGiqi ~SA "649Mo OJ. WjrAWH We2egdwMS &SgqJL

VOC 6C* 691, LII 6s £5 68 eLk OZL 18 96 OIL c.z 6a.

61o lGot LLL iLL 88 Li O&C "a~ EL& OUL 1o Is all cmc l9M LIt

@9 is 099 UL Ott to 35 oil Qfz 99& £11t 618 i5 L99

  • Lt OUL to es 95 Octt m Pti 16 Is "99 Z.LI 611 16 9$ stl E*EC CIt, C 16 is 919 ILL s1t o06 96 Ott 16 141 Ot Is S49 ILL 611 05 AS. etc[ LLt ILL, 611t 16 es LL 6s11 06 eS CtC: 16 VLt am at 60£ 611 es ILL 611 06 LS ZIC ILl 05 es 90£ 05 OLI G6L 06 i5 SLo 90C etc IL 611.&

05 US U59 OLI IUL 06 £5 90C L* oLI i 61L is Is Ott 05 Li £599 Oil 114 05 LrP OLt 9tL O91 IML 06 aS WeC OLI OIL 06 is SOL 4S SK ova 69L Ott 689 S LOu 90C OVE OLL OIL O5 099 60 £5 LI 60 iS '0C AS 69L LOV 6M 691 9s1 66 so L"9 6C 691 91l1 as Is am 60 iS o8 69 a5 uoc 2g9 LUt C M 8Z9g Lt "K£ am 991 LU* Ul £ SOL £5 01£ amP ELI &, 1t6 e 969 6OE 69 is 9099 01£ owC UL1 OUL 16 Is Soc 9CC SEC 691 W

go&

£11I LII LJL 68 Is ON 16l 95 VOC JU ti ctZ L.LL OEL 99 LII 68 99 W9 VOC £CC 09 ti " WL1 Ot 16 W v 4W WLI 611 16 95 COC EC Cl Ott 16 Is ILl 6it 05 95 CK LVZ ULL O6t 16 is iLL 61W DO 99 999 M UL 611 16 Of S99 iLL elk 05 L5 es 190 Ot mt IrC ILll GIL IS ra 0099 Oit, OltI 06 is "95 GK IPCr ILl 611* 9s m5 OLL tLt 05 Is 90C 06 OK anr Ot* i9, 06 Is L5 05 i.S 90C IlPC re[ O~il

&it Olt 611. 06 Is Oil. 911 OPC CLI 911 O6

  • 611 tL 06 £S is 05 is SOC 6£z 691 911 89 Li 0PC GO& 911 £5 at L a t a "S0 OL a t I v a 0 qs pO1 (5X5 Mg3 RANM= -q~m (3 M -"ima 38UNMM-Lq~f Uopeo sinS *a Asp~s *I "J*ftv~mm~ .dws *.taw.l

TM&S 1. Swanp Size ROeqid To 8Satiy ft 9515 Cftwaon

-nspec* MIMUM Nmb in gaf c) -of I Mm fwm mof awyk 4nn m Lot Size 0 1 2 4 7 10 LotSite 0 1 2 4 7 10 721 57 so 117 18t 219 305 757 58 91 120 173 245 312 722 57 89 116 189 240 305 so 91 120 173 245 313 72M 57 116 189 240 308 759 so 91 120 173 246 313 724 57 8g 110 170 240 306 760 57 69 118 169 240 305 725 57 110 170 241 300 761 57 89 118 19 240 305 726 57 go 90 118 170 241 307 782 57 69 118 170 241 307 727 57 gO 118 170 241 307 763 57 89 118 170 241 307 728 57 go 57 go 118 170 119 170 242 30o 764 765 241 306 729 57 00 t19 171 242 306 57 go 116 170 242 308 730 57 90 119 171 242 319 786 57 go 119 171 242 3W 731 S7 90 119 111 243 301 767 57 90 119 171 242 309 732 58 119 171 243 311 760 57 90 119 171 243 309 733 58 WIO 769 57 go li1 M

91 119 172 243 171 243 310 734 91 120 172 244 310 770 57 90 119 171 243 310 735 I" 120 172 244 311 171 58 go 119 172 244 311 IF 73I 120 172 244 311 772 58 so RI 773 91 119 172 244 311 c1 737 91 120 173 24S 312 so 91 120 172 244 311 738 91 120 173 245 312 774 so 91 120 172 284 312 739 91 120 173 245 3M2 775 so 91 120 173 24S 312 740 09 117 160 230 305 776 56 91 120 173 245 313 741 57 so 91 57 09 118 169 240 30w 120 173 245 313 742 89 89 118 169 240 308 778 58 91 120 173 246 313 743 57 118 170 240 .779 58 91 57 89) 3w9 121 174 246 314 744 li 170 241 307 78O 57 69 118 170 241 307 745 57 90 781 so 57 118 170 241 307 57 89 118 170 241 307 746 go 115 170 241 310 782 57 89 118 170 241 306 747 57 783 57 go 119 171 242 308 57 go 115 170 241 300 748 119 171 242 309 704 57 90 118 170 242 30 749 57 90 90 300 785 57 go 119 171 242 57 90 118 171 242 309 750 119 171 243 7.8 57 go 119 171 242 309 751 S7 90 310 787 58 119 171 243 57 go 119 171 243 310 752 110 172 243 310 788 57 90 119 171 se go 243 310 753 119 172 244 311 789 57 90 119 172 243 310 56 go 754 91 120 172 244 311 790 57 go 119 172 244 311 7ss so 791 so 91 120- 172 244 311 6 90 119 172 244 311 758 120 173 245 312 792 so 91 120 172 244 312

Tab"e . SauTq Siz Requ*sd To aSdf* Ow 95/5 Cdtelon LotSIN 0 1 2 4 7 10 LotS 0 1 2 4 7 10 7,3 91 120 172 245 312 829 57 90 119 172 244 312 794 Sal sa 91 120 173 245 312 830 58 91 120 172 244 312 795 91 120 1M3 245 313 831 s8 91 120 172 245 312 70P 91 120 173 245 313 812 58 91 120 173 245 313 707n 91 120 173 248 314 833 58 91 120 173 245 313 798 91 120 173 248 314 834 58 91 120 173 248 314 799 57 91 121 174 248 314 83S So 91 120 173 248 314 57 89 118 170 241 308 837 5B 91 120 173 248 314 801 57 89 118 170 241 308 837 58 91 121 174 247 315 90 118 170 242 308 58 91 121 174 247 315 803 57 118 170 242 804 57 90 309 839 58 92 121 174 247 315 57 90 118 171 242 309 840 57 g0 118 170 242 309 805 OSI 119 171 243 310 57 90 841 57 80 118 11 242 309 90 119 171 243 310 842 57 90 118 171 243 310 807 57 57 90 119 171 243 310 843 57 90 119 171 243 310 57 90 119 172 243 311 644 57 90 119 171 243 310 809 go 119 172 244 311 845 57 90 119 171 243 311 810 so 119 172 311 811 53 90 244 848 57 90 119 172 244 311 91 120 172 244 312 847 57 90 119 172 244 312 812 $8, 57 91 120 172 245 312 so 57 90 119 172 244 312 813 814 58 91 120 173 243 313 849 53 go 119 172 245 312 91 120 173 245 313 58 91 120 172 245 313 815 58 120 173 246 313 816 so 91 851 58 91 120 173 245 313 91 120 173 246 314 852 58 91 120 173 245 313 817 91 818 120 173 246 314 853 58 91 120 173 246 314 91 121 174 246 315 804 so 91 120 173 246 314 819 121 174 247 820 58 91 315 855 58 91 120 173 246 314 89 118 170 241 308 856 s8 91 120 174 247 315 821 57 118 170 242 309 822 57 90 857 s8 91 121 174 247 315 90 Ila 170 242 309 8458 58 91 121 174 247 316 823 57 90 118 171 242 B24 57 309 58 92 121 174 247 316 a25 90 TO 119 171 243 310 57 80 118 171 242 310 57 90 119 171 243 310 1861 8126 57 862 57 80 118 171 243 310 827 119 171 243 311 863 57 90 119 171 243 310 57 828 57 90 119 172 244 311 9o g7 119 171 243 311 90 119 172 144 311 864 57 80 119 171 243 311

4 T"le 1. 8amle Size Roeed To SadtWSe 9Ciftedmn Lot Sine 0 1 2 4 7 10 Lot Sime 0 1 2 4 7 10 57 go 119 172 244 311 901 57 go 119 171 243 311 57 90 119 172 244 312 902 57 90 119 171 244 311 87 57 90 119 172 244 312 903 57 90 119 172 244 312 an 57 go 119 172 245 312 904 57 90 119 172 244 312 Nio so 91 120 172 245 313 gas 57 90 119 172 245 313 870 so 91 120 173 245 313 905 57 90 119 172 245 313 871 so 91 120 173 245 314 907 57 go 120 172 245 313 872 58 91 120 173 246 314 w~e so 91 120 173 245 314 873 58 91 120 173 246 314 909 so 91 120 173 246 314 874 so 91 120 173 246 315 910 so 91 120 173 246 314 875 so 91 120 174 247 31S 911 s8 91 120 173 246 315 se 91 121 174 247 31S 912 58 91 120 173 245 315 677 58 91 121 174 247 316 913 so 91 120 174 247 315 878 58 121 174 247 316 914 so 91 120 174 247 318

.ca 92 879 58 92 go 121 174 248 316 91s so 91 121 174 247 316 U'I 580 57 90 118 171 243 310 916 58 91 121 174 248 318 681 57 O0 110' 171 243 311 017 58 91 121 174 248 317

$82 57 90 119 171 243 311 018 58 92 121 174 248 317 883 57 90 119 171 244 311 919 58 92 121 175 317 584 go 246 57 go 119 172 244 312 920 57 90 119 171 244 311 w 57 119 172 244 312 921 57 90 119 171 244 312 SO 57 90 119 172 244 312 922 57 90 119 172 244 312 57 119 172 245 313 923 57 90 119 172 244 312 90 m 58 90 120 172 245 313 924 57 9o 119 172 245 313 88g s8 90 120 173 245 313 925 57 00 119 172 245 313 890 s5 120 173 246 314 o28 57 90 119 172 313 eel 90 245 691 58 120 173 246 314 927 S8 91 120 173 245 314 91 58 91 120 173 246 314 m2g 58 91 120 173 246 314 693 se 01 120 173 246 315 929 120 173 246 314 694 58 120 174 247 315 930 so 91 120 173 246 315 91 s6 91 58 91 121 174 247 316 931 $a 91 120 173 246 315 efl6 54 121 174 247 316 932 120 174 247 315 897 91 so 91 soo 58 92 121 174 247 310 933 120 174 247 316 5a 121 174 248 317 934 58 sa 91 ol 121 174 247 316 92 $a 01 69w 58 92 121 175 248 317 935 so 91 121 174 248 318 S7 119 171 243 311 9)8 121 174 248 317

I.

4 T"blg 1. Sample Sin Reqired To Satisy the 95/5 Otteoan LotSin 0 1 2 4 7 10 LotStz 0 1 2 4 7 10 93J7 92 121 174 248 317 973 so 91 121 174 248 317 g38 58 121 58 92 175 248 317 974 58 9l 121 174 248 317 939 57 92 121 175 249 318 975 s8 91 121 174 248 317 g4o go 57 00 119 171 244 312 976 58 92 121 175 248 316 941 57 119 172 244 312 977 58 92 121 175 249 31S o42 90 go 119 172 244 313 57 978 58 92 121 175 249 318 943 M 119 172r 245 313 5o 92 121 175 944 57 90 119 172 245 970 249 319 57 313 57 90 119 172 245 313 945 90 91 119 172 245 314 g81 57 90 119 172 245 313 946 57 91 120 173 962 57 245 314 57 go 119 172 245 314 947 go g9 120 173 246 so 314 963 57 90 119 172 245 314 046 O1 120 173 246 315 964 57 90 120 173 246 314 949 se 120 173 248 58 31S 965 57 91 120 173 ,4 314 gO's 91 120 173 246 315 .9" 58 91 120 173 246 315 0o 951 58 S91 120 173 247 316 56 91 120 173 246 315 952 s6 91 120 174 247 31W se 9l 120 173 247 315 953 so 01 120 174 247 316 969 s8 91 120 173 247 316 954 so 91 121 174 248 317 9900 58 91 120 174 247 316 955 58 91 121 174 248 317 991 58 91 120 174 247 316 958 57 91 121 174 248 317 992 58 91 121 174 248 317 957 so 92 121 175 248 318 993 so 9t 121 174 248 317 958 s8 92 121 175 249 318 994 so 91 121 174 248 317 959 so 92 90 121 175 249 318 58 91 121 174 248 318 WO 57 119 172 244 312 58 92 121 175 249 318 901 57 119 172 244 313 58 92 121 175 249 310 982 57 go 119 172 245 313 SO 92 121 175 249 319 953 57 go 119 172 245 313 58 92 121 175 249 319 064 57 90 58 110 172 245 314 1000 57 go 119 172 245 313 57 90 120 173 245 314 s8 50 Ol 120 173 314 go?

967 so Ol 248 58 so 91 01 120 173 246 315 58 120 173 248 315 TON 989 56 Ol 120 173 247 315 070 5s 91 120 173 247 318 071 91 120 174 247 316 972 120 of 174 247 318 0 0

C p

1 REGULATORY ANALYSIS 2

3 1. STATEMENT OF PROBLEM 4

5 The U.S. Nuclear Regulatory Commission has promulgated regulations to provide quality a assurance requirements for ruclear power plants. Those requiremenls are contained in 7 Appendix B to 10 CFR Part 50. which provides criteria for quality assurance programs fNr a structwes. systerns, and components that prevent or mitigate the consequences of postulated 9 accidents that could cause undue safety risk to the health and safety of the public.

10 In the past, nuclear utilities have relied on suppliers with qtoallfied Appendix B quality II assuance programs to provide replacement parts necessary (or general maintenance and repair 12 or replacement. For economic reasons, those suppliers have relinquished their Appendix B 13 quality assurance programs. This change has caused a shortage of qualified Appendix 8 14 suppliers for nuclear utilities and has forced an increasing reliance on suppliers of commercial 15 grafe items.

16 So that the safety of the public is assured, commercial grade items intended for safety-17 related applications undergo a dedication process to verify their ability to perform their safety 18 function. Currently, nuclear utilities and their suppliers dedicate these items to verify a CGl's 19 critical characteristics. However. as utilities Increase their purchases of CGIs Intended for 20 unrestricted use in nuclear power plants, they are relying on various sampling programs to 21 establish the acceptability of purchased lots.

22 To satisfy the requirements of Appendix B to 10 CFR Part 50. there is a need for 23 methods acceptable to the NRC staff for performing sampling to dedicate simple metallic 24 commercial grade items. Dedication is the process undertaken to provide a reasonable 25 assurance that a CGI to be used as a basic component will perform its intended safety 26 function. When this is dedicated, an item Is deemed equivalent to an item designed and 27 manufactured under an Appendix B quality assurance program.

28 There is wide variation in sampling programs applied by vendors in the dedication of 29 commercial grade items. The use of this standardized guidance increases the ability of the 30 NRC and utilities to-assess dedicat.-d CGI quality and ensures that actual dedicated CGI quality 31 levels will provide a reasonable assurance that the item will perlorm its intended safety 32 function.

33 34 2. OBJECTIVE 35 36 The objective of this guide Is to provide guidelines. acceptance criteria, and sampling 37 tables that are acceptable to the NRC staff for performing sampling for commercial grade 38 dedication of simple metallic items. The use of this guidance by licensees and their suppliers 39 will result in a more uniform applicaticn of sampling. This will improve the overall confidence 40 in the industry's sampling process for CGI dedication, provide additional supplier performance 41 history to the dedicating entity, and provide a reasonable assurance that the item will perform 42 its intended safety function in compliance with Appendix 8 to 10 CFR Part 50.

43 44 3. ALTEMNATIVES 46 46 The alternatives to issuing a regulatory guide on the use of sampling for dedicating 47 simple, metallic commercial grade items are as follows:

48 RA-!

1 3.1 Do Not Issue Regulator Guidance 2 The detailed guidance, acceptance criteria, and seapling methods considered 3 acceptable to the staff could be provided to the licensees and vendors through individual 4 reviews and discussions. Individual discussions with licensees are extrdinely time-consuming 6 foa both the NRC staff and the licensee, -we highly subject to individual interpretation, and do 6 not result in an established standard.

7 Individual discussions with vendors, e.g.. suppliers of components and services to a nuclear power plants, are equally time-consuming. Generally. discussions occur between the 9 vendor and NRC staff shortly before, during, and after NRC inspections. Without an to established standard, vendors will be hesitant to change their dedication programs as a result II of those discussions. This-alternative is basically the same as the current practice and is 12 equivalent to taking no action.

13 14 3.2 Issue Generic Letter 15 Guidance similar to that proposed in this regulatory guide could be included in a generic 16 letter. However. this is not considered an acceptable alternative since a generic letter does not 17 provide a wide consensus from the public or industry.

18 19 3.3 issue a RegWatory Guide Endorsing a NUREG-Series Report 20 Guidelines for dedicating simple metallic commercial grade items in nuclear power plants 21 could be published in a NUREG-series report and referenced by a regulatory guide. However.

22 these NUREG reports generally do not receive ACRS or public review and are not appropriate 23 for providing regulatory guidance.

24 25 4. COSTS AND BENEFITS 26 27 The costs and benefits of the decision to issue this guidance as a regulatory guide are 28 as follows, 29 30 4.1 Benefits 31 This regulatory guide delineates two methods acceptable to the NRC staff for sampling 32 for commercial grade item dedication. These methods may be used to meet the requirements 33 of Appendix a to 10 CFR Part 50. By using either of these methods, the licensees, acting as 34 either the dedicators or purchasers of dedicated CGls. may have confidence in the quality and 35 consistency of the dedication and know that vendors will be using identical references.

38 acceptance criteria, and confidence intervals while performing the dedications.

37 38 4.2 NRC Costs 39 The NRC costs are limited to the time and expenses needed to properly train inspectors 40 and revise Inspection procedures if deemed necessary by the staff. The costs associated with 41 performing inspections of commercial grade dedication programs would be substantially 42 reduced, since the need to discuss and explain NRC policy for sampling would be eliminated.

43 44 4.3 Licensee Costs 45 The specific, per-item cost of dedicated commercial grade items should Increase as a 46 result of the costs of testing by this guidance being passed down from licensees to vendors 47 performing the dedications. Licensees may also have to spend some time familiarizing 48 themselves with the new acceptance criteria and samole sizes. However, the market will 49 adjust to the changes by eliminating suppliers that can not comply with the new requirements RA-2

I (which may serve to boost prices) and standardizing, among all vendors, the criteria that must 2 be met (which may serve to reduce prices by increasing competition).

3 iUcensees may also realize a decrease in degradation or failure rate of replacement pans.

4 and a corresponding increase in availability of components or systems. This benefit may be 5 difficult to estimate, given that many repairs and replacements are included in estimates of 6 preventive maintenance activities.

7 a 4.4 Vendo Cos" 9 Vendors that currently do not meet the intent of Appendix 8 to 10 CFR Part 50 must 10 decide whether to remain in the nuclear supply business. For other vendors, added costs may 1 be limited to upgrading equipment and procedures and training personnel in the new 12 methodology. Ultimately, all costs associated with the changes will be passed on to the 13 customer.

14 16 5. DECISION RATIONALE 15 17 This guidance should be issued as a regulatory guide because I I I a wider consensus of 18 the NRC. ACAS. industry, and the public would be possible. (2) a standard methodology would 19 be established, and (31 Inefficient use of the NRC staff, vendor, and licensee resources would 20 be eliminated.

21 The other alternatives. Identified above, for providing guidance on the use of s~mpting 22 for the dedication of simple metallic commercial grade items do not provide the level of review 23 and wide consensus required. In addition, while these alternatives may result in the same 24 costs to licensees or vendors, they result In inefficient use of NRC staff resources. The 25 alternatives wre therefore judged to be unacceptable.

26 27 r-e Pscym n RA-3