ML14129A179
| ML14129A179 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 05/09/2014 |
| From: | Kenneth Riemer NRC/RGN-III/DRP/B2 |
| To: | Davison K Northern States Power Co |
| References | |
| Download: ML14129A179 (8) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 May 9, 2014 Mr. Kevin Davison Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota 1717 Wakonade Drive East Welch, MN 55089
SUBJECT:
INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION AT PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2
Dear Mr. Davison:
This letter is to request information to support our biennial Problem Identification and Resolution (PI&R) inspection beginning June 9, 2014, at the Prairie Island Nuclear Generating Plant. This inspection will be performed in accordance with the U.S. Nuclear Regulatory Commission (NRC) baseline Inspection Procedure 71152.
Experience has shown that these inspections are extremely resource intensive both for the NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required for the inspection.
The documents requested are copies of performance reports and lists of information necessary to ensure the inspection team is adequately prepared for the inspection. The documents should be provided in compact disc format and should be ready for NRC review by May 30, 2014.
Mr. Lucas Haeg, the Lead Inspector, will contact your staff to determine the best method of providing the requested information.
If there are any questions about the material requested, or the inspection in general, please do not hesitate to call or e-mail Mr. Haeg at (319) 851-5111 or lucas.haeg@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011.
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket No. 50-282; 50-306;72-010 License No. DPR-42; DPR-60; SNM-2506
Enclosure:
Requested Information to Support PI&R Inspection cc w/encl: Distribution via LISTSERV
Enclosure Requested Information Problem Identification and Resolution (PI&R) Inspection Please provide the information on a compact disc (one for each team member), if possible, with a disc for each inspector for inspection preparation. Currently, four full time inspectors are planned.
- 1.
A copy of administrative procedure(s) for the corrective action program (CAP), trending program, quality assurance program, self-assessment program, corrective action effectiveness review program, and industry operating experience review program.
- 2.
A listing of the current top 10 risk-significant systems, components, and operator manual actions.
- 3.
The scheduled date/time/location of all meetings associated with implementation of the CAP, such as CAP screening meetings, corrective action review board meetings, etc.
- 4.
A description of changes made to the CAP since the last NRC biennial PI&R Inspection performed in July, 2012.
- 5.
A list of all closed Action Requests (ARs) since May 31, 2012, sorted by priority, with the following information: AR number; title; priority; and date initiated. The ARs should be grouped by the initiating department (operations, maintenance, engineering, radiation protection, emergency preparedness, and security).
- 6.
A list of all open ARs sorted by priority, with the following information: AR number; title; priority; and date initiated. The ARs should be grouped by the initiating department (operations, maintenance, engineering, radiation protection, emergency preparedness, and security).
- 7.
A listing of the total number of ARs generated annually, sorted by the above departments, for 2012 and 2013.
- 8.
A list of ARs generated after May 31, 2012, that identified trends of conditions adverse to quality. The list should be sorted by priority and have the following information:
number, title, date initiated, status and initiating department.
- 9.
A list of ARs generated after May 31, 2012, that involved inadequate or ineffective corrective actions. The list should be sorted by priority and have the following information: number, title, date initiated, status and initiating department.
- 10.
A list of ARs issued during the past two refueling outages (each unit) sorted by system and component. The list should be sorted by priority and have the following information: number, title, date initiated, status and initiating department.
- 11.
A list of current outstanding corrective actions, sorted by priority, with a brief description, initiating date and due date. Please also identify and list any associated due date extensions.
- 12.
A copy of the most recent operating experience program effectiveness review.
2
- 13.
A list of effectiveness reviews completed after May 31, 2012.
- 14.
A list of current control room deficiencies and operator work-arounds, sorted by priority, with a brief description and corresponding AR and/or work order number.
- 15.
A chronological list and copy of all nuclear quality assurance audits, CAP audits, and department/station self-assessments completed after May 31, 2012. Additionally, a plan/schedule of all self-assessments and audits for the next year through 2016.
- 16.
A list of all operability determinations and operational decision making issue items performed since May 31, 2012, with the following information: date initiated, initiating AR and status (open or closed).
- 17.
A copy of all root, apparent, and common cause evaluations performed since May 31, 2012.
- 18.
A list of maintenance preventable functional failures of risk-significant systems (include actions completed and current status) since May 31, 2012. A list of current Maintenance Rule a(1) systems and a list of those systems that entered a(1) within the last two years, but which were returned to a(2) status. Include a copy of the current system health report for those systems now in a(1).
- 19.
A list of test failures (in-service tests or Technical Specification surveillances) since May 31, 2012 with a brief description of component/system that failed.
- 20.
A copy of the latest CAP statistics such as the number initiated by department, human performance errors by department, backlog, corrective action timeliness and others as may be available.
- 21.
Any performance indicators associated with backlog of corrective maintenance items.
- 22.
A list of industry operating experience evaluated by the site since May 31, 2012.
Additionally, list of all NRC generic communications (information notices, generic letters, etc.) evaluated by the site for applicability to the station regardless of the determination of applicability since May 31, 2012.
- 23.
A list of condition reports issued since May 31, 2012, where the NRC was the identifying organization. This list should include non-cited and minor violations, and findings, regardless of whether there was an associated violation. Please provide the AR number, title, date initiated and status.
- 24.
A chronological list of all Licensee Event Reports generated since May 31, 2012, with a brief description of the affected components or systems.
- 25.
A chronological list of ARs, system audits, 50.59 screenings or evaluations, operability evaluations, maintenance rule, root or apparent cause evaluations, and permanent or temporary modifications associated with emergency diesel generators and safety-related breakers since May 2009. Please indicate the status of the associated documents (i.e., open or closed) in the listing.
3
- 26.
A list of open temporary modifications.
- 27.
A list of all ARs, action plants, etc. to address emerging or existing cross-cutting themes.
- 28.
A list of the current maintenance backlog. Include the date initiated, a brief description, and a priority for each item sorted by system.
- 29.
A list of the current engineering backlog. Include the date initiated, a brief description, and priority of each item.
- 30.
A list of the procedure change request backlog. Include the date initiated, a brief description, and priority of each item.
- 31.
A list of ARs generated after May 31, 2012, that involved age-related issues. The list should be sorted by priority and have the following information: number, title, date initiated, status and initiating department.
- 32.
A list of ARs generated after May 31, 2012, that involved fatigue-related issues identified through the fitness for duty program. The list should be sorted by priority and have the following information: number, title, date initiated, status and initiating department.
- 33.
A listing of the following (as applicable) since May 31, 2012:
Site improvement and/or recovery plans; ARs associated with Management Review Meetings; Independent assessment reports; and ARs identifying trend issues.
Documents Requested to be Available as Printed Copies On-Site During the Inspection
- a. A list of systems/components currently governed under an Aging Management Program.
- b. A list of CAP organizational codes, equipment system codes and a description of codes used to identify the significance of ARs.
- c. A list of issues brought to the Employee Concerns Program/Ombudsman and the actions taken for resolution.
- d. The latest organization chart and phone listing.
- e. Self-assessments and associated condition reports generated in preparation for this inspection.
- f.
Results of any self-assessments of safety culture/safety conscious work environment completed after May 31, 2012, including potential safety-culture items referred to you by the NRC for follow-up or information-only.
4 The Following Items Should be Available Either as Printed Copies or in Electronic Format (i.e. on compact disc or accessible via licensee computer database)
- b. Technical Specifications
- c. Plant Procedures
- d. The QA manual.
Additionally, inspectors will require computer access to the CAP database while on site.
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket No. 50-282; 50-306;72-010 License No. DPR-42; DPR-60; SNM-2506
Enclosure:
Requested Information to Support PI&R Inspection cc w/encl: Distribution via LISTSERV DISTRIBUTION:
See next page DOCUMENT NAME: Prairie Island RFI Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME NShah:mt KRiemer DATE 05/08/14 05/09/14 OFFICIAL RECORD COPY
Letter to Kevin Davison from Kenneth Riemer dated May 9, 2014
SUBJECT:
INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION AT PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 DISTRIBUTION:
Joseph Nick RidsNrrPMPrairieIsland Resource RidsNrrDorlLpl3-1 Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Carmen Olteanu ROPassessment.Resource@nrc.gov