ML14122A024
"Draft Supplement" is not in the list (Request, Draft Request, Supplement, Acceptance Review, Meeting, Withholding Request, Withholding Request Acceptance, RAI, Draft RAI, Draft Response to RAI, ...) of allowed values for the "Project stage" property.
| ML14122A024 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 04/21/2014 |
| From: | Barnes K - No Known Affiliation |
| To: | Rules, Announcements, and Directives Branch |
| References | |
| 79FR13079 00016, NRC-2010-0298 | |
| Download: ML14122A024 (1) | |
Text
Page 1 of I
,ULES E" ECTIES As of: April 24, 2014 Received: April 21, 2014 PUBLIC SUBMISSION 2Status:
PendingPost PUBLI
'RUBMISSION0: 5 9 Tracking No. ljy-8bolI-m4xw Comments Due: April 21, 2014 Submission Type: Web Docket: NRC-2010-0298
\\/
fl_
Receipt and Availability of Application for License Renew) Fa I V L
Comment On: NRC-2010-0298-0033 License Renewal Application for Davis-Besse Nuclear Power Station, Unit I; Draft Supplemental Generic Environmental Impact Statement Document: NRC-2010-0298-DRAFT-0039 Comment on FR Doc # 2014-05021 Submitter Information Name: Kathy Barnes Address:
PO Box 26 Sherwood, MI, 49089 Email: greenwoodsart@ msn.com General Comment Re: Docket ID NRC-2010-0298 The relicensing of Davis Besse Nuclear Power Plant:
I am opposed to relicensing Davis Besse for a variety of reasons. I will try to be clear and concise:
- l. Davis Besse creates nuclear waste. There is no solution to the safe storage of nuclear waste. It remains toxic for longer than anyone can guarantee its safe storage. There is no way to dispose of it that would not endanger the environment sooner or later. When businesses pollute, they should be shut down.
- 2. Davis Besse has had a history of huge running cracks. Even though the cracks are "patched" the real problem has not been solved. What is causing the cracking? Because cracking could lead to containment compromise, including a full blown melt down, I believe Davis Besse and its cracks should be shut down and decommissioned, not relicensed.
- 3. Just like Consumers Power promised to repair Palisades, what happened after it was relicensed? CP sold it to Entergy who still has not done the repairs CP thought necessary, and were contingent upon relicensing. The NRC has not made Entergy do the repairs, but has left it up to Entergy to decide whether the repairs are necessary or not. Meanwhile, Palisades has had leaks, come close to melt downs, and sump pump failure etc.....Davis Besse also may run the risk of being resold...possibly to a foreign nation if they can unload it that way.....and not do repairs.
- 4. Even if 'repaired' Davis Besse is not a good investment. As a taxpayer I am horrified the government uses my tax dollars to subsidize the nuclear industry.
- 5. Sometimes the best thing to do is to quit trying to fix a broken thing. When a car rusts out underneath, you don't keep driving it down the road even though the engine is still running. You shouldn't allow a dangerous nuclear
.... aging..... power plant to keep operatfng. The risk is too great.
3
[ttps://www. dmss.grv/fdms-web-agency/component/contentstreamer?objectld=09ý48164816bfaf2&for...
04/24/2014