|
---|
Category:Letter
MONTHYEARIR 05000186/20232022023-12-12012 December 2023 the Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000186/2023202 ML23198A0222023-08-29029 August 2023 Examination Report Letter No. 50-186/OL-23-02, University of Missouri - Columbia ML23198A0232023-08-29029 August 2023 Examination Result Letter No. 50-186/OL-23-02, University of Missouri-Columbia ML23221A1172023-08-0303 August 2023 Written Communication as Specified by 10 CFR 50.4(b)(4) Regarding the Submittal of the Physical Security Plan for the University of Missouri Research Reactor as a Part of the Process to Renew Amended Facility Operating License R-103 ML23213A0592023-08-0101 August 2023 Written Communication as Specified by University of Missouri Research Reactor Technical Specification 6.6.2(d) Regarding a Permanent Change in the Facility Organization Involving the Executive Director ML23186A2132023-07-31031 July 2023 Examination Confirmation Letter No. 50-186/OL-23-03, University of Missouri - Columbia IR 05000186/20232012023-07-31031 July 2023 the Curators of the University of Missouri U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000186/2023201 ML23124A0422023-05-0808 May 2023 Examination Confirmation Letter 50-186/OL-23-02, University of Missouri - Columbia ML23103A0742023-04-10010 April 2023 University of Missouri, Columbia Research Reactor, Shipment of Radioactive Material Shipment Identifier MURR 23-01 Highway Route Controlled Quantity ML23024A2772023-04-0707 April 2023 Cover Letter for the Security Inspection Report for the University of Missouri (Public) - October 2022 ML23089A3162023-03-29029 March 2023 Letter Notifying Univ. of Missouri That Us Dept. of Energy Funding Will Not Be Available in Fiscal Year 2023 to Complete the Conversion of MURR to LEU Fuel ML23087A1142023-03-29029 March 2023 Examination Results Letter No. 50-186/OL-23-01, University of Missouri - Columbia ML23087A1132023-03-29029 March 2023 Examination Report No. 50-186/OL-23-01, University of Missouri-Columbia ML23055B1372023-02-24024 February 2023 Submittal of Annual Operating Report for the University of Missouri-Columbia Research Reactor as Required by MURR Technical Specification 6.6.e IR 05000186/20222022023-02-23023 February 2023 the Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000186/2022202 - Cover Letter and Enclosure ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML23017A2072023-01-13013 January 2023 Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 6.1.f ML22349A0422022-12-0808 December 2022 Written Communication as Specified in 10 CFR 50.54(b)(5) Regarding Changes to the University of Missouri-Columbia Research Reactor Facility Emergency Plan Without Prior Commission Approval Pursuant to 10 CFR 50.54(q)(3) ML22314A2102022-11-0909 November 2022 Written Communication as Required by Technical Specification 6.6.d(2), Other Reports, Regarding a Change in University of Missouri-Columbia Research Reactor Organization Involving the Reactor Facility Director ML22304A0042022-10-27027 October 2022 University of Missouri - Columbia, Shipment of Radioactive Material, Highway Route Controlled Quantity ML22291A0322022-10-14014 October 2022 University of Missouri Written Communication as Required by 10 CFR 73, Appendix G Regarding a Deviation from the MURR Physical Security Plan ML22290A0042022-10-12012 October 2022 University of Missouri-Columbia Research Reactor, Reportable Event Report Pursuant to 20.2201(a)(ii) Regarding Loss of Licensed Material During Shipment ML22266A2772022-09-29029 September 2022 Letter to P. Noss Re Revision No. 10 of Certificate of Compliance No. 9341 for the Model No. Brr Transportation Package ML22180A2412022-06-27027 June 2022 Orano Federal Services, LLC, Letter from Nishka Devaser to Philip Noss of June 10, 2022, Transmittal of Response to Request for Additional Information (RAI) IR 05000186/20222012022-06-14014 June 2022 the Curators of the University of Missouri - U.S. NRC Routine Inspection Report No. 05000186/2022201 ML22146A3412022-06-10010 June 2022 Letter to P. Noss Application for Amendment Request of Certificate of Compliance No. 9341 for the Model No. Brr - Request for Additional Information W/Enclosure ML22158A0792022-06-0606 June 2022 Submittal of Revised Annual Operating Report for the University of Missouri-Columbia Research Reactor as Required by MURR Technical Specification 6.6.e ML22097A0592022-04-0707 April 2022 Approval for Spent Nuclear Fuel Highway Route Application - NRC Route No. 182D - Docket Number 050-0186 ML22088A0782022-03-25025 March 2022 Univ. of Missouri, Federal Funding for the Conversion of the Columbia Research Reactor from Highly-Enriched Uranium Fuel to Low-Enriched Uranium Fuel IR 05000186/20212032022-03-0202 March 2022 the Curators of the University of Missouri U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000186/2021203 ML22056A5162022-02-25025 February 2022 Submittal of Annual Operating Report for the University of Missouri-Columbia Research Reactor as Required by MURR Technical Specification 6.6.e ML22038A6012022-02-0808 February 2022 Acceptance for Spent Nuclear Fuel Highway Route Application NRC No. 182D-Docket No. 050-0186 ML22013B1412022-01-21021 January 2022 Examination Confirmation Letter No. 50-186-OL-22-02, University of Missouri-Columbia ML21327A3042021-11-23023 November 2021 Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.2.f.6 ML21313A2292021-11-0808 November 2021 Orano Federal Services, LLC - Brr Package Amendment Request, Docket No. 71-9341 ML21298A1972021-10-25025 October 2021 University of Missouri-Columbia Research Reactor - Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.2.g.6 ML21253A2482021-09-23023 September 2021 Examination Confirmation Letter No. 50-186/OL-22-01, University of Missouri Columbia ML21221A3252021-08-0909 August 2021 University of Missouri-Columbia Research Reactor, Written Communication as Required by Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specifications 3.2.a ML21217A2982021-08-0505 August 2021 University of Missouri-Columbia Research Reactor - Reportable Event Report Pursuant to 20.2203(a)(2)(iv) ML21215A4982021-07-0707 July 2021 Univ of Missouri, Submittal of Revised Road Transportation Security Plan for the Shipment of Irradiated Reactor Fuel ML21098A1992021-06-10010 June 2021 the Curators of the University of Missouri Issuance of Amendment No. 40 to Renewed Facility Operating License No. R 103 to Amend Technical Specifications 6.2 and 6.4 for the University of Missouri Columbia Research Reactor IR 05000186/20212022021-05-28028 May 2021 the Curators of the University of Missouri - U.S. Nuclear Commission Routine Inspection Report No. 05000186/2021202 IR 05000186/20212012021-05-27027 May 2021 University of Missouri-Columbia U. S. Nuclear Regulatory Commission Security Inspection Report No. 05000186/2021201 - Non-OUO-Sri Cover Letter ML21118A9682021-04-28028 April 2021 Examination Confirmation Letter No. 50-186/OL-21-01, University of Missouri-Columbia ML21092A1712021-04-0202 April 2021 University of Missouri-Columbia Research Reactor - Federal Funding for the Conversion of the University of Missouri-Columbia Research Reactor from Highly-Enriched Uranium Fuel to Low-Enriched Uranium Fuel ML21078A5002021-03-19019 March 2021 University of Missouri-Columbia Research Reactor Written Communication as Specified by 10 CFR 20.1007 Regarding a Reportable Event Pursuant to 20.2203(a)(2)(iv) ML21075A2922021-03-16016 March 2021 Written Communication as Specified by 10 CFR 50.4(b)(l) Requesting U.S. Nuclear Regulatory Commission Approval to Revise the Technical Specifications Appended to Renewed Facility Operating License No. R-103 Pursuant to 10 CFR 50.90 IR 05000186/20202022021-03-12012 March 2021 University of Missouri - Columbia - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000186/2020202 - Cover Letter and Enclosure ML21050A2512021-02-19019 February 2021 Submittal of Annual Operating Report for the University of Missouri-Columbia Research Reactor as Required by MURR Technical Specification 6.6.e ML21041A5402021-02-10010 February 2021 Univ. of Missouri-Columbia Research Reactor - Written Communication as Specified by Univ. of Missouri Research Reactor Tech Spec 6.6.d(2) Regarding a Permanent Change in the Facility Organization Involving the Office of the Chancellor 2023-08-03
[Table view] |
Text
UNIVERSITY of MISSOURI RESEARCH REACTOR CENTER April 14, 2014 ATTN: Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001
REFERENCE:
Docket 50-186 University of Missouri-Columbia Research Reactor Amended Facility License R-103
SUBJECT:
Written report, in accordance with 10 CFR 71.1, as required by 10 CFR 71.95(b) [for NRC Docket 91-934 1] regarding conditions in the Certificate of Compliance for the BEA Research Reactor Package that were not met during shipment
Dear Sir or Madam,
The University of Missouri Research Reactor (MURR) submits this letter to report a condition pursuant to 10 CFR 71.95(b) regarding the use of the BEA Research Reactor (BRR) Package, NRC Docket 71-9341.
The following is a description of the event, reported in accordance with 10 CFR 71.95(c):
(1) Briefabstract of the event During 7 shipments of irradiated research reactor fuel between Columbia, MO and the Savannah River Site (SRS) between October 2011 and May 2013, the conditions contained in Section 5.(a)(3) of the Certificate of Compliance (CoC) were not met in their entirety. Specifically, a part supplied by the certificate holder, the alignment pin between the cask body and the closure lid, was not made of the material specified on the General Arrangement Drawings referenced in the CoC. To correct this situation, the certificate holder is ensuring a new alignment pin is being fabricated to the specifications of the CoC.
Until the new pin is installed, the cask has been removed from service.
(2) Narrative descriptionof the event On March 10, 2014, MURR was notified by a representative of Idaho National Laboratory (INL) that the part known as the alignment pin had originally been fabricated using a material not approved in the certificate (NRC Certificate of Compliance 71-9341). This fabrication error was attributed to a typographical error on the package as-built drawings. A 1513 Research Park Drive Columbia, MO 65211 Phone: 573-882-4211 Fax: 573-882-6360 Web: www.murr.missouri.edu Fighting Cancer with Tomorrow's Technology
Apr 14, 2014 MURR, Docket 50-186 The purpose of the pin is to align the bolt holes in the closure lid with the threaded holes in the cask body during installation of the lid. Per the certificate holder's documentation, the pin has no safety function and has therefore been categorized as Quality Category C. The material of the pin is specified in the List of Materials of drawing 1910-01-01-SAR, Revision 4, as ASTM A276, UNS 21800. The actual material used for the pin was Type 304 stainless steel. All other requirements of the CoC were met by the subject shipments.
The original alignment pin had been installed on the package by the manufacturer and was in place upon MURR's original receipt of the package. The package was used by MURR in this configuration during 2 shipments between October 2011 and April 2012. Subsequently, the pin failed at another user's site and was replaced using a part fabricated at MJURR, per the certificate holder's instructions, from 304 stainless steel. Installation of the pin was performed at the other user's site, and the package has been used by MURR in this configuration during 5 shipments between April 2012 and May 2013.
For all shipments of the packaging from MURR, the payload consisted of up to eight irradiated aluminum plate-type research reactor fuel elements. A detailed description of the irradiated fuel is given in Section 1.2.2.1 of the BRR Package Safety Analysis Report.
(3) Assessment of safety consequences of the event Since the alignment pin does not perform a safety function, there were no safety consequences of the event. The alignment pin continued to perform its alignment function, even though made of the wrong material.
(4) Descriptionof corrective actions As noted above, the packaging has been taken out of service until the alignment pin can be replaced in accordance with the certificate holder's Quality Assurance Program and procedures.
Since the alignment pin is threaded in place, replacement may be readily performed. The certificate holder, AREVA Federal Services LLC, has opened a Corrective Action Report (CAR) in accordance with their 10 CFR 71 Subpart H Quality Assurance Program and procedures, and has performed a complete reconciliation between the licensing drawings and the fabrication drawings to ensure that all other components have been fabricated in full compliance with the licensing drawings. A more complete description of corrective actions taken by the certificate holder may be obtained from AREVA.
MURR has initiated a Corrective Action Program (CAP) item, CAP 14-0023, to document the issue and will review the certificate holder's corrective actions and NRC resolution of the issues prior to using the cask.
(5) Reference to similar events By letter dated March 23, 2012, MURR notified the NRC of performing two shipments using the BRR Package in the fall of 2011 with an incorrect drain port sealing washer installed. This sealing washer was incorrectly specified in the package documentation; therefore, the incorrect part had been supplied by the manufacturer with the cask. A similar issue was experienced at the Massachusetts Institute of Technology Page 2 of 3
Apr 14, 2014 MURR, Docket 50-186 (MIT) Nuclear Reactor Laboratory in November 2011, as indicated in their letters to the NRC dated January 25 and February 3, 2012.
(6) Licensee contact For further discussion of this incident, please contact John Ernst, Associate Director for Health and Safety, at 573-882-5226 or emstj@missouri.edu.
(7) Extent of exposure of individuals There was no exposure to individuals as a result of this event.
I declare under penalty of perjury that the foregoing is true and correct.
Sincerely, 0:ý Ralph A. Butler, P.E.
Director ~ IZ~'MRGEE P.STOUr kNoTAR1. MY Commissofi Ezpirs Maimh 24, 2016 montgomelycounty xc: Mr. Alexander Adams, U.S. NRC Commrssion #12511436 Mr. Johnny Eads, U.S. NRC Reactor Advisory Committee Reactor Safety Subcommittee Battelle Energy Alliance Page 3 of 3