MONTHYEARML14093A5842014-04-0303 April 2014 EA-14-022; Fermi Power Plant, Unit 2 - Notice of Regulatory Conference on April 14, 2014 2014-04-03
[Table view] Category:Meeting Notice
MONTHYEARML24150A3802024-05-29029 May 2024 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Fermi Nuclear Plant for Performance for 2023 Calendar Year ML23115A4022023-04-25025 April 2023 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Fermi Nuclear Plant for Performance for 2022 Calendar Year PMNS20221029, Preapplication Meeting with DTE Electric Company to Discuss a Planned License Amendment Request for Fermi 2 Regarding the Emergency Core Cooling System Strainer Performance Evaluation for Fermi 22022-10-0505 October 2022 Preapplication Meeting with DTE Electric Company to Discuss a Planned License Amendment Request for Fermi 2 Regarding the Emergency Core Cooling System Strainer Performance Evaluation for Fermi 2 ML22116A0412022-04-26026 April 2022 Notice of Significant Public Meeting to Discuss NRC End of Cycle Performance Assessment of Fermi Nuclear Plant for Performance for 2021 Calendar Year ML21152A2962021-06-0101 June 2021 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Fermi Power Plant, Unit 2 for Performance for 2020 Calendar Year ML21153A1192021-06-0101 June 2021 Notice of Information Meeting with a Question and Answer Session to Discuss NRC 2020 End-Of-Cycle Plant Performance Assessment of Fermi Power Plant, Unit 2 ML20226A2202020-08-13013 August 2020 8/27/2020 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of Fermi 2 Power Plant Performance for the 2019 Calendar Year ML19071A0402019-03-11011 March 2019 4/30/2019 Notice of Significant Public Meeting to Discuss Nrc'S End-Of-Cycle Assessment of the Fermi Power Plant, Unit 2 Performance for the 2018 Calendar Year ML18124A2272018-05-0404 May 2018 5/30/2018 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Fermi Power Plant Performance for the 2017 Calendar Year ML17257A3762017-09-14014 September 2017 Public Meeting Notice of NRC Region III 2017 Operator Licensing Workshop ML17258A0322017-09-14014 September 2017 17 U.S. Nuclear Regulatory Commission Region III 2017 Operator Licensing Workshop (Public Meeting) for Fermi Power Plant (CMS) ML17178A2792017-06-27027 June 2017 Reissue - Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Fermi Power Plant Performance for the 2016 Calendar Year ML17174A0862017-06-22022 June 2017 7/10/17 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Fermi Power Plant Performance for the 2016 Calendar Year ML16138A5592016-05-17017 May 2016 6/2/16 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Fermi Power Plant Performance for the 2015 Calendar Year ML15182A4412015-07-0101 July 2015 Notice and Agenda - 2015 Operator Licensing Workshop ML15183A4842015-07-0101 July 2015 Ltr. 07/01/15 Davis-Besse U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4792015-07-0101 July 2015 Ltr. 07/01/15 D.C. Cook U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting)(Drm) ML15183A4782015-07-0101 July 2015 Ltr. 07/01/15 Duane Arnold U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4722015-07-0101 July 2015 Ltr. 07/01/2015 Fermi U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4632015-07-0101 July 2015 Ltr. 07/01/15 Monticello U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4452015-07-0101 July 2015 Ltr. 07/01/15 Perry U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A3862015-07-0101 July 2015 Ltr. 07/01/15 Prairie Island U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML14169A5132014-06-13013 June 2014 Operator License Workshop Invitation ML14168A1862014-06-13013 June 2014 07/9-10/2014 Meeting Notice with the Public - 2014 Operator Licensing Workshop ML14122A2552014-05-0202 May 2014 Notice of Meeting with DTE Electric Company to Present the Licensee the Results of NRC End-Of-Cycle Assessment Regarding Fermi Power Plant ML14093A7172014-04-0303 April 2014 EA-14-022; Fermi Notice of Significant Non-Public Licensee Meeting ML14093A5842014-04-0303 April 2014 EA-14-022; Fermi Power Plant, Unit 2 - Notice of Regulatory Conference on April 14, 2014 ML14008A0652014-01-0808 January 2014 Notice of Category I Public Meeting Concurrence by NRO to Discuss Resolution of Open Items and Outstanding Requests for Additional Info Responses to Support the Safety Review of the DTE Electric Company'S... ML13135A1852013-05-15015 May 2013 Notice of Meeting with DTE Electric Company to Present the Licensee the Results of NRC End-of-Cycle Assessment Regarding Fermi ML13123A3922013-05-0202 May 2013 Ltr 5/2/13 Fermi Operator Licensing Workshop ML12151A1982012-05-30030 May 2012 Meeting Notice for Fermi Unit 2 Open House to Discuss NRC Activities, Nuclear Power Issues, and 2011 End-of-Cycle Performance Assessment ML12110A3572012-04-17017 April 2012 Notice of Meeting with Detroit Edison Co., to Discuss the Nrc'S Assessment of Fermi Security Security Performance for the 2011 Calendar Year ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1111704182011-04-26026 April 2011 Meeting Notice for Open House to Discuss NRC Activities, Nuclear Power Issues, and 2010 EOC Performance Assessment Re Fermi 2 ML1031301152010-11-0909 November 2010 Notice of Meeting with Detroit Edison Company to Discuss the Results of the Fermi Baseline Inspection ML1022803202010-08-16016 August 2010 Cancelled: 08/18/10 Notice of Category 1 Meeting with Detroit Edison Company to Discuss Degraded Voltage License. Amendment Request for Fermi 2 ML1021101342010-07-30030 July 2010 Notice of Category 1 Meeting with Detroit Edison Company to Discuss Degraded Voltage License Amendment Request for Fermi 2 ML1009901712010-04-0808 April 2010 Notice of Meeting with Detroit Edison Company to Discuss NRC End-of-Cycle Assessment of Fermi Nuclear Power Plant Performance for the 2009 Calendar Year ML1009901562010-04-0808 April 2010 Notice of Public Meeting to Discuss the 2009 End-of-Cycle Plant Performance Assessment for Fermi Power Plant Unit 2 ML1008204242010-03-23023 March 2010 Meeting Notice with Fermi-1 to Discuss Status of Groundwater Characterization and Decommissioning Status ML0932902422009-11-25025 November 2009 Notice of Public Meeting with Detroit Edison Company to Discuss One Apparent Violation Identified During a Routine Inspection ML0912102652009-04-29029 April 2009 Notice of Meeting with Public to Discuss the 2008 End-of-Cycle Plant Performance Assessment of Fermi Power Plant, Unit 2 ML0912102302009-04-29029 April 2009 Notice of Public Meeting to Discuss the 2008 End-of-Cycle Plant Performance Assessment of Fermi Power Plant ML0826307092008-10-0606 October 2008 Notice of Meeting with Fermi-1 Regarding Status of License Termination Planning Development ML0826302292008-09-19019 September 2008 Notice of Meeting with Detroit Edison to Discuss a Recurring Substantive cross-cutting Issue That Has Been Open for Two Consecutive Assessment Cycles ML0808602372008-03-26026 March 2008 Notice of Meeting with Detroit Edison Company to Present the Licensee the Results of the End-of-Cycle Assessment ML0808601772008-03-26026 March 2008 Notice of Public Meeting with Detroit Edison Company to Discuss the 2007 End-of-Cycle Plant Performance Assessment of the Fermi Power Plant, Unit 2 ML0803205262008-02-13013 February 2008 Notice of Meeting with Fermi-1 Regarding Status of License Termination Planning Development ML0724701872007-09-0505 September 2007 Notice of Meeting with FERMI-1 Regarding Status of Ltp Development and Reactor Vessel Waste Classification 2024-05-29
[Table view] Category:Memoranda
MONTHYEARML23044A3662023-02-15015 February 2023 Calendar Year 2022 Reactor Oversight Process Baseline Inspection Program Completion - Region III ML20244A3432020-08-31031 August 2020 Summary of the August 27, 2020 Public Webinar to Discuss the NRC 2019 End-of-Cycle Plant Performance Assessment of Fermi 2 Nuclear Power Plant ML19184A6202019-07-0303 July 2019 Memo 07/03/19 Special Inspection Team Charter for Fermi Nuclear Power Plant, Unit 2, Torus Strainer Blockage (DRS-K.Stoedter) ML18194A5402018-07-16016 July 2018 Summary of Public Meeting with DTE Electric Company Regarding Upcoming License Amendment Request to Revise a License Condition Related to Boraflex Storage Racks ML16330A1172016-11-28028 November 2016 Update to Renewal of Full-Power Operating License for Fermi 2 ML16270A2702016-11-0909 November 2016 Renewal of Full-Power Operating License for Fermi 2 ML16019A4052016-01-28028 January 2016 Advisory Committee on Reactor Safeguards Review of the Fermi 2 License Renewal Application - Transmittal of Safety Evaluation Report with Open Items ML15188A3192015-07-13013 July 2015 Note to File for Michigan Historic Preservation Office Visit 10SEP14 ML15051A5072015-03-19019 March 2015 Summary of Telecom Drai Sets 4, 5 and 6 - November 14 2014 ML15051A5092015-03-11011 March 2015 Summary of Telecon Drai Set 24 - February 9, 2015 ML15005A5382015-01-12012 January 2015 121814, Summary of Telephone Conference Call Between NRC and DTE Electric Company Concerning Responses to RAIs Pertaining to the Fermi 2 LRA Environmental Review ML14308A5302014-11-20020 November 2014 Summary of Phone Call Between the NRC and DTE Electric Co, Concerning RAIs Pertaining to the Fermi 2 LRA Environmental Review ML14093A5842014-04-0303 April 2014 EA-14-022; Fermi Power Plant, Unit 2 - Notice of Regulatory Conference on April 14, 2014 ML13309A0802013-12-11011 December 2013 Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors ML13218B2582013-06-14014 June 2013 Draft Memo from M. Mitchell, NRR to R. Pascarelli, NRR on Request for Additional Information Related to Request for Relief for Fermi, Unit 2 Reactor Vessel Internal Components ML13133A3672013-06-0606 June 2013 4/16/2013 - Summary of Meeting with the U.S. EPR Design Center Working Group ML13127A2792012-04-24024 April 2012 Draft Memo from M. Mitchell, NRR to R. Pascarelli, NRR on Request for Additional Information Related to Request for Relief for Fermi, Unit 2 Reactor Vessel Internal Components ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1022300182010-08-17017 August 2010 Independent Spent Fuel Storage Installation Physical Security Plan and Verification of ASM Incorporation ML1022803202010-08-16016 August 2010 Cancelled: 08/18/10 Notice of Category 1 Meeting with Detroit Edison Company to Discuss Degraded Voltage License. Amendment Request for Fermi 2 ML1021101342010-07-30030 July 2010 Notice of Category 1 Meeting with Detroit Edison Company to Discuss Degraded Voltage License Amendment Request for Fermi 2 ML1006903532010-04-28028 April 2010 Memo Notice of Exemption from Certain Control and Tracking Requirements in 10 CFR Part 20 Appendix G Section Iii.E for Enrico Fermi Atomic Power Plant Unit 1 ML1009901712010-04-0808 April 2010 Notice of Meeting with Detroit Edison Company to Discuss NRC End-of-Cycle Assessment of Fermi Nuclear Power Plant Performance for the 2009 Calendar Year ML1009105332010-04-0505 April 2010 U.S. Nuclear Regulatory Commission Staff Review of the Department of Homeland Security Consultation Reports ML1008204242010-03-23023 March 2010 Meeting Notice with Fermi-1 to Discuss Status of Groundwater Characterization and Decommissioning Status ML0909211042009-04-0707 April 2009 4/7/2009 Memo to M. T. Lesar Notice of Issuance of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access to Detroit Edison Company. Fermi Power Plant Independent Spent Fuel Installation, EA-09-072 ML0826307092008-10-0606 October 2008 Notice of Meeting with Fermi-1 Regarding Status of License Termination Planning Development ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0804204352008-02-25025 February 2008 Response to Fermi Power Plant, Unit 2 - Task Interface Agreement (TIA) 2007-003 Inadequate Degraded Voltage Time Delays ML0803205262008-02-13013 February 2008 Notice of Meeting with Fermi-1 Regarding Status of License Termination Planning Development ML0719400942007-08-0101 August 2007 Teleconference with Fermi 2 Regarding Draft Response to Request for Additional Information on Emergency Diesel Generators (EDG) Allowed Outage Time Extension Amendment Request ML0600300802006-02-17017 February 2006 Transmittal of Final ASP Analyses (August 14, 2003 Grid Disturbance Events) ML0421003322004-06-30030 June 2004 Close-out of Tacs Relating to the Review of 35-day Letters Submitted in Response to the April 29, 2003, Orders Revising the Design Basis and Security Guard Force Training Enhancements and Physical Fitness Requirements ML0417400862004-06-21021 June 2004 All Region III Facility Training Managers Revised NRC Form 398 - Personal Qualification Statement Licensee ML0405806902004-02-27027 February 2004 Transmittal of Preliminary ASP Analyses for Peer Review (August 14, 2003 Grid Event) ML0325200522003-09-0808 September 2003 Results of the Fermi Nuclear Power Plant, Unit 2, SDP Phase 2 Notebook Benchmarking Visit NRC Generic Letter 1989-111989-06-30030 June 1989 NRC Generic Letter 1989-011: Resolution of Generic Issue 101 Boiling Water Reactor Water Level Redundancy ML19227A0761984-09-0707 September 1984 Notification of 840914 Meeting W/Detroit Edison in Bethesda, MD to Discuss Applicant Evaluation of Coatings Used in Containment Drywell & Wetwell, Supercedes 840823 Notice ML19227A0751984-08-23023 August 1984 Notice of Meeting with Detroit Edison Company in Bethesda, MD to Discuss Applicant'S Evaluation of Coatings Used in Containment Drywell & Wetwell 2023-02-15
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 April 3, 2014 EA-14-022 Mr. Joseph Plona Senior Vice President and Chief Nuclear Officer Detroit Edison Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166
SUBJECT:
FERMI POWER PLANT, UNIT 2 - NOTICE OF REGULATORY CONFERENCE ON APRIL 14, 2014
Dear Mr. Plona:
This letter confirms our plans, as discussed between members of our staffs, to hold a regulatory conference to discuss a finding preliminarily determined to be Greater-than-Green.
The details regarding the issue was conveyed to you in our letter dated March 18, 2014, and its accompanying inspection report. The meeting will begin at 9:00 a.m. Central Time on April 14, 2014, at the Region III NRC offices located at Suite 210, 2443 Warrenville Road, Lisle, IL 60532. This meeting is closed to the public because it will involve the discussion of security-related information.
The regulatory conference is being held to obtain information to assist the NRC in determining the security significance of the finding and apparent violation detailed in the above letter and inspection report. The conference will provide an opportunity for you to provide your perspective on the facts and assumptions used by the NRC to arrive at the finding, your assessment of the significance of the finding, your detailed corrective actions, including any root cause evaluation, and any other information that you believe the NRC should take into consideration in making an enforcement decision.
The NRC would appreciate receiving any supporting documents by no later than April 9, 2014, in order to make the conference more effective and efficient.
Following the conference, you will be advised by separate correspondence of the results of our deliberations on this matter.
In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
J. Plona However, the NRC is waiving the affidavit requirements for any supporting documents you submit, in accordance with 10 CFR 2.390(b)(1)(ii). This practice will ensure that your submittal will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).
If you have any questions regarding this meeting, I can be reached at (630) 810-4373.
Sincerely,
/RA/
Steven K. Orth Enforcement/Investigations Officer Docket No. 50-341 License No. NPF-43 cc: Distribution via ListServTM
J. Plona However, the NRC is waiving the affidavit requirements for any supporting documents you submit, in accordance with 10 CFR 2.390(b)(1)(ii). This practice will ensure that your submittal will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).
If you have any questions regarding this meeting, I can be reached at (630) 810-4373.
Sincerely,
/RA/
Steven K. Orth Enforcement/Investigations Officer Docket No. 50-341 License No. NPF-43 cc: Distribution via ListServTM DISTRIBUTION: DRPIII Joseph Nick DRSIII RidsNrrDorlLpl3-1 Resource Patricia Buckley RidsNrrPMFermi2 Resource Carmen Olteanu RidsNrrDirsIrib Resource ROPassessment.Resource@nrc.gov Cynthia Pederson Nick Hilton Darrell Roberts David Furst Steven Orth Carleen Sanders Allan Barker Shyrl Coker Carole Ariano RidsOemailCenter Linda Linn OEWeb.Resource NAME: G:\ORAIII\EICS\ENFORCEMENT\Cases\Enforcement Cases 2014\EA-14-022 Fermi Security\EA-14-022 Fermi Conference Letter.docx OFFICE RIII RIII RIII NAME Lougheed:cs Funk for Skokowski Orth DATE 04/03/14 04/03/14 04/03/14 OFFICIAL RECORD COPY