PSEG Nuclear LLC Hope Creek Generating Station Flood Hazard Reevaluation SL-012271 Revision 0 Project No.: 12800-213 Page 2-7 Following the model simulation run, GIS tools are used to post-process output text files to create shape files and rasters and hydrograph plots as described in Section 2.1.4 below.
2.1.4 LIP Event Simulation Results The FLO-2D model results, maximum flood depth, maximum water surface elevation and maximum velocity, are presented on Figure 2.1-5, Figure 2.1-6, Figure 2.1-7, and Figure 2.1-8.
Throughout this section and on all associated figures, the term maximum flood depth refers to the maximum flood depth above grade. Figure 2.1-6 is similar to Figure 2.1-5 since it shows maximum flood depths, but Figure 2.1-6 uses a classified graphic scale to display results to more easily see the range of depth. The intent of Figure 2.1-6 is to clearly identify the flood depth levels and areas on the site with more than 0.5 ft. of depth above grade.
2.1.4.1 Critical Door Locations HCGS is flood protected to elevations significantly above the predicted flood depths associated with the LIP event. However, in order to implement that flood protection, water tight doors must be closed. Since the flood depths predicted in this analysis exceed the door sill elevations at some locations, the time to exceed the threshold is considered the critical parameter for this analysis.
Each of the door locations is assigned a unique ID and corresponding FLO-2D grid cell from the model. There are nine locations at grade (IDs 1-9) for HCGS (see Figure 2.1-3 for locations) which represent the location of a watertight door. At each of the door locations, the maximum WSEL, depth, and velocity were determined. The duration of flooding (i.e., the amount of time when the water surface elevation exceeds the door elevation) was also computed at each door location.
The results are summarized in Table 2.1-3. In addition, depth-time hydrographs at each of the door locations were extracted from the model. These plots show the flood depths and durations for each door location, and are presented in Figures 2.1-10 through 2.1-18. Table 2.1-3 lists the corresponding figure number for each door locations hydrograph.
2.1.4.2 Erosion Potential The maximum velocities in Table 2.1-3 at all critical door locations are relatively low, ranging from 0.61 to 0.91 ft. per second (fps). Figure 2.1-8 also shows that the maximum velocities resulting from the LIP event are less than 2.5 fps in the immediate vicinity of all safety-related structures. In general, the areas near the door locations and surrounding the safety-related structures are highly compacted and covered with pavement, concrete, or gravel. Thus, the potential for erosion/deposition during the LIP event is low, because flow velocities less than 2.5 fps are not expected to erode these materials, according to the maximum permissible velocities shown in Chows Open Channel Hydraulics (Reference 2.1-4).
PSEG Nuclear LLC Hope Creek Generating Station Flood Hazard Reevaluation SL-012271 Revision 0 Project No.: 12800-213 Page 2-8 2.1.4.3 Final Floodplain Depths and Velocities In order to evaluate the duration of flooding and associated draindown time, the model simulation was run for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br /> of simulated flood routing following the 1-hour precipitation event). The model results indicate that the flood elevations will recede below all of the door elevations after 8.1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from the start of the 1-hour precipitation event (see Table 2.1-3).
The final floodplain depths at the end of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> are shown on Figure 2.1-9. As shown on the figure, there will be some locations of standing or ponded water that will drain slowly or eventually infiltrate/evaporate. The final velocities at 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> are essentially negligible (less than 0.2 fps for the entire site except at a few isolated locations).
2.1.5 Conclusions The model results indicate that door locations around the plant area will experience flood depths from 0.5 ft. to about 1.7 ft. above grade during a LIP event, resulting in a peak WSEL of 12.75 ft.
NAVD or 102.6 ft. PSD. The flood depth exceeds the door sill elevations within minutes. Based on these results, the reevaluated LIP flood elevations are above the CLB and are further assessed in Chapter 3.
2.1.6 References 2.1-1 U.S. Nuclear Regulatory Commission, Design-Basis Flood Estimation for Site Characterization at Nuclear Power Plants in the United States of America, NUREG/CR-7046, November 2011.
2.1-2 National Oceanic and Atmospheric Administration, Application of Probable Maximum Precipitation Estimates - United States East of the 105th Meridian, Hydrometeorological Report (HMR) No. 52, August, 1982.
2.1-3 FLO-2D Software, Inc., FLO-2D Reference Manual, Version 2009, 2009.
2.1-4 Chow, V.T. Open-Channel Hydraulics, Mcgraw-Hill, New York, 1959.
2.1-5 MASER Consulting, PA ALTA/ACSM Land Title Survey for PSEG Nuclear LLC of Block 26, Lots 4, 4.01, 5 and 5.01, Job Number 05001694D, Index Number HASU023453 dated June 13, 2008.
PSEG Nuclear LLC Hope Creek Generating Station Flood Hazard Reevaluation SL-012271 Revision 0 Project No.: 12800-213 Page 2-9 Table 2.1-1 1-Hour, 1 Square Mile PMP Rainfall Depths Duration Area (mi2)
Multiplier Applied to Local Intense Precipitation (in)
Note 60 min 1
NA NA 18.10 HMR 52 Figure 24 30 min 1
0.753 1-hr, 1-mi2 PMP 13.63 HMR 52 Figure 38 15 min 1
0.525 1-hr, 1-mi2 PMP 9.50 HMR 52 Figure 37 5 min 1
0.334 1-hr, 1-mi2 PMP 6.05 HMR 52 Figure 36 0
1 0.000 N/A 0.00 N/A
PSEG Nuclear LLC Hope Creek Generating Station Flood Hazard Reevaluation SL-012271 Revision 0 Project No.: 12800-213 Page 2-10 Table 2.1-2 FLO-2D Mannings n Values Description Manning's n Grass/Vegetation 0.05 Developed/Pavement 0.03 Debris/Obstructions 0.10
PSEG Nuclear LLC Hope Creek Generating Station Flood Hazard Reevaluation SL-012271 Revision 0 Project No.: 12800-213 Page 2-11 Table 2.1-3 LIP Analysis Results Summary at Door Locations HCGS Door Number Door Location ID(a)
FLO-2D Grid Cell Max WSEL (ft.
NAVD)
Max Flood Depth Above Grade Elevation (ft.)
Max Velocity (fps)
Time to Max Depth (hrs)
Door Elevation (ft)
(NAVD)
Duration of Flooding above Door Elevation (hrs)
Depth-Time Plot Figure Number 6312 6323B 1
125277 12.69 0.78 0.67 0.99 12.20 2.60 2.1-10 3340B 3337B S-13 Hatch 2
124127 12.75 1.70 0.91 1.00 12.20 2.50 2.1-11 5315A 5315C 3
141567 12.46 0.49 0.79 0.17 12.20 1.90 2.1-12 4(b) 139295 12.66 1.66 0.61 1.00 12.20 1.90 2.1-13 3209A 3315B 3329A 3331B 5(b) 159035 12.23 1.23 0.91 1.00 12.20 0.05 2.1-14 3301A 3305B 6
157277 12.04 1.04 0.63 0.99 12.20 0.00 2.1-15 4304 4323A 7
158421 11.87 0.87 0.7 1.01 12.20 0.00 2.1-16 SWIS #1 SWIS #2 8
147881 9.67 0.67 0.74 0.08 12.20 0.00 2.1-17 SWIS #3 SWIS #4 9
150787 9.66 0.66 0.77 0.08 12.20 0.00 2.1-18 a) See Figure 2.1-3 for corresponding door location IDs.
b) Locations 4 and 5 represent turbine building doors that could allow water to flow towards the interior watertight doors between the turbine building and auxiliary building.
PSEG Nuclear LLC Hope Creek Generating Station Flood Hazard Reevaluation Figure 2.1-1 SL-012271 Revision 0 Project No.: 12800-213 1-Hour, 1-Square-Mile PMP Rainfall Distribution Plot 2U 18
.-16 III 111 "fi 14
.S
')
o Page 2-12 I
I I
I I I
I I
I i
I I I I
I I
I I
I i
I j,
~
I I
I U/I I i
! ~r I
I i I
/ !
I I
,/ 1 I !
I j I I
I Ifi I
I I
I o
10 20 I
I ! I I
I I
I I
I I i
! jJ...
"". ~ ~
I
~
I I
I J.J....r-
~ -T" I
I I
I
! I I
I"..~"'-
I""'"
I I
I I I I
I I I
i I
I I I I
I I
I I
I I I I I
I I
! i I I
I 1
I I
I I
- i I
I I
I
~
I I I
I I
I I I I I
I I 1-I i I
i
, i I
i I
I I
30 40 50 60 Time (minutes)
Sargent &
Ll.Jndy~ ~~
PSEG Nuclear LLC Hope Creek Generating Station Flood Hazard Reevaluation Figure 2.1-2 1-Hour, 1-Square-Mile PMP Rainfall Hyetograph 7.0 i--
6.0
";;:\\
~ 5.0 u c:
- 4.0 a
Qj o 3.0 1.0 0.0 SL-012271 Revision 0 Project No.: 12800-213 o
s 10 1S 20 25 30 3S 40 45 SO SS 60 Time (minutes)
Page 2-13 Sargent &
L..undyl lC
PSEG Nuclear LLC Hope Creek Generating Station Flood Hazard Reevaluation Page 2-14
.. *....,kwJ
\\
~(......
a" r n. l"fY' n r Figure 2.1-3 General Site Layout and FLO-2D Model Components PSEG
- Salem and Hope Creek Generating Stations UP/PMP f LO-2D Analysis Figure 3 - General Site Layout and FLO-2D Model Components SL-012271 Revision 0 Project No.: 12800-213 Vfllk'k 8 ;11'J1e' Z!i2et!l l~18 3 ~ -
5' Imln ¢Gntxlw (NA'a'o a$j
~I Il1l l' ln te n-~Iatt -Conmur (NNlOSII)
.J..U. Moael 0CI!'.I0w Scu:dlr)'
D Sulking:
ClZc.aJ Door I..aC l tloft~
Sargent &
Lund:y~~ ~
PSEG Nuclear LLC Hope Creek Generating Station Flood Hazard Reevaluation Page 2-15 Manning's n Values D
Developed I Pavement (0.03)
D Grass I Vegetation (0.05)
Debris l Obstructions (0.1)
Figure 2.1 -4 FLO-2D Manning's n Values o
SL-012271 Revision 0 Project No.: 12800-213 PSEG
- Salem and Hope Creek Generating Stations UPIPMP FLO*2D Analysis Figure 4 - FLO-2D Manning's n Values N
'b-I' \\ i---
D Buildings Vehicle Barrier System (VBS)
- 300, (lOa 1.WO Model Outflow Boundary Sargent &
LundyLL C
PSEG Nuclear LLC Hope Creek Generating Station Flood Hazard Reevaluation Page 2-16 Maximum Depth (ft) 10.....__ High: 7.50 Low : 0.00 Figure 2.1 -5 Maximum Flood Depth (Above Grade)
PSEG - Salem and Hope Creek Generating Stations LIP/PMP FLO-2D Analysis SL-012271 Revision 0 Project No.: 12800-213 Figure 5
- Maximum Flood Depth (Above Grade) iI Critical Door Locations N
Vehicle Barrier System (VBS
--}-
O.5~ft Depth Contour
~
rvlodel Outflow Boundary 300 600 1,200 D Buildings feet Sargent &
Lundy ~ ~ 11