Request for Information for an NRC Triennial Permanent Modifications and 10 CFR 50.59 (MOD/50.59) Baseline Inspection 05000454/20140007; 05000455/2014007
ML14071A338
Person / Time
Site: Byron  Constellation icon.png
Issue date: 03/11/2014
From: Robert Daley
Engineering Branch 3
To: Pacilio M
Exelon Generation Co
John Bozga
References
IR-14-007
Download: ML14071A338 (7)


See also: IR 05000455/2014007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

March 11, 2014

Mr. Michael J. Pacilio

Senior Vice President

Exelon Generation Company, LLC

President and Chief Nuclear Officer (CNO)

Exelon Generation Company, LLC

4300 Winfield Road

Warrenville, IL 60555

SUBJECT:

BYRON STATION, UNITS 1 AND 2, REQUEST FOR INFORMATION FOR AN

NRC TRIENNIAL PERMANENT MODIFICATIONS AND 10 CFR 50.59

(MOD/50.59) BASELINE INSPECTION 05000454/20140007; 05000455/2014007

Dear Mr. Pacilio:

On June 9, 2014, the U.S. Nuclear Regulatory Commission (NRC) will begin a MOD/50.59

Baseline inspection at the Byron Station, Units 1 and 2. This inspection will be performed in

accordance with the NRC baseline Inspection Procedure (IP) 71111.17T. The onsite portion of

the inspection will take place on June 9 - 13 and June 23 - 27, 2014.

Experience has shown that these baseline inspections are extremely resource intensive, both

for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on

the site and to ensure a productive inspection for both parties, we have enclosed a request for

documents needed for the inspection. These documents have been divided into three groups.

The first group of information is necessary to ensure that the inspection team is adequately

prepared for the inspection. This information should be made available via compact disc and

delivered to the regional office no later than April 25, 2014. The inspection team will review this

information and, by May 9, 2014, will request specific items that should be provided for review in

the regional office by May 23, 2014.

The second group of requested documents contains additional items that the team will review,

or need access to, during the inspection. Certain documents contained within Group II (i.e.,

Item 1), will be requested for review in the regional office prior to the inspection by May 23,

2014, as identified above. The remaining documents should be available by the first day of the

onsite inspection, June 9, 2014.

The third group lists information necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to the

lead inspector as the information is generated during the inspection. It is important that all of

these documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

Mr. Pacilio

-2-

The lead inspector for this inspection is John V. Bozga. We understand that our regulatory

contact for this inspection is Lisa Zurawski of your organization. If there are any questions

about the inspection or the material requested, please contact the lead inspector at 630-829-

9613 or via e-mail at john.bozga@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

In accordance with Title 10, Code of Federal Regulations (CFR), Section 2.390 of the NRC's

"Rules of Practice," a copy of this letter and its enclosure will be available electronically for

public inspection in the NRC Public Document Room or from the Publicly Available Records

(PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC

Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Robert C. Daley, Chief

Engineering Branch 3

Division of Reactor Safety

Docket Nos. 50-454; 50-455

License Nos. NPF-37; NPF-66

Enclosure:

Modification and 50.59 Inspection Document Request

cc w/encl: Distribution via ListServ'

MODIFICATION AND 50.59 INSPECTION DOCUMENT REQUEST

Enclosure

1

Inspection Report: 05000454/2014007; 05000455/2014007

Inspection Dates:

June 9 - 13 and June 23 - 27, 2014

Inspection Procedure:

Inspection Procedure 71111.17T, Evaluations of Changes, Tests,

and Experiments and Permanent Plant Modifications

Lead Inspector:

John V. Bozga

(630) 829-9613

john.bozga@nrc.gov

I.

Information Requested for In-Office Preparation Week

The following information is requested by April 25, 2014, or sooner, to facilitate the

selection of specific items that will be reviewed during the onsite inspection week. The

inspection team will select specific items from the information requested below and

submit a list to your staff by May 9, 2014. We will request that certain items be made

available to the regional office prior to the inspection by May 23, 2014. We request that

the remaining items selected from the lists be available and ready for review on the first

day of inspection. All requested information should identify the associated system and

cover the time frame from the receipt of information for the last MOD/50.59 inspection to

the present.

The required information identified below should be provided on compact disc (CD).

Please provide three copies of each CD submitted (i.e., one for each inspector). The

preferred file format is a searchable pdf file. The CDs should be indexed and hyper-

linked to facilitate ease of use, if possible. If you have any questions regarding this

information, please call the inspection team leader as soon as possible.

1).

List of permanent plant modifications to systems, structures, or components that

are field work complete. (For the purpose of this inspection, permanent plant

modifications include permanent: plant changes, design changes, set point

changes, equivalency evaluations, suitability analyses, and commercial grade

dedications.)

The list should contain the number of each document, the title, the revision

(or date), and the affected system. In addition to the list, please provide a

description of each modification and a list of associated calculations and affected

procedures.

MODIFICATION AND 50.59 INSPECTION DOCUMENT REQUEST

Enclosure

2

2).

List of all 10 CFR 50.59 completed evaluations involving (a) calculations,

(b) procedure revisions, (c) changes to the facility (modifications), (d) non-routine

operating configurations, or (e) departures in methods of analyses. This list

should include 10 CFR 50.59 evaluations for the following:

a.

Changes that have been made under the provisions of 10 CFR 50.59

that have been updated in accordance with 10 CFR 50.71(e)(4) since the

last MOD/50.59 inspection;

b.

Modifications that are field work complete; and

c.

Changes to calculations (or initiation of new calculations) that have been

issued. The list should contain the number and title of each document, a

brief description of the change, and the corresponding number and type

of the affected document (i.e., the modification or procedure to which the

evaluation applies). The list should NOT include any evaluations in

which prior NRC approval was sought and obtained.

3).

A list of all 10 CFR 50.59 changes that have been screened out as not requiring a

full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to

the facility (modifications); (d) non-routine operating configurations; or

(e) departures in methods of analyses.

The list should contain the number and title of each document, a brief

description of the change, and the corresponding number and type of the

affected document (i.e., the modification or procedure to which the evaluation

applies).

4).

A list of any modifications, procedure revisions, or UFSAR changes where it was

determined that 10 CFR 50.59 did not apply.

5).

A list of calculation changes that have been issued for use.

6).

A list of corrective action documents (open and closed) that address permanent

plant modifications or 10 CFR 50.59 issues, concerns, or processes. These

documents should also include the corrective action documents associated with

the modification and the 50.59 change implementation.

The list should contain the number, title and revision (or date) of each document,

the affected system and corresponding documentation (if applicable), and

should be sorted in order of significance.

7).

Copies of procedures addressing the following: modifications, design changes,

set point changes, equivalency evaluations or suitability analyses, commercial

grade dedications, post-modification testing, 10 CFR 50.59 evaluations and

screenings, and Updated Final Safety Analysis Report (UFSAR) updates.

8).

Updated Final Safety Analysis Report updates submitted in accordance with

10 CFR 50.71(e)(4). Provide copies of the complete submittal.

MODIFICATION AND 50.59 INSPECTION DOCUMENT REQUEST

Enclosure

3

9).

Copy of the UFSAR change log or a synopsis of the changes. This should

include all of the changes made to the UFSAR that were incorporated in the last

10 CFR 50.71(e)(4) submittal.

10).

Electronic copy of the UFSAR and Technical Specifications, if available.

11).

Name(s) and phone numbers for the regulatory and technical contacts.

12).

Current management and engineering organizational chart.

II.

Information Requested to be Available Prior to Inspection. Requests will be Made

for Section II Item 1) Documents by May 9, 2014, for Availability of Requested

Documents in Section II Item 1) in Regional Office by May 23, 2014, and Section II

Items 2.), 3), and 4) Documents on First Day of Inspection (June 9, 2014).

1).

Copies of all selected items from Section I. This includes copies of

associated documents such as calculations, post-modification test packages,

10 CFR 50.59 evaluations, or screenings, and any corrective action documents.

2).

Copies of these documents do not need to be solely available to the inspection

team as long as the inspectors have easy and unrestrained access to them.

a.

Updated Final Safety Analysis Report (UFSAR), if not previously provided;

b.

Original FSAR Volumes;

c.

Original SER and Supplements;

d.

FSAR Question and Answers;

e.

Quality Assurance Plan;

f.

Technical Specifications, if not previously provided;

g.

Latest IPE/PRA Report;

h.

Vendor Manuals; and

i.

The latest 10 CFR 50.59 UFSAR Update Submittal.

3).

Please ensure that other supporting documents for the selected items have

been located and are readily retrievable, as the inspection team will likely be

requesting these documents during the inspection. Examples of supporting

documents are:

a. Drawings supporting the modifications;

b. Procedures affected by the modifications; and

c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation

MODIFICATION AND 50.59 INSPECTION DOCUMENT REQUEST

Enclosure

4

4).

Assessment and Corrective Actions:

a. The most recent MOD/50.59 Quality Assurance (QA) audit and/or

self-assessment; and

b. Corrective action documents (e.g., condition reports, including status

of corrective actions) generate as a result of the most recent

MOD/50.59 Quality Assurance (QA) audit and/or self-assessment.

5).

A discussion of scheduling fire drills which may occur during the

inspection so that the inspectors may be able to observe a fire drill, if

possible.

III.

Information Requested to be provided throughout the inspection

1).

Copies of any corrective action documents generated as a result of the

inspection teams questions or queries during this inspection.

2).

Copies of the list of questions submitted by the inspection team members

and the status/resolution of the information requested (provide daily

during the inspection to each inspection team member).

If you have any questions regarding the information requested, please contact the

inspection team leader.

Mr. Pacilio

-2-

The lead inspector for this inspection is John V. Bozga. We understand that our regulatory contact for

this inspection is Lisa Zurawski of your organization. If there are any questions about the inspection or

the material requested, please contact the lead inspector at 630-829-9613 or via e-mail at

john.bozga@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements

were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not

conduct or sponsor, and a person is not required to respond to, a request for information or an

information collection requirement unless the requesting document displays a currently valid Office of

Management and Budget Control Number.

In accordance with Title 10, Code of Federal Regulations (CFR), Section 2.390 of the NRC's "Rules of

Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Robert C. Daley, Chief

Engineering Branch 3

Division of Reactor Safety

Docket Nos. 50-454; 50-455

License Nos. NPF-37; NPF-66

Enclosure:

Modification and 50.59 Inspection Document Request

cc w/encl: Distribution via ListServ'

DISTRIBUTION:

Ernesto Quinones

RidsNrrDorlLpl3-2 Resource

RidsNrrPMByron Resource

RidsNrrDirsIrib Resource

Cynthia Pederson

Darrell Roberts

Steven Orth

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

Patricia Buckley

DOCUMENT NAME: G:\\DRSIII\\DRS\\Work in Progress/Ltr 031114 Byron MOD 50 59 RFI JVB.docx

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE

RIII

RIII

NAME

JBozga:ls

RDaley

DATE

03/11/14

03/11/14

OFFICIAL RECORD COPY