Category:Letter type:RC
MONTHYEARRC-22-0004, (Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System2022-01-14014 January 2022 (Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System RC-18-0157, (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-12-28028 December 2018 (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0149, ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-12-21021 December 2018 ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0136, (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683)2018-12-12012 December 2018 (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683) RC-18-0144, (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 252018-11-20020 November 2018 (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 25 RC-18-0126, (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-01692018-11-0909 November 2018 (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-0169 RC-18-0070, (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ...2018-10-0808 October 2018 (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ... RC-18-0067, (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.22018-10-0808 October 2018 (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.2 RC-18-0123, NRC Request for Information Baseline Radiation Safety Inspection2018-10-0404 October 2018 NRC Request for Information Baseline Radiation Safety Inspection RC-18-0117, (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment2018-09-28028 September 2018 (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment RC-18-0112, (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.32018-09-27027 September 2018 (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.3 RC-18-0119, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-09-19019 September 2018 (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0118, (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange2018-09-14014 September 2018 (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange RC-18-0116, (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information2018-09-11011 September 2018 (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information RC-18-0113, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-08-31031 August 2018 (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0091, License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions2018-08-29029 August 2018 License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions RC-18-0111, License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-08-24024 August 2018 License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0100, (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information2018-08-22022 August 2018 (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information RC-18-0105, (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water ..2018-08-14014 August 2018 (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water .. RC-18-0102, Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error2018-08-10010 August 2018 Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error RC-18-0098, (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-07-30030 July 2018 (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0085, (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-01262018-07-23023 July 2018 (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-0126 RC-18-0090, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request...2018-07-12012 July 2018 (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request... RC-18-0089, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping2018-07-11011 July 2018 (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RC-18-0084, Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Requ2018-07-0303 July 2018 Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Reques RC-18-0082, Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping2018-07-0303 July 2018 Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RC-18-0079, Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error2018-06-29029 June 2018 Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error RC-18-0074, Change of the Commitment Date of DRIB/105A&B Door Submittal2018-06-18018 June 2018 Change of the Commitment Date of DRIB/105A&B Door Submittal RC-18-0060, (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error2018-05-30030 May 2018 (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error RC-18-0064, (Vcsns), Unit 1 - Annual Commitment Change Summary Report2018-05-18018 May 2018 (Vcsns), Unit 1 - Annual Commitment Change Summary Report RC-18-0063, Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation2018-05-0202 May 2018 Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation RC-18-0056, (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors2018-04-25025 April 2018 (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors RC-18-0059, Annual Radioactive Effluent Release Report2018-04-25025 April 2018 Annual Radioactive Effluent Release Report RC-18-0046, License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information2018-04-19019 April 2018 License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information RC-18-0036, (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information2018-04-0202 April 2018 (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information RC-18-0041, Report of Status of Decommissioning Funding2018-03-28028 March 2018 Report of Status of Decommissioning Funding RC-17-0175, Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error2018-01-31031 January 2018 Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error RC-18-0006, Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-01-25025 January 2018 Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-17-0169, Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-00192017-12-11011 December 2017 Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-0019 RC-17-0182, (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status2017-12-11011 December 2017 (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status RC-17-0172, Notification of Personnel Changes2017-11-30030 November 2017 Notification of Personnel Changes RC-17-0161, Submittal of Change of the Commitment Date of DRIB/105A&B Door2017-11-28028 November 2017 Submittal of Change of the Commitment Date of DRIB/105A&B Door RC-17-0135, Annual Commitment Change Summary Report2017-11-0303 November 2017 Annual Commitment Change Summary Report RC-17-0123, Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds2017-10-30030 October 2017 Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds RC-17-0140, Transmittal of 10 CFR 50.59 Biennial Report2017-10-23023 October 2017 Transmittal of 10 CFR 50.59 Biennial Report RC-17-0107, (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change2017-10-0606 October 2017 (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change RC-17-0134, Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 12017-09-27027 September 2017 Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 1 RC-17-0126, Reply to a Notice of Violation, Per Inspection Report 05000395/20170022017-09-0606 September 2017 Reply to a Notice of Violation, Per Inspection Report 05000395/2017002 RC-17-0112, Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days2017-09-0101 September 2017 Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days RC-17-0069, (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description2017-08-30030 August 2017 (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description 2022-01-14
[Table view] Category:Status Report
MONTHYEARML23089A3892023-03-30030 March 2023 (Vcsns), Unit 1 - Decommissioning Funding Status Report ML21099A1072021-03-30030 March 2021 Report of Status of Decommissioning Funding ML21085A6252021-03-25025 March 2021 (VCSNS) Unit 1 - Decommissioning Funding Status Report RC-19-0012, NPDES Permit No. SC0030856 Renewal Application, Operational Status2019-01-31031 January 2019 NPDES Permit No. SC0030856 Renewal Application, Operational Status ML18213A1552018-07-23023 July 2018 Status Report on South Carolina Public Service Authority'S Position on the Termination of the COL for VCSNS Units 2 & 3 ML18206A2302018-07-23023 July 2018 Santee Cooper Letter to NRC Regarding the V.C. Summer, Units 2 & 3, Position on the Termination of the COL for VCSNS ND-18-0002, Submittal of Six (6) Month Status Report Regarding Implementation of the Overall Integrated Plan for Mitigation Strategies for Beyond Design Basis External Events2018-02-15015 February 2018 Submittal of Six (6) Month Status Report Regarding Implementation of the Overall Integrated Plan for Mitigation Strategies for Beyond Design Basis External Events ML17090A1122017-03-30030 March 2017 Report of Status of Decommissioning Funding RC-17-0037, Report of Status of Decommissioning Funding2017-03-28028 March 2017 Report of Status of Decommissioning Funding ML16243A4642016-08-29029 August 2016 Seventh Six-Month Status Report in Response to 03/12/2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) RC-15-0125, Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-08-24024 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) RC-15-0126, Fifth 6-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)2015-08-20020 August 2015 Fifth 6-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) RC-15-0055, V.C. Summer, Report of Status of Decommissioning Funding2015-03-30030 March 2015 V.C. Summer, Report of Status of Decommissioning Funding ML15090A1972015-03-27027 March 2015 Report of Status of Decommissioning Funding RC-15-0031, Fourth 6-Month Status Report of Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation2015-02-27027 February 2015 Fourth 6-Month Status Report of Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation RC-14-0141, Third 6-Month Status Report of Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation2014-08-28028 August 2014 Third 6-Month Status Report of Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation RC-14-0144, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-04)2014-08-28028 August 2014 Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-04) RC-14-0031, Second 6-Month Status Report of Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation2014-02-27027 February 2014 Second 6-Month Status Report of Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation RC-14-0030, South Carolina Electric & Gas Company'S Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External..2014-02-27027 February 2014 South Carolina Electric & Gas Company'S Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External.. RC-13-0117, 6-Month Status Report of Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation2013-08-28028 August 2013 6-Month Status Report of Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation RC-13-0123, V. C. Summer, Unit 1 - First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)2013-08-28028 August 2013 V. C. Summer, Unit 1 - First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) ML13091A0742013-03-28028 March 2013 Report of Status of Decommissioning Funding RC-13-0051, Report of Status of Decommissioning Funding2013-03-27027 March 2013 Report of Status of Decommissioning Funding ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 RC-09-0032, Report of Status of Decommissioning Funding2009-03-30030 March 2009 Report of Status of Decommissioning Funding ML0909103522009-03-30030 March 2009 Report of Status of Decommissioning Funding ML0309805402003-03-31031 March 2003 Report of Status of Decommissioning Funding ML0224007812002-01-18018 January 2002 E-mail from Jacob Zimmerman, Bulletin 2001-01 Status Report 2023-03-30
[Table view] |
Text
Thomas D. Gatlin Vice President,Nuclear Operations (803) 345-4342 A/ CANA C'OMPANY February 27, 2014 A scANA COMPANY RC-14-0031 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
Dear Sir / Madam:
Subject:
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 SOUTH CAROLINA ELECTRIC & GAS COMPANY (SCE&G) SECOND 6-MONTH STATUS REPORT OF ORDER EA-12-051, ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR RELIABLE SPENT FUEL POOL INSTRUMENTATION
References:
- 1. NRC Order Number EA-1 2-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," dated March 12, 2012
[ML12054A682]
- 2. SCE&G's Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)," dated February 28, 2013 RC-13-0031 [ML13063A099]
On March 12, 2012, the Nuclear Regulatory Commission issued an order (Reference 1) to South Carolina Electric & Gas Company (SCE&G). Reference 1 was immediately effective and directs SCE&G to have a reliable indication of the water level in associated spent fuel storage pools.
Reference 1 requires submission of a 6-month status report following the submittal of the Overall Integrated Plan (Reference 2). The purpose of this letter is to provide the second 6-month status report pursuant to Section IV, Condition C.2, of Reference 1. SCE&G developed an Overall Integrated Plan (Reference 2), documenting the-requirements to install reliable spent fuel pool level instrumentation, in response to Reference 1. Attachment I provides the second 6-month status report of milestone accomplishments since the submittal of the Overall Integrated Plan. This update includes any changes to the compliance method, schedule, or need for relief/relaxation and the basis.
This letter contains no new regulatory commitments. If you have any questions regarding this report, please contact Mr. Bruce L. Thompson at (803) 931-5042.
Virgil C.Summer Station - Post Office Box 88 . Jenkinsville, SC.29065 *F(803) 941-9776 ei,
Document Control Desk CR-12-01070 RC-14-0031 Page 2 of 2 I certify under penalty of perjury that the foregoing is true and correct.
Executed on Thomas D. Gatlin BD/TDG/ts
Attachment:
I. South Carolina Electric & Gas (SCE&G)'s Second Six Month Status Report of Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation c: K. B. Marsh S. A. Byrne J. B. Archie N. S. Carns J. H. Hamilton J. W. Williams W. M. Cherry E. J. Leeds V. M. McCree (w/attachment)
S. A. Williams (w/attachment)
NRC Resident Inspector K. M. Sutton NSRC RTS (CR-12-01070)
File (815.07)
PRSF (RC-14-0031)
Document Control Desk CR-12-01070 RC-14-0031 Attachment I Page 1 of 8 VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT I ATTACHMENT I SOUTH CAROLINA ELECTRIC & GAS COMPANY (SCE&G) SECOND 6-MONTH STATUS REPORT OF ORDER EA-12-051, ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR RELIABLE SPENT FUEL POOL INSTRUMENTATION
- 1. Introduction SCE&G developed an Overall Integrated Plan (Reference 2) and first six-month status report (Reference 4), documenting the requirements to install reliable spent fuel pool level instrumentation (SFPLI), in response to Reference 1. This attachment provides an update of milestone accomplishments since submittal of the Overall Integrated Plan, including any changes to the compliance method, schedule, or need for relief/relaxation and the basis, if any.
- 2. Milestone Accomplishments The following milestone(s) in section 3 have been completed since the development of the Overall Integrated Plan (Reference 2), and are current as of February 28, 2014.
Submitted the Virgil C. Summer Nuclear Station, Unit 1 Response to Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (TAC NO. MF1173) Dated August 28, 2013 (RC-13-0119).
- 3. Milestone Schedule Status The following provides an update to milestone schedule to support the Overall Integrated Plan.
This section provides the activity status of each item, and the expected completion date. The dates are planning dates subject to change as design and implementation details are developed.
The revised milestone target completion dates do not impact the order implementation date.
Target Revised Completion Activity Target Milestone Date Status Completion Date Submit 60 Day Status Report Oct 2012 Complete Submit Overall Integrated Plan Feb 2013 Complete Submit Response to RAIs on Overall Aug 2013 Complete Integrated Plan Submit Response to RAls on Overall Oct 2014 In Progress
Document Control Desk CR-1 2-01097 RC-14-0031 Attachment I Page 2 of 8 Target ARevised Completion Activity Target Milestone Date Status Completion Date Integrated Plan Submit 6 Month Updates:
Update 1 Aug 2013 Complete Update 2 Feb 2014 Complete Update 3 Aug 2014 Not Started Update 4 Feb 2015 Not Started Update 5 Aug 2015 Not Started Update 6 Feb 2016 Not Started Modifications:
Modification Development Jan 2014 In Progress Complete Procurement of Jun 2013 In Progress March 2014 Instrumentation Package Complete Engineering and Design Jul 2014 In Progress January 2015 Commence Implementation Oct 2014 Not Started March 2015 Unit 1 Implementation Outage Oct 2015 Not Started Procedures:
Complete Procedures Development Feb 2015 Not Started Training:
Develop Training Plan Feb 2015 Not Started Training Complete Aug 2015 Not Started
- 4. Changes to Compliance Method There is one change to the compliance method as documented in the Overall Integrated Plan (OIP) (Reference 2). The backup channel of the spent fuel pool level monitoring system will be
Document Control Desk CR-12-01070 RC-14-0031 Attachment I Page 3 of 8 a permanently installed channel instead of the portable channel described in the OIP. The details of this change were provided in the station response to the Request for Additional Information (References 3 and 5)
- 5. Need for Relief/Relaxation and Basis for the Relief/Relaxation SCE&G expects to comply with the order implementation date and no relief/relaxation is required at this time.
- 6. Open Items from Overall Integrated Plan and Draft Safety Evaluation Public meetings were held on November 26, 2013 and February 6, 2014 to discuss reliable spent fuel pool level instrumentation RAIs based on binning (References 7, 8, and 9). The two bins are: generic RAIs to be answered by the vendor and plant specific. VCSNS will provide a response to all RAIs by October 31, 2014. Below is an update on plant specific RAIs listed in reference 6.
RAI #1 Please provide additional information describing how the design of shielding for the SFP level instrumentation meets the requirement of the Order to arrange the instruments in a manner that provides reasonable protection of the level indication function against missiles that may result from damage to the structure over the SFP. Also, describe plans for protecting any equipment mounted outside the buildings from the effects of tornado driven missiles, freezing, elevated temperature, humidity, flooding, and other BDB conditions.
SCE&G Update This RAI is part of the detailed seismic design, and has not been started.
RAI #2 Please provide the following:
a) The design criteria to be used to estimate the total loading on the mounting device(s), including static weight loads and dynamic loads. Describe the methodology to be used to estimate the total loading, inclusive of design basis maximum seismic loads and the hydrodynamic loads that could result from pool sloshing or other effects that could accompany such seismic forces.
b) A description of the manner in which the level sensor (and stilling well, if appropriate) will be attached to the refueling floor and/or other support structures for each planned point of attachment of the sensing waveguide assembly. Indicate in a schematic the portions of the level sensor waveguide that will serve as points of attachment for mechanical/mounting or electrical connections.
Document Control Desk CR-12-01070 RC-14-0031 Attachment I Page 4 of 8 c) A description of the manner by which the mechanical connections will attach the level instrument to permanent SFP wall or floor structures so as to support the waveguide level sensor assembly.
SCE&G Update This RAI is part of the detailed seismic design, and has not been started.
RAI#4 For each of the mounting attachments required to fasten SFP level equipment to plant structures, please describe the design inputs, and the methodology that will be used to qualify the structural integrity of the affected structures/equipment.
SCE&G Update The SFP level indication equipment is being purchased Quality related per VCSNS Specification SP-1000. VCSNS Specification SP-1 000 requires the SFPL indication equipment to operate at a temperature of 212 degrees Fahrenheit, operate in a boiling water or steam environment at 100% humidity, operate at an elevation of at least 150 meters above sea level, and in radiological conditions for a normal refueling quantity of freshly discarded (100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />) fuel with the SFP water level 3, as described in NEI 12-02. The instrument channel reliability under seismic conditions will be established using the methodology in NEI 12-02 Revision 1 Section 3 and will meet the intent of interim staff guidance for reliable spent fuel pool instrumentation in NRC JLD-ISG-2012-03, Revision 0. The instrument channel design basis seismic conditions will correspond to the VCSNS Safe Shutdown Earthquake in structure response spectra from SP-702 at the locations of the components of the instrument channel. The adequacy of the seismic design and installation will comply with the applicable guidance in IEEE Standard 344-2004 Sections 7, 8, 9, and 10. The instrumentation will also meet the shock qualifications of NEI 12-02 and MIL-S-901D.
RAI #5 Please provide analysis of the maximum expected radiological conditions (dose rate and total integrated dose) to which the equipment located within the FH building exterior wall and the auxiliary building stairwell will be exposed. Also, provide documentation indicating how it was determined the electronics for this equipment is capable of 3
withstanding a total integrated dose of lX1O Rads. Discuss the time period over which the analyzed total integrated dose was applied.
SCE&G Update The first part of this RAI will be provided in generic vendor meetings.
The second part of this RAI response is in progress, no new update.
Document Control Desk CR-1 2-01070 RC-1 4-0031 Attachment I Page 5 of 8 RAI #7 Please provide information indicating the maximum expected relative humidity in the rooms in which the system electronics will be located under BDB conditions, with no AC power available to run HVAC systems, and whether the sensor electronics are capable of continuously performing required functions under this expected humidity condition.
SCE&G Update RAI response is in progress. The maximum humidity postulated for the spent fuel pool area is 100 percent relative humidity, saturated steam. The radar sensor electronics will be located outside of the spent fuel pool room in an area away from the steam atmosphere. The waveguide pipe can tolerate condensation formation on the inner wall surface, provided condensate pooling does not occur within the waveguide pipe. Condensate pooling is prevented by installing a weep hole(s) at the low point(s) in the wave guide pipe. VCSNS is still determining BDB conditions for the Fuel Handling Building exterior wall and the auxiliary building stairwell. Additional test information for the equipment will be provided once the purchase order is in place. This documentation is to be provided by the vendor per VCSNS Specification SP-1000.
RAI #11 Please provide an evaluation of the seismic testing results to show that the instrument performance reliability, following exposure to simulated seismic conditions representative of the environment anticipated for the SFP structures at Virgil C. Summer Nuclear Station has been adequately demonstrated. Include information describing the design inputs and methodology used in any analyses of the mounting of electronic equipment onto plant structures, as requested in RAI #4 above.
SCE&G Update The first part of this RAI will be provided in generic vendor meetings.
VCSNS Specification SP-1 000 requires the design inputs for equipment related to instrument channel reliability under seismic conditions be established using the methodology in NEI 12-02 Revision 1 Section 3. These design inputs will meet the intent of interim staff guidance for reliable spent fuel pool instrumentation in NRC JLD-ISG-2012-03, Revision 0. The instrument channel design basis seismic conditions will correspond to the VCSNS Safe Shutdown Earthquake in structure response spectra from SP-702 at the locations of the components of the instrument channel.
RAI #12 Please provide the final configuration of the power supply source for each channel so the staff may conclude the two channels are independent from a power supply assignment perspective.
Document Control Desk CR- 2-01070 RC-14-0031 Attachment I Page 6 of 8 SCE&G Update RAI response is in progress. VCSNS is waiting on the vendor to provide the final configuration of the primary and backup power sources for each channel. These channels will be independently fed with their own DC power sources.
RAI# 15 Please provide a description of the in-situ calibration process at the SFP location that will result in the channel calibration being maintained at its design accuracy.
SCE&G Update RAI response is in progress, no new update.
RAI #16 Please describe the evaluation used to validate the display locations can be accessed without unreasonable delay following a BDB event. Include the time available for personnel to access the display as credited in the evaluation, as well as the actual time (e.g., based on walk-throughs) that it will take for personnel to access the display.
Additionally, include a description of the radiological and environmental conditions on the paths personnel might take. Describe whether the display location remains habitable for radiological, heat and humidity, and other environmental conditions following a BDB event. Describe whether personnel are continuously stationed at the display or monitor the display periodically.
SCE&G Update RAI response is in progress, no new update.
RAI #17 Please provide a list of the procedures addressing operation (both normal and abnormal response), calibration, test, maintenance, and inspection that will be developed for use of the SFP instrumentation. Include a brief description of the specific technical objectives to be achieved within each procedure.
SCE&G Update Appropriate quality assurance measures will be selected for the SFP instrumentation as required by Order EA-1 2-051, consistent with Appendix A-1 of NEI 12-02 and similar to those imposed by Regulatory Guide 1.155. Site procedures will be developed for system inspection, calibration and test, maintenance, repair, operation, and normal and abnormal responses, in accordance with VCSNS procedure controls. The development of these procedures has not started.
Document Control Desk CR-12-01070 RC-14-0031 Attachment I Page 7 of 8 Procedure Obiectives to be achieved
- 1) System Inspection To verify that system components are in place, complete, and in the correct configuration, and that the sensor probe is free of significant deposits of crystallized boric acid.
- 2) Calibration and Test To verify that the system is within the specified accuracy, is functioning as designed, and is appropriately indicating SEP water level.
- 3) Maintenance To establish and define scheduled and preventive maintenance requirements and activities necessary to minimize the possibility of system interruption.
- 4) Repair To specify troubleshooting steps and component repair and replacement activities in the event of system malfunction.
- 5) Operation To provide sufficient instructions for operation and use of the system by plant operation staff.
- 6) Response To define the actions to be taken upon observation of system level indications, including actions to be taken at the levels defined in NEI 12-02.
RAI #18 Please provide the following:
a) Further information describing the maintenance and testing program the licensee will establish and implement to ensure that regular testing and calibration is performed and verified by inspection and audit to demonstrate conformance with design and system readiness requirements. Please include a description of the plans for ensuring that necessary channel checks, functional tests, periodic calibration, and maintenance will be conducted for the level measurement system and its supporting equipment.
b) Information describing compensatory actions when both channels are out-of order, and the implementation procedures.
c) Additional information describing expedited and compensatory actions in the maintenance procedure to address when one of the instrument channels cannot be restored to functional status within 90 days.
SCE&G Update RAI response is in progress, no new update.
Document Control Desk CR-12-01070 RC-14-0031 Attachment I Page 8 of 8
- 7. Potential Draft Safety Evaluation Impacts There are no potential impacts to the Draft Safety Evaluation identified at this time.
- 8. References The following references support the updates to the Overall Integrated Plan described in this attachment.
- 1. NRC Order Number EA-12-051, " Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, " dated March 12, 2012
- 2. SCE&G's Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)," dated February 28, 2013 (RC-13-0031)
- 3. Robert E. Martin to Thomas D. Gatlin Letter: Virgil C. Summer Nuclear Station, Unit 1-Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (TAC NO. MF1 173) dated July 29, 2013
- 4. SCE&G's 6-Month Status Report of Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation, dated August 28, 2013 (RC-13-0117)
- 5. Virgil C. Summer Nuclear Station, Unit 1 Response to Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (TAC NO. MF1 173) dated August 28, 2013 (RC-13-0119)
- 6. Shawn Williams to Thomas D. Gatlin Letter: Virgil C. Summer Nuclear Station, Unit 1-Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation (TAC NO. MF1173) dated December 5, 2013
- 7. NRC (Nuclear Regulatory Commission 2013) Public Meeting on Reliable Spent Fuel Pool Instrumentation-StaffEvaluations of Licensee Plans for Addressing Order EA- 12-051, November 26, 2013 Rockville, MD: NRC
- 8. NEI (Nuclear Energy Institute 2013) Spent Fuel Pool Instrumentation Order (EA-12-051)
RAls Binning Nov. 26, 2013 Washington, DC: NEI
- 9. NRC (Nuclear Regulatory Commission 2013) Public Meeting on Reliable Spent Fuel Pool Instrumentation-StaffEvaluations of Licensee Plans for Addressing Order EA-12-051, February 6, 2014 Rockville, MD: NRC
- 10. SCE&G's Virgil C. Summer Nuclear Station (VCSNS) Unit 1 Specification for Fukushima (FLEX) SFP Level Instrumentation System SP-1 000, Revision 1 dated February 4, 2014