Text

SEntergy SAFEGUARDS INFORMATION Entergy Nuclear Generation Company Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852-2738 February 19, 2014

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 Physical Security Plan, Revision 11 LETTER NUMBER: 2.14.015

Dear Sir or Madam:

By this letter Entergy submits Revision 11 of the Pilgrim Nuclear Power Station (PNPS)

Physical Security Plan (PSP). This revision revised Section 11.3 "Protected Area Barriers" to incorporate additional plant specific information, and Section 18 "Response Requirements".

These changes do not decrease the effectiveness of the PSP. Attachment 1 to this letter contains a summary description of each change. Attachment 2 to this letter contains a complete copy of Revision 11. A compact disk (CD) containing an electronic copy of the PNPS PSP, Revision 11, is enclosed in accordance with 10 CFR 50.54(p).

Attachments 1 and 2 and the Enclosure to this letter contain Safeguards Information as defined in 10 CFR 73.21(e). Entergy therefore requests, Attachments 1 and 2 and the Enclosure to this letter be withheld from public disclosure.

There are no new commitments contained in this letter.

Please contact me at (508) 830-8320, if you have any questions or require additional information.

Sincerely, David J. B rke Manager, ecurity MJG/mg NOTE: ATTACHMENTS 1 and 2 AND THE ENCLOSURE TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF ATTACHMENT 1, ATTACHMENT 2 AND THE ENCLOSURE, THIS LETTER IS "DECONTROLLED."

SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Letter Number: 2.14.015 Page 2 Attachments

1. Summary of Changes to PNPS Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan, Revision 10
2. PNPS Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan", Revision 11 Enclosure (1)

CD - "PNPS Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan", Rev. 11 cc (with attachments)

Mr. William M. Dean Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 2100 Renaissance Boulevard, Suite 100 King of Prussia, PA 19406-1415 Senior Resident Inspector Pilgrim Nuclear Power Station cc (w/o attachments):

Ms. Nadiyah Morgan, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8C2A Washington, DC 20555 Mr. John Giarrusso Jr.

Planning, Preparedness & Nuclear Section Chief Mass. Emergency Management Agency 400 Worcester Road Framingham, MA 01702 NOTE: ATTACHMENTS 1 and 2 AND THE ENCLOSURE TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF ATTACHMENT 1, ATTACHMENT 2 AND THE ENCLOSURE, THIS LETTER IS "DECONTROLLED."

SAFEGUARDS INFORMATION