ML14055A403

From kanterella
Jump to navigation Jump to search

Submittal of Marked-Up Version & Proposed Final Version of Reed College'S Technical Specifications
ML14055A403
Person / Time
Site: Reed College
Issue date: 02/12/2014
From: Krahenbuhl M
Reed College
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML14055A403 (9)


Text

REED COLLEGE

/

REACTOR FACI LITY 3203 Southeast Woodstock Boulevard Portland, Oregon 97202-8199 Feb 12, 2014 telephone 503/777-7274 enmail ATTN: Document Control Desk reacror@reed.edu U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 http://reactor.reed.edu Docket: 50-288 License No: R-112 A mark-up version and proposed final version of Reed College's technical specifications are enclosed. This submission supersedes preceding submissions dated July 17, 2013, Sept. 17, 2013 Oct. 4, 2013 and Oct. 25, 2013.

The changes are requested to accommodate the creation of a new position entitled Reactor Operations Manager and the retiring of the title Assistant Director. Additionally, a change was made to TS 6.1.3 to clarify the minimum staffing required when the reactor is not secured.

Please contact me if you have any further questions.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on 2-/ /£//

Melinda Krahenbuhl, Ph.D.

Director, Reed Research Reactor PCQ2C

TECHNICAL SPECIFICATIONS 6 ADMINISTRATIVE CONTROLS 6.1 Organization Individuals at the various management levels, in addition to being responsible for the policies and operation of the reactor facility, shall be responsible for safeguarding the public and facility personnel from undue radiation exposures and for adhering to all requirements of the operating license, TS, and federal regulations.

6.1.1 Structure The reactor administration shall be as shown in Figure 1. The Levels refer to ANSI/ANS- 15.4-1988; R1999.

Figure 1: Administrative Structure Communication Authoit 35 proposed Research Reactor Reed Research Reactor 35 proposed

TECHNICAL SPECIFICATIONS 6.1.2 Responsibility The following specific organizational levels and responsibilities shall exist.

a. President (Level 1): The President of Reed College is responsible for the facility license and represents Reed College.
b. Director (Level 2): The Director reports to the President of Reed College via the Dean of the Faculty, and is accountable for ensuring that all regulatory requirements, including implementation, are in accordance with all requirements of the NRC and the Code of Federal Regulations.
c. Reactor Operations Manager (Level 3): The Reactor Operations Manager reports to the Director and is responsible for directing the activities of the reactor staff and for the day-to-day operation and maintenance of the reactor. The Supervisors report to the Reactor Operations Manager.
d. Operations Staff - Reactor Operators and Senior Reactor Operators (Level 4): The Reactor Operators (RO) and Senior Reactor Operators (SRO) report to the Supervisors, Reactor Operations Manager and the Director, and are primarily involved in the manipulation of reactor controls, monitoring of instrumentation, and operation and maintenance of reactor-related equipment.
e. Radiation Safety Officer: The Radiation Safety Officer reports to the President of Reed College via the Vice President and Treasurer and is responsible for directing health physics activities including implementation of the radiation safety program. The Radiation Safety Officer shall communicate with the Reactor Director regarding health physics issues.

Reed Research Reactor 36 proposed

TECHNICAL SPECIFICATIONS 6.1.3 Staffing

a. The minimum staffing when the reactor is not secured shall be:
1. A licensed reactor operator in the control room;
2. A second person present in the reactor facility able to scram the reactor and summon help;
3. If neither of these two individuals is an SRO, a designated SRO shall be readily available on call. "Readily available on call" means an individual who:

a) has been specifically designated and the designation known to the operator on duty, b) can be contacted quickly by the operator on duty, and c) is capable of getting to the reactor facility within 15 minutes.

b. A list of reactor facility personnel by name and telephone number shall be readily available in the control room for use by the operator. The list shall include:
1. Reactor Director;
2. Reactor Operations Manager;
3. Supervisor;
4. Radiation Safety Officer; and
5. At least one other person who is a licensed SRO.
c. Events which require the presence of an SRO in the facility shall include:
1. Initial start-up and approach to power of the day or following significant changes

(> $0.25) to the core;

2. All fuel or control rod relocations in the reactor core;
3. Maintenance on any reactor safety system;
4. Recovery from unscheduled reactor scram or significant power reduction; and
5. Relocation of any in-core experiment or irradiation facility with a reactivity worth greater than one dollar.

6.1.4 Selection and Training of Personnel The selection, training, and requalification of personnel should be in accordance with ANSI/ANS 15.4-1988; R1999, "Standard for the Selection and Training of Personnel for Research Reactors."

Reed Research Reactor 37 proposed

TECHNICAL SPECIFICATIONS 6.5 Experiment Review and Approval

a. Approved experiments shall be carried out in accordance with established and approved procedures.
b. All new experiments or classes of experiments shall be reviewed and approved by the ROC.
c. Substantive changes to previously approved experiments shall be made only after review by the ROC and approval in writing by the Director or Reactor Operations Manager.
d. Minor changes that do not significantly alter the experiment may be approved by the Supervisor, Reactor Operations Manager, or Director.

6.6 Required Actions 6.6.1 Actions to Be Taken in Case of Safety Limit Violation In the event the safety limit is exceeded:

a. The reactor shall be shut down and reactor operation shall not be resumed until authorized by the NRC.
b. An immediate notification of the occurrence shall be made to the Director, the Chair of the ROC, the NRC, and the President of Reed College.
c. A report shall be prepared and reviewed by the ROC. The report shall describe the following:

I. Applicable circumstances leading to the violation including, when known, the cause and contributing factors;

2. Effects of the violation upon reactor facility components, systems, or structures and on the health and safety of personnel and the public; and
3. Corrective action to be taken to prevent recurrence.

6.6.2 Actions to Be Taken in the Event of an Occurrence of the Type Identified in Section 6.7.2 Other than a Safety Limit Violation For all events that are required by regulations or TS to be reported to the NRC within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> under Section 6.7.2, except a safety limit violation, the following actions shall be taken:

a. The reactor shall be shut down and the Director or Reactor Operations Manager and ROC chair notified;
b. Operations shall not resume unless authorized by the Director or Reactor Operations Manager;
c. The ROC shall review the occurrence at or before their next scheduled meeting; and
d. A report shall be submitted to the NRC in accordance with TS 6.7.2.

Reed Research Reactor 40 proposed

TECHNICAL SPECIFICATIONS 6 ADMINISTRATIVE CONTROLS 6.1 Organization Individuals at the various management levels, in addition to being responsible for the policies and operation of the reactor facility, shall be responsible for safeguarding the public and facility personnel from undue radiation exposures and for adhering to all requirements of the operating license, TS, and federal regulations.

6.1.1 Structure The reactor administration shall be as shown in Figure 1. The Levels refer to ANSI/ANS-l15.4-1988; R1999.

Figure 1: Administrative Structure

--- - Communication Authority 35 Research Reactor Reed Research Reactor 35

TECHNICAL SPECIFICATIONS 6.1.2 Responsibility The following specific organizational levels and responsibilities shall exist.

a. President (Level 1): The President of Reed College is responsible for the facility license and represents Reed College.
b. Director and ,A*sso*.cia D-ieta (Level 2): The Director reports to the President of Reed College via the Dean of the Faculty, and is accountable for ensuring that all regulatory requirements, including implementation, are in accordance with all requirements of the NRC and the Code of Federal Regulations. The Accciatc Dircotor rcporto tho Director Zo~ A.-.'L 0f~ro.-

pL~+ , AAmns.

c. GpefatimTT~npervisr (Level 3): The p ts p' rreports to the A6&eeift*

- Director and is responsible for directing the activities of the reactor staff and rj_, r-+

for the day-to-day operation and maintenance of the reactor. 1'Lr. 5 ,,,,'-s0'r*

1

d. Reactor Operators and Senior Reactor Operators (Level 4): The Reactor Operators (RO) *"('" I.dvd and Senior Reactor Operators (SRO) report to the per~aions S,,pA"

-9ireetor, and the Director, and are primarily involved in the manipulation of reactor 0r" controls, monitoring of instrumentation, and operation and maintenance of reactor-related equipment.

e. Radiation Safety Officer: The Radiation Safety Officer reports to the President of Reed College via the Vice President and Treasurer and is responsible for directing health physics activities including implementation of the radiation safety program. The Radiation Safety Officer shall communicate with the Reactor Director regarding health physics issues.

ostv- .

36 Aprii-~

Research Reactor Reed Research Reed Reactor 36 AprHlm

TECHNICAL SPECIFICATIONS 6.1.3 Staffing

a. The minimum staffing when the reactor is opeFa*ifg shall be:
1. A licensed reactor operator in the control room;
2. A second person present in the reactor facility able to scram the reactor and summon help;
3. If neither of these two individuals is an SRO, a designated SRO shall be readily available on call. "Readily available on call" means an individual who:

a) has been specifically designated and the designation known to the operator on duty, b) can be contacted quickly by the operator on duty, and c) is capable of getting to the reactor facility within 15 minutesý

b. A list of reactor facility personnel by name and telephone number shall be readily available in the control room for use by the operator. The list shall include:
1. Reactor Director;
2. Reactor, ^cA,,-t- --. ,,; Oj -r' -'13 /tAA -aje,
3. a Supervisor;
4. Radiation Safety Officer; and
5. At least one other person who is a licensed SRO.

c, Events which require the presence of an SRO in the facility shall include:

1. Initial start-up and approach to power of the day or following significant changes

(> $0.25) to the core;

2. All fuel or control rod relocations in the reactor core;
3. Maintenance on any reactor safety system;
4. Recovery from unscheduled reactor scram or significant power reduction; and
5. Relocation of any in-core experiment or irradiation facility with a reactivity worth greater than one dollar.

6.1.4 Selection and Training of Personnel The selection, training, and requalification of personnel should be in accordance with ANSI/ANS 15.4-1988; R1999, "Standard for the Selection and Training of Personnel for Research Reactors."

Reed Research Reactor 37

TECHNICAL SPECIFICATIONS 6.5 Experiment Review and Approval

a. Approved experiments shall be carried out in accordance with established and approved procedures.
b. All new experiments or classes of experiments shall be reviewed and approved by the ROC.
c. Substantive changes to previously approved experiments shall be made only after review by the ROC and approval in writing by the Director or * ,-oate Dirc, Qr. A
d. Minor changes that do not significantly alter the experiment may be approved by the upervisor, A-eriat

....  : ....c,, or Director.

6.6 Required Actions 6.6.1 Actions to Be Taken in Case of Safety Limit Violation In the event the safety limit is exceeded:

a. The reactor shall be shut down and reactor operation shall not be resumed until authorized by the NRC.
b. An immediate notification of the occurrence shall be made to the Director, the Chair of the ROC, the NRC, and the President of Reed College.
c. A report shall be prepared and reviewed by the ROC. The report shall describe the following:
1. Applicable circumstances leading to the violation including, when known, the cause and contributing factors;
2. Effects of the violation upon reactor facility components, systems, or structures and on the health and safety of personnel and the public; and
3. Corrective action to be taken to prevent recurrence.

6.6.2 Actions to Be Taken in the Event of an Occurrence of the Type Identified in Section 6.7.2 Other than a Safety Limit Violation For all events that are required by regulations or TS to be reported to the NRC within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> under Section 6.7.2, except a safety limit violation, the following actions shall be taken:

a. The reactor shall be shut down and the Director or Asýciat, Director and ROC chair notified; or-

" -%' M* ,1 V

b. Operations shall not resume unless authorized by the Director or  ;
c. The ROC shall review the occurrence at or before their next scheduled meeting; and
d. A report shall be submitted to the NRC in accordance with TS 6.7.2.

40 ~7fr9O4~

Reed Research Reactor Research Reactor 40 Ap-ril-2-9ý