ML14042A179

From kanterella
Jump to navigation Jump to search
10 CFR 50, Appendix E - Evacuation Time Estimate Analysis
ML14042A179
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 01/31/2014
From: Jim Barstow
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML14042A179 (3)


Text

200 Exelon Way AM Exelon Generationm Kennett Square, PA 19348 www.exeloncorp.com 10 CFR 50, Appendix E 10 CFR 50.4 January 31, 2014 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Limerick Generating Station, Units I and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352, 50-353, and 72-65

Subject:

10 CFR 50, Appendix E - Evacuation Time Estimate Analysis for Limerick Generating Station In accordance with the requirements of 10 CFR 50 Appendix E, Section IV, "Contentof Emergency Plans," paragraph 4, Exelon Generation Company, LLC (Exelon) is submitting Evacuation Time Estimates (ETE) analysis information and supporting checklists for Limerick Generating Station (LGS), Units 1 and 2. 10 CFR 50, Appendix E, Section IV, paragraph 4 stipulates the following:

Within 365 days of the laterof the date of the availabilityof the most recent decennial census data from the U.S. Census Bureau or December 23, 2011, nuclearpower reactorlicensees shall develop an ETE analysis using this decennial data and submit it under § 50.4 to the NRC. These licensees shall submit this ETE analysis to the NRC at least 180 days before using it to form protective action recommendations and providing it to State and local governmentalauthoritiesfor use in developing offsite protective action strategies.

The attached LGS, Units 1 and 2, ETE analysis information was developed using the decennial census data from the U.S. Census Bureau and in accordance with the Federal guidance established in NUREG/CR-7002 (SAND2010-0016P), "Criteriafor Development of Evacuation Time Estimate Studies,"published November 2011. The analysis is being resubmitted following re-performance of the ETE to address comments received from the U.S. Nuclear Regulatory Commission (NRC).

Aý,-46 i ,

U.S. Nuclear Regulatory Commission Limerick Generating Station Evacuation Time Estimate Analysis Information January 31, 2014 Page 2 There are no commitments contained in this submittal.

If you have any questions concerning this letter, please contact Richard Gropp at (610) 765-5557.

Respectfully, James .arstow Director, Licensing and Regulatory Affairs Exelon Generation Company, LLC

Attachment:

Limerick Generating Station - Development of Evacuation Time Estimates cc: w/o Attachment Regional Administrator - NRC Region I NRC Senior Resident Inspector - Limerick Generating Station NRC Project Manager, NRR - Limerick Generating Station R. R. Janati, Commonwealth of Pennsylvania

Attachment Limerick Generating Station Development of Evacuation Time Estimates