ML14041A176
| ML14041A176 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 02/06/2014 |
| From: | Mark D. Sartain Dominion Nuclear Connecticut |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 13-596 | |
| Download: ML14041A176 (2) | |
Text
Dominion Nuclear Connecticut, Inc.
If t
minio n 5000 Dotal~iion Bothcvard, Glen Allen. VA 23060
\\',eb Address: w-w.dnam.comn February 6, 2014 U.S. Nuclear Regulatory Commission Serial No.13-596 Attention: Document Control Desk NLOS/WDC RO Washington, DC 20555 Docket No.
50-423 License No.
NPF-49 DOMINION NUCLEAR CONNECTICUT. INC.
MILLSTONE POWER STATION UNIT 3 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION FOR ALTERNATIVE REQUEST IR-3-17 TO ASME SECTION XI FOR REPAIR/REPLACEMENT OF CLASS 3 SERVICE WATER SYSTEM VALVES In a letter dated March 28, 2013, Dominion Nuclear Connecticut, Inc. (DNC) requested approval of Alternative Request IR-3-17 to permit certain degraded valves in the service water system to remain in service until they could be replaced. The affected valves have now been replaced.
In a letter dated October 22, 2013, the Nuclear Regulatory Commission (NRC) transmitted a request for additional information (RAI) to DNC related to the alternative request.
DNC agreed to respond by February 7, 2014. to this letter contains DNC's response to the RAI. Attachment 2 provides information on examination of MPS3 service water valves for selective leaching and provides information on examination of MPS3 service water valves for dealloying. Attachment 4 provides the bend test report for MPS3 service water valves.
If you have any questions regarding this submittal, please contact Wanda Craft at (804) 273-4687.
Sincerely, Mark D. Sartain Vice President - Nuclear Engineering Attachments:
- 1. Response to Request for Additional Information for Alternative Request IR-3-17 to ASME Section Xl for Repair/Replacement of Class 3 Service Water System Valves
- 2. Examination Of MPS3 Service Water Valves For Selective Leaching
- 3. Examination Of MPS3 Service Water Valves For Dealloying
- 4. Bend Test Report for MPS3 Service Water Valves
Serial No.13-596 Docket No. 50-423 Page 2 of 2 Commitments made in this letter: None cc:
U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd Suite 100 King of Prussia, PA 19406-2713 J. S. Kim Project Manager - Millstone Power Station U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 08 C2A Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station