February 7, 2014 EN 14-006 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee:
NextEra Energy Duane Arnold, LLC EA-13-223 Duane Arnold Energy Center Docket No.: 50-331
Subject:
ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OF VIOLATION This is to inform the Commission that a Notice of Violation will be issued on or about February 11, 2014, to NextEra Energy Duane Arnold, LLC (NextEra) for a violation associated with a White Significance Determination Process finding identified during an inspection of the Duane Arnold Energy Center. The White finding, an issue of low to moderate safety significance, will require additional U.S. Nuclear Regulatory Commission (NRC) inspections. It involves the failure of Duane Arnold personnel to perform an immediate operability determination in accordance with NextEras procedures on June 21, 2013, when a reactor core isolation cooling (RCIC) system turbine speed indicator in the main control room was found degraded. Specifically, Duane Arnold personnel failed to consider the degraded speed indications impact on RCIC operability. As a result, RCIC inoperability was not discovered until August 22, 2013, when the RCIC turbine tripped on overspeed during startup for post-maintenance surveillance testing.
A Notice of Violation is included based on NextEras failure to meet Technical Specification 3.5.3, RCIC System, which requires the RCIC system shall be operable when operating in MODES 1, 2 or 3 with reactor steam dome pressure greater than 150 psig. Specifically, from June 21, 2013, to August 24, 2013, the RCIC system was inoperable for a period greater than the Technical Specification allowed outage time of 14 days. In accordance with the NRC Enforcement Policy, the NOV is considered an escalated enforcement action because it is associated with a White finding.
In response to the preliminary determination letter, NextEra attended a Regulatory Conference on January 8, 2014, and provided information on the risk characterization of the finding and corrective actions. After reviewing the information developed during the inspection, and the information provided by NextEra, the staff concluded that the inspection finding is appropriately characterized as White.
It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is:
Mailing of Final Significance Determination February 11, 2014 Telephone Notification of Licensee February 11, 2014 The State of Iowa will be notified.
CONTACTS: Lauren Casey, OE, (301) 415-1038 Nick Hilton, OE, (301) 415-2741
Distribution: EN-14-006, February 7, 2014 OWFN Chair. MacFarlane Comm. Svinicki Comm. Apostolakis Comm. Magwood Comm. Ostendorff SECY OCA OPA OIP OWFN EDO DEDR DEDMRS OE OGC NRR OI OIG TWFN OCFO OIS FSME RES ACRS RES 3WFN NMSS NSIR OP CENTER Regional Offices RI RII RIII RIV MAIL Public OE staff Electronic DISTRIBUTION:
R. Zimmerman, OE N. Hilton, OE L. Casey, OE OE r/f EN binder X PUBLIC X NON-SENSITIVE ADAMS ML14038A089 OFFICE OE:ES OE:BC NAME LCasey NHilton DATE 2/7/2014 2/07/2014 OFFICIAL RECORD COPY