<Dominion Dominion Nuclear Connecticut, Inc.
Rope Ferry Rd-, Warerford, CT 06385 Mailing Address: P.O. Box 128 Waterford, CT 06385 don.com JAN 22 2W1 Attention: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Serial No.
NSS&L/MLC Docket Nos.
License Nos.14-026 R0 50-336 50-423 DPR-65 NPF-49 DOMINION NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION UNITS 2 AND 3 TECHNICAL SPECIFICATIONS 2013 ANNUAL REPORT In accordance with the referenced Technical Specification (TS) reporting requirements for Millstone Power Station Unit 2 (MPS2) and Millstone Power Station Unit 3 (MPS3), Dominion Nuclear Connecticut, Inc. hereby submits the following information for the period January 1, 2013 through December 31, 2013.
MPS2 did not exceed the specific activity limits set forth under TS 3.4.8 (TS 6.9.1.5c).
MPS3 did not exceed the specific activity limits set forth under TS 3.4.8 (TS 6.9.1.2b).
If you have any further questions, please contact Mr. William D. Bartron at (860) 444-4301.
Sincerely, L. J. Armstrong Director, Nuclear Station Safety and Licensing Attachments: None Commitments made in this letter: None
/AbbI
Serial No.14-026 2013 Annual Report Page 2 of 2 cc:
U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 J. S. Kim Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C2A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station