ominion Energy Kewaunee, Inc.
D 40Hwy 42. Kewaunee, W11 54216 o
iof Web Address: www.dom.corn DEC H 2_013 ATTN: Document Control Desk Serial No.13-289 U. S. Nuclear Regulatory Commission LIC/NW/RO Washington, DC 20555-0001 Docket No.: 50-305 License No.: DPR-43 DOMINION ENERGY KEWAUNEE. INC.
KEWAUNEE POWER STATION INSPECTION REPORT 05000305/2013008 - RESPONSE TO NRC REQUEST On March 4, 2013, the Nuclear Regulatory Commission (NRC) issued an inspection report for the Kewaunee Power Station (KPS) (Reference 1) indicating a preliminary significance determination for a White finding for fire brigade activities. On April 30, 2013, the NRC issued the final significance determination for a White finding and notice of violation (Reference 2).
The April 30, 2013 letter (Reference 2) also informed Dominion Energy Kewaunee, Inc. (DEK) the NRC would be conducting a supplemental inspection using Inspection Procedure 95001, "Inspection for One or Two White Inputs in a Strategic Performance Area," when NRC has been notified by DEK of its readiness for the inspection.
On May 31, 2013, the NRC issued a letter describing the termination of the Reactor Oversight Process for KPS and commencement of the Decommissioning Power Reactor Inspection Program (Reference 3).
In that letter the NRC states that it will conduct the inspection for the fire brigade finding using Inspection Procedure 92702, "Follow-Up on Corrective Actions for Violations and Deviations," to verify appropriate corrective actions are being implemented instead of using Inspection Procedure 95001.
DEK has undertaken the steps necessary to assure that the cause evaluation and corrective actions are of sufficient scope and breadth to address the identified performance deficiencies. DEK requests the NRC perform the inspection identified in Reference 3 starting on or after January 20, 2014.
If you have questions or require additional information, please feel free to contact Mr.
Richard P. Repshas at 920-388-8217.
Very truly yours, Site Vic President, Kewaunee Power Station
Serial No.13-289 Page 2 of 2
References:
- 1. Letter from Gary L. Shear (NRC) to David A. Heacock (DEK), "Kewaunee Power Station-NRC NRC Inspection Report 05000305/2013007 Preliminary White Finding; And Results of NRC Office of Investigation Report No. 3-012-010," dated March 4, 2013. (ADAMS Accession No. ML13063A397)
- 2. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Final Significance Determination of A White Finding With Assessment Followup; Notice of Violation And Proposed Imposition of Civil Penalty - $70,000; NRC Inspection Report No.
05000305/2013008; Kewaunee Power Station," dated April 30, 2013.
(ADAMS Accession No. ML13121A317)
- 3. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Termination of Reactor Oversight Process For Kewaunee Power Station And Commencement of Decommissioning Inspection Program," dated May 31, 2013. (ADAMS Accession No. ML13151A375)
Commitments made by this letter: NONE cc:
Regional Administrator, Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Mr. K. D. Feintuch Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08-Dl 5 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Kewaunee Power Station