|
---|
Category:Letter type:PNP
MONTHYEARPNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-031, License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements2022-09-14014 September 2022 License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2022-025, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 182022-09-12012 September 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 18 PNP 2022-032, 2022 Evacuation Time Estimate Report2022-09-0707 September 2022 2022 Evacuation Time Estimate Report PNP 2022-023, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 172022-08-15015 August 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 17 PNP 2022-014, Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 342022-07-13013 July 2022 Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 34 PNP 2022-016, License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-07-12012 July 2022 License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-017, Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E2022-07-11011 July 2022 Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E PNP 2022-019, & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals2022-06-24024 June 2022 & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals PNP 2022-011, Termination of the Emergency Response Data System (Eros) Link2022-06-13013 June 2022 Termination of the Emergency Response Data System (Eros) Link PNP 2022-010, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2022-06-13013 June 2022 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel PNP 2022-004, 2021 Radiological Environmental Operating Report2022-05-12012 May 2022 2021 Radiological Environmental Operating Report PNP 2022-003, and Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report2022-04-25025 April 2022 and Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2022-007, 2021 Annual Non-Radiological Environmental Operating Report2022-04-21021 April 2022 2021 Annual Non-Radiological Environmental Operating Report PNP 2022-012, Response to Request for Additional Information Regarding License Amendment Request to Revise Facility Operating License and Technical Specifications for a Permanently Defueled Condition2022-04-21021 April 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise Facility Operating License and Technical Specifications for a Permanently Defueled Condition PNP 2022-002, Annual Report of Changes in Emergency Core Cooling System Models2022-03-24024 March 2022 Annual Report of Changes in Emergency Core Cooling System Models PNP 2021-012, Report of Changes, Tests and Experiments, and Summary of Commitment Changes2021-10-0707 October 2021 Report of Changes, Tests and Experiments, and Summary of Commitment Changes PNP 2021-029, Pre-Notice of Disbursement from Decommissioning Trust2021-09-0202 September 2021 Pre-Notice of Disbursement from Decommissioning Trust PNP 2021-013, Request for Rescission of Interim Compensatory Measure from Order EA-02-0262021-07-21021 July 2021 Request for Rescission of Interim Compensatory Measure from Order EA-02-026 PNP 2021-020, Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.122021-06-15015 June 2021 Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.12 PNP 2021-005, License Amendment Request to Revise Renewed Facility Operating License and Technical Specifications for Permanently Defueled Condition2021-06-0101 June 2021 License Amendment Request to Revise Renewed Facility Operating License and Technical Specifications for Permanently Defueled Condition PNP 2021-026, Pre-Notice of Disbursement from Decommissioning Trust2021-05-27027 May 2021 Pre-Notice of Disbursement from Decommissioning Trust PNP 2021-016, 2020 Radiological Environmental Operating Report2021-05-12012 May 2021 2020 Radiological Environmental Operating Report PNP 2021-022, 2020 Annual Non-Radiological Environmental Operating Report2021-04-27027 April 2021 2020 Annual Non-Radiological Environmental Operating Report PNP 2021-015, and Big Rock Point, Submittal of 2020 Annual Radioactive Effluent Release and Waste Disposal Report2021-04-21021 April 2021 and Big Rock Point, Submittal of 2020 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2021-017, Schedule Change to Open Phase Condition Detection Implementation2021-04-0101 April 2021 Schedule Change to Open Phase Condition Detection Implementation PNP 2021-003, 2020 Steam Generator Tube Inspection Report2021-03-25025 March 2021 2020 Steam Generator Tube Inspection Report PNP 2021-010, Annual Report of Changes in Emergency Core Cooling System Models2021-03-19019 March 2021 Annual Report of Changes in Emergency Core Cooling System Models PNP 2021-004, Report - Changes to Palisades Nuclear Plant Technical Specifications Bases2021-03-10010 March 2021 Report - Changes to Palisades Nuclear Plant Technical Specifications Bases PNP 2021-006, Pre-Notice of Disbursement from Decommissioning Trust2021-03-0808 March 2021 Pre-Notice of Disbursement from Decommissioning Trust PNP 2021-001, ASME Section XI 90-Day Owner'S Activity Report2021-01-12012 January 2021 ASME Section XI 90-Day Owner'S Activity Report 2023-09-28
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARPNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2022-031, License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements2022-09-14014 September 2022 License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2022-016, License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-07-12012 July 2022 License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme ML21152A1112021-06-0101 June 2021 Proposed Changes (mark-up) to Palisades Plant - Appendix a Technical Specifications, and Appendix B Environmental Protection Plan Pages ML21152A1122021-06-0101 June 2021 Page Change Instructions and Retyped Pages for the Palisades Plant Appendix a Permanently Defueled Technical Specifications and Appendix B Environmental Protection Plan ML21152A1132021-06-0101 June 2021 Palisade Nuclear Plant - Proposed Technical Specifications Bases Changes ML21152A1102021-06-0101 June 2021 Evaluation of the Proposed Changes PNP 2020-042, and Big Rock Point Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments2020-12-23023 December 2020 and Big Rock Point Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-06-25025 June 2019 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19149A3032019-05-28028 May 2019 Enclosure Attachment 1 to Pnp 2019-028: Renewed Facility Operating License Page Markups ML19149A3042019-05-28028 May 2019 Enclosure Attachment 1 (Continued) to Pnp 2019-028: Operating License Page Change Instructions and Retyped Renewed Facility Operating License Pages ML19149A3022019-05-28028 May 2019 Enclosure to Pnp 2019-028: Response to Request for Additional Information - License Amendment Request to Revise Existing Facility Operating License Conditions Regarding NFPA 805 Modifications PNP 2019-007, License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications2019-03-0808 March 2019 License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 ML18305B3212018-11-0101 November 2018 License Amendment Request to Revise Existing Facility Operating License Conditions Regarding NFPA 805 Modifications ML18305B3222018-11-0101 November 2018 License Amendment Request to Revise Existing Facility Operating License Conditions Regarding NFPA 805 Modifications - Proposed Operating License Change PNP 2018-040, License Amendment Request to Revise Existing Facility Operating License Conditions Regarding NFPA 805 Modifications - Proposed Renewed Facility Operating License Page Changes (Markup)2018-11-0101 November 2018 License Amendment Request to Revise Existing Facility Operating License Conditions Regarding NFPA 805 Modifications - Proposed Renewed Facility Operating License Page Changes (Markup) ML18270A3252018-09-27027 September 2018 Attachment 4: Page Change Instructions and Revised Pages, and Appendix a Technical Specifications ML18270A3232018-09-27027 September 2018 Attachment 2: Probabilistic Risk Assessment Technical Adequacy ML18270A3242018-09-27027 September 2018 Attachment 3: Proposed Changes and Appendix a Technical Specifications Pages ML18270A3262018-09-27027 September 2018 Attachment 5: Proposed Technical Specification Bases Changes ML18270A3222018-09-27027 September 2018 Attachment 1: Description and Evaluation of Technical Specifications Changes ML18270A3282018-09-27027 September 2018 Attachment 7: Traveler TSTF-425 Versus Pnp RFOL SR Applicability Cross Reference Table ML18270A3272018-09-27027 September 2018 Attachment 6: No Significant Hazards Consideration PNP 2018-025, License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b.2018-09-27027 September 2018 License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b. ML18152A9292018-05-30030 May 2018 License Amendment Request to Revise Emergency Diesel Generator Degraded Voltage Surveillance Requirement PNP 2018-004, Supplement to License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications2018-01-24024 January 2018 Supplement to License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications PNP 2017-066, License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications2017-11-0101 November 2017 License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications PNP 2017-059, License Amendment Request Supplement - Cyber Security Plan Implementation Schedule2017-10-17017 October 2017 License Amendment Request Supplement - Cyber Security Plan Implementation Schedule PNP 2017-035, License Amendment Request - Administrative Controls for a Permanently Defueled Condition2017-07-27027 July 2017 License Amendment Request - Administrative Controls for a Permanently Defueled Condition PNP 2017-007, License Amendment Request, Cyber Security Plan Implementation Schedule2017-03-30030 March 2017 License Amendment Request, Cyber Security Plan Implementation Schedule PNP 2016-046, License Amendment Request for Editorial and Administrative Changes to Technical Specifications2016-11-0909 November 2016 License Amendment Request for Editorial and Administrative Changes to Technical Specifications PNP 2016-049, License Amendment Request: Control Rod Drive Exercise Surveillance2016-08-22022 August 2016 License Amendment Request: Control Rod Drive Exercise Surveillance PNP 2016-005, License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal and Clarify SR Usage Rule Application to Section 5.5 Testing.2016-07-11011 July 2016 License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal and Clarify SR Usage Rule Application to Section 5.5 Testing. PNP 2016-001, License Amendment Request - Revision to the Requirements for Steam Generator Tube Inspections and Repair Criteria in the Cold Leg Tube Sheet Region2016-03-0303 March 2016 License Amendment Request - Revision to the Requirements for Steam Generator Tube Inspections and Repair Criteria in the Cold Leg Tube Sheet Region PNP 2015-035, License Amendment Request - Cyber Security Plan Implementation Schedule2015-06-11011 June 2015 License Amendment Request - Cyber Security Plan Implementation Schedule PNP 2014-111, Revised License Condition - License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors2014-12-18018 December 2014 Revised License Condition - License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors PNP 2014-091, Supplement to License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times2014-12-0909 December 2014 Supplement to License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times ML14237A1442014-12-0808 December 2014 Issuance of Amendment Cyber Security Plan Implementation Schedule ML14211A5252014-07-29029 July 2014 WCAP-17628-NP, Revision 1, Palisades, Alternate Pressurized Thermal Shock (PTS) Rule Evaluation. PNP 2014-049, License Amendment Request to Implement 10 CFR 50.61 a, Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events.2014-07-29029 July 2014 License Amendment Request to Implement 10 CFR 50.61 a, Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events. PNP 2014-042, License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the Consolidated Line Item Improvement Process2014-06-11011 June 2014 License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the Consolidated Line Item Improvement Process PNP 2013-086, License Amendment Request - Cyber Security Plan Implementation Schedule2013-12-30030 December 2013 License Amendment Request - Cyber Security Plan Implementation Schedule PNP 2013-044, License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times2013-06-25025 June 2013 License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times PNP 2012-074, License Amendment Request - Technical Specifications Change to Add LCO 3.0.8 on the Lnoperability of Snubbers2012-09-0606 September 2012 License Amendment Request - Technical Specifications Change to Add LCO 3.0.8 on the Lnoperability of Snubbers PNP 2012-046, License Amendment Request - Cyber Security Plan Implementation Schedule Milestones2012-06-20020 June 2012 License Amendment Request - Cyber Security Plan Implementation Schedule Milestones PNP 2012-005, License Amendment Request - Replacement of Spent Fuel Pool Region 1 Storage Racks2012-02-28028 February 2012 License Amendment Request - Replacement of Spent Fuel Pool Region 1 Storage Racks PNP 2011-058, License Amendment Request to Revise Calculated Peak Containment Internal Pressure2011-08-16016 August 2011 License Amendment Request to Revise Calculated Peak Containment Internal Pressure PNP 2011-018, Regarding License Amendment Request to Extend the Containment Type a Leak Rate Test Frequency to 15 Years2011-04-0606 April 2011 Regarding License Amendment Request to Extend the Containment Type a Leak Rate Test Frequency to 15 Years PNP 2011-002, License Amendment Request for Spent Fuel Pool Region I Criticality2011-01-31031 January 2011 License Amendment Request for Spent Fuel Pool Region I Criticality 2023-12-14
[Table view] |
Text
-=::=*Enfergy Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530 Tel 269-764-2000 Anthony J. Vitale Site Vice President 10 CFR 2.390 Attachments Withheld PNP 2013-086 December 30, 2013 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
License Amendment Request - Cyber Security Plan Implementation Schedule Palisades Nuclear Plant Docket 50-255 License No. DPR-20
REFERENCES:
- 1. NRC Internal Memorandum to Barry Westreich from Russell Felts, Review Criteria for Title 10 of the Code of Federal Regulations Part 73.54, Cyber Security Implementation Schedule Milestone 8 License Amendment Requests, dated October 24, 2013 (Adams Accession No. ML13295A467)
- 2. NRC letter to Entergy Nuclear Operations, Inc., Palisades Nuclear Plant
-Issuance of Amendment Regarding the Cyber Security Plan: (TAC NO. ME4355), dated July 28, 2011 (Adams Accession No. ML111801243)
- 3. NRC Internal Memorandum to Directors of Regional Divisions of Reactor Safety from Barry Westreich, Enhanced Guidance For Licensee Near-Term Corrective Actions To Address Cyber Security Inspection Findings And Licensee Eligibility For "Good- Faith" Attempt Discretion, dated July 1, 2013
Dear Sir or Madam:
Pursuant to 10 CFR 50.4 and 10 CFR 50.90, Entergy Nuclear Operations, Inc. (ENO) hereby requests an amendment to the Renewed Facility Operating Licenses for Palisades Nuclear Plant (PNP). In accordance with the guidelines provided by Reference 1, this request proposes a change to the PNP Cyber Security Plan Milestone 8 full implementation date as set forth in the Cyber Security Plan Implementation Schedule approved by Reference 2.
Attachment 1 provides an analysis of the proposed change. Attachment 2 contains proposed marked-up operating license pages for the Physical Protection license condition for PNP that reference the commitment change provided in this submittal. Attachment 3 contains the This letter contains security-related information - Attachments 1 and 4 are withheld from public disclosure per 10 CFR 2.390
This letter contains security-related information - Attachments 1 and 4 are withheld from public disclosure per 10 CFR 2.390 PNP 2013-086 Page 2 proposed revised operating license pages. Attachment 4 contains a change to the date of Implementation Milestone 8. ENO requests that Attachments 1 (Sections 1, 2, and 3) and 4, which contain security-related information (S-RI), be withheld from public disclosure in accordance with 10 CFR 2.390.
The proposed changes have been evaluated in accordance with 10 CFR 50.91(a)(1) using criteria in 10 CFR 50.92(c), and it has been determined that the changes involve no significant hazards consideration. The bases for these determinations are included in Attachment 1.
ENO requests this license amendment be effective as of its date of issuance. Although this request is neither exigent nor emergency, your review and approval is requested prior to December 15, 2014.
This letter contains one revised commitment related to the full implementation of PNP cyber security plan, which is listed in Attachment 5.
In accordance with 10 CFR 50.91 (b), ENO is notifying the State of Michigan of this proposed license amendment by transmitting a copy of this letter to the deSignated state official.
Should you have any questions concerning this letter, or require additional information, please contact Jim Miksa at 269-764-2945.
I declare under penalty of perjury that the foregoing is true and correct. Executed on December 30,2013.
ajv/jpm Attachments: 1. Analysis of Proposed Operating License Change (contains S-RI)
- 2. Proposed PNP Operating License Changes (mark-up)
- 3. Renewed Operating License Page Change Instructions and Revised PNP Operating License Pages
- 4. Revised Cyber Security Plan Implementation Schedule (contains S-RI)
- 5. List of Regulatory Commitments cc: Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC State of Michigan This letter contains security-related information - Attachments 1 and 4 are withheld from public disclosure per 10 CFR 2.390
ATTACHMENT 2 Proposed PNP Operating License Changes (showing proposed changes; additions are highlighted and deletions are strikethrough)
One page follows
D. The facility has been granted certain exemptions from the requirements of Section III, G of Appendix R to 10 CFR Part 50, "Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979." This section relates to fire protection features for ensuring the systems and associated circuits used to achieve and maintain safe shutdown are free of fire damage. These exemptions were granted in letters dated February 8, 1983, July 12, 1985, and July 23, 1985.
In addition, the facility has been granted certain exemptions from Appendix J to 10 CFR Part 50, "Primary Reactor Containment Leakage Testing for Water Cooled Power Reactors." This section contains leakage test requirements, schedules and acceptance criteria for tests of the leak-tight integrity of the primary reactor containment and systems and components which penetrate the containment. These exemptions were granted in a letter dated December 6, 1989.
These exemptions granted pursuant to 10 CFR 50.12, are authorized by law, will not present an undue risk to the public health and safety, and are consistent with the common defense and security. With these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.
E. END shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Entergy Nuclear Palisades Nuclear Plant Physical Security Plan."
ENO shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The Palisades CSP was approved by License Amendment No. 243 as supplemented by a chang approved by License Amendment No . 24~ =n ;. .:.d
- ....
- ..
- .=.1 F. [deleted]
G. ENP and END shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.
Renewed License No. DPR-20 Amendment No. 248, XXX
ATTACHMENT 3 Renewed Operating License Page Change Instructions and Revised PNP Operating License Pages Two pages follow
Page Change Instructions ATTACHMENT TO LICENSE AMENDMENT NO. 2xx RENEWED FACILITY OPERATING LICENSE NO. DPR-20 DOCKET NO. 50-255 Remove the following page of Renewed Facility Operating License, and replace with the attached revised page. The revised page is identified by amendment number and contains a line in the margin indicating the area of change.
REMOVE INSERT Page 6 Page 6
D. The facility has been granted certain exemptions from the requirements of Section III, G of Appendix R to 10 CFR Part 50, "Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979." This section relates to fire protection features for ensuring the systems and associated circuits used to achieve and maintain safe shutdown are free of fire damage. These exemptions were granted in letters dated February 8, 1983, July 12, 1985, and July 23, 1985.
In addition, the facility has been granted certain exemptions from Appendix J to 10 CFR Part 50, "Primary Reactor Containment Leakage Testing for Water Cooled Power Reactors." This section contains leakage test requirements, schedules and acceptance criteria for tests of the leak-tight integrity of the primary reactor containment and systems and components which penetrate the containment. These exemptions were granted in a letter dated December 6, 1989.
These exemptions granted pursuant to 10 CFR 50.12, are authorized by law, will not present an undue risk to the public health and safety, and are consistent with the common defense and security. With these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.
E. END shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Entergy Nuclear Palisades Nuclear Plant Physical Security Plan."
ENO shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The Palisades CSP was approved by License Amendment No. 243 as supplemented by changes approved by License Amendment Nos. 248 and XXX.
F. [deleted]
G. ENP and END shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.
Renewed License No. DPR-20 Amendment No. ~ XXX
ATTACHMENT 5 LIST OF REGULATORY COMMITMENTS One page follows
List of Regulatory Commitments The following table identifies those actions committed to by Entergy Nuclear Operations, Inc. in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.
TYPE (Check One) SCHEDULED COMPLETION COMMITMENT ONE* DATE TIME CONTINUING (If Required)
ACTION COMPLIANCE Full implementation of Palisades Nuclear Plant Cyber Security Plan for all safety, X June 30, 2016 security, and emergency preparedness functions will be achieved.
4.0 REGULATORY EVALUATION
4.1 Applicable Regulatory Requirements/Criteria 10 CFR 73.54 requires licensees to maintain and implement a CSP. PNP's Facility Operating License No. DPR-20 includes a Physical Protection license condition that requires END to fully implement and maintain in effect all provisions of the Commission-approved CSP, including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
4.2 Significant Safety Hazards Consideration Entergy Nuclear Operations, Inc. (END) is requesting an amendment to the Palisades Nuclear Plant (PNP) Facility Operating License to revise the Physical Protection license condition as it relates to the Cyber Security Plan (CSP). This change includes a proposed change to a CSP Implementation Schedule milestone date and a proposed revision to the PNP Facility Operating License to include the proposed deviation. Specifically, ENO is propOSing a change to the Implementation Milestone B completion date.
ENO has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below:
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change to the CSP Implementation Schedule is administrative in nature.
This change does not alter accident analYSis assumptions, add any initiators, or affect the function of plant systems or the manner in which systems are operated, maintained, modified, tested, or inspected. The proposed change does not require any plant modifications which affect the performance capability of the structures, systems, and components relied upon to mitigate the consequences of postulated accidents, and has no impact on the probability or consequences of an accident previously evaluated.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
The proposed change to the CSP Implementation Schedule is administrative in nature.
This proposed change does not alter accident analYSis assumptions, add any initiators, or affect the function of plant systems or the manner in which systems are operated, maintained, modified, tested, or inspected. The proposed change does not require any plant modifications which affect the performance capability of the structures, systems, and components relied upon to mitigate the consequences of postulated accidents and Page60fB
does not create the possibility of a new or different kind of accident from any accident previously evaluated.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No.
Plant safety margins are established through limiting conditions for operation, limiting safety system settings, and safety limits specified in the technical specifications. The proposed change to the CSP Implementation Schedule is administrative in nature. In addition, the milestone date delay for full implementation of the CSP has no substantive impact because other measures have been taken which provide adequate protection during this period of time. Because there is no change to established safety margins as a result of this_change, the proposed change does not involve a significant reduction in a margin of safety.
Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above, ENO concludes that the proposed change presents no Significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and accordingly, a finding of "no significant hazards consideration" is justified.
4.3 Conclusion In conclusion, based on the considerations discussed above: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner; (2) such activities will be conducted in compliance with the Commission's regulations; and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
5.0 ENVIRONMENTAL CONSIDERATION
The proposed amendment provides a change to the CSP Implementation Schedule. The proposed amendment meets the eligibility criterion for a categorical exclusion set forth in 10 CFR 51.22(c)(12). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 REFERENCES
- 1. NRC Internal Memorandum to Barry Westreich from Russell Felts, Review Criteria for 10 CFR 73.54, Cyber Security Implementation Schedule Milestone 8 License Amendment Requests, dated October 24, 2013 (Adams Accession No. ML13295A467)
Page 7 of 8
- 2. NRC letter to ENG, Palisades Nuclear Plant - Issuance of Amendment Regarding Cyber Security Plan: (TAC NO. ME4355) dated July 28, 2011 (Adams Accession No. ML111801243)
- 3. NRC internal memorandum from the Director Cyber Security Directorate, Office of Nuclear Security and Incident Response, to the Region I through IV Directors of Reactor Safety, Enhanced Guidance for Licensee Near-Term Corrective Actions to Address Cyber Security Inspection Findings and Licensee Eligibility for "Good-Faith" Attempt Discretion, Enclosure 2, Milestone 4 Resolution Actions, dated July 1,2013 Page 8 of 8