-wAmeren MISSOURI Callaway Plant December 19, 2013 ULNRC-06060 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:
10 CFR 50.90 DOCKET NUMBER 50-483 CALLA WAY PLANT UNIT 1 UNION ELECTRIC CO.
FACILITY OPERATING LICENSE NPF-30 RESPONSE TO RAI SET #5 REGARDING ADOPTION OF NATIONAL FIRE PROTECTION ASSOCIATION STANDARD NFPA 805 Reference 1): Ameren Missouri Letter ULNRC-05781, "Request for License Amendment to Adopt NFP A 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)," August 29, 2011 Reference 2): NRC Letter, "Request for Additional Information License Amendment Request to Adopt National Fire Protection Association Standard 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Callaway Plant (TAC No. ME7046)" November 14,2013 By the Reference I letter, Union Electric Company (Ameren Missouri) submitted a license amendment request (LAR) for Callaway Plant Unit 1 to adopt National Fire Protection Association Standard 805 (NFP A 805). Per Reference 2 the NRC electronically transmitted its fifth Request for Additional Information (RAI) related to our application. contains Ameren Missouri's response to the single request contained in the RAI. contains LAR Attachments to reflect changes made to the LAR as a result of the RAI response and NRC requested changes to the LAR. It contains the complete updated version of Attachments B and C even though most of the pages were not modified. It also contains seven new licensee identified changes that correct minor errors in the LAR.
PO Box 620 Fulton, MO 65251 AmerenMissouri.com
ULNRC-06060 December 19, 20 13 Page2 This submittal does contain one new commitment which is provided in the revised LAR Transition Report Attachment S, Table S-3 Implementation Items in Enclosure 2.
If there are any questions with regard to these RAI responses, please contact me at (573) 676-8719 or Mr. Justin Hiller at (314) 225-1141.
I declare under penalty of perjury that the foregoing is true and correct.
Sincerely, Executed on: 11./ L Cj I UJ l ~
~~!9 Regulatory Affairs Manager EMP
Enclosures:
RAI Set #5 Response Changes to the Transition Report
ULNRC-06060 December 19, 2013 Page 3 cc:
Mr. Marc L. Dapas Regional Administrator U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Fred Lyon Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8B 1 Washington, DC 20555-2738
ULNRC-06060 December 19, 2013 Page4 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:
A. C. Heflin F. M. Diya C. 0. Reasoner III L. H. Graessle S. A. Maglio T. B. Elwood Corporate Communications NSRB Secretary STARS Regulatory Affairs Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)
Ms. Leanne Tippett-Mosby (DNR)
ULNRC-06060 December 19, 2013 Page 5 LIST OF COMMITMENTS The following table identifies those actions committed to by Ameren Missouri in this document. Any other statements in this document are provided for information purposes and are not considered commitments. Please direct questions regarding these commitments to:.
COMMITMENT Due Date/Event COMN Remove requirement to enter Technical 8 months after 50386 Specification 3.0.3 from FSAR Table 9.5.1-2 NRC approval Note 2 and procedure APA-ZZ-00703, Fire Protection Operability Criteria And Surveillance Requirements