OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION December 18, 2013 EA-13-141 Mr. Christopher J. Wamser, Site Vice President Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear Power Station 320 Governor Hunt Road Vernon, VT 05354
SUBJECT:
VERMONT YANKEE NUCLEAR POWER STATION - NRC INVESTIGATION REPORT NO. 1-2013-015
Dear Mr. Wamser:
This letter refers to an investigation by the U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (OI) conducted at Entergy Nuclear Operations, Inc.s (ENOs) Vermont Yankee Nuclear Power Station (VY). The OI investigation, which was completed on July 25, 2013, involved security matters that are considered sensitive information. Therefore, details of the investigation are not included in this letter, but are described in the non-public enclosure. The NRC initiated the OI investigation after ENO identified the issue, took immediate corrective actions to address any security-related vulnerability, entered the issue into its Corrective Action Program, and notified the NRC Region I office.
Based on the results of the NRC OI investigation, the NRC concluded that a Severity Level IV violation occurred. After considering the factors set forth in Section 2.3.2 of the Enforcement Policy, and with the approval of the Director, Office of Enforcement, this issue has been characterized as a non-cited violation (NCV). The NRC has concluded that information regarding the reason for the violation, the corrective actions taken and planned to correct the violation and prevent recurrence, and the date when full compliance was achieved is already adequately addressed on the docket in the non-public enclosure to this letter. Therefore, you are not required to respond to this letter unless the description herein does not accurately reflect your corrective actions or your position. If you contest this NCV or its significance, you should provide a response within 30 days of the date of this letter, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington, D.C.
20555-0001, with copies to the Regional Administrator, Region I, 2100 Renaissance Boulevard, Suite 100, King of Prussia, PA 19406; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001; and the NRC Resident Inspector at VY.
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from its Enclosure, this document is DECONTROLLED
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION C. Wamser 2
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room located at NRC Headquarters in Rockville, MD, and from the NRCs document system, the Agency-wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from ADAMS.
Should you have any questions regarding this matter, please contact Mr. Raymond McKinley, Chief, Projects Branch 5, Division of Reactor Projects in Region I, at (610) 337-5150.
Sincerely,
/RA/
Michael L. Scott Acting Division Director Division of Reactor Projects Docket No.
50-271 License No.
Enclosure:
Results of NRC OI Investigation Report No. 1-2013-015 (CONTAINS OFFICIAL USE ONLY - SECURITY RELATED INFORMATION (OUO-SRI))
cc w/Enclosure; w/OUO-SRI P. Ryan, Security Manager J. Giarrusso, SLO, Massachusetts Emergency Management Agency (MEMA) cc w/o Enclosure; w/o OUO-SRI Distribution via ListServ
SUNSI Review/
X Non-Sensitive Sensitive X
Publicly Available Non-Publicly Available OFFICE RI/ORA RI/ DRS RI/ DRP OI RI/ORA RI/ ORA NAME M
McLaughlin/MMM*
A. Dimitriadis/AD*
R McKinley/RM*
J Teator/JAT*
E Monteith/ELM*
D Holody/MMM for DATE 11/13/13 11/20/13 11/19/13 11/20/13 12/4/13 12/06/13 OFFICE OE OGC RI/DRP NAME D Furst via email B Klukan via email M Scott/MLS DATE 10/31/13 10/31/13 12/17/13
- Concurrence on Previous Page
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION Letter to Christopher Wamser from Michael L. Scott, dated December 18, 2013
SUBJECT:
VERMONT YANKEE NUCLEAR POWER STATION - NRC INVESTIGATION REPORT NO. 1-2013-015 Distribution: (w/o encl)
W. Dean, RA D. Lew, DRA M. Scott, DRP R. Lorson, DRS J. Rogge, DRS D. Screnci / N. Sheehan, OPA C. Hair, ORA D. Holody, ORA B. Bickett, ORA M. McLaughlin, ORA C. Crisden, ORA R. Urban, ORA R. McKinley, DRP S. Shaffer, DRP A. Dimitriadis, DRS N. McNamara/ D. Tifft, ORA S. Rutenkroger, SRI, VY S. Rich, RI, VY D. Bearde, ORA Enforcement Coordinators RII, RIII, RIV (C. Evans, S. Orth, H. Gepford)
D. Furst, OE C. Sanders, NRR S. Coker, NSIR J. Teator, OI M. Holmes, OI B. Klukan, OGC R1DRPMailResource R1 OE Files (with concurrences)
RidsNrrPMVermontYankee Resource RidsOeMailCenter Resource ROPreports Resource Distribution: (w/encl)