Correction to Letter Granting Relaxation of the Schedular Requirements of Order EA-12-049
ML13350A101
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 12/16/2013
From: Jeremy Bowen
NRC/NRR/MSD
To: Meyer L
Point Beach
Hall J
References
Download: ML13350A101 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 16, 2013 Mr. Larry Meyer Site Vice President NextEra Energy Point Beach, LLC Point Beach Nuclear Plant, Units 1 & 2 6610 Nuclear Road Two Rivers, WI 54241-9516

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNIT 1 -CORRECTION TO LETTER GRANTING RELAXATION OF THE SCHEDULAR REQUIREMENTS OF ORDER EA-12-049

Dear Mr. Meyer:

By letter dated December 11, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13322B208), the U.S. Nuclear Regulatory Commission (NRC) granted NextEra Energy Point Beach, LLC, a relaxation from the schedular requirements for full implementation of Order EA-12-049, "Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events," for Point Beach Nuclear Plant, Unit 1. The purpose of this letter is to correct a minor administrative error in that letter. The docket number listed at the bottom of page 3 was incorrect; the correct docket number is 50-266, corresponding to Point Beach Nuclear Plant, Unit 1.

We have confirmed that the original letter received the proper distribution and we regret any inconvenience this error may have caused.

Jeremy S. Bowen, Chief Mitigating Strategies Projects Branch Mitigating Strategies Directorate Office of Nuclear Reactor Regulation Docket No. 50-266 cc: Listserv

  • .. ML13350A101 OFFICE NRR/MSD/MSPB/PM NRR/MSD/MSPB/LA NRR/MSD/MSPB/BC NAME RHall Slent JBowen DATE 12/16/13 12/16/13 12/16/13