MONTHYEARL-23-009, Independent Spent Fuel Storage Installation, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0404 December 2023 Independent Spent Fuel Storage Installation, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-032, Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program2023-05-22022 May 2023 Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program ML23109A3602023-04-19019 April 2023 Independent Spent Fuel Storage Installation, Annual Report of Occupational Radiation Exposure for 2022 L-23-002, Independent Spent Fuel Storage Installation Annual Radiological Environmental Monitoring Report for 20222023-03-16016 March 2023 Independent Spent Fuel Storage Installation Annual Radiological Environmental Monitoring Report for 2022 ML23047A3662023-02-16016 February 2023 Independent Spent Fuel Storage Installation - Response to NRC Request for Additional Information on Revision 1 to the Humboldt Bay ISFSI Quality Assurance Plan ML22340A5362022-12-19019 December 2022 Independent Spent Fuel Storage Installation (ISFSI) Revision 1 to Humbold Bay ISFSI Quality Assurance Plan L-22-005, Independent Spent Fuel Storage Installation - Material Status Report for the Period Ending July 31, 20222022-09-0808 September 2022 Independent Spent Fuel Storage Installation - Material Status Report for the Period Ending July 31, 2022 ML22200A2422022-07-19019 July 2022 Independent Spent Fuel Storage Installation (ISFSI) - Revision 1 to Humboldt Bay ISFSI Quality Assurance Plan L-22-002, Independent Spent Fuel Storage Installation - Annual Report of Occupational Radiation Exposure for 20212022-04-27027 April 2022 Independent Spent Fuel Storage Installation - Annual Report of Occupational Radiation Exposure for 2021 L-22-001, Independent Spent Fuel Storage Installation - Annual Radiological Environmental Monitoring Report for 20212022-03-0808 March 2022 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Monitoring Report for 2021 ML22027A4682022-02-0404 February 2022 Acceptance Letter, Humboldt Bay ISFSI License Amendment Request 21-02 L-21-009, Independent Spent Fuel Storage Installation, Decommissioning Funding Plan2021-12-14014 December 2021 Independent Spent Fuel Storage Installation, Decommissioning Funding Plan L-21-007, License Amendment Request 21-02 - Proposed Revisions to Humboldt Bay Independent Spent Fuel Storage Installation - Special Nuclear Materials License Number 2514 and Technical Specifications2021-12-14014 December 2021 License Amendment Request 21-02 - Proposed Revisions to Humboldt Bay Independent Spent Fuel Storage Installation - Special Nuclear Materials License Number 2514 and Technical Specifications ML21285A0492021-11-29029 November 2021 U.S. Nuclear Regulatory Commission'S Analysis of Pacific Gas and Electric'S Decommissioning Funding Status Report for Humboldt Bay Power Plant Facility, Unit 3, Docket No. 50-133 ML21295A2502021-11-18018 November 2021 Cover Letter from J Marshall to J Welsch Regarding Humboldt Bay Unit 3 License Termination ML21299A2532021-11-17017 November 2021 Completion of Scheduled Decommissioning Activities at the Humboldt Bay Power Plant, Unit 3 Near Eureka, California (License No. DPR-7) L-21-006, Independent Spent Fuel Storage Installation Material Status Report for the Period Ending September 30, 20212021-11-0404 November 2021 Independent Spent Fuel Storage Installation Material Status Report for the Period Ending September 30, 2021 ML21313A3082021-11-0404 November 2021 Independent Spent Fuel Storage Installation, Final Safety Analysis Report Update, Revision 11 and Changes to Technical Specification Bases and 10 CFR 72.48 Report of Changes, Tests, and Experiments for the Period of 10/2/2019 - 10/01/2021 ML21299A2352021-11-0202 November 2021 Approval of Final Status Survey Reports for Remaining Facility Survey Units HBL-21-017, Clarification Regarding Final Status Survey Report for Humboldt Bay Power Plant2021-10-28028 October 2021 Clarification Regarding Final Status Survey Report for Humboldt Bay Power Plant IR 07200027/20214012021-10-21021 October 2021 Independent Spent Fuel Storage Installation - Independent Spent Fuel Storage Installation Security Inspection Report 07200027/2021401 HBL-21-016, Request to Terminate the Humboldt Bay Power Plant 10 CFR Part 50 License2021-10-21021 October 2021 Request to Terminate the Humboldt Bay Power Plant 10 CFR Part 50 License DCL-21-056, Pacific Gas & Electric Co - Proposed Revision to the Pacific Gas and Electric Company Quality Assurance Program Approval Form for Radioactive Material Packages No. 02022021-08-31031 August 2021 Pacific Gas & Electric Co - Proposed Revision to the Pacific Gas and Electric Company Quality Assurance Program Approval Form for Radioactive Material Packages No. 0202 ML21225A7752021-08-25025 August 2021 Letter to J. Welsch, Pg&E, from A. Snyder, NRC - Hbpp, Unit 3 - Approval of Final Status Survey Reports for Multiple Survey Units ML21225A7722021-08-24024 August 2021 Letter to J. Welsch, Pg&E, from A. Snyder, NRC - Humboldt Bay Power Plant, Unit 3 - Approval of Final Status Survey Reports for Trailer City Survey Units (OOL09-01 Through OOL09-10) ML21214A1002021-08-0303 August 2021 Letter to J. Welsch, Pg&E, from A. Snyder, NRC, Humboldt Bay Power Plant, Unit 3 - Approval of Final Status Survey Reports for Caisson Survey Units NOL01-09/NOL01-09-FSR HBL-21-012, Errata for Humboldt Bay Power Plant 2020 Annual Radioactive Effluent Release Report2021-07-28028 July 2021 Errata for Humboldt Bay Power Plant 2020 Annual Radioactive Effluent Release Report HBL-21-011, Final Status Survey Report for the Humboldt Bay Power Plant2021-07-13013 July 2021 Final Status Survey Report for the Humboldt Bay Power Plant ML21189A0752021-07-0808 July 2021 Letter to J. Welsch, Pg&E, from A. Snyder, NRC, Correction to License Numbering Humboldt Bay Power Plant, Unit 3 - Issuance of License Termination Plan Amendment ML21158A1262021-06-24024 June 2021 Letter - Humboldt Bay Power Plant Unit 3 - Issuance of Amendment No. 46 Re License Termination Plan HBL-21-009, Supplemental Response to NRC Request for Additional Information on the License Amendment Request to Revise the License Termination Plan2021-05-20020 May 2021 Supplemental Response to NRC Request for Additional Information on the License Amendment Request to Revise the License Termination Plan HBL-21-007, Response to NRC Request for Additional Information on the License Amendment Request to Revise the License Termination Plan2021-04-29029 April 2021 Response to NRC Request for Additional Information on the License Amendment Request to Revise the License Termination Plan HBL-21-008, Annual Radiological Environmental Monitoring Report for 20202021-04-28028 April 2021 Annual Radiological Environmental Monitoring Report for 2020 HBL-21-006, Annual Report of Occupational Radiation Exposure for Year 20202021-04-15015 April 2021 Annual Report of Occupational Radiation Exposure for Year 2020 ML21099A1192021-04-0808 April 2021 Independent Spent Fuel Storage Installation - Annual Report of Occupational Radiation Exposure for 2020 ML21091A0472021-04-0101 April 2021 Request for Additional Information on License Amendment Request to Revise the License Termination Plan DCL-21-030, 2021 Annual Statement of Insurance for Pacific Gas and Electric Company'S Diablo Canyon Power Plant and Humboldt Bay Power Plant2021-04-0101 April 2021 2021 Annual Statement of Insurance for Pacific Gas and Electric Company'S Diablo Canyon Power Plant and Humboldt Bay Power Plant HBL-21-004, Annual Radioactive Effluent Release Report for 20202021-03-30030 March 2021 Annual Radioactive Effluent Release Report for 2020 HBL-21-003, Decommissioning Funding Report for Humboldt Bay Power Plant, Unit 32021-03-29029 March 2021 Decommissioning Funding Report for Humboldt Bay Power Plant, Unit 3 ML21055A8262021-03-0303 March 2021 Letter to Welsch, Change in NRC Staff Project Management for Humboldt Bay Power Plant Unit 3 L-21-001, Independent Spent Fuel Storage Installation - Annual Radiological Environmental Monitoring Report for 20202021-02-18018 February 2021 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Monitoring Report for 2020 HBL-21-001, License Amendment Request 21-01 Revise Methodology in License Termination Plan2021-02-0808 February 2021 License Amendment Request 21-01 Revise Methodology in License Termination Plan IR 05000133/20200012020-12-0101 December 2020 NRC Inspection Report 05000133/2020-001 and 07200027/2020-001 HBL-20-013, Final Status Survey Report for the Humboldt Bay Power Plant (Office Annex, Security Building, Intake Structure, Count Room Building, and Waste Management Facility)2020-09-24024 September 2020 Final Status Survey Report for the Humboldt Bay Power Plant (Office Annex, Security Building, Intake Structure, Count Room Building, and Waste Management Facility) HBL-20-012, Responses to NRC Requests for Additional Information on the Final Status Survey Reports for the Humboldt Bay Power Plant2020-09-0303 September 2020 Responses to NRC Requests for Additional Information on the Final Status Survey Reports for the Humboldt Bay Power Plant ML20281A4062020-09-0303 September 2020 Independent Spent Fuel Storage Installation (Isfsi), Submittal of Revision 10 to the Updated Final Safety Analysis Report HBL-20-011, Response to NRC Request for Additional Information on the Final Status Survey Report for the Caisson, Survey Units NOL01-09 and NOL01-09-FSR2020-07-20020 July 2020 Response to NRC Request for Additional Information on the Final Status Survey Report for the Caisson, Survey Units NOL01-09 and NOL01-09-FSR ML20161A0252020-06-10010 June 2020 Letter to J. Welsch Re. Issuance of Renewed License No. SNM-2514 ML20162A0612020-06-10010 June 2020 Issuance of Temporary Exemption from 10 CFR Part 73, Appendix B, for Humboldt Bay ISFSI (COVID-19) L-20-001, Independent Spent Fuel Storage Installation, Request for Temporary Exemption from 10 CFR Part 73, Appendix B2020-05-13013 May 2020 Independent Spent Fuel Storage Installation, Request for Temporary Exemption from 10 CFR Part 73, Appendix B 2023-05-22
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML22340A5372022-12-19019 December 2022 Encl - Humboldt Bay RAI, HBI-L6, Humboldt Bay ISFSI Quality Assurance Plan, Rev. 1 ML22340A5362022-12-19019 December 2022 Independent Spent Fuel Storage Installation (ISFSI) Revision 1 to Humbold Bay ISFSI Quality Assurance Plan ML21091A0472021-04-0101 April 2021 Request for Additional Information on License Amendment Request to Revise the License Termination Plan ML20261H5512020-08-12012 August 2020 E-Mail Dated August 12, 2020, from John Hickman, NRC, to William Barley, Pg&E, Forwarding a Request for Additional Information on the Humboldt Bay Caisson Final Status Survey Report ML19122A2302019-04-30030 April 2019 Enclosurai (Letter to J. Welsch Request for Additional Information for the Technical Review of the Application for Renewal of the Humboldt Bay Independent Spent Fuel Storage Installation License No. SNM-2514 (CAC No. 001028)) ML18267A1922018-09-20020 September 2018 Enclosurequest for Supplemental Information: (Letter to J. Welsch Request for Supplemental Information for the Technical Review of the Application for Renewal of the Humboldt Bay Independent Spent Fuel Storage Installation License No. SNM-2 ML13357A7672013-12-24024 December 2013 E. Halpin Ltr. Request for Additional Information Regarding Amendment Request to Add License Condition 2.C.5 ML13347B3092013-12-16016 December 2013 E. Halpin Ltr. Request for Additional Information for the Decommissioning Funding Status for Humboldt Bay ML1126304822011-09-22022 September 2011 Letter to John T. Conway Humboldt Bay Decommissioning Funding Request for Additional Information ML0829500802008-10-20020 October 2008 E-mail, Humbolt and Diablo Canyon Rais for Use of Weighting Factors for Ede ML0511805012005-05-10010 May 2005 Request for Additional Information for License Transfer Applications ML0434403502004-12-0909 December 2004 Request for Additional Information Regarding Spent Fuel Pool Davit Crane Design Application (TAC No. L52634) 2022-12-19
[Table view] |
Text
December 16, 2013 Mr. Edward D. Halpin Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company P. O. Box 56 Mail Code 104/6 Avila Beach, CA 93424
SUBJECT:
HUMBOLDT BAY POWER PLANT UNIT 3 - REQUEST FOR ADDITIONAL INFORMATION
Dear Mr. Halpin:
On April 1, 2013, Pacific Gas and Electric submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for Humboldt Bay Power Plant Unit 3, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No. 50-133
Enclosure:
Request for Additional Information cc w/enclosure: Humboldt Bay Service List
Mr. Edward D. Halpin Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company P. O. Box 56 Mail Code 104/6 Avila Beach, CA 93424
SUBJECT:
HUMBOLDT BAY POWER PLANT UNIT 3 - REQUEST FOR ADDITIONAL INFORMATION
Dear Mr. Halpin:
On April 1, 2013, Pacific Gas and Electric submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for Humboldt Bay Power Plant Unit 3, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No. 50-133
Enclosure:
Request for Additional Information cc w/enclosure: Humboldt Bay Service List DISTRIBUTION: BSpitzberg, RIV AKock, NRR KLois, NRR ML13347B309 OFC DWMEP DWMEP DWMEP DWMEP NAME JHickman CHolston BWatson JHickman DATE 12 / 16 / 2013 12 / 16 / 2013 12 / 16 / 2013 12 / 16 / 2013 OFFICIAL RECORD COPY
Humboldt Bay Power Plant, Unit 3 Service List cc:
Mr. Edward D. Halpin Senior Vice President and Redwood Alliance Chief Nuclear Officer P.O. Box 293 Pacific Gas and Electric Company Arcata, CA 95521 P.O. Box 56 Mail Code 104/6 Dr. Rich Ferguson, Energy Chair Avila Beach, CA 93424 Sierra Club California 1100 11th Street, Suite 311 Loren Sharp Sacramento, CA 94814 Director and Plant Manager Humboldt Bay Nuclear Mr. Gonzalo Perez, Radiation Program Pacific Gas & Electric Company Director 1000 King Salmon Avenue Radiologic Health Branch Eureka, CA 95503 Dept. of Health Services, MS-7610 P.O. Box 997414 Jennifer K. Post Sacramento, CA 95899-7414 Law Department Pacific Gas and Electric Company Stephen Hsu, M.S., Senior Health Physicist 77 Beale Street, B30A Radiological Assessment Unit San Francisco, CA Radioactive Material Licensing Section Radiologic Health Branch Chairman, Humboldt County Board Dept. of Health Services, MS-7610 of Supervisors P.O. Box 997414 County Courthouse Sacramento, CA 95899-7414 825 Fifth Street Eureka, CA 95501 Commissioner California Energy Commission Regional Administrator, Region IV 1516 Ninth Street U.S. Nuclear Regulatory Commission Sacramento, CA 95814 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Deputy Attorney General State of California California Public Utilities Commission 110 West A Street, Suite 700 505 Van Ness, Room 4102 San Diego, CA 92101 San Francisco, CA 94102
REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION 2013 DECOMMISSIONING FUNDING STATUS REPORT FOR HUMBOLDT BAY POWER PLANT UNIT 3 The request for additional information (RAI) is in response to the 2013 Decommissioning Funding Status (DFS) report for Humboldt Bay Power Plant Unit 3. On April 1, 2013, Pacific Gas and Electric (PG&E) submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for Humboldt Bay Power Plant Unit 3, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii).
On April 1, 2013, PG&E did not provide the difference between actual and estimated costs for decommissioning work performed during the previous year.
Per 10 CFR 50.82(a)(8)(v),
The report must include the following information, current through the end of the previous calendar year: an estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based.
RAI #1: Decommissioning Costs Provide the difference between actual and estimated costs for decommissioning work performed during the previous year.
Enclosure