Appendix D Scenario Outline Form ES-D-1 Facility: _Vogtle___ Scenario Nofl: 1 Op-Test NoW: 2012-301 Examiners: _

Operators:

Initial Conditjons: The plant is at 2 X 1 0% power, EOL, Reactor startup in progress.

(Base IC # 1 6, snapped to IC # 1 81 for HL1 7 NRC Exam)

Equipment 00$: None Turnover: Raise power to 1 to 3% and continue power ascension. Containment mini-p urge is in service for a Containment entry on the next shift.

Preloaded Malfunctions:

ESO8 Train A SI auto actuation failure.

ES16 Train B SI auto actuation failure.

RHO4A Block Auto Start on RHR Pump A RHO1 B RHR pump B trip (conditional trigger with SI + 60 seconds).

E525A Mini-Purge dampers 1 HV-2628B fails to automatically close ES25B Mini-Purge dampers 1 HV-2629B fails to automatically close CCO4E CCW pump # 5 auto contact failure Overrides HS-40008 SI switch to NORMAL (Panel Map, C Panel, click on HS, override to norma l).

Note to Simulator Instructor Place Containment Mini-Purge in service.

NOTE to Simulator Instructor-After IC reset, cycle N31 and N32 Shutdown monitors from OFF to ON, these are NOT on switch check.

NOTE to Simulator Instructor Proper setup for N311N32 for this scenario can be verified on Event # 1, page #1.

Event Malf Event Event No. No. Type* Description 1 N/A R-OATC Raise power from 2 X 1 0% to beyond the POAH per 1 2003-C.

R-SS N-UO Unblocks SR Channels N31/N32 HFASA circuits, adjusts AFW flows.

T2 RC1OC I-OATC Narrow Range Tcold fails high causing FV-0121 to throttle open.

@ 100% 1-55 TS-SS LCO 3.3.1 , Condition A, FU 6, 7 Condition E and LCO 3.3.2, Condition A, FU 5b Condition I 1

Appendix D Scenario Outline Form ES-D-1 Event Maif. Event Event j9 No Type* Description T3 RM13122 I-NA Steam Generator # 3 Main Steam Line Radiation Monitor fails high

@ 100%

TS-SS LCO 3.33, Condition A, FU 15 Condition F T4 MSO3B C-UO Steam Generator ARV Loop # 2 fails open.

@ 100% 0-55 T5 0001A C-UO 00W pump # 1 trips, standby pump fails to auto start.

0-55 TS-SS INFO LCO 3.7.7 T6 RP1OA C-OATC RCP # 1 High Vibration and manual RCP # 1 trip by operator.

0-55 TS-sS LCO 3.4.4 Condition A T7 RCO4A M-ALL Small Break LOCA requires entry into 1 8004-C (75 gpm) 0 to 25% LCO 3.4.1 3 Condition A with 60 second Ramp from 25% to 100% (300 gpm over 20 seconds) when NRC ramp chief examiner directs.

9 Preloaded l-OATC Auto SI fails to actuate, manual SI action from panel A2 1-55 required.

Critical 10 Preloaded C-QATC RHR pump A fails to auto start and can be manually started.

C-SS RHR pump B will trip shortly after SI actuates.

Critical Preloaded C-UO CNMT Mini-Purge Dampers fail to automatically close (HV 11 0-55 2628B and HV-2629B).

Critical T8 RCO3A M-ALL Double-Ended pipe rupture at RCP discharge just after transition to E-1 prior to step 4 for RCP Trip Criteria.

(N)ormal, (R)eactivity, (l)nstrument, (C)omponent, (M)ajor 2

Appendix D Scenario Outline Form ES-D-1 Event 1:

Power is at 2 X 10-3% power and critical data has been taken. The crew will raise reactor power from the present level to beyond the POAH and continue power ascension.

Verifiable Actions:

OATC Withdraw control rods to establish a positive SUR and raise power to between 1 to 3% as read on the Power Range Nuclear Instrumentation, then stabilize reactor power using control rods.

uO Unblocks SR NIS Hi Flux at Shutdown.

uO Controls AFW flow as the POAH is reached to control SG levels.

Event 2:

Loop # 3 NA Tcold fails high resulting in PRZR program level failing high. This will result in charging flow controller FV-0121 throttling open to raise PRZR level. There will be a PRZR LO LEVEL DEVIATION (ALB1 1 DOl ) annunciator to warn the crew that PRZR program level is failed high. If the crew does not have FIC-0121 in manual, when they defeat loop # 3 NR Tcold PRZR level will be high relative to program level, FIC-0121 will reduce to minimum causing a possible flashing of letdown.

Verifiable Actions:

OATC Performs lOA of 1 8001 -C section B and verifies rods are in manual.

OATC Takes manual control of FV-1 21 and reduces demand to control charging flow.

OATC Selects affected loop # 3 on both the Tavg and Delta T defeat switches.

OATC Controls charging flow to restore program PRZR level and returns FV-121 to automatic if desired.

Technical Specifications:

LCO 33i, Reactor Trip Instrumentation, Condition A LCO 3.3.1 Reactor Trip Instrumentation, FU 6, Condition E LCO 3.3.1 Reactor Trip Instrumentation, FU 7, Condition E LCO 3.3.2, Engineered Safety Features Actuation System (ESFAS) Condition A LCO 3.3.2, Engineered Safety Features Actuation System (ESFAS), FU 5b, Condition I 3

Appendix D Scenario Outline Form ES-D-1 Event 3:

Steam Generator # 3 Main Steam Line Radiation Monitor Fails High (1 RE-i 3122)

Verifiable Actions:

None This malfunction is an extra Technical Specification call for the 55. No board actions required.

Technical Specifications:

LCO 333 Post Accident Monitoring (PAM) Instrumentation, Condition A LCO 333 Post Accident Monitoring (PAM) Instrumentation, FU 1 5 Condition F Event 4:

Steam Generator # 2 ARV PV-3010 pressure transmitter fails high resulting in PV-3010 opening causing a reactor power excursion and entry in AOP-1 8008-C, Secondary Steam Leak.

Verifiable Actions:

uO Manually closes PV-301 0 to isolate the secondary coolant steam release, stopping the power excursion.

OATC Manually inserts/withdraws rods as necessary to match Tavg with Tref.

Technical Specifications:

None Event Si CCW pump # 1 will trip with failure of standby CCW pump # 5 to automatically start.

Verifiable Actions:

UO Manually starts CCW pump #5 Technical Specifications:

INFO LCO 3.7.7 Component Cooling Water (CCW) System 4

Appendix D Scenario Outline Form ES-D1 Event 6:

RCP # 1 rising vibration with vibration alert alarm and high vibration alarms (Immediate Trip Criteria exceeded)

Verifiable Actions:

OATC Starts RCP # 1 oil lift pump.

OATC Trips RCP # 1 by opening the non-i E breaker first.

OATC Places RCP # 1 spray valve in manual and closes RCP # 1 spray valve to prevent short cycling of the spray lines causing PRZR spray to be ineffective at PRZR control.

Technical Specifications:

LCQ 3.4.4 RCS Loops Modes i and 2, Condition A Event 7, 9 1O 11:

RCS Small Break LOCA of 75 gpm, LOCA will increase to 300 gpm requiring a Reactor trip and manual Safety Injection. At 300 gpm RCS pressure will slowly lower to i800 psig with SI injection flow present and PRZR level will be off scale low.

Verifiable Actions:

OATC Manually Trips Reactor OATC Manually actuates SI using the hand switch on QMCB panel A2 (other switch is failed).

OATC Manually starts RHR pump A during OATC Initial Operator Actions.

UO Manually closes Containment Mini-Purge Dampers HV-2628B and HV-2629B.

Technical Specifications:

LCO 3.4.i3 RCS Operational Leakage, Condition A.

5

Appendix D Scenario Outline Form ES-D-1 Event 8:

Break turns into large break LOCA after entry into 1 901 0-C and prior to step # 4 for RCP Trip Criteria.

Verifiable Actions:

OATC Manually trips the RCPs after DBA LOCA in first steps of 1 901 0-C.

NOTE to Examiners:

The natural procedure flow path at this point will progress until step 23 of E-1 to check for transition to 1 901 2-C, ES-i 2 Post LOCA Cooldown and Depressurization which will NOT be met.

The procedure will transition you back to step 1 7 of 1 901 0-C to wait for Cold Leg Recirculation criteria on RWST Lo-Lo Level to be met.

The scenario may be stopped after this point with chief examiner approval or sooner than the crew returning from step 23 to 1 7 if desired for time considerations.

CRITICAL TASKS:

1 ) Manually actuates Safety Injection from QMCB panel A2 hand switch (the other switch will not function) by no later than step # 4 of 1 9000-C Immediate Operator Actions to ensure adequate core cooling during LOCk

2) Manually starts RHR pump A no later than RCS pressure dropping to lower than the RHR pumps discharge pressure to ensure adequate ECCS injection flow for core cooling and recirculation capability during an ensuing DBA LOCk
3) Manually close at least one CVI damper for Containment Mini-Purge which fail to automatically close ensuring termination of release flow path to the environment from Containment during a LOCA Action must be performed by completion of Initial Operator Actions of 1 9000-C.

6

NUCLEAR SAFETY FOCUS ZrR TARGET ZERO Protected Train: EOOS: Green Alpha LI Yellow LI Bravo LI Orange LiRed Plant 2 x 1O% power EOL, critical data has been taken. 12003-C Conditions: Step 4.227 is current step in progress.

Major Activities: Raise power to the POAH, continue power ascent per UOP 1 2004-C.

Active LCOs:

f No LCOs are in effect at this time.

OOS/Degraded U None CR Instruments:

Narrative U Containment mini-purge is in service for a planned Status: Containment Entry on next shift.

El 1 3501 -1 NIS, Step 4.2.2.2d N31/N35 (N32/N36) Signal Processor Operational Test has been performed SAT per 1 4423-1 (1 4424-1 ) within the last 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

El The remnants of Hurricane Maya are passing through, severe weather and thunderstorms will be in the area for the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. The Severe Weather Checklist is in effect.

All Mode 1 entry requirements are met.

F

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 1 Event No. : 1 Event

Description:

The Control Room Crew will perform actions necessary to continue the Reactor startup after criticality is achieved using procedure 1 2003-C.

The OATC will need to withdraw control rods to establish a positive SUR and raise power to the POAH and continue power ascension Time Position Applicants Action or Behavior ss The following steps are from UQP-12003-C, Reactor Startup (Mode3toMode2)

NOTE: The Tavg/Tref Deviation alarm, ALB12-A05, provides actions to maintain Tavg above 551°F, the minimum temperature for criticality.

OATC 4.2.27 Monitor Tavg/Tref Deviation alarm, ALB12-A05, during the SS remainder of the startup and take corrective actions as directed to maintain Tavg at 557°F +/-2°F. (TS SR 3.4.2.1) uc 4.2.28 Unblock both Source Range channels HFASA circuits per 1 3501 Nuclear Instrumentation System.

(1) Source Range Channel N31 (2) Source Range Channel N32 HFASA NOTE for Examiners: Correct HFASA setup for the scenario below.

Correct Setup

  • SR level trip light ON lR power above P-6 light ON
  • Instrument power light ON
  • Control power light ON
  • All other lights OFF
  • 9.99 E4 setpoint 1

Appendix D RequiredOperator Actions Form ES-D-2 Op-Test No : 201 2-301 Scenario No. : I Event No. : 1 Event

Description:

The Control Room Crew will perform actions necessary to continue the Reactor startup after criticality is achieved using procedure 1 2003-C.

The OATC will need to withdraw control rods to establish a positive SUR and raise power to the POAH and continue power ascension.

Time Position Applicants Action or Behavior uo 1 3501 Nuclear Instrumentation System.

4.222 To unblock the HF@SD Alarm:

a. At the N31 (N32) SHUTDOWN MONITOR, reset the HF@SD as follows:

(1) IF source range indication is off scale high, push and release the TEST pushbutton.

(2) IF source range indication is on scale, reset the HF@SD ALARM SETPOINT per Step 4.2.1.1.

2

Appendix D Required Operator Actions Form ES-D-2 Op-Test No, : 201 2-301 Scenario No, : 1 Event No. : 1 Event

Description:

The Control Room Crew will perform actions necessary to continue the Reactor startup after criticality is achieved using procedure 1 2003-C.

The OATC will need to withdraw control rods to establish a positive SUR and raise power to the POAH and continue power ascension Time Position Applicants Action or Behavior uc 4.2.1 Adjusting The HFASA Setpoint From The Shutdown Monitor NOTES

. The High Flux and Shutdown Alarm setpoint will automatically adjust as SR count rate remains stable or decreasing. Resetting the alarm setting is normally only required for increasing count rate, but may be reset manually at any time.

. When the SHUTDOWN MONITOR is in the HFASA Mode of Operation and the current count rate less than the Alarm setpoint, the red ALARM LED will not be lit. If the SHUTDOWN MONITOR is in the 1/M Mode of operation, or in the HFASA Mode of Operation and the current count rate exceeds the Alarm setpoint, the red ALARM LED will be lit.

. Depressing the COUNT RATE 1/M PUSH BUTTON toggles the SHUTDOWN MONITOR between the HFAS Mode and the 1/M Mode.

. In the 1/M Mode the ALARM SETPOINT will read 1.0 immediately after depressing the ALARM SETPOINT RESET Pushbutton. In the HFAS Mode the ALARM SETPOINT will read approximately 2 times the COUNTRATE reading immediately after depressing the ALARM SETPOINT RESET Pushbutton.

3

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 2012-301 Scenario No. : 1 EventNo.: 1 Event

Description:

The Control Room Crew will perform actions necessary to continue the Reactor startup after criticality is achieved using procedure 12003-C.

The OATC will need to withdraw control rods to establish a positive SUR and raise power to the POAH and continue power ascension.

Time Position j Applicants Action or Behavior uo 4.2.1.1 Atthe N31 (N32) SHUTDOWN MONITOR:

a. Check the selected SHUTDOWN MONITOR is in the HFAS Mode of Operation, (red ALARM LED not lit>.

(1 > IF the red ALARM LED is lit, depress the ALARM SETPOINT RESET Pushbutton.

(2) IF the red ALARM LED is still lit, depress the COUNT RATE 1/M PUSH BUTTON.

b. Note the steady state N31 (N32) SHUTDOWN MONITOR COUNTRATE indication.

C. Depress the ALARM SETPOINT RESET Pushbutton and verify the red ALARM LED is not lit.

d. Verify the ALARM SETPOINT indication is less than or equal to 2.3 times the COUNTRATE noted above.

4

AppendixD Required Operator Actions Form ES-D-2 Op-Test Nofl: 2O123O1 Scenario Nofl: 1 Event No. : 1 Event

Description:

The Control Room Crew will perform actions necess ary to continue the Reactor startup after criticality is achieved using proced ure 1 2003-C.

The OATC will need to withdraw control rods to establish a positive SUR and raise power to the POAH and continue power ascension.

Time Position Applicants Action or Behavior uo 4.22.2. To unblock the HF@SD Alarm: (Continued)

b. Atthe N31(N32) Signal Processor Drawer:

(1) Place the SR HF@SD Switch in NORMAL.

(2) Check SR HF@SD red lamp not lit.

c. At the QMCB, check the following annunciators extinguished:

(1) ALB1O-BO1 SOURCE RNG HI SHUTDOWN FLUX ALARM BLOCKED (2) ALB1O-CO1 SOURCE RANGE HI FLUX LEVEL AT SHUTDOWN NOTE: Crew turnover sheet states the Signal Processor Channel Operational Test has been performed within the last 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

d. Verify 1 4423-1 (1 4424-1 ), N311N35(N32/N36) Signal Processor Channel Operational Test: has been performed satisfactorily in the last 92 days.
e. Notify the 55 that the HF@SD alarm has been returned to OPERABLE and to exit TS LCO 3.3.8 and TS LCO 3.9.2, IF entered.

UO NOTE: The candidate will have to perform steps 4.2.2.2 and 4.2.1.1 twice. Once for each channel of HFASA.

5

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2012301 Scenario No.: 1 Event No. : 1 Event

Description:

The Control Room Crew will perform actions necessary to continue the Reactor startup after criticality is achieved using procedure 12003-C.

The OATC will need to withdraw control rods to establish a positive SUR and raise power to the POAH and continue power ascension.

Time Position

} Applicants Action or Behavior Uc 1 3501 Nuclear Instrumentation System.

4.2.2.2 To unblock the HF@SD Alarm:

a. At the N31 (N32) SHUTDOWN MONITOR, reset the HF@SD as follows:

(1) IF source range indication is off scale high, push and release the TEST pushbutton.

(2) IF source range indication is on scale, reset the HF@SD ALARM SETPOINT per Step 4.21.1.

6

Appendix D Required Operator Actions Form ESD-2 Op-Test No. : 201 2-301 Scenario No. : 1 Event No. : 1 Event

Description:

The Control Room Crew will perform actions necessary to continue the Reactor startup after criticality is achieved using procedure 1 2003-C.

The OATC will need to withdraw control rods to establish a positive SUR and raise power to the POAH and continue power ascension.

Time Position Applicants Action or Behavior uo 4.21 Adjusting The HFASA Setpoint From The Shutdown Monitor NOTES

. The High Flux and Shutdown Alarm setpoint will automatically adjust as SR count rate remains stable or decreasing. Resetting the alarm setting is normally only required for increasing count rate, but may be reset manually at any time.

. When the SHUTDOWN MONITOR is in the HFASA Mode of Operation and the current count rate less than the Alarm setpoint, the red ALARM LED will not be lit. If the SHUTDOWN MONITOR is in the 1/M Mode of operation, or in the HFASA Mode of Operation and the current count rate exceeds the Alarm setpoint, the red ALARM LED will be lit.

. Depressing the COUNT RATE 1/M PUSH BUTTON toggles the SHUTDOWN MONITOR between the HFAS Mode and the 1/M Mode.

. In the 1/M Mode the ALARM SETPOINT will read 1.0 immediately after depressing the ALARM SETPOINT RESET Pushbutton. In the HFAS Mode the ALARM SETPOINT will read approximately 2 times the COUNTRATE reading immediately after depressing the ALARM SETPOINT RESET Pushbutton.

7

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 1 Event No. : 1 Event

Description:

The Control Room Crew will perform actions necessary to continue the Reactor startup after criticality is achieved using procedure 1 2003-C.

The OATC will need to withdraw control rods to establish a positive SUR and raise power to the POAH and continue power ascension.

Time Position

[ Applicants Action or Behavior uo 4.2.1 .1 At the N31 (N32) SHUTDOWN MONITOR:

a. Check the selected SHUTDOWN MONITOR is in the HFAS Mode of Operation, (red ALARM LED not lit).

(3) IF the red ALARM LED is lit, depress the ALARM SETPOINT RESET Pushbutton.

(4) IF the red ALARM LED is still lit, depress the COUNT RATE 1/M PUSH BUTTON.

b. Note the steady state N31 (N32) SHUTDOWN MONITOR COUNTRATE indication.
c. Depress the ALARM SETPOINT RESET Pushbutton and verify the red ALARM LED is not lit.
d. Verify the ALARM SETPOINT indication is less than or equal to 2.3 times the COUNTRATE noted above.

8

Appendix D Required Operator Actions Form ES-D2 Op-Test No. : 201 2301 Scenario No. : 1 Event No. : 1 Event

Description:

The Control Room Crew will perform actions necessary to continue the Reactor startup after criticality is achieved using procedure 1 2003-C The OATC will need to withdraw control rods to establish a positive SUR and raise power to the POAH and continue power ascension.

Time Position Applicants Action or Behavior uc 4.22.2. To unblock the HF@SD Alarm: (Continued)

b. At the N31 (N32) Signal Processor Drawer:

(3) Place the SR HF@SD Switch in NORMAL.

(4) Check SR HF@SD red lamp not lit.

c. At the QMCB, check the following annunciators extinguished:

(3) ALB1O-BO1 SOURCE RNG HI SHUTDOWN FLUX ALARM BLOCKED (4) ALB1O-CO1 SOURCE RANGE HI FLUX LEVEL AT SHUTDOWN

d. Verify 1 4423-1 (1 4424-1), N31/N35(N32/N36) Signal Processor Channel Operational Test, has been performed satisfactorily in the last 92 days.
e. Notify the 55 that the HF@SD alarm has been returned to OPERABLE and to exit TS LCO 3.3.8 and TS LCO 3.9.2, IF entered.

END of steps for placing HF@SD in service.

9

Appendix D Required Operator Actions Form ESD-2 Op-Test No. : 201 2-301 Scenario No. : 1 Event No. : 1 Event

Description:

The Control Room Crew will perform actions necessary to continue the Reactor startup after criticality is achieved using procedure 1 2OO3C The OATC will need to withdraw control rods to establish a positive SUR and raise power to the POAH and continue power ascension.

Time Position Applicants Action or Behavior ss 12003-C 42.29 IF this Reactor startup was a dilution to criticality for LPPT, perform LPPT-GAEIGBE-01.

This Step is N/A OATC 42.30 Verify Power Range Channels indicating properly on recorder NR-45.

ss NOTE OATC A spike in startup rate (SUR) will occur when intermediate range nuclear instruments (N35 and N36) automatically swap from pulse counting to MSV mode at about 3 X 1 0-2% power (rising).

OATC CAUTION Ensure alternate indications of Reactor power level are observed to back up nuclear instrumentation readings.

OATC 4.231 Raise power to approximately 1 % to 3%.

uO 4232 Verify steam dumps or, if applicable, S/G atmospheric relief Valves, maintain Tavg at 557°F +/- 2°F.

10

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 1 Event No. : 1 Event

Description:

The Control Room Crew will perform actions necessary to continue the Reactor startup after criticality is achieved using procedure 1 2003-C.

The OATC will need to withdraw control rods to establish a positive SUR and raise power to the POAH and continue power ascension.

Time Position Applicants Action or Behavior ss 4.2.33 Continue to power operation per 1 2004-C, Power Operation (Mode 1).

ss Transitions to UOP-1 2004-C 4.1 .1 Obtain from the Control Room Mode Change Binder AND the Surveillance Tracking Coordinator all deferred (NOT performed) surveillance tests required for Mode 1 entry.

a. Schedule AND perform those applicable test procedures PRIOR to Mode 1 entry.

CAUTION: Reactor power shall remain less than 5% as read on highest reading PR NIS or highest reading Loop delta T, until all Mode 1 entry requirements have been met.

4. 1 .2 Slowly raise Reactor Power to 4%.

END OF EVENT 1.

11

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 201 2-301 Scenario No.: 1 Event Nofl: 2 Event

Description:

RCS NR Temperature Instrument TE-431 B Fails High (Tcold) on loop # 3.

The crew will then enter AQP-18001 section B Failure of RCS Narrow Range Temperature Instrumentation to complete the corrective actions for this failure.

Time Position Applicants Action or Behavior Diagnose N R Temperature Instrument Failure:

(Loop 3 TCOLD TE-431 B fails high)

Symptoms I alarms:

OATC ALB12-A04 AC LOOP TAVG/AUCT TAVG HI-LO DEV ALB12-A05 TAVG TREE DEVIATION ALB12-A06 OVERTEMP 1T ALERT ALB12-B04 AUCT TAVG HIGH ALB1 1 DO1 PRZR LO LEVEL DEVIATION ALB1O-E03 OVERTEMP tT ROD BLOCK AND RUNBACK ALERT ALBO7-A05 REGEN HX LTDN HI TEMP ALBO8-F06 RCP SEAL WATER INJ LO FLOW Indications:

. Loop 3 Tavg I Delta T indications deviating from other loops.

. 1 FIC-0121 Charging Flow Controller raising to maximum demand.

18001-c Section B OATC IMMEDIATE OPERATOR ACTION Bi . Verify ROD BANK SELECTOR SWITCH in MAN position.

55 Verifies immediate operator action step Bi with OATC.

55 Enters AOP 1 8001 -C, Section B. (Crew Update)

OATC Subseguent Actions B2. Restore TAVG to program band.

NOTE: The OATC should take manual control of charging per direction of ARP 17011, window DOl for PRZR LO LEVEL DEVIAT1ON to prevent a charging transient after defeating the failed Tavg channel. The OATC will take manual control of FIC-121 to raise I control charging flow and adjust seal injection using HC-1 82.

Cue to Simbooth: IF asked, the Shift Manager has given permission to place the charging flow controller in auto.

12

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 201 2-301 Scenario No.: 1 Event No: 2 Event

Description:

RCS NR Temperature Instrument TE-431 B Fails High (Tcold) on loop # 3.

The crew will then enter AQP-18001 section B Failure of RCS Narrow Range Temperature Instrumentation to complete the corrective actions for this failure.

Time Position Applicants Action or Behavior OATC B3. Select affected loop on TS-412T TAVG DEFEAT SEL Defeats 432 NOTE: It is possible the crew may isolate letdown during this event.

The AOP steps for letdown isolation are on page # 16.

B4. Select affected loop on TS-41 1 F DELTA T DEFEAT SEL.

Defeats 431 OATC B5. Place ROD BANK SELECTOR SWITCH in AUTO position, if desired.

NOTE: The OATC will leave rods in MANUAL for the power ascent.

55 B6. Notify I & C to initiate repairs.

Calls 55 to perform the following:

. Notify Operations Duty of AOP entry

. Write a Condition Report

. Notify Maintenance of the failure SS B7. Bypass the affected instrument channel using 13509-C, BYPASS TEST INSTRUMENTATION (BTI) PANEL OPERATION, if desired.

NOTE: Expect the 88 will NOT bypass the channeL SS B8. Trip the affected channel bistables and place the associated MASTER TEST switches in TEST position per TABLE B1 within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. (TS 3.3.1 & 33.2)

NOTE: The $8 is expected to leave bistables untripped during the allowed out of service time to facilitate l&C trouble shooting of the failed channeL 13

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.; 201 2-301 Scenario No.: 1 Event NoW: 2 Event

Description:

RCS NR Temperature Instrument TE-431 B Fails High (Tcold) on ioop # 3.

The crew will then enter AOP-18001 section B Failure of ACS Narrow Range Temperature Instrumentation to complete the corrective actions for this failure.

Time Position Applicants Action or Behavior ss B9. Initiate the applicable actions of:

. TS33i

. TS3.3.2 ss LCO 33.1 Function 6, 7 Condition E OTAT Trip, OPAT CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Al Enter the Condition referenced in Immediately Functions with Table 3.3.11 for the channel(s).

one or more required channels inoperable.

E. One channel Inoperable. El Place channel in trip.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OR E.2 Be in MODE 3.

78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> LCO 3.3.2 Function 5b. Condition I FWI CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Al Enter the Condition referenced in Immediately Functions with Table 332-1 for the channel(s) or one or more train(s).

required channels inoperable.

I. One channel 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Inoperable. 1.1 Place channel in trip.

OR 1.2 Be in MODE 3. 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> 14

Appendix D Reciyired Operator Actions Form ESD-2 Op-Test No.: 201 24Oi Scenario No: 1 Event No.: 2 Event

Description:

RCS NR Temperature Instrument TE-431 B Fails High (Tcold) on loop # 3.

The crew will then enter AOP-1 8001 section B Failure of RCS Narrow Range Temperature Instrumentation to complete the corrective actions for this failure.

Time Position Applicants Action or Behavior OATC I UC 81 0. Initiate the Continuous Actions Page.

ss *Bj Check repairs and surveillances COMPLETE. (NO)

RNO

  • B1 1 . Perform the following:
a. WHEN repairs and surveillances are complete, THEN perform Step B12.
b. Return to procedure and step in effect.

OATC ALB1 1 -DOl PRZR LO LEVEL DEVIATION actions.

1 .0 PROBABLE CAUSE 1 . Pressurizer Level Control System malfunction.

2. ChargingLetdown System malfunction.

2.0 AUTOMATIC ACTIONS NONE 3.0 INITIAL OPERATOR ACTIONS Check pressurizer level using 1 -LR-0459 recorder and if a Pressurizer Level Control System malfunction is indicated, initiate 1 8001 -C, Primary Systems Instrumentation Malfunction.

4.0 SUBSEQUENT OPERATOR ACTIONS IF Pressurizer Level Control System is not correcting level, take manual control and adjust as required.

5.0 COMPENSATORY OPERATOR ACTIONS NONE END OF EVENT 2.

15

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 1 Event No. : 2, Steps from AOP for Loss of LetdownS Event

Description:

NR Tcold Fails High steps from AOP for Loss of Letdown Time Position Applicants Action or Behavior OATC Al . Isolate letdown relief flowpath by performing the following:

a. Close letdown orifice isolation valves.

. HV-8149A

. HV-81 49B

. HV-8149C

b. Close letdown isolation valves.

. LV-459

. LV-460 QATC A2. Adjust HC-1 82 and FIC-1 21 as necessary to establish the following.

. Seal injection flow to all RCPs 8 to 13 GPM.

-AND-

. Charging flow APPROXIMATELY 10 GPM GREATER THAN TOTAL SEAL INJECTION FLOW.

OATC A3. Check pipe break protection valves OPEN: (YES)

. HV-15214

. HV-8160 uO A4. Check instrument air to Containment ESTABLISHED.

16

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 2012-301 Scenario No. : 1 Event No. : 2, Steps from AOP for Loss of Letdown.

Event

Description:

Nfl Tcold Fails High steps from AOP for Loss of Letdown Time Position

} Applicants Action or Behavior OATC A5. Check CVCS letdown to BTRS flowpath.

a. Check TV-0381 B BTRS Demin Inlet Temperature Control OPEN. (HS-10351 DILUTE or OFF lights lit.)
b. Check HV-81 15 LETDOWN DIVERT TO BTRS - OPEN.

OATC A6. Identify and correct cause for loss of letdown:

a. Check for letdown path valve failures or mispositions.
b. Check instrumentation.

. Pl-131A

. Tl-130

c. Check PIC-131.
d. Check HV-81 52 OPEN.
e. Check for other causes.

OATC A7. Check normal letdown AVAILABLE.

UO A8. Restore normal letdown by initiating 1 3006, CHEMICAL AND VOLUME CONTROL SYSTEM.

NOTE to examiner: Go to steps for Restoration of Normal Letdown to Service starting on page # 19, once that has been completed, return to the following step A9 to continue the AOP.

SS A9. Initiate the Continuous Actions Page.

CREW 17

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 1 Event No. : 2, Steps from AOP for Loss of Letdown.

Event

Description:

NR Tcold Fails High steps from AOP for Loss of Letdown Time Position Applicants Action or Behavior OATC AlO. Verify PRZR level - TRENDING TO PROGRAM.

OATC Al 1 Check normal letdown flow ESTABLISHED.

SS Al 2. Return to procedure and step in effect.

SS Note to examiner: The crew will return to page # 1 3, step B4 for the NR Temperature Instrument AOP if letdown was isolated during this event.

18

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 201 2-301 Scenario No.: 1 Event No.: 2, Steps for placing Letdown in Service.

Event

Description:

PIC-131 fails low resulting in lifting the Letdown relief to the PRT. The OATC will isolate Letdown and place either Excess or Normal Letdown in service. This event description is for placing Normal Letdown in service.

Time Position Applicants Action or Behavior OATC I UO Letdown Restoration using 1 3006-1 , Section 442 Step 44.2.1 Not applicable as a Charging pump is running.

Step 4.42.2 jf NCP is in service, verify NCP MINIFLOW 1-HV-8109 is open.

Step 4.4.2.3 Perform the following:

a. Close LETDOWN ORIFICE Isolation valves

. 1-HV-8149A

. 1-HV-81498

. 1-HV-8149C

b. Close LETDOWN ISOLATION VLV UPSTREAM AND DOWNSTREAM Valves:

. 1-LV-460

. 1-LV-459 C. Close PZR AUX SPRAY VALVE 1-H V-81 45.

d. Open CVCS LETDOWN PIPE BREAK PROT ISOLATION 1-HV-15214.
e. Open RCS LETDOWN LINE ISO VLV IRC 1-HV-8160.
f. Open RCS LETDOWN LINE ISO VLV ORC 1 -HV-81 52.

g Place Letdown Pressure Controller 1 PlC-i 31 in MAN and adjust output to between 50% and 75%.

h. Place LETDOWN HX OUTLET TEMP 1TIC-130 in MAN and adjust output to the most current position as recorded on the Control Room Rounds Sheets.
i. Verify PRESSURIZER LEVEL 1 LR-459 greater than 17%.

19

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Q12-3Oi Scenario No.: 1 Event No.: 2, Steps for placing Letdown in Service.

Event

Description:

PlC-i 31 fails low resulting in lifting the Letdown relief to the PRT. The OATC will isolate Letdown and place either Excess or Normal Letdown in service. This event description is for placing Normal Letdown in service.

Time Position Applicants Action or Behavior OATC I UO Step 4.4.2.3.j Verify one of the following are OPEN NORMAL CHARGING TO LOOP 1 1-HV-8146 (even-numbered fuel cycle)

OR ALTERNATE CHARGING TO LOOP 4 1-HV-8147 (odd-numbered fuel cycle)

Step 4.4.2.4 Verify CHARGING TO RCS ISOLATION Valves are OPEN:

. HV-8105

. HV-8106 Step 4.4.2.5 Simultaneously perform the following:

. Adjust 1 HC-1 82 output to maintain between 8 and 13 gpm to each RCP.

. Adjust 1FIC-121 to raise CHG FLOW 1FI-121A to between 80 and 90 gpm.

Step 4.4.2.6 Open LETDOWN ISOLATION VLV UPSTREAM Q DOWNSTREAM Valves by holding their handswitches in OPEN UNTIL the valves are fully open:

. 1 -LV-460 1 HS-460

. 1 -LV-459 1 HS-459 20

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 201 2-301 Scenario No.: 1 Event No.: 2, Steps for placing Letdown in Service.

Event

Description:

PIC-131 fails low resulting in lifting the Letdown relief to the PRT. The OATC will isolate Letdown and place either Excess or Normal Letdown in service. This event description is for placing Normal Letdown in service.

Time Position Applicants Action or Behavior OATC I UO Step 4,4,2.7 Establish Letdown flow:

a. Simultaneously open a Letdown Orifice and maintain pressure by performing the following:

. Open one LETDOWN ORIFICE Isolation Valve by holding its handswitch in the OPEN position until fully open:

1HS-8149B (75 gpm odd fuel cycles)

OR 1 HS-81 49C (75 gpm even fuel cycles)

OR 1 HS-81 49A (45 gpm)

. Adjust 1 PlC-i 31 A to maintain LETDOWN PRESS 1 Pl-131A between 360 and 380 psig.

b. Record the letdown orifice that was placed in service in the Unit Control Log.

Step 4.4.2.8 WHEN LETDOWN PRESS 1PI-131A stabilizes between 360 and 380 psig, place 1 PlC-i 31 in AUTO.

Step 4.4,2,9 Place LETDOWN HX OUTLET TEMP 1TIC-130 in AUTO and verify it maintains temperature less than or equal to 115°F, Step 4.4.2.10 Verify LETDOWN REGEN HX OUT 1TI-127 indicates less than 380°F.

Step 4.4.2.1 1 - Monitor 1 LR-459 Pressurizer Level and Pressurizer Level Setpoint.

Step 4.4.2.12 Maintain Pressurizer Level within 1% of Level Setpoint using 1FIC-121.

21

AppendixD Required Operator Actions Form ES-D-2 0pTest No.: 201 2-301 Scenario No.: 1 Event NoW: 2, Steps for placing Letdown in Service.

Event

Description:

PlC-i 31 fails low resulting in lifting the Letdown relief to the PRT. The OATC will isolate Letdown and place either Excess or Normal Letdown in service. This event description is for placing Normal Letdown in service.

Time Position Applicants Action or Behavior OATC I UO Step 4.42i 3 Place Pressurizer Level Control in automatic UNLESS it is to remain in Manual under Tagout or Caution tag:

a. Verify PRZR Level Controller 1 LIC-459 in AUTO.
b. AFTER level has been stable within 1% of setpoint for approximately 3 minutes, place 1 FIC-1 21 in AUTO.

Step 4A2.14 Check Excess Letdown in service;

a. IF Excess Letdown in service WHEN directed by the 55, remove Excess Letdown from service per 13008-1 Chemical and Volume Control System Excess Letdown.

Step 4.4.2.1 5 - U this section was performed to restore normal charging and letdown to service following termination of Safety Injection, Return To 19011-C, ES-l.l SI Termination.

Return to page # 1 7, step A9 for AOP Loss of Letdown Event 22

Appendix D Reauared Operator Actions Form ES-D-2 Op-Test Nofl: 201 2-301 Scenario No.: 1 Event No: 3 Event

Description:

Main Steam Line Rad Monitor 1 RE-i 31 22 Fails High Time Position Applicants Action or Behavior OATC Alarms I Indications:

uc 55

  • ALBO5 B03 INTMD RADIATION ALARM
  • ALBO5 C03 HIGH RADIATION ALARM
  • Safety Related Display Console (SRDC) 1 RE-i 31 22 High &

Alert alarms.

uo 1 7005-1 803 INTMD RADIATION ALARM OATC PROBABLE CAUSE An alert condition on one or more of the Radiation Monitor Channels.

AUTOMATIC ACTIONS NONE INITITIAL OPERATOR ACTIONS NONE JBSEQUENT OPERATOR ACTIONS 1 Check the Safety Related Display Console (QRM2), the RMS Communications Console (QRM1) and the Plant Computer to determine the monitor in alarm and Go To 17100-1, Annunciator Response Procedure For The Process And Effluent Radiation Monitor System (RMS) or 17102-1, Annunciataor Response Procedure For The Safety Related Display Control QRM2 as appropriate.

2. IF alarm is for 1 -RE-2562A or C, refer to response for High Alarm in 17102-1.

3 Initiate a CR documenting Alarm condition.

COMPENSATORY OPERATOR ACTIONS Monitor Plant Computer for radiation alarms if annunciators is inoperable or in solid.

23

Appendix D Required OperatorActions Form ES-D-2 Op-Test No.: 201 23O1 Scenario No: 1 Event Nofl: 3 Event

Description:

Main Steam Line Rad Monitor 1 RE-i 31 22 Fails High Time Position Applicant s Action or Behavior OATC 17005-1 C03 HIGH RADIATION ALARM uO SS PROBABLE CAUSE A high alarm on one or more of the Radiation Monitor Channels.

AUTOMATIC ACTIONS NONE INITIAL OPERATOR ACTIONS NONE SUBSEQUENT OPERATOR ACTIONS 1 . Check the Safety Related Display Console (QRM2), the RMS Communications Console (QRM1) and the Plant Computer to determine the monitor in alarm and Go To 17100-1, Annunciator Response Procedure For The Process And Effluent Radiation Monitor System (RMS) or 17102-1, Annunciataor Response Procedure For The Safety Related Display Control QRM2 as appropriate.

2. Initiate a CR documenting Alarm condition.

NOTE to examiner: The simulator does NOT actually model the Communications Console.

COMPENSATORY OPERATOR ACTIONS Monitor Plant Computer for radiation alarms if annunciators is inoperable or in solid.

24

Appendix D Required Operator Actions Form ES-D-2 Op-Test Nofl: 201 2-301 Scenario No: 1 Event NoW: 3 Event

Description:

Main Steam Line Rad Monitor 1 RE-i 31 22 Fails High Time __Position Applicants Action or Behavior OATC 17102-1 CDCA C2 1-RE-13122 (RED LAMP LIT) (HIGH) uo SS NOTE: For other than HIGH conditions see pages 5 and 6.

PROBABLE CAUSE 1 Steam Generator 3 tube rupture.

2. Equipment malfunction.

AUTOMATIC ACTIONS NONE OATC INTITIAL OPERATOR ACTIONS uO SS NOTE: Steam Line Radiation Monitor sensitivity is very low and they are not expected to provide indication for tube ruptures less than 1000 gpm with RCS DEQ 1-131 concentrations below I uCi/gm.

1 Evaluate plant parameters to determine if a Steam Generator tube rupture is indicated.

a. VCT makeup frequency and/or charging flow has increased.
b. Pressurizer level and/or pressure has decreased.
c. Steam Flow/Feed Flow mismatch and SG level response.
2. IF a Steam Generator tube rupture is verified, manually initiate reactor trip and SI and Go To 1 9000-C.

25

Appendix D Required Operator Actions Form ES-D-2 Op-Test NoW: 201 2-301 Scenario No.: 1 Event No.: 3 Event

Description:

Main Steam Line Rad Monitor 1 RE-i 3i 22 Fails High Time Position

{ Applicants Action or Behavior OATC SUBSEQUENT OPERATOR ACTIONS uo SS i . IF a Steam Generator tube rupture is NOT identified.

a. Obtain detector trend data per i 58, Radiation Monitoring Systems
b. Notify Health Physics of the alarm.

C. Request Chemistry to sample and count Steam Generators and Condenser Off-Gas for activity.

d. Monitor the channel for further changes.
2. IF sampling and analysis determine that Steam Generator tube leakage exists, Go To 18009-C, Steam Generator Tube Leakage.

3, IF sampling and analysis determine the channel has malfunctioned.

a. Comply with Technical Specification LCO 3.3.3
b. Request Chemistry to deactivate the channel.

COMPENSATORY OPERATOR ACTIONS NONE OATC LCO 3.3.3 Post Accident Monitoring (PAM) Instrumentation.

uO 55 FU 1 5 Steam Line Radiation Monitor.

Required Channels i/steam line.

Condition F One Steam Line Radiation Monitor channel inoperable.

Required Action Restore the channel to OPERABLE status.

Completion Time 30 days.

ENDOFEVENT3.

26

Appendix D Required Operator Actions Form ES-D-2 Op-Test NoW: Qi2-i Scenario No.: 1 Event No.: 4 Event

Description:

SG #2 ARV Pressure Transmitter Fails High resulting in a fully opened ARV. The crew will respond by performing the actions of AQP 1 8008-C, Secondary Coolant Leakage. The UC will be able to isolate the leak with manual operation of the ARV controller on the main control board.

Time Position Applicants Action or Behavior uo Diagnoses opening of SG ARV Loop 4 by the following indications:

. ALB15-FO1 MN STM SFTY VLVS LEAKING

. ALB61-CO1 MN STM SFTY VLVS LEAKING

. ALB1 1 -DOl PRZR LO LEVEL DEVIATION

. ALB12-A03 RC LOOP DELTA T I AUCT DELTA T HI-LO DEV

. ALB12-A04 RC LOOP TAVG/AUCT TAVG HI-tO DEV

. High ARV tailpipe temperature (back panel indication).

. SG #2 ARV position indicating lights Red ON, Green OFF.

. Lowering RCS temperature.

. Rising Reactor power.

. SG #2 ARV controller indication, (RED UP ARROW LIT)

SS Enters AOP 1 8008-C, Secondary Coolant Leakage.

SS 1 . Perform the following as necessary:

UO

  • Reduce Turbine load if any of the following indications exceed 100%

power:

OATC UQ1 1 18 (GREATER THAN 100% MWT for the applicable unit)

NIs LTs UO

  • Isolate the leak. (UO closes SG ARV)
  • if leakage is such that significant hazard to personnel equipment exists Q6 leakage rate is unstable and is worsening, THEN:
1) Trip the reactor.
2) WHEN reactor trip is verified, THEN close MSIVs and BSIVs.
3) Go to 19000-C, E 0 REACTOR TRIP OR SAFETY INJECTION.

OATC/UO 2. Initiate the Continuous Actions Page.

27

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 201 23O1 Scenario No: 1 Event No: 4 Event

Description:

SG #2 ARV Pressure Transmitter Fails High resulting in a fully opened ARV. The crew will respond by performing the actions of AQP 18008-C, Secondary Coolant Leakage. The UO will be able to isolate the leak with manual operation of the ARV controller on the main control board.

Time Position Applicants Action or Behavior uo *3 Monitor steam leakage characteristics:

. Small in magnitude such that no significant hazard to personnel or equipment exists. (YES)

. Leakage rate is relatively stable and is not rapidly worsening. (YES)

QATC 4. Check the following:

a. Tavg MATCHED WITH TREF. (YES)
b. PRZR level IN PROGRAM BAND. (YES)

UO

c. PRZR pressure BETWEEN 2220 AND 2250 PSIG. (YES)
d. SG levels IN PROGRAM BAND. (YES) uO 5. Check containment conditions NORMAL:

. Pressure (YES)

. Temperature (YES)

. Moisture (YES)

. Sump level (YES) uO 6. Close SG blowdown isolation valves if the source of leakage is unknown.

uO *7 Check CSTs level GREATER THAN 80%. (YES) uO *8 Monitor hotwell makeup rate SUFFICIENT TO MAINTAIN LEVEL.

(YES) 55 9. Review applicable Technical Specification requirements.

No LCOs.

28

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 201 2-301 Scenario No: 1 Event No.: 4 Event

Description:

SG #2 ARV Pressure Transmitter Fails High resulting in a fully opened ARV. The crew will respond by performing the actions of AQP 1 8008-C, Secondary Coolant Leakage. The UC will be able to isolate the leak with manual operation of the ARV controller on the main control board.

Time Position Applicants Action or Behavior 55 10. Perform one of the following:

plant operation. YES

-OR-a unit shutdown by initiating 12004 C, POWER OPERATION (MODE 1). NO END OF EVENT 4.

29

Appendix D Required Operator Actions Form ES-D-2 Op-Test No: 201 2-301 Scenario No.: 1 Event No.: 5 Event

Description:

CCW pump # 1 trips with failure of CCW pump # 5 to automatically start.

!I!if!uJ Applicant s Action orBehavior CREW Diagnoses CCW pump # 1 trip Symptoms I alarms:

ALB36 AOl 4160V SWGR 1AAO2 TROUBLE ALBO2 A06 CCW TRAIN A LO HDR PRESS ALBO2 B06 CCW TRAIN A LO FLOW ALBO2 D06 CCW TRAIN A RHR HX LO FLOW ALBO2 E05 CCW TRAIN A RHR PMP SEAL LO FLOW 55 Enters AOP 18020-C Loss of Component Cooling Water.

UO 1 . Check CCW pumps in the affected train TWO RUNNING. (NO) 1 . RNO Starts CCW pump # 5 on Train A.

NOTE: It is possible the candidate will start the pump using the guidance of 10020-C step 3.12 for automatic actions.

UO 2. Checks CCW train operation:

. Flow APPROXIMATELY 9000 GPM. (YES)

. Pressure APPROXIMATELY 90 P51G.

55 3. Returns to procedure and step in effect.

NOTE to Simbooth: IF, the crew calls I & C to investigate the failure of the CCW standby pump to auto start. Report back the following:

Troubleshooting has determined that a failure of the low header pressure switch and trip of a running pump switches failed to work.

The pump will still start on an SI or an LOSP.

55 INFO LCO 3J.7 Component Cooling Water (CCW) System.

END OF EVENT5.

30

Appendix D Required Operator Actions Form ES-D-2 Op-Test No: 201 2-301 Scenario No: 1 Event No: 6 Event

Description:

RCP # 1 High Vibration with RCP # I manual trip.

_Time___Position__f Applicants Action or Behavior OATC Symptoms I Alarms:

ALBO8 E03 RCP 1 VIBRATION ALERT ALBO8 E05 RCP VIBRATION HIGH (1 minute later)

CREW 17008-1 E03/E05 1 . Dispatch an operator to the Vibration Monitoring Panel 1-1201-P5-VMP to:

a. Check both vibration channels and alarm setpoints for shaft and frame of RCP 1 (4 points in all) to verify no obvious vibration monitoring equipment problems exist.
b. Notify maintenance to verify alarm condition.
c. Log any RCP Vibration LEDs illuminated and any elevated vibration readings in Control Room Electronic Log.

NOTE: Simbooth Operator will report back the following:

. 22 mils shaft and rising

. 5.5 mils frame and rising NOTE: Simbooth Operator will report back the following for the previous shifts rounds IF asked.

. 7 mils shaft.

. O.468milsframe.

SS Refers to 1 3003-1 Reactor Coolant Pump Operation 31

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 201 2-301 Scenario No,: 1 Event No.: 6 Event

Description:

RCP # 1 High Vibration with RCP # 1 manual trip.

Time_j_Position Applicants Action or Behavior OATC 13003-1 PRECAUTION 2.2.10 An RCP shall be stopped f any of the following conditions exist.

. RCP shaft vibration of 20 mils or greater.

. RCP frame vibration of 5 mils of greater.

4.31 RCP Shutdown CAUTION: If RCP # 1 or # 4 is to be stopped, the associated Spray Valve is placed in manual and closed to prevent spray short cycling.

OATC 4.3.1 .1 IF RCP # 1 or # 4 is to be stopped, place the associated spray valve in MANUAL and close the valve:

. RCP 1 : 1 -PIC-0455C (OATC will close this valve)

. RCP 4: 1-PIC-0455B (OATC will leave this valve alone)

OATC 4.3.1 .2 IF in Modes 1 or 2, perform an RCP shutdown as follows:

a. Start the RCP Oil Lift Pump for affected RCP, if available.
b. IF Reactor Power is Greater than 1 5% Rated Thermal Power: (It is NOT, this step is N/A)
c. IF Reactor Power is less than 1 5% Rated Thermal Power (IT IS)

(1 ) Stop the RCP by placing its Non-i E Control Switch in STOP and then placing its 1 E Control Switch in STOP:

RCP Non-i E Control Switch 1 E Control Switch Loop 1 1 -HS-0495B 1 -HS-0495A (2) Initiate 1 8005-C, Partial Loss of Flow.

32

Appendix D Required Operator Actions Form ES-D2 Op-Test No.: 201 2-301 Scenario No.: 1 Event No.: 6 Event

Description:

RCP # 1 High Vibration with RCP # 1 manual trip.

Time Position Applicants Action or Behavior QATC NOTE: When stopping the last RCP, its Oil Lift Pump needs to run for at least 10 minutes after stopping the RCP.

4.3.1 .4 WHEN the RCP has coasted to a stop (as indicated by reverse flow), stop the RCP Oil Lift Pump.

ss 18005-C 1 . Check Reactor power LESS THAN OR EQUAL TO 1 5%. (YES)

SS 2. Stop any power changes in progress.

3. Initiate the Continuous Actions Page.

UO 4. Check affected loop SG NR Level TRENDING TO 65%. (NO)

RNO Control feed flow to maintain affected loop SG NR level between 60% and 70%.

OATC 5. Check Tavg - TRENDING TO PROGRAM. (YES)

6. Verify PRZR level - TRENDING TO PROGRAM. (YES)
7. Verify PRZR pressure TREND1NG TO 2235 P51G. (YES)
8. Check RCP 1 and RCP 4 RUNNING. (NO)

RNO Close the affected loop spray valve:

. Loop 1: PIC-0455C 33

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 201 2-301 Scenario No.: 1 Event No.: 6 Event

Description:

RCP # 1 High Vibration with RCP # 1 manual trip.

Tame JPosition Applicants Action or Behavior ss 9 Initiate shutdown to Mode 3 by initiating 12004-C, POWER OPERATION (MODE 1). (TS 3.4.4) 3.4.4 RCS Loops MODES 1 and 2 LCO 3.4.4 Four RCS loops shall be OPERABLE and in operation.

APPLICABILITY: MODES 1 and 2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Requirements of LCO A.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> not met.

SS 10. Determine and correct the cause of the pump trip.

SS 1 1 Check shutdown to Mode 3

. COMPLETE.

RNO Return to step 9.

END OF EVENT6.

34

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 201 2-301 Scenario NoW: 1 Event Nofl: 7 Event

Description:

RCS leakage will develop that is within the capacity of the normal charging flow path to maintain PRZR level and pressure. The crew will be require d to enter AOP-18004 for ACS Leakage. The crew will determine an approximate leak rate of 75 gpm, then the leak will increase requiring a reactor trip with manual action by the OATC to actuate SI (auto SI fails). The QATC will also be required to manually start RHR pump A which will not auto start. The UO will be required to close HV-2628B and HV-26298 on CNMT Mini-Purge which will not auto close.

Time Position Applicants Action or Behavior TEAM Diagnoses an RCS leak has developed:

Symptoms I alarms:

S iNTERMEDIATE AND HIGH RADIATION ALARMS Indications:

. RE-2562 showing alarm condition on SRDC.

. Charging letdown flow mismatch.

. PRZR level lowering.

SS I TEAM Enters AOP-1 8004-C section A for RCS Leakage (MODE 1 2, AND 3 ,

WITH RCS PRESSURE > 1000 PSIG)

Step Al SS checks crew in proper section (section A).

Step A2 SS directs initiation of Continuous Actions page.

OATC Step A3 Maintains PRZR level.

Step A3a adjusts charging flow to maintain PRZR level.

Step A3b Checks PRZR level stable or rising. (NO) 35

Appendix D Required Operator Actions Form ES-D-2 Op-Test NoW: 201 2-301 Scenario Nofl: 1 Event No.: 7 Event

Description:

RCS leakage will develop that is within the capacity of the normal charging flow path to maintain PAZA level and pressure. The crew will be required to enter AOP-1 8004 for RCS Leakage. The crew will determine an approximate leak rate of 75 gpm, then the leak will increase requiring a reactor trip with manual action by the OATC to actuate SI (auto SI fails). The OATC will also be required to manually start RHR pump A which will not auto start. The UO will be required to close HV-2628B and HV-2629B on CNMT Mini-Purge which will not auto close.

Time Position Applicants Action or Behavior OATC RNO Step A3b

b. Perform the following:
1) Isolate letdown by closing:
a. Letdown Orifice Valves.
b. Letdown Isolation Valves.
c. Excess Letdown Valves.
2) Start an additional Charging Pump as necessary.
3) IF PRZR level can NOT be maintained greater than 9%, THEN perform the following:
a. Trip the Reactor.
b. WHEN Reactor trip verified, THEN actuate SI.
c. Go to 1 9000-C, E-0 REACTOR TRIP OR SAFETY INJECTION.

OATC Step # A4 Maintains VCT level using AUTO or MANUAL makeup.

55 Step # A5 Notifies SM to implement EPIPs per NMP-EP-1 10.

OATC Step # A6 Checks PRZR PORVs closed.

Step # A7 Checks PRZR Safety valves closed.

55 I UO Step # A8 Stops any load changes in progress.

36

Appendix D Required Qerator Actions Form ES-D-2 Op-Test No.: 201 2-301 Scenario No.: 1 Event No: 7 Event

Description:

RCS leakage will develop that is within the capaci ty of the normal charging flow path to maintain PRZR level and pressure. The crew will be require d to enter AOP-18004 for RCS Leakage. The crew will determine an approximate leak rate of 75 gpm, then the leak will increase requiring a reactor trip with manual action by the OATC to actuate SI (auto SI fails). The OATC will also be required to manually start RHR pump A which will not auto start. The UQ will be required to close HV-2628B and HV-26298 on CNMT Mini-Purge which will not auto close.

Time Position Applicants Action or Behavior OATC Step # A9 Checks PRZR pressure trending to program.

OATC Step # AlO Monitors CTMT pressure < 3.8 psig and stable.

OATC Step # Al 1 Initiates an RCS leak rate in accordance with 14905.

NOTE: The OATC should be able to determine by a rough leak balance that leak rate is approximately 75 gpm.

55 LCO 3.4.13 RCS Operational LEAKAGE.

a. No pressure boundary LEAKAGE;
b. 1 gpm unidentified LEAKAGE;
c. 10 gpm identified LEAKAGE;
d. 150 gallons per day primary to secondary LEAKAGE through any one steam generator (SG).

Condition A RCS operational LEAKAGE not within limits for reasons other than pressure boundary LEAKAGE or primary to secondary LEAKAGE.

Required Action Reduce LEAKAGE to within limits.

Completion Time 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

Simbooth Increase leak severity to force a reactor trip and manual safety injection, Operator due to lowering PRZR level and pressure when NRC examiner requests.

May be earlier than step Al 1 for time considerations if NRC desires.

37

Appendix D Required Operator Actions Form ES-D-2 Op-Test No: 201 2-301 Scenario No: 1 Event NoW: 7 Event

Description:

RCS leakage will develop that is within the capacity of the normal charging flow path to maintain PRZR level and pressure. The crew will be required to enter AOP-18004 for RCS Leakage. The crew will determine an approximate leak rate of 75 gpm, then the leak will increase requiring a reactor trip with manual action by the QATC to actuate SI (auto SI fails). The QATC will also be required to manually start RHA pump A which will not auto start. The UO will be required to close HV-2628B and HV-26298 on CNMT Mini-Purge which will not auto close.

Time Position Applicants Action or Behavior OATC 1 8004-C RNQ Step A3b. (continuous action)

b. Perform the following:
4) Start an additional Charging Pump as necessary.
5) IF PRZR level can NOT be maintained greater than 9%, THEN perform the following:
a. Trip the Reactor, Critical NOTE: SI auto actuation will NOT occur, OATC must actuate.
b. WHEN Reactor trip verified, THEN actuate SI.
c. Go to 19000-C, E-0 REACTOR TRIP OR SAFETY INJECTION.

CREW Performs Immediate Operator Actions per 1 9000-C, E-0 Reactor Trip or Safety Injection.

55 Makes a page announcement of Reactor Trip.

OATC 1 Check Reactor Trip: (YES)

. Rod Bottom Lights LIT

. Reactor Trip and Bypass Breakers OPEN

. Neutron Flux LOWERING uO 2. Check Turbine Trip: (YES)

. All Turbine Stop Valves CLOSED 38

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 201 23O1 Scenario No.: 1 Event No.: 7 Event

Description:

RCS leakage will develop that is within the capacity of the normal charging flow path to maintain PRZR level and pressure. The crew will be required to enter AOP-18004 for RCS Leakage. The crew will determine an approximate leak rate of 75 gpm, then the leak will increase requiring a reactor trip with manual action by the OATC to actuate SI (auto SI fails), The OATC will also be required to manually start RHR pump A which will not auto start. The UQ will be required to close HV-2628B and HV-26298 on CNMT Mini-P urge which will not auto close.

Time Position Applicants Action or Behavior uo 3. Check Power to AC Emergency Buses. (YES)

a. AC Emergency Busses AT LEAST ONE ENERGIZED

. 4l6OAClEBusses

b. AC Emergency Busses ALL ENERGIZED

. 41 60V AC 1 E Busses

. 480V AC 1 E Busses OATC 4. Check if SI is actuated. (YES)

. Any SI annunciators LIT

. SI ACTUATED BPLP window LIT 55 GotoStep6 55 6. Initiate the Foldout Page.

CREW SS 7. Perform the following:

OATC

  • OATC Initial Actions Page.

UO

  • Uo Initial Actions Page.

NOTE: 55 initiates step 8 after OATC/UO Initial Actions comple ted.

39

Appendix D RectuiredOperator Actions Form ES-D-2 Op-Test No.: 201 2-301 Scenario No.: 1 Event No.: 7 Event

Description:

RCS leakage will develop that is within the capaci ty of the normal charging flow path to maintain PRZR level and pressure. The crew will be require d to enter AOP-1 8004 for RCS Leakage. The crew will determine an approximate leak rate of 75 gpm, then the leak will increase requiring a reactor trip with manual action by the OATC to actuate SI (auto SI fails). The OATC will also be required to manually start RHR pump A which will not auto start.

The UO will be required to close HV-2628B and HV-2629B on CNMT Mini-Purge which will not auto close.

Time Position Applicants Action or Behavior OATC PERFORMS OATC INITIAL ACTIONS 1 Check both trains of ECCS equipment ALIGNING FOR INJECTION PHASE: (YES)

. MLB indication OATC 2. Check Containment Isolation Phase A ACTUATED. (YES)

. CIA MLB indication OATC 3 Check ECCS Pumps and NCP status:

a. CCPs RUNNING. (YES)
b. SI Pumps RUNNING. (YES)

Critical NOTE: RHR pump B is tripped, RHR pump A tailed to auto start, per NRC, step must be completed by the time RCS pressure drops below RHR pump discharge head when the DBA LOCA occurs to satisty the critical step.

c. RHR Pumps - RUNNING. (NO)

RNO

c. Start pumps.
d. NCP - TRIPPED. (YES)

OATC 4. Verify CCW Pumps - ONLY TWO RUNNING EACH TRAIN. (YES) 40

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 201 2-301 Scenario No.: 1 Event No.: 7 Event

Description:

RCS leakage will develop that is within the capaci ty of the normal charging flow path to maintain PRZR level and pressure. The crew will be required to enter AOP-1 8004 for RCS Leakage. The crew will determine an approximate leak rate of 75 gpm, then the leak will increase requiring a reactor trip with manual action by the OATC to actuate SI (auto SI fails). The OATC will also be required to manually start RHR pump A which will not auto start. The UQ will be required to close HV-26286 and HV-2629B on CNMT Mini-Purge which will not auto close.

Time Position Applicants Action or Behavior OATC PERFORMS OATC INITIAL ACTIONS

5. Verify proper NSCW system operation: (YES)
a. NSCW Pumps - ONLY TWO RUNNING EACH TRAIN.
b. NSCW TOWER RTN HDR BYPASS BASIN hand switches - IN AUTO:

. HS-1668A

. HS-1669A OATC 6. Verify Containment Cooling Units: (YES)

a. ALL RUNNING IN LOW SPEED.

. MLB indication

b. NSCW Cooler isolation valves OPEN.

. MLB indication OATC NOTE: HV-2628B and HV-2629B will NOT automatically close.

7. Check Containment Ventilation Isolation.
a. Dampers and Valves CLOSED.

. CVI MLB indication (NOT ALL)

RNO Critical a. Perform the following 1 ) Close Dampers and Valves.

2) Start Piping Pen Units.

41

Appendix D Required Operator Actions Form ES-D-2 Op-Test NoW: 201 2-301 Scenario NO.: 1 Event Nofl: 7 Event

Description:

RCS leakage will develop that is within the capaci ty of the normal charging flow path to maintain PRZR level and pressure. The crew will be require d to enter AOP-18004 for RCS Leakage. The crew will determine an approximate leak rate of 75 gpm, then the leak will increase requiring a reactor trip with manual action by the OATC to actuate SI (auto SI fails). The OATC will also be required to manually start RHR pump A which will not auto start. The UO will be required to close HV-2628B and HV-2629B on CNMT Mini-Purge which will not auto close.

Time Position Applicants Action or Behavior QATC PERFORMS OATC INITIAL ACTIONS

8. Check Containment pressure REMAINED LESS THAN 21 P51G.

(YES)

OATC 9. Check ECCS flows:

a. BIT flow. (YES)
b. RCS pressure LESS THAN 1625 PSIG. (YES)
c. SI Pump flow. (YES)
d. RCS pressure LESS THAN 300 P51G. (NO)

RNO

d. GotoSteplO.

OATC 10. Check ECCS Valve alignment PROPER INJECTION LINEUP INDICATED ON MLBs. (YES)

OATC 11 . Check ACCW pumps - AT LEAST ONE RUNNING. (YES)

OATC 12. Adjust Seal Injection flow to all RCPs 8 to 13 GPM.

OATC 1 3. Dispatch Operator to ensure one train of SPENT FUEL POOL COOLING in service per 13719, SPENT FUEL POOL COOLING AND PURIFICATION SYSTEM.

END OF OATC INITIAL ACTIONS RETURNS TO MAIN BODY OF 19000-C CONTINUING AT STEP 8.

42

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 201 2-301 Scenario No.: 1 Event No.: 7 Event

Description:

ACS leakage will develop that is within the capaci ty of the normal charging flow path to maintain PRZR level and pressure. The crew will be require d to enter AOP-18004 for RCS Leakage. The crew will determine an approximate leak rate of 75 gpm, then the leak will increase requiring a reactor trip with manual action by the OATC to actuate SI (auto SI fails). The OATC will also be required to manually start RHR pump A which will not auto start. The UQ will be required to close HV-2628B and HV-2629B on CNMT Mini-Purge which will not auto close.

Time Position Applicants Action or Behavior uo PERFORMS UO INITIAL ACTIONS 1 . Check AFW Pumps RUNNING. (YES)

. MDAFW Pumps

. TDAFW Pump, if required.

Uo 2. Check NR level in at least one SG GREATER THAN 10%

(32% ADVERSE). (YES)

UO 3. Check if main steamlines should be isolated: (NO)

a. Check for one of more of the following conditions:

Any steamline pressure LESS THAN OR EQUAL TO 585 P51G.

Containment pressure GREATER THAN 14.5 P51G.

Low Steam Pressure SI/SLI BLOCKED AND High Steam Pressure Rate ON TWO OR MORE CHANNELS OF ANY STEAMLINE.

RNO

a. GotoStep4.

43

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: O1 2-3O1 Scenario No.: 1 Event No.: 7 Event

Description:

RCS leakage will develop that is within the capacity of the normal charging flow path to maintain PRZR level and pressure. The crew will be required to enter AQP-18004 for RCS Leakage. The crew will determine an approximate leak rate of 75 gpm, then the leak will increase requiring a reactor trip with manual action by the OATC to actuate SI (auto SI fails). The OATC will also be required to manually start RHR pump A which will not auto start. The UC will be required to close HV-2628B and HV-2629B on CNMT Mini-P urge which will not auto close.

Time Position Applicants Action or Behavior uo PERFORMS UO INITIAL ACTIONS 4 Verify FW Isolation Valves closed: (YES)

. MFIVs

. BFIVs

. MFRVs

. BFRVs uo 5. Verify SG Blowdown isolated: (YES)

. Place SG Blowdown Isolation Valve handswitches HS-76 03A, B, C, and D in the CLOSE position.

. SG Sample Isolation Valves CLOSED uO 6. Verify Diesel Generators RUNNING. (YES)

UO 7. Throttle total AFW flow as necessary to maintain SG NR levels between 10% (32% ADVERSE) and 65%.

uO 8. Verify both MFPs TRIPPED. (YES) uO 9 Check Main Generator Output Breakers OPEN. (YES)

Critical NOTE TO EXAMINER: The UO will be asked by the OATC I 55 to close CVI dampers HV-2628B and HV-2629B that do NOT automa tically close on the CVI signal. These dampers need to be closed by the end of the Operator Initial Actions (OATC or UO) prior to returning to step 8 of 1 9000-C main procedure body.

44

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 201 2-301 Scenario No.: 1 Event NoV: 7 Event

Description:

RCS leakage will develop that is within the capacity of the normal charging flow path to maintain PRZR level and pressure. The crew will be required to enter AOP-18004 for ACS Leakage. The crew will determine an approximate leak rate of 75 gpm, then the leak will increase requiring a reactor trip with manual action by the OATC to actuate SI (auto SI fails).

The OATC will also be required to manually start RHR pump A which will not auto start. The UO will be required to close HV-2628B and HV-2629B on CNMT Mini-Purge which will not auto close.

Time Position Applicants Action or Behavior BACK TO 19000-C PROCEDURE MAIN BODY OATC uo 8. Initiate the Continuous Actions Page.

OATC 9. Check RCS temperature stable at or trending to 557°F

-OR-Without RCP(s) running RCS WR COLD LEG TEMPERATURES.

RNO (IF needed) 9, IF temperature is less than 557°F and lowering, THEN perform the following as necessary:

a. Stop dumping steam.
b. Perform the following as appropriate:

IF at least one SG NR level greater than 10%

(32% ADVERSE), THEN lower total feed flow.

-OR-IF all SG NR levels less than 10% (32% ADVERSE), THEN lower total feed flow to NOT less than 570 gpm.

c. If cooldown continues, THEN close MSIVs and BSIVs.
d. If temperature greater than 557°F and rising, THEN dump steam.

45

Appendix D Required Operator Actions Form ES-D-2 Op-Test No: 201 2-301 Scenario No.: I Event No.: 7 Event

Description:

RCS leakage will develop that is within the capacity of the normal charging flow path to maintain PRZR level and pressure. The crew will be required to enter AOP-1 8004 for RCS Leakage. The crew will determine an approximate leak rate of 75 gpm, then the leak will increase requiring a reactor trip with manual action by the OATC to actuate SI (auto SI fails). The OATC will also be required to manually start RHR pump A which will not auto start. The UO will be required to close HV-26288 and HV-2629B on CNMT Mini-P urge which will not auto close.

Time Position Applicants Action or Behavior OATC CAUTION: A PRZR PORV Block Valve which was closed to isolate an excessively leaking or open PRZR PORV should not be opened unless used to prevent challenging the PRZR Safeties.

10. Check PRZR PORVs, Block Valves, and Spray Valves:
a. PRZR PORVs - CLOSED AND IN AUTO. (YES)
b. Normal PRZR Spray Valves CLOSED. (YES)
c. Power to at least one Block Valve AVAILABLE. (YES)
d. PRZR PORV Block Valves AT LEAST ONE OPEN. (NO)

RNO

d. Verify open at least one PRZR PORV Block Valve when PRZR pressure is greater than 21 85 psig.

OATC 11 . Check if RCPs should be stopped:

a. ECCS Pumps - AT LEAST ONE RUNNING: (YES)

. CCPorSIPump

b. RCS pressure LESS THAN 1375 P51G. (NO)

RNO

b. GotoStepl2.

46

Appendix D Reguired Operator Actions Form ES-D-2 Op-Test No: 201 2-301 Scenario No.: 1 Event Nofl: 7 Event

Description:

RCS leakage will develop that is within the capacity of the normal charging flow path to maintain PRZR level and pressure. The crew will be required to enter AOP-18004 for RCS Leakage. The crew will determine an approximate leak rate of 75 gpm, then the leak will increase requiring a reactor trip with manual action by the OATC to actuate SI (auto SI fails). The OATC will also be required to manually start RHR pump A which will not auto start. The UO will be required to close HV-26288 and HV-2629B on CNMT Mini-P urge which will not auto close.

Time Position Applicants Action or Behavior uo 12. Check SGs secondary pressure boundaries:

a. SG Pressures:

Any lowering in an uncontrolled manner. (NO)

-OR-Any completely depressurized. (NO)

RNO

a. GotoStepl3.

47

Appendix D Required Operator Actions Form ES-D-2 OpTest No.: 201 2-301 Scenario No: 1 Event No.: 7 Event

Description:

RCS leakage will develop that is within the capacity of the normal charging flow path to maintain PRZR level and pressure. The crew will be required to enter AOP-18004 for RCS Leakage. The crew will determine an approximate leak rate of 75 gpm, then the leak will increase requiring a reactor trip with manual action by the OATC to actuate SI (auto SI fails). The OATC will also be required to manually start RHR pump A which will not auto start. The UO will be required to close HV-2628B and HV-2629B on CNMT Mini-P urge which will not auto close.

Time Position Applicants Action or Behavior uc 13. Check SG Tubes intact:

a. Direct Chemistry to take periodic activity samples of all SGs one atatime.
b. Secondary Radiation NORMAL. (YES)

. MAIN STEAM LINE MONITORS:

. RE-13120(SGI)

. RE-13121 (SG2)

. RE-13122 (SG3)

. RE-13119(SG4)

. CNDSR AIR EJCTR/STM RAD MONITORS:

. RE-12839

. RE-12839D (if on scale)

. RE-12839E (if on scale)

. STM GEN LIQ PROCESS RAD:

. RE-0019 (Sample)

. RE-0021 (Blowdown)

. SG sample radiation:

c. Check SG levels ANY RISING IN AN UNCONTROLLED MANNER. (NO)

RNO

c. GotoStepl4.

48

Appendix D Reauired Operator Actions Form ES-D-2 Op-Test Nofl: O1 2-301 Scenario No.: I Event No.: 7 Event

Description:

RCS leakage will develop that is within the capacity of the normal charging flow path to maintain PRZR level and pressure. The crew will be required to enter AOP-1 8004 for RCS Leakage. The crew will determine an approximate leak rate of 75 gpm, then the leak will increase requiring a reactor trip with manual action by the OATC to actuate SI (auto SI fails). The QATC will also be required to manually start RHR pump A which will not auto start. The UO will be required to close HV-2628B and HV-2629B on CNMT Mini-Purge which will not auto close.

Time Position Applicants Action or Behavior CREW 14. Check if RCS is intact inside Containment. (NO)

. Containment radiation NORMAL (NO)

. Containment pressure NORMAL (NO)

. Containment Emergency Recirculation Sump levels NORMAL (NO)

RNO

14. Go to 19010-C, E-1 LOSS OF REACTOR OR SECO NDARY COOLANT.

SS Transitions to 1 901 0-C, E-1 Loss of Reactor or Second ary Coolant.

THIS IS THE END OF EVENT 7.

EVENT 8 and steps for 1 901 0-C are on the following pages.

NOTE: This will be a plausible alternate ending if the NRC Chief Examiner wishes to end the scenario at this point for time considerations as all Critical steps will have been performed at this time.

49

Appendix D Required Operator Actions Form ES-D-2 Op-Test Nofl: 201 2-301 Scenario No. : 1 Event No. : 8 Event

Description:

Large break LOCA will occur just after transition to 1 901 0-C, E-1 Loss of Reactor or Secondary Coolant. This will require the OATC to trip the RCPs due to RCS pressure will drop to CNMT pressure.

Time Position Applicants Action or Behavior OATC 1 . Initiate the following:

uc

. Continuous Actions and Foldout Page.

. Critical Safety Function Status Trees per 1 9200-C, F-C CRITICAL SAFETY FUNCTION STATUS TREE.

SS 2. Initiate NMP-EP-1 10, EMERGENCY CLASSIFICATION DETERMINATION AND INITIAL ACTION.

OATC 3. Maintain Seal Injection flow to all RCPs 8 to 1 3 GPM.

OATC 4. Check if RCPs should be stopped:

a. ECCS Pumps - AT LEAST ONE RUNNING: (YES)

. CCPorSIPump

b. RCS pressure LESS THAN 1375 P51G. (YES)
c. Stop all RCPs.

OATC 5. Check ACCW Pumps - AT LEAST ONE RUNNING. (YES)

UO 6. Place Containment Hydrogen Monitors in service by initiating 1 31 30, POST-ACCIDENT HYDROGEN CONTROL.

NOTE to examiners: Actions to place in service on page # 62.

50

Appendix D Required Operator Actions Form ESD-2 Op-Test No, : 2012-301 Scenario No, : 1 Event No. : 8 Event

Description:

Large break LOCA will occur just after transition to 1 901 0-C, E-1 Loss of Reactor or Secondary Coolant. This will require the OATC to trip the RCPs due to RCS pressure will drop to CNMT pressure.

Time Position Applicants Action or Behavior uo 7. Check SGs secondary pressure boundaries:

a. Identify faulted SG(s):

ANY SG PRESSURE LOWERING IN AN UNCONTROLLED MANNER. (NO)

-OR-ANY SG COMPLETELY DEPRESSURIZED. (NO)

RNO

a. GotoStep8.

UO 8. Check intact SG levels:

a. NR level AT LEAST ONE GREATER THAN 10% (32%

ADVERSE.

b. Maintain NR levels between 1 0% (32% ADVERSE) and 65%.
c. NR level - ANY RISING IN AN UNCONTROLLED MANNER.

(NO)

RNO C. GotoStep9.

51

Appendix D Required Operator Actions Form ES-D2 Op-Test No. : 201 2-301 Scenario No. : 1 EventNo.: 8 Event

Description:

Large break LOCA will occur just after transit ion to 1 901 0-C, E-1 Loss of Reactor or Secondary Coolant. This will require the OATC to trip the RCPs due to RCS pressure will drop to CNMT pressure.

Time Position j Applicants Action orBehavior uo 9. CheckSG Tubes intact:

a. Direct Chemistry to take periodic activity samples of all SGs one at a time.
b. Secondary radiation NORMAL. (YES)

. MAIN STM LINE MONITORS

. RE-13120(SG1)

. RE-13121 (SG2)

. RE-13122(SG3)

. RE-13119(SG4)

. CNDSR AIR EJCTR/STM RAD MONITORS

. RE-i 2839C

. RE-i 2839D (if on scale)

. RE-i 2839E (if on scale)

. STM GEN LIQ PROCESS RAD:

. RE-00i9 (Sample)

. RE-002i (Blowdown)

. SG sample radiation.

C. Check SG levels - ANY RISING IN AN UNCONTROLLED MANNER. (NO)

RNO

c. GotoSteplO.

52

Appendix D Required Operator Actions Form ES.D-2 Op-TestNo.: 2O12-3O1 Scenario No. : 1

( EventNo 8 Event

Description:

Large break LOCA will occur just after transition to 1 901 0-C, E-1 Loss of Reactor or Secondary Coolant. This will require the OATC to trip the RCPs due to RCS pressure will drop to CNMT pressure.

Time Position Applicants Action or Behavior OATC 1 0. Check PRZR PORVs and Block Valves:

a. Power to PRZR PORV Block Valves AVAILABLE. (YES)
b. PRZR PORVs - CLOSED. (YES)
c. PRZR PORV Block Valves AT LEAST ONE OPEN. (NO)

RNO

c. IF NOT closed to isolate an excessively leaking or open PRZR PORV, AND WHEN PRZR pressure is greater than 2185 psig, THEN verify open at least one PRZR PORV Block Valve.
d. Any RCS WR CL temperature LESS THAN 220°F. (YES)
e. Arm COPS.

CREW 11 . Check if ECCS flow should be reduced:

a. RCS Subcooling GREATER THAN 24°F (38°F ADVERSE). (NO)

RNO

a. GotoStepl2 53

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 1 Event No. : 8 Event

Description:

Large break LOCA will occur just after transition to 1 901 0-C, E-1 Loss of Reactor or Secondary Coolant. This will require the QATC to trip the RCPs due to RCS pressure will drop to CNMT pressure.

Time Position Applicants Action or Behavior OATC 1 2. Check if Containment Spray should be stopped:

a. CS Pumps - RUNNING. (YES)
b. Containment pressure LESS THAN 15 P51G. (NO)

RNO

b. WHEN Containment pressure is less than 15 psig, THEN go to step 12.c.

Go to Step 13.

CREW CAUTIONS:

If offsite power is lost after 51 reset, action is required to restart the following ESF equipment if plant conditions require their operation.

. RHR pumps

. SI pumps

. Post-LOCA Cavity Purge Units

. Containment Coolers in low speed (Started in high speed on a UV signal)

. ESF Chilled Water Pumps (if CR1 is reset) 54

Appendix D Required Operator Actions Form ESD-2 OpTest No. : 201 2-301 Scenario No. : 1 Event No. : 8 Event

Description:

Large break LOCA will occur just after transit ion to 1 901 0-C, E-1 Loss of Reactor or Secondary Coolant. This will require the OATC to trip the RCPs due to RCS pressure will drop to CNMT pressure.

Time Position Applicants Action or Behavior QATC 1 3. Check if RHR Pumps should be stopped:

a. RHR Pumps ANY RUNNING WITH SUCTION ALIGNED TO RWST. (YES)
b. RCS pressure:

1 ) Greater than 300 psig. (NO)

RNO

1) GotoStepl6.

55

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 23O1 Scenario No. : 1 Event No. : 8 Event

Description:

Large break LOCA will occur just after transit ion to 1 901 0-C, E-1 Loss of Reactor or Secondary Coolant. This will require the OATC to trip the RCPs due to RCS pressure will drop to CNMT pressure.

Time Position[ Applicants Action or Behavior uO 16. Check if DGs should be stopped:

a. AC Emergency Busses ENERGIZED BY OFFSITE POWER. (YES)
b. Reset SI, if necessary. (YES, reset SI at this time)

C. Stop any unloaded DG and place in standby by initiating 13145, DIESEL GENERATORS.

d. Check Stub Busses ENERGIZED. (NO)

. NBO1

. NB1O RNO

d. Energize Stub Busses by performing the following as necessary:

NBO1 NB1O

1) Openbreaker 1) Open breaker NBO1-O1 NB1O-O1
2) Close breaker 2) Close breaker AAO2-22 BAO3-1 8
3) Close breaker 3) Close breaker NBO1-O1 NB1O-O1 Note to Simbooth: The crews will request to send the OSA operator to shutdown the DG per 1 31 45-1 Report back that C & T will dispatch an operator to shutdown the DGs.

56

Appendix D Required Operator Actions Form ES-D-2 Op-Test No : 201 2-301 Scenario No. : 1 Event No. : 8 Event

Description:

Large break LOCA will occur just after transition to 1 901 0-C, E-1 Loss of Reactor or Secondary Coolant. This will require the OATC to trip the RCPs due to RCS pressure will drop to CNMT pressure.

Time Position Applicants Action or Behavior OATC 1 7. Check Cold Leg recirculation capability:

a. Power available to:

Train A comronents:

. HV-881 IA - CNMT SUMP TO RHR PMP-A SUCTION (YES)

. RHR Pump A OPERABLE (YES)

. HV-8809A - RHR PMP-A TO COLD LEG 1 & 2 ISO VLV (YES)

. RHR Heat Exchanger A OPERABLE (YES)

NOTE to examiners: Train B is NOT available due to RHR pump B is tripped.

-OR-Train B components:

. HV-881 1 B - CNMT SUMP TO RHR PMP-B SUCTION (YES)

. RHR Pump B OPERABLE (NO)

. HV-8809B - RHR PMP-B TO COLD LEG 3 & 4 ISO VLV (YES)

. RHR Heat Exchanger B OPERABLE (YES) 57

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 1 Event No. : 8 Event

Description:

Large break LOCA will occur just after transition to 1 901 0-C, E-1 Loss of Reactor or Secondary Coolant, This will require the OATC to trip the RCPs due to RCS pressure will drop to CNMT pressure.

Time Position Applicants Action or Behavior uo I 8. Check Auxiliary Building leak detection systems:

a. PLANT VENT Radiation Monitors NORMAL: (YES)

. RE-i 2442A EFFL PART

. RE-12442B EFFL IODINE

. RE-i2442C EFFL RAD

. RE-i2444C RAD1OGAS RAD

b. Auxiliary Building break detection system on QPCP ALL LEAK DETECTION STATUS LIGHTS NOT LIT. (YES)

CREW 19. Direct Chemistry to obtain samples:

. For boron, pH, and radioactivity:

  • RCS

. Both Containment Emergency Sumps (if cold leg recirculation has been established.)

. For radioactivity, hydrogen and oxygen concentrations.

. Containment atmosphere 58

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 1 EventNo.: 8 Event

Description:

Large break LOCA will occur just after transition to 1 901 0-C, E-1 Loss of Reactor or Secondary Coolant. This will require the OATC to trip the RCPs due to RCS pressure will drop to CNMT pressure.

Time

{ Position Applicants Action or Behavior CREW 20. Evaluate plant equipment.

a. Secure unnecessary plant equipment.
b. Within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of SI actuation, isolate NSCW Corrosion Monitor Racks:

. Close 1202-U4-179

. Close 1 202-U4-1 80 (located in NSCTs on NSCW return header)

c. Repair or make available inoperable equipment which may be required.
d. Consult TSC for additional equipment to be started or actions to be taken to assist in recovery including.

. H2 Monitors

. CRDM Fans

. Within 5 days, initiate Containment inspection/cleanup if Containment Spray actuated and was terminated prior to recirculation.

59

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 1 EventNo.: 8 Event

Description:

Large break LOCA will occur just after transition to 1 901 0-C, E-1 Loss of Reactor or Secondary Coolant. This will require the OATC to trip the RCPs due to RCS pressure will drop to CNMT pressure.

Time Position Applicants Action or Behavior CREW 21 . In the event of a Design Basis Accident, the following apply concerning conservation of Ultimate Heat Sink inventory:

. if a DBA LOCA coincident with a LOSP has occurred, THEN secure one train of NSCW within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the initiating event per 13150, NUCLEAR SERVICE COOLING WATER SYSTEM.

. I.E a DBA LOCA without an LOSP has occurred and normal NSCW makeup is lost, THEN secure one train of NSCW within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the loss of makeup capability per 13150, NUCLEAR SERVICE COOLING WATER SYSTEM.

. Initiate periodic monitoring of NSCW Basin level to ensure adequate inventory is maintained for continued operation of NSCW Basin makeup.

. Consult TSC as necessary for alternate sources of NSCW Basin makeup.

60

Appendix D Required Operator Actions Form ES-D-2 OpTest No : 201 2-301 Scenario No. : 1 Event No : 8 Event

Description:

Large break LOCA will occur just after transition to 1 901 0-C, E-1 Loss of Reactor or Secondary Coolant. This will require the OATC to trip the RCPs due to RCS pressure will drop to CNMT pressure.

Time Position Applicants Action or Behavior ss 22. Check is RCS cooldown and depressurization is required:

a. RCS pressure - GREATER THAN 300 PSIG. (NO)

RNO

a. IF RHR Pump flow is greater than 500 gpm, THEN go to step 23.

ss 23. Check if transfer to Cold Leg recirculation is required:

a. RWST level - LESS THAN 29%. (NO)

RNO

a. Return to Step 17.

THE THISISTHEENDOFEVENT8.

END AND THE END OF THE SCENARIOS (unless stopped earlier by NRC) 61

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : I Event No. : 8 Event

Description:

Large Break LOCA just after entry into 1 901 0-C, the following are steps for placing the H2 Monitors in service per 1 31 30-1.

[ Time Position Applicants Action or Behavior uo 4.2.1 Containment Hydrogen MonitorA 1-1513-P5-HMA Operation (Hydrogen Measurement)

NOTE: The Hydrogen Monitors require a 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> warm-up period in SAND8Y before accurate readings may be obtained.

CAUTION: The Hydrogen Monitor Isolation Valves must remain closed except during Hydrogen Monitor operation while in Modes 5 or 6 or during post accident conditions to ensure containment integrity is maintained.

Note to examiner: If student performs Train B steps first, these are on page#65.

uO 4.2.1 1 IF the following conditions exist, ThEN notify maintenance to implement 28834-1 to provide power to Containment Isolation Valves 1 -HV-2791 -B and 1 -HV-27938:

a. A post accident condition (LOCA) exist AND
b. 1 25 VDC Bus 1 BD1 I is not available AND
c. Containment Hydrogen Concentration is required.

Note to examiner: Step 4.2.1 1 is Not Applicable (N/A).

uO 4.2.1 .2 Verify the Hydrogen Monitor A sample line heat tracing temperature is greater than 260°F:

a. At Heat Tracing Panel 1 -1 81 7-U3-0078, (1 AB-807) read the temperature for circuit Cl -7 and Cl -8.
b. IF less than 260°F, notify the Control Room immediately.

62

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 1 Event No. : 8 Event

Description:

Large Break LOCA just after entry into 1 901 0-C, the following are steps for placing the H2 Monitors in service per 1 31 30-1.

0 Time Position Applicants Action or Behavior uc 4.2.1 .3 Open the H 2 MONITORASPLY ISO IFC.

a. 1 -HV-2792A
b. 1 -HV-27928 uo 4.2. 1 .4 Open H 2 MONITORA SPLY ISO CFC 1 -HV-2791 B.

uc 4.2. 1 .5 Open H 2 MONflORA RTN D Oft 1 -HV-27938.

uo 4.2. 1 .6 Place Mode Switch 1 -HS-22900 in ANAL.

uc 4.2.1 .7 Verify Function Selector Switch 1 -HS-22904 in Sample position.

uo 4.2.1 .8 Momentarily depress Remote Control Selector Pushbutton 1-HS-22944 and verify Sample Light LIT.

NOTE: Indication of hydrogen concentration is available within 30 minute s

of initiating flow through the monitors. This is accomplished by operating the monitors in Standby during normal plant operation.

uo 4.2.1 .9 Note containment hydrogen concentration as indicated by CO1\ffAIN H2 MONITOR TRN A 1 -Al-i 2979 on QMD8 WI-EN indications stabilize.

63

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 23O1 Scenario No : 1 Event No. : 8 Event

Description:

Large Break LOCA just after entry into 19010-C, the following are steps for placing the H2 Monitors in service per 1 31 30-1.

Time Position Applicants Action or Behavior uc 4.2.1 .10 WHEN hydrogen monitoring is no longer desired, place Mode Switch 1 -HS-22900 in STAND BY.

uo 4.2.1 .1 1 Close the Hydrogen Monitor A Isolations by placing their control switches to close:

a. 1 -HV-2792A
b. 1 -HV-2792B
c. 1 -HV-2791 B
d. 1 -HV-27938 64

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : I Event No. : 8 Event

Description:

Large Break LOCA just after entry into 1 901 0-C, the following are steps for placing the H2 Monitors in service per 1 31 30-1.

Time Position

[ Applicants Action or Behavior uc 422 Containment Hydrogen Monitor B 1 -151 3-P5-HMB Operation (Hydrogen Measurement)

NOTE: The Hydrogen Monitors require a 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> warm-up period in STANDBY before accurate readings may be obtained.

CAUTION: The Hydrogen Monitor Isolation Valves must remain closed except during Hydrogen Monitor operation while in Modes 5 or 6 or during post accident conditions to ensure containment integrity is maintained.

uO 422.1 lF the following conditions exist, Ti-EN notify maintenance to implement 28834-1 to provide power to Containment Isolation Valves 1 -HV-2791A and 1 -HV-2793A:

a. A post accident condition (LOCA) exist AND
b. 125 VDCBus 1BD1 1 is not available AND C. Containment Hydrogen Concentration is required.

Note to examiner: Step 4.2.2.1 is Not Applicable (N/A).

uO 4.2.2.2 Verify the Hydrogen Monitor A sample line heat tracing temperature is greater than 260°F:

a. At Heat Tracing Panel 1 -1 81 7-U3-007A, (1 FHB-A1 0) read the temperature for circuit Cl -1 and C1-2.
b. IF less than 260°F, notify the Control Room immediately.

65

Appendix D Required Operator Actions Form ES-D-2 OpTest No. : 201 2-301 Scenario No. : 1 Event No. : 8 Event

Description:

Large Break LOCA just after entry into 1 901 0-C, the following are steps for placing the H2 Monitors in service per 1 31 30-1.

Time Position Applicants Action or Behavior uo 4.2.2.3 Open the H 2 MQNflORBSPLY ISO IFU

a. 1 -HV-2790A
b. 1 -HV-27908 uc 4.2.2.4 Open H 2 MONITOR B SPLY ISO OFC 1 -HV-2791 A.

uo 4.2.2.5 Open H 2 MONITOR B RTN ISO OFO 1 -HV-2793A.

uo 4.2.2.6 Place Mode Switch 1 -HS-22901 in ANAlYZE uc 42.2.7 Verify Function Selector Switch 1 -HS-22905 in Sample position.

uo 4.2.2.8 Momentarily depress Remote Oontrol Selector Pushbutto n 1 -HS 22945 and verify Sample Light LIT.

NOTE: Indication of hydrogen concentration is available within 30 minutes of initiating flow through the monitors. This is accomplished by operating the monitors in Standby during normal plant operation.

uo 4.2.2.9 Note containment hydrogen concentration as indicated by CONTAIN H2 MONITORTRN B 1 -Al-i 2980 on QMD8 W[-EN indications stabilize.

66

Appendix D Required Operator Actions Form ES-.D-2 Op-Test No. : 201 2-301 Scenario No, : 1 Event No. : 8 Event

Description:

Large Break LOCA just after entry into 1 901 0-C, the following are steps for placing the H2 Monitors in service per 1 31 30-1 Time Position Applicants Action or Behavior uo 4.2.2.10 WHEN hydrogen monitoring is no longer desired, place Mode Switch 1 -HS-22901 in STAND BY.

uc 4.2.2.1 1 Close the Hydrogen Monitor B Isolations by placing their contro l

switches to close:

a. 1 -HV-2790A
b. 1 HV-279OB
c. 1-HV-2791A
d. 1 -HV-2793A 67

Appendix D Scenario Outline Form ESD-1 Facility: Scenario NoW: Op-Test No.: 2012-301 Examiners: Operators:

Initial Conditions: The plant is at 1 00% power, MOL, steady state operations.

(Base IC # 14, snapped to IC # 182 for HL17 NRC Exam.)

Equipment QOS: Safety Injection Pump A is tagged out for motor repair.

Turnover: Maintain 1 00% power. Containment mini-purge is in service for a Containment entry on the next shift.

Preloaded Malfunctions:

GE12A PCB 161710 Auto Trip Failure GE12B PCB 161810 Auto Trip Failure SIO6B Block Auto Start on SI Pump B Overrides 1 HV-8801 A BIT Discharge Valve SHUT 1 HV-8801 B BIT Discharge Valve SHUT NOTE to Simbooth: Place Containment Mini-Purge in service.

Event Malt. Event Event No. No. Type* Description Ti TU1 9A I-OATC Main Turbine Impulse Pressure Transmitter PT505 fails low.

@ 0% I-SS TS-SS LCO 3.3.1 , Condition A, FU 1 6b, 1 6f Condition S (1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Tech Spec actions)

T2 RD1 3D R-OATC Dropped Rod K-i 4 in Control Bank B, reduces power to < 75 in 1 N-UO hour.

R-SS TS-SS LCO 3.1 .4 Condition B T3 FWO2C C-UO Controlling SG # 3 feed flow channel (FI-530A) fails low.

@ 0% C-SS T4 NSO2B C-UO NSCW pump # 3 locked rotor, NSCW pump # 5 shaft shears on start.

NSO4C C-SS TS-SS LCO 3.7.8 Condition A, LCO 3.8.1 Condition B T5 CVO7 C-QATC Normal Charging Pump (NCP) trips.

C-SS TS-SS LCO TR 1 3.1 .5 Condition A, LCO TR 1 3.1 .3 Condition A

Appendix D Scenario Outline Form ESD-1 6 N/A N-OATC Places CVCS Charging and Letdown in service.

N-SS T7 RC16 M-ALL RCS Head LOCA (Small Break LOCA just large enough to reach

@ 0.6% RCP Trip Criteria over time).

OATC Trips RCPs with RCS pressure < 1 375 psig and ECCS flow present.

uo Critical 8 Preloaded C-OATC SIP B auto start failure requiring manual start.

C-SS Critical 9 Preloaded 1-UC Main Generator Output Breakers fail to automatically trip open.

1-55 Event Malt Event Event No. No. Type* Description (N)ormai, (R)eactivity, (l)nstrument, (C)omponent, (M)ajor Event 1:

Main Turbine Impulse Pressure PT-505 fails low (Tref) resulting in inward rod motion.

Verifiable Actions:

OATC Performs IOA of 1 8001 -C, section H and places control rods in manual to stop uncontrolled inward rod motion.

OATC Restores Tavg to program band to maintain Tavg and Tref matched.

uO Verifies PIC-507 Steam Dump Control Pot at 7.28 (1092 psig) and in AUTO, then place Steam Dumps in the Steam Pressure Mode.

Technical Specifications:

LCO 3.3.1 Reactor Trip System (RTS) Instrumentation Condition A LCO 3.3.1 Reactor Trip System (RTS) Instrumentation EU 16b, 16f Condition S.

(1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Tech Spec actions) 2

Appendix 0 Scenario Outline Form ES-D-1 Event 2:

Rod K-14 drops requiring 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> power reduction to < 75% RTP per Tech Specs.

Verifiable Actions:

OATC Controls power distribution and RCS temperature using control rods and boron.

uO Lower turbine load to match Tave and Tref.

Technical Specifications:

LCO 3.1 .4 Rod Group Alignment Limits, Condition B Event 3:

Steam Generator # 3 controlling feed flow channel fails low resulting in MFRV # 3 opening causing SG # 3 level to rise.

Verifiable Actions:

uO Performs IQA of 1 8001 -C and to manually control of MFP(s) speed and affected feed flow valves to control SG levels between 60 70% NA.

uO Selects an unaffected steam flow control channel on FS-530C selector switch.

uO Returns MFP(s) speed and SG control valves to automatic.

Technical Specifications:

None Event 4:

NSCW pump # 3 trips and NSCW pump # 5 shears shaft on start.

Verifiable Actions:

UO Places all Train A NSCW pumps in PTL.

UO Depresses both Emergency Stop push buttons for DG1A.

UO I OATC Places various components in PTL on affected NSCW train.

Technical Specifications:

LCO 3.7.8 Nuclear Service Cooling Water (NSCW), Condition A LCO 3.8.1 AC Sources Operating, Condition B 3

Appendix D Scenario Outline Form ES-D1 Event The Normal Charging Pump will trip.

Verifiable Actions:

OATC Manually closes the Letdown Orifices and the Letdown Isolation valves to stop flashing in the Letdown system.

OATC I UO Trends the RCP operating parameters on the IPC computer.

Technical Specifications:

LCO TR 13t5 Charging Pumps Operating LCO TA 1 3.1 .3 Boration Flow Paths Operating Event 6:

CVCS Charging and Letdown will be returned to service. (NOTE: The Chief Examiner may decide to go to the next event after a charging pump is started and prior to placing Letdown in service.

Verifiable Actions:

OATC Adjusts HC-182 Seal Flow Controller to maximum seal flow and adjusts Charging Flow Controller FC-121 to minimum.

OATC Starts a charging pump. (CCP)

OATC Adjusts HC-1 82 to obtain 8 -1 3 gpm seal injection and adjusts Charging Flow Controller FC-121 to obtain desired charging flow.

NOTE: The next malfunction may be entered at this point with NRC Chief Examiner discretion.

OATC Places Letdown Pressure Controller PlC-i 31 to 50 75% demand.

OATC Places Letdown Temperature Controller TiC-i 30 in manual and adjusts to the recorded control room rounds position.

OATC Opens letdown isolations and letdown orifices.

OATC Adjusts P IC-i 31 and places in AUTO and places TiC-i 30 in AUTO.

OATC Adjusts FIC-i 21, HO-i 82 to maintain PRZR level and seal injection.

Technical Specifications:

None 4

Appendix D Scenario Outline Form ES-D-1 Event 7, 8, 9:

RCS small break vessel head LOCA resulting in ACS pressure < RCP Trip Criteria over time.

Verifiable Actions:

OATC Manually starts SIP B which fails to start on SI with the other SIP not available.

uO Manually opens Main Generator Output Breaker.

OATC I UO Manually trips the Reactor Coolant Pumps per RCP Trip Criteria.

Technical Specifications:

Not applicable.

The scenario may be stopped after the Reactor Coolant Pumps are tripped per the RCP Trip Criteria of 19OOOC or 19010-C at Chief NRC Examiner discretion.

CRITICAL TASKS:

I ) Manually starts SIP B to ensure adequate ECCS injection flow for core heat removal during small break LOCk This will be performed prior to receipt of a valid Core Cooling Orange Path due to CETs temperatures > 71 1 °F with RVLIS Full Range > 41 % OR CETs temperature < 711°F with RVLIS Full Range < 41%.

2) Manually trip the Reactor Coolant Pumps per the RCP Trip Criteria on the Foldout Page of 1 9000-C. This will be performed no later than step # 1 1 of 1 9000-C, if RCP trip criteria are met prior to reaching this step. If trip criteria are reached after this step, this will be performed per Foldout Page of 19000-C or step #4 of 19010-C, whichever comes first.

This will reduce inventory loss out the break during a classic small break LOCA event and will reduce peak clad temperatures than if the pumps were to trip later during the accident.

5

NUCLEAR SAFETY FOCUS Z R TARGET ZERO Protected Train: EOOS: Green Alpha LI Yellow LI Bravo Orange EjRed Plant 1 00 % power MOL.

Conditions:

Major Activities: Maintain power operations per UOP 1 2004-C section 4.3 for power operation.

Active LCOs:__f_i LCO 3.5.2 Condition A is in effect due to SIP A tagged out.

OOS/Degraded El None CR Instruments:

Narrative L1 Containment mini-purge is in service for a planned Status: Containment Entry on next shift.

E SIP A is tagged outfor motor repair, expected return to service time is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> left on a shutdown LCO of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

U The remnants of Hurricane Maya are passing through, severe weather and thunderstorms will be in the area for the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. The Severe Weather Checklist is in effect.

Appendix D Required Operator Actions Form ES-D2 Op-Test No. : 201 2-301 Scenario No. : 2 Event No. : 1 Event

Description:

PT505 Fails Low resulting in inward rod motion.

Time Position Applicants Action or Behavior OATC Diagnose Turbine Impulse Pressure PT505 failed low:

uo Symptoms I alarms:

ALB12-A05 TAVG TREF DEVIATION ALBO5-E04 AMSAC TROUBLE Indications:

. Control rods rapidly inserting in automatic.

SS Enters AOP 1 8001 -C, Section H, FAILURE OF TURBINE IMPULSE PRESSURE INSTRUMENTATION.

OATC IMMEDIATE OPERATOR ACTIONS Hi . Check - NO ROD MOTION (NO)

RNO Hi . Place ROD BANK SELECTOR SWITCH in MAN position.

OATC H2. Restore TAVG to program band. (NOTE: Withdraws rods)

UO H3. Perform the following:

a. Verify PIC-507 STEAM DUMP CONTROL set at 1092 psig.

(approximately 7.28)

b. Verify PIC-507 in AUTO.
c. Place HS-500C STEAM DUMP CONTROL MODE SELECT in STEAM PRESS.

1

Ajx_D Required Operator Actions Form ES-D-2 Op-Test Nofl: O12-3O1 Scenario NoW: 2 Event No. : 1 Event

Description:

PT505 Fails Low resulting in inward rod motion.

Time Position Applicants Action or Behavior OATC H4. Check P-7 and P-i 3 status lights indicate correctly for plant conditions within one hour. (TS 3,3.1) ss 115, Initiate the applicable actions of Technical Specification 3.3.1.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions with A,1 Enter the Condition Immediately one or more required referenced in Table 3.3.1-1 channels inoperable. for the channel(s).

FUNCTION APPLICABLE REQUIRED CONDITIONS MODES CHANNELS 16 Reactor Trip System Interlocks

b. Low Power Reactor 1 1 per train S Trips Block, P-7
f. Turbine Impulse 1 ,2 2 S Pressure, P-13 CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions with Al Enter the Condition Immediately one or more required referenced in Table 3.3.2-channels inoperable. 1 for the channel(s) or train(s).

S. One or more channels Si Verify interlock in required 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable. state for existing unit conditions.

OR S.2 Be in MODE 2 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> 2

Appendix D Required Operator Actions Form ES-D-2 OpTest No. : 201 2-301 Scenario No. : 2 Event No. : 1 Event

Description:

PT505 Fails Low resulting in inward rod motion.

Time Position Applicants Action or Behavior ss H6. Notify I & C to initiate repairs.

OATC H7. Initiate the Continuous Actions Page.

uo ss H8. Check repairs and surveillances COMPLETE.

RNO H8. Perform the following:

a. WHEN repairs and surveillances are complete, THEN perform Step H9.
b. Return to procedure and step in effect.

END OF EVENT 1 , PROCEED TO EVENT 2.

3

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 2O123O1 Scenario No. : 2 Event No. : 2 Event

Description:

Control Rod K-14 will drop requiring an entry into the Rod Control System Malfunction AOP for a dropped rod. The AOP will require a power descent to < 75% in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

Time Position Applicants Action or Behavior QA1ID Diagnose control rod K-14 has dropped:

Symptoms I alarms:

AWl O-C02 POWBR RANEOHANNE DEVIATION AWl O-D06 ROD DEV AWl O-E05 FOD AT BOTTOM ALB1O-E06 RADIALTILT(short delay)

AWl 1 -D02 PRRDONTFOL LO PFAND HEATEEON (the annunciator above will briefly illuminate and then extinguish)

A1B1 2-A03 Ft; LOOPTAVG/AUCTTAVG HI-LO DE/

AWl 2-A04 TAVG1rF DE\MTION ALB1 O-D02 PW1R RANGE UP DET HI FLX EEl (delayed 5 mm)

ALB1 O-E02 PWR RANGE LVVF DET HI RX DEN? (delayed 5 mm)

ALBO6-FO1 T(Subcriticality for IRSUR bad)

Indications:

. Rod bottom LED on digital rod position indication for rod K-14.

. Ta\IdrOpping.

. pi:ø: pressure drops and then rises back toward program.

. Nl-44 lowers to 82% power.

Enters 1 8003-C, Rod Control System Malfunction, section A for Dropped Rods in Mode 1.

UO Al Stop any turbine loading changes.

OATC A2. Checkthe following:

a. DFPI AVAILABLE.
b. Only one Rod dropped by observing DFI.

4

ciLxD Required Operator Actions Form ES-D-2 Op-Test No : 201 2-301 Scenario No. : 2 Event No. : 2 Event

Description:

Control Rod K-i 4 will drop requiring an entry into the Rod Control System Malfunction AOP for a dropped rod. The AOP will require a power descent to < 75% in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

Time Position

[ Applicants Action or Behavior A3. Initiate TS3.1 .4.

LOD 3.1 .4 All shutdown and control rods shall be QP6A8LE, with all individual rod positions within 12 steps of their group step counter demand position.

Applicability: MODB 1 and 2.

/CRONS:

CONDITION REQUIRED ACTION COMPLETION TIME B. One rod not within 61 .1 Verify SDM is the limit

. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> alignment limits. specified in the COLR.

OR 6.1 .2 Initiate boration to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore SDM to within limit.

AND 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> B.2 Reduce THERMAL POWER to 75% RTP.

AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> B.3 Verify SDM is the limit specified in the COLR.

AND 8.4 Perform SR 3.2.1.1 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AND B.5 Perform SR 3.2.2.1 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AND B.6 Reevaluate safety 5 days analysis and confirm results remain valid for duration of operation under these conditions.

5

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 2012-301 Scenario No. : 2 Event No. : 2 Event

Description:

Control Rod K-14 will drop requiring an entry into the Rod Control System Malfunction AOP for a dropped rod. The AOP will require a power descent to < 75% in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

Time Position Applicants Action or Behavior NOTE: Power reduction assoon as practical after the rod drop occurs minimizes local fuel power distribution variances and the chances of fuel damage. Although 1S31 .4 requires power be reduced to less than 75% within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, a target of achieving reactor power level less than 75% in one hour meets the as soon as practical objective.

ci:vv A4. Reduce Thermal Power to less than 75% within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from time of Rod drop.

Note to examiner: The crew may use the guidance in this procedure to lower power to < 75% OR may use 1 8013-C, Iapid Power Reduction.

The steps for Rapid Power Reduction are at the end of this event starting on page #9.

AS Fuel preconditioned power level greater than or equal to 9O%

per Reactor Engineering.

Note to examiner: The simbooth will inform the SS power level is > or =

90% preconditioned fuel per Reactor Engineering when the SS calls for this information.

OATC A6. Initiate the Continuous Actions Page.

uo 6

Appendix D Required Operator Actions Form ES-D-2 Op-Test No : 201 2-3O Scenario No. : 2 Event No. : 2 Event

Description:

Control Rod K-i 4 will drop requiring an entry into the Rod Control System Malfunction AOP for a dropped rod. The AOP will require a power descent to < 75% in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

Time

{ Position Applicants Action or Behavior OATC A7. Maintain Tavg at program by performing the following as uo appropriate:

. Adjust turbine load (UC)

. Dilute or borate (OATC)

. Use manual Rod control (OATC)

QAIC A8. Maintain power distribution when greater than or equal to 51Y/

0

a. AFD WfHlN PIlE OR M INUS 5% OFTART. (NO)

(Note: Target is -1 .8 and average is +3.6 = 5.4%)

RNO

a. Reduce power until one of the following are met:

plusor minuss%of target.

-OR-Reactor power less than 5Y%.

b. TR LBSTHAN OR EQUALTO 1 .02. (NO)

(Note: 1 .07 on top, 1 .08 on bottom per note below)

AND

b. Initiate tS. 3.2.4.

Note to examiner The crew may call for C & T to dispatch personnel to perform CSP-14915-1 SpecialCondition Surveillance Log DataSheet 7 to perform a QPTRfor the dropped rod. After a time delay, Inform the of the QPTR reading (to be determined).

7

D Required Operator Actions Form ES-D-2 Op-Test No.: 2O12-3Q Scenario NoW: 2 Event No. : 2 Event

Description:

Control Rod K-i 4 will drop requiring an entry into the Rod Control System Malfunction AOP for a dropped rodS The AOP will require a power descent to < 75% in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

Time Position Applicants Action or Behavior A9. Initiate action to determine cause and repair Fbd Control malfunction.

AlO. Record the following in the UnitOontrol Log:

. TimeofRod drop.

. Dropped Rod number.

. Initial power level.

. Affected group step counter position.

NOTE: The time allowed for reactor shutdown in step Al 1 may be extended past 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> by Reactor Engineering.

FEW Al 1 Commence a Unit shutdown per 12004-C, Rwer Operation (Mode

1) to be in Mode 3 within the next 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> or as specified by Reactor Engineering.

Note to examiner: Rapid Power Reduction steps follow.

8

Appendix D Required Operator Actions Form ES-D2 Op-Test No: 2O123O1 Scenario No.: 2 Event No. : 2 Event

Description:

Control Rod K-i 4 will drop requiring an entry into the Rod Control System Malfunction AOP for a dropped rod. The AOP will require a power descent to < 75% in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

Time Position Applicants Action or Behavior j ss Enters 1801 3-C, Rapid Power Reduction 1 . Perform SHUTDOWN BRIB9NG.

SHUTDOWN BRIEFING METHOD

. Auto rod control should be used.

. Reduce Turbine Load at approximately 3% RTP per minute. (approx 36 MWe) up to 5% rn-p (approx 60 MWe).

. Borate considering the calculations from the reactivity briefing sheet and BEPiDDN.

. Maintain AFD within the doghouse.

. (orSRDdesignee) Maintain supervisory oversight.

ll rod withdrawals will be approved by the .

. Approval for each reactivity manipulation is not necessary as long as manipulations are made within the boundaries established in this briefing. (i.e. turbine load adjustment up to 60 MWe, etc.).

. A crew update should be performed at approximately every 100 MWe power change.

. If manpower is available, peer checks should be used for all reactivity changes.

9

Appendix z:::::z__ Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 2 Event No. : 2 Event

Description:

Control Rod K-i 4 will drop requiring an entry into the Rod Control System Malfunction AOP for a dropped rod. The AOP will require a power descent to < 75% in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

Time Position Applicants Action or Behavior

]

OPERATIONAL LIMITS

. Maintain TAVG within +/-6°F of T. If TAYG/TREF mismatch

>6°F and nottrending toward a matched condition j if TAVG 551 °F, then trip the reactor.

. If load reduction due to a loss of vacuum, every effort should be made to maintain the steam dumps closed. (Permissive 0-9 @ 24.92 Hg).

INDUSTRY OE

. Shift supervision must maintain effective oversight and exercise conservative decision making.

. Correction of significant RBTj deviations should only be via secondary plant control manipulations and jj primary plant control manipulations. (i.e., do jjg withdraw control rods or dilute).

2. Verify rodsinAUTO.

Note to examiner: Due to Tref failure earlier in scenario, the rods will continuously insert at full speed if placed in automatic. There is no RNO for step # 2 so the SS will have to make the call to place the rods in manual for the down power if using 18013-C.

10

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 2 Event No. : 2 Event

Description:

Control Rod K-14 will drop requiring an entry into the Rod Control System Malfunction AOP for a dropped rod. The AOP will require a power descent to < 75% in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Time Position Applicants Action or Behavior ss 3. Reduce Turbine Load at the desired rate up to 5% mm (60 MVVE/min).

4, Borate as necessary by initiating 13009, C\itS FEPCTCR MAKEUP cOI\rrFCLSrSTEM.

Note to examiner: Boration steps from 13009 on start page # 12.

QAIC 5. Initiate the ContinuousActions Page.

Uo SB 6. Check desired ramp rate LESS THAN OR EQUAL TO 5% MIN.

7. Maintain Tavg within 6°F of Tref.
a. Monitor Tavg/Tref deviation. (UT-0495)
b. Verify rods inserting as required.

AND

b. Manual rod control should be used with insertions of up to 5stepsata time.

Note to examiner: This may be the AND the crew uses to justify placing rods in manual.

c. Energize Pressurizer back-up heaters as necessary.

END OF EVENT 2, MOVE TO EVENT 3 when NRC Chief directs.

11

2Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No: 2 Event No. : 2 Rapid Power Reduction boration steps Event

Description:

Rapid Power Reduction boration steps from 13009.

Time Position Applicants Action or Behavior OATC 4.2 BORATION 4.2.1 Determine the existing RCS boron concentration from Boron Meter 1 -Al-401 34 OR by sample analysis.

4.2.2 To determine the number of gallons of boric acid required to borate the RCS, perform the following.

IF borating to required boron for a xenon free cool down, obtain the maximum boron concentration for the cool down range from the PTDB Tab 1 .3.4-Ti and T2.

OR IF borating to a desired boron concentration, determine the desired change in boron concentration by subtracting the existing concentration from the desired concentration.

THEN Determine the amount of boric acid necessary to accomplish the desired change in boron concentration using PTDB Tab 2.3 and correct the obtained value using PTDB Tab 2.1.

Note to examiner: The OATC may also use a Beacon Book calculation to obtain a boron addition target for the Rapid Power Reduction. For a power reduction to 70%, this will be a boron addition of 230 gallons at 30 gpm.

OATC 4.2.3 Place VCT MAKEUP CONTROL 1 -HS-40001 B in STOP.

OATC 4.2.4 Place VCT MAKEUP MODE SELECT 1-HS-40001A in BOR.

12

2AppendixD Required Operator Actions Form ES-D-2 Op-Test No 201 2-301 Scenario No 2 Event No. : 2 Rapid Power ReductIon boration steps Event

Description:

Rapid Power Reduction boration steps from 13009.

Time Position Applicants Action or Behavior NOTE If necessary, boric acid flow may be adjusted using 1 -FIC-Ol 1 0 with ss concurrence. Changes to pot setting should be logged in the Control Room Log and restored at completion of activity.

OATC 4.2.5 Adjust potentiometer on Boric Acid Blender Flow Controller 1 -FIC-Ol 1 0 as desired and verify in AUTO.

CAUTION Digital counter setting on BORIC ACID TO BLENDER integrator 1-FQI-O11O reads in tenth-gallon increments.

OATC 4.2.6 Set BORIC ACID TO BLENDER integrator 1 -FQI-O1 1 0 to the desired amount of Boric Acid.

13

2Appendix D Required OperatorActions Form ES-D2 Op-Test No. : 201 2-301 Scenario No: 2 Event No. : 2 Rapid Power Reduction boration steps Event

Description:

Rapid Power Reduction boration steps from 13009.

Time J Position Applicants Action or Behavior QATC 42 .7 Verify the following:

. BA TO BLENDER 1 -HS-O1 1 OA is in AUTO.

. BLENDER OUTLET TO CHARGING PUMPS SUCT 1 -HS-O1 1 OB is in AUTO.

. One Boric Acid Transfer Pump in AUTO or START.

. RX MU WTR TO BA BLENDER 1 -FV-O1 1 1 A is closed with 1HS-O111A in AUTO.

. BLENDER OUTLET TO VCT 1 -FV-O1 1 1 B is closed with 1HS-O111B in AUTO.

NOTES

. Boration can be manually stopped at any time by placing 1-HS-40001B in STOP.

. VCT pressure, 1 -P1-i 1 5 should be maintained between 20 and 45 p51g.

OATC 4.2.8 Place VCT MAKEUP CONTROL 1 -HS-40001 B in START and perform the following:

. Verify Boric Acid Transfer Pump is running.

. Verify 1 -FV-01 1 OB is open.

. Verify 1 -FV01 1 OA throttles open to provide desired flow on 1-Fl-O11OA.

. Monitor BORIC ACID TO BLENDER integrator 1 -FQI-01 10.

14

2Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No: 2 Event No. : 2 Rapid Power Reduction boration steps Event

Description:

Rapid Power Reduction boration steps from 13009.

Time Position Applicants Action or Behavior OATC 42.9 WHEN 1 -FQI-O1 1 0 BORIC ACID TO BLENDER integrator reaches its setpoint, verify boration stops and the following valves close.

. 1-FV-O1 bA, BA TO BLENDER

. 1 -FV-O1 1 OB, BLENDER OUTLET TO CHARGING PUMPS SUCT OATC 4.2.10 Flush approximately 15 gallons of Reactor Makeup Water through 1 -FV-O1 1 OB by performing the flowing:

a. Place VCT MAKEUP MODE SELECT 1-HS-40001A to ALT DIL.
b. Set TOTAL MAKEUP integrator 1-FQI-.O1 1 1 for 13 to 15 gallons.
c. Place BLENDER OUTLET TO VCT 1 -HS-O1 1 1 B in CLOSE.
d. Place VCT MAKEUP CONTROL 1 -HS-40001 B in START.
e. Verify flow is indicated on 1 -FI-Ol 1 OB.
f. WHEN TOTAL MAKEUP integrator 1 -FQI reaches the desired setpoint, verify the following valves close:

. 1 -FV-O1 1 1 A, RX MU WTR TO BA BLENDER

. 1-FV-O1 lOB, BLENDER OUTLET TO CHARGING PUMPS SUCT 15

2Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No: 2 Event No. : 2 Rapid Power Reduction boration steps Event

Description:

Rapid Power Reduction boration steps from 13009.

Time

[ Position Applicants Action or Behavior OATC 4.2.1 1 Verify 1 -FIC-Ol 1 0 potentiometer is set to setting recorded prior to boration. (or as directed by SS)

OATC 4.2.12 Align Reactor Makeup Control system for automatic operation as follows:

COMPONENT NAME POSITION

a. 1 -HS-1 1 OB BLENDER OUTLET TO VCT AUTO
b. 1 HS-40001 A VCT MAKEUP MODE SELECT AUTO C. 1-HS-40001B VCT MAKEUP CONTROL START OATC 4.2.1 3 IF BA TRANSFER PUMP was placed in START at Step 4.2.7, return to AUTO or as directed by 55.

OATC 4.2. 1 4 Monitor RCS Tavg, source range count rate, and Reactor Power as applicable.

OATC 4.2. 1 5 Operate the Pressurizer Back-up Heaters as necessary to equalize boron concentration between the RCS and the Pressurizer.

16

2Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 23O1 Scenario No: 2 Event No. : 2 Rapid Power Reduction boration steps Event

Description:

Rapid Power Reduction boration steps from 13009.

Time Position Applicants Action or Behavior OATC 4.2i6 Verify desired boration through sample analysis or from Boron Concentration Meter 1 -1 208-T6-006. (1 -Al-401 34).

Return to EVENT 2, Rapid Power Reduction, page #11.

17

ppendix D Required Operator Actions Form ES-D-2 OpTest No. : 01 2-301 Scenario No. : 2 EventNo.: 3 Event

Description:

SG # 3 Feed Flow 1 Fl-530A fails low.

Time Position Applicants Action or Behavior uo Diagnoses failure of SG # 3 controlling feed flow instrument:

Symptoms I alarms I indications:

. ALB13-CO1 STM GEN 3 FLOW MISMATCH

. Any unexplained steam I feed flow mismatch indication uO Performs IMMEDIATE OPERATOR ACTIONS of AOP-18001 Section G for Failure of Controlling Feed Flow Channel.

Gi . Checks steam and feed flows MATCHED ON ALL SGS.

RNO Gi . Take manual control of the following as necessary to restore NR level between 60% and 70%:

. Affected SG feed flow valves (SG 3 MFRV 1 FV-0530)

(UO will need to depress the down arrow)

. MFP(s) speed (Master Speed Controller SIC-509A)

(UO will need to depress the up arrow)

Note to examiner: Depending on the candidate, the actions above may be different. The key point is they control SG levels.

55 Verifies immediate operator actions performed with UO.

Enters AOP 1 8001 -C, Section G.

18

pen - Required OperatorActions Form ES-D-2 Op-Test No 201 2-301 Scenario No 2 Event No. : 3 Event

Description:

SG # 3 Feed Flow 1 Fl-530A fails low.

1:i Posion ApphcansAction or Behavior uo SUBSEQUENT OPERATOR ACTIONS 18001-C Section G.

G2. Select an unaffected control channel.

NOTE: Selects Channel F531 on 1FS-530C Select Switch.

uO G3. Return MFP(s) speed controls to AUTO.

NOTE: Returns Master Speed Controller SIC-509A to AUTO.

Cue to Simbooth: IF asked, the Shift Manager has given permission to place the MFRV and MFPT speed controllers in auto.

UO G4. Return SG feed flow valve to AUTO. (Loop 4)

NOTE: Returns SG3 MFRV 1FV-530 to AUTO.

Cue to Simbooth: IF asked, the Shift Manager has given permission to place the MFRV and MFPT speed controllers in auto.

UQ G5. Initiate the Continuous Actions Page.

UO G6. Check SG level control maintains NR level AT 65%.

RNO G6. Take manual control of the following as necessary to maintain NR level between 60% and 70%.

. Affected SG feed flow valves.

. MFP(s) speed.

19

Required Operator Actions Form ES:D2 Op-Test No 201 2-O1 Scenario No 2 EventNo: 3 Event

Description:

SG # 3 Feed Flow 1 Fl-530A fails low.

Time Position Applicants Action or Behavior ss G7. Notifies I & C to initiate repairs:

Calls SS C & T to perform the following:

. Notify Operations Duty of AOP entry.

. Write a Condition Report.

. Notify Maintenance of the failure.

ss G8. Check repairs and surveillances COMPLETE. (NO)

RNO G8. Perform the following:

a. WHEN repairs and surveillances are complete, THEN perform Step G9.
b. Return to procedure and step in effect.

NOTE: Repairs are not expected to be completed.

END OF EVENT 3.

20

AppendaxD Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 2 Event No. : 4 Event

Description:

NSCW pump # 3 trips (locked rotor) with NSCW pump # 5 shaft shear on auto start. The crew will have to shutdown NSCW Train A and take actions of AOP-18021-C, Loss of Nuclear Service Cooling Water System.

Time Position Applicants Action or Behavior OATC Diagnose trip of running NSCW pump # 3 on Train A and determine that NSCW pump # 5 is not performing as expected:

Symptoms I alarms:

ALB36-AO1 4160V SWGR 1AAO2 TROUBLE ALBO2-BO1 NSCW TRAIN A LO HDR PRESS ALBO2-C03 NSCW TRAIN A DG CLR LO FLOW ALBO2-C04 NSCW Train A RHR PMP & MTR CLR LO FLOW ALBO2-D02 NSCW TRAIN A CNMT CLR 1 & 2 LO FLOW ALBO2-E02 NSCW TRAIN A CNMT CLR 5 & 6 LO FLOW ALBO2-F02 NSCW TRAN A RX CVTY CLG COIL LOW FLOW (comes in then clears after a short time)

Indications:

. Low NSCW Supply Header pressure ( 50 psig).

. Low Supply and Return Header flows ( 12,000 gpm).

. NSCW Pump # 3 green and amber lights lit on hand switch.

. NSCW Pump # 5 red light lit on hand switch.

SS Enters AOP 18021-C, LOSS OF NUCLEAR SERVICE COOLING WATER SYSTEM.

UO 1 . Check if catastrophic leakage from NSCW system EXISTS.

(NO)

RNO

1. Go to Step 6.

21

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2012-301 Scenario No.: 2 Event No. : 4 Event

Description:

NSCW pump # 3 trips (locked rotor) with NSCW pump # 5 shaft shear on auto start. The crew will have to shutdown NSCW Train A and take actions of AOP-18021-C, Loss of Nuclear Service Cooling Water System.

Time Position[ Applicants Action or Behavior uc 6. Verify NSCW pumps in affected train TWO OR MORE OPERATING:

. Supply header pressure greater than 70 psig. (NO)

TrainA: P1-1636 TrainB: P1-1637

. Supply header flow approximately 1 7,000 gpm. (NO)

Train A: Fl-1640B TrainB: Fl-1641B RNO

6. Perform the following:
a. Place affected train NSCW pump hand switches in Pu LL-TO-LOCK.
b. Depress both Emergency Stop pushbuttons for the affected DG.

NOTE: The following alarm illuminates when step 6.b. is performed.

ALB 35-ClO DG1A DISABLED NON RESET OF EMERGENCY TRIP

c. Investigate cause for trip of the running pump(s).

NOTE: The following annunciators will illuminate when the NSCW Train A pumps are placed in PTL.

ALBO2-E03 NSCW TRAIN A NORM/BYP VLV MISPOSITIONED ALBO4-EO1 TRAIN A SYS STATUS MON PNL ALERT 22

AppendixD Required Operator Actions FormES-D-2 OpTest No. : 201 2-3O1 Scenario No. : 2 Event No. : 4 Event

Description:

NSCW pump # 3 trips (locked rotor) with NSCW pump # 5 shaft shear on auto start. The crew will have to shutdown NSCW Train A and take actions of AOP-18021.C, Loss of Nuclear Service Cooling Water System.

Time Position f Applicants Action or Behavior uo Step 6 RNO Continued

d. Verify proper operation of UNAFFECTED NSCW train:

. Two pumps running. (YES)

. Supply header pressure greater than 70 psig: (YES)

TrainA: P1-1636 TrainB: P1-1637

. Supply header temperature computer indication less than 90°F: (YES)

Train A : TE-1 642 TrainB: TE-1643

. Supply header flow approximately 1 7,000 gpm. (YES)

Train A: Fl-1640B TrainB: Fl-1641B Go to Step 13.

UC 1 3. Verify the following components in the UNAFFECTED train RUNNING IF REQUIRED:

CCP (NO)

SIP (NO)

CS Pump (NO)

RHR Pump (NO)

CCW Pumps (UO will simultaneously start 2 CCW pumps)

CREFS (CR FILTER UNIT SUPPLY AIR FAN) (NO)

ESF Chiller (NO) 23

Appendix D Required_Operator Actions Form ES-D-2 Op-Test No : 201 2- Scenario No. : 2 EventNo,: 4 Event

Description:

NSCW pump # 3 trips (locked rotor) with NSCW pump # 5 shaft shear on auto start. The crew will have to shutdown NSCW Train A and take actions of AOP-18021-C, Loss of Nuclear Service Cooling Water System.

Time Position Applicants Action or Behavior OATC 1 4. Place the affected train components in PULL-TO-LOCK:

UO

  • CCP

. SIP

. CS Pump

. RHR Pump

. CCW Pumps (Both pumps are required to be stopped simultaneously)

. CREFs (CR FILTER UNIT SUPPLY AIR FAN)

. ESF Chiller (STOP position)

CREW 1 5. Swap SFP Cooling as necessary by initiating 1 371 9, SPENT FUEL POOL COOLING AND PURIFICATION SYSTEM.

NOTE: The crew can verify which train of SFP Cooling is running via IPC computer points. One of the crew members will call the Aux Building Operator or C & T to swap SFP Cooling Trains.

UO 16. Isolate and repair any leaks on affected NSCW train:

a. Check significant leakage from affected train INDICATED.

(NO)

RNO

a. GotoStepl6c.

1 6c. Dispatch operator(s) to locate and isolate the leak. (N/A) 24

Appendix D Required Operator Actions Form ES-D-2 Op-Test No : Q1 3Qi Scenario No. : 2 Event No : 4 Event

Description:

NSCW pump # 3 trips (locked rotor) with NSCW pump # 5 shaft shear on auto start. The crew will have to shutdown NSCW Train A and take actions of AOP-18021-C, Loss of Nuclear Service Cooling Water System Time Position Applicants Action or Behavior uo 17. Perform the following using ATTACHMENT A for hand switch numbers:

a. Start fans in UNAFFECTED train:

. CTB Coolers in high speed.

. CTB Aux Air Cooler

. Reactor Cavity Cooler

b. Place fans in affected train in PULL-TO-LOCK or STOP as required:

. CTB Coolers in high speed.

. CTB Coolers low speed.

. CTB Aux Air Cooler

. Reactor Cavity Cooler NOTE to examiner: ATTACHMENT A CONTAINMENT VENTILATION EQUIPMENT LIST attached. (Between pages 30-31)

UO 1 8. Disable automatic operation of affected DG using 1 31 45A-1, DIESEL GENERATORS.

NOTE to examiner: The UO will call an SO to disable Train A Diesel Generator Automatic Operation per Section 4.4.1 1 of 13145A-1 The SO will place the LOCAL-REMOTE switch in LOCAL and the following annunciator will illuminate on the QEAB.

ALB35-E05 DG1A DISABLED ENGINE CONTROL IN LOCAL 25

Required Operator Actions Form ES-D-2 Op-Test No : 201 2-301 Scenario No : 2 Event No. : 4 Event

Description:

NSCW pump # 3 trips (locked rotor) with NSCW pump # 5 shaft shear on auto start. The crew will have to shutdown NSCW Train A and take actions of AOP-1 8021 -C, Loss of Nuclear Service Cooling Water System.

Time Position

[ Applicants Action or Behavior Step 18 continued.

1 8. Disable automatic operation of affected DG using 13145, DIESEL GENERATORS.

NOTE to examiner: The UO will call an SO to disable Train A Diesel Generator Automatic Operation per Section 4.4. 1 1 of 1 31 45-Al The SO will place DG1A in Maintenance Mode and the following annunciator will illuminate on the QEAB.

ALB35-E1O DG1A DISABLED MAINTENANCE LOCK OUT 55 19. Initiate the following:

a. 14230, OFFSITE AC CIRCUIT VERIFICATION AND CAPACITY I CAPABILITY EVALUATION.

NOTE: The crew will call C & T to have someone perform the AC Source Verification.

b. Verify SAT energized using 1 341 8-A(B), STANDBY AUXILIARY TRANSFORMER UNIT 1 (2) TRAIN A(B)

OPERAT1ONS.

NOTE: The crew will dispatch an SO or call C & T to have someone verify the SAT is energized.

NOTE to examiner: The above are 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Tech Spec Actions from LCO 3.8.1 AC Sources Operating, Condition B.

26

Required Operator Actions Form ESD-2 Op-Test No : 201 4Q1 Scenario No. : 2 Event No. : 4 Event

Description:

NSCW pump # 3 trips (locked rotor) with NSCW pump # 5 shaft shear on auto start, The crew will have to shutdown NSCW Train A and take actions of AOP-18021-C, Loss of Nuclear Service Cooling Water System.

Time Position Applicants Action or Behavior ss 20. Initiate the following as appropriate:

TS 3.7.8 TS 3.7.9 NOTE to examiner: LCO 3.7.8 below. LCO 3.7.9 is N/A.

LCO 3.7.8 Two NSCW trains shall be OPERABLE.

APPLICABILITY: MODES 1 2, 3, and 4. ,

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One NSCW train inoperable NOTES 1 Enter applicable Conditions and Required Actions of LCO 3.8.1 AC Sources Operating. For emergency diesel generator made inoperable by NSCW system

2. Enter applicable Conditions and Required Actions of LCO 3.4.6, RCS Loops MODE 4, for residual heat removal loops made inoperable by NSCW system.

A.1 Restore NSCW System to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

OPERABLE status.

B. Required Action and B.1 Be in MODE 3 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A not AND met.

B.2 Be in MODE 5 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> 27

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 2 Event No. : 4 Event

Description:

NSCW pump # 3 trips (locked rotor) with NSCW pump # 5 shaft shear on auto start. The crew will have to shutdown NSCW Train A and take actions of AOP-18021-C, Loss of Nuclear Service Cooling Water System Time Position Applicants Action or Behavior 55 LCO 3.8.1 The following AC electrical sources shall be OPERABLE.

a. Two qualified circuits between the offsite transmission network and the onsite Class 1 E AC Electrical Power Distribution System; and
b. Two diesel generators (DGs) capable of supplying the onsite Class 1 E power distribution subsystem(s).

Automatic load sequencers for Train A and Train B ESF buses shall be OPERABLE.

APPLICABILITY: MODES 1 2, 3, and 4. ,

ACTIONS NOTE LCO 3O.4b is not applicable to DGs.

ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. One DG inoperable B.1 Perform SR 38.1.1 for the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> required offsite circuit(s).

AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

AND B.2 Verify SAT available. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND AND Once per 1 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> thereafter.

Note to examiner: More steps from Tech Spec 3.8.1 follow.

28

Appendix 0 Required Operator Actions Form ES-D-2 Op-Test No. : 2012-301 Scenario No : 2 Event No : 4 Event

Description:

NSCW pump # 3 trips (locked rotor) with NSCW pump # 5 shaft shear on auto start. The crew will have to shutdown NSCW Train A and take actions of AOP-18021-C, Loss of Nuclear Service Cooling Water System Time Position Applicants Action or Behavior ss ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME 8.3 Declare required 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from discovery of feature(s) Supported by Condition B concurrent with the inoperable DG inoperability of redundant inoperable when its required features.

required redundant feature(s) is inoperable.

AND B.4.1 Determine OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> DG is not inoperable due to common cause failure.

OR B.4.2 Perform SR 3.8. 1 .2 for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

OPERABLE DG.

AND NOTE Required Action B.5.1 is only applicable if the combined reliability of the enhanced black-start combustion turbine generators (CTG) and the black-start diesel generator is

>95%. Otherwise, Required Action B.5.2 applies.

B.5.1 Verify an enhanced 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> black-start diesl generator starts and OR achieves steady state voltage and frequency. Within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> prior to entry into Condition B.

B.5.2 Start and run at least 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> one CTG while in Condition B. OR Prior to entry into Condition B AND for preplanned maintenance.

NOTE to examiner: More Tech Spec 3.8.1 steps follow:

29

AppendixD Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 2 Event No. : 4 Event

Description:

NSCW pump # 3 trips (locked rotor) with NSCW pump # 5 shaft shear on auto start. The crew will have to shutdown NSCW Train A and take actions of AOP-1 8021 -C, Loss of Nuclear Service Cooling Water System

[ Time Position

{ Applicants Action or Behavior CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) 6.6 Restore DG to 14 days from discovery of OPERABLE status. failure to meet LCO.

uc 21. Check NSCW return temperature on affected train LESS THAN 95°F.

TrainA: Tl-1676A Train B: Tl-1677A 55 22. Return to procedure and step in effect.

SS END OF EVENT 4, PROCEED TO EVENT 5.

30

Approved By . Procxluro Number Rev J. B. Stanley Vogtle Electric Generating Plant 18021-C 18 I Approved Nurnb&

LOSS OF NUCLEAR SERVICE COOLING WATER SYSTEM 7/21/2011 ATTACHMENT A Sheet 1 of 1 CONTAINMENT VENTILATION EQUIPMENT LIST QHVC LOCATION EQUIPMENT EQUIPMENT NAME (COORDINATESj. NUMBER HANDSWITCH TRAIN A CTB CLG UNIT FAN-i LOW SPEED A-24 1 501 -A7-OO1 HS-1 2582A CTB CLG UNIT FAN-i HIGH SPEED B-24 1 501 -A7-OO1 HS-1 2582D CTB CLG UNIT FAN-2 LOW SPEED A-25 1 501 -A7-002 HS-2582A CTB CLG UNIT FAN-2 HIGH SPEED B-25 1 501 -A7-002 HS-2582D CTB CLG UNIT FAN-5 LOW SPEED 0-24 1 501 -A7-005 HS-1 2584A CTB CLG UNIT FAN-S HIGH SPEED D-24 1 501 -A7-005 HS-1 2584D CTB CLG UNIT FAN-6 LOW SPEED 0-25 1 501 -A7-006 HS-2584A CTB CLG UNIT FAN-6 HIGH SPEED D-25 1 501 -A7-006 HS-2584D CTBAUXCLG UNITCIRC FAN-i E-26 1 51 5-A7-OO1 HS-1 2255 REACTOR CAVITY COOLING FAN-i 0-36 1 51 1 -B7-OO1 HS-2650 TRAIN B CTB CLG UNIT FAN-3 LOW SPEED A-26 1 501 -A7-003 HS-1 2583A CTB CLG UNIT FAN-3 HIGH SPEED B-26 1 501 -A7-003 HS-1 2583D CTB CLG UNIT FAN-4 LOW SPEED A-27 1 501 -A7-004 HS-2583A CTB CLG UNIT FAN-4 HIGH SPEED B-27 1 501 -A7-004 HS-2583D CTB CLG UNIT FAN-7 LOW SPEED 0-26 1501 -A7-007 HS-1 2585A CTB CLG UNIT FAN-7 HIGH SPEED D-26 1501 -A7-007 HS-12585D CTB CLG UNIT FAN-8 LOW SPEED 0-27 1501 -A7-008 HS-2585A CTB CLG UNIT FAN-8 HIGH SPEED D-27 1501 -A7-008 HS-2585D CTB AUX CLG UNIT CIRC FAN-2 E-27 151 5-A7-002 HS-1 2257 REACTOR CAVITY COOLING FAN-2 0-37 1511 -B7-002 HS-2651 END OF ATTACHMENT A

Appendix D Required Operator Actions Form ESD-2 Op-Test No. : 201 2-301 Scenario No. : 2 Event No. : 5 Event

Description:

Normal Charging Pump (NCP) trips, Loss of Charging flow.

Time

[ Position Applicants Action or Behavior OATC Diagnose Normal Charging Pump (NCP) has tripped:

Symptoms I alarms:

ALBO7-A05 REGEN HX LTDN HI TEMP ALBO7-806 CHARGING LINE HI/LO FLOW ALBO7-C06 CHARGING PUMP OVERLOAD TRIP ALBO8-F06 RCP SEAL WATER INJ LO FLOW ALB33-A05 41 60V SWGR 1 NAO5 TROUBLE md ications:

. NCP hand switch green and amber light lit.

. Charging flow indicates 0 gpm on 1 FI-Ol 21 A or 1 FI-Ol 21 C.

. Letdown flashing on 1 Fl-i 32A or 1 Fl-i 32C.

SS Enters 1 8007-C, section B Loss of Charging.

IMMEDIATE OPERATOR ACTIONS OATC Bi . Isolate letdown:

a. Close letdown orifice isolation valves:

. HV-8149A

. HV-8149B

. HV-8149C

b. Close letdown orifice isolation valves:

. HV-0459

. HV-0460 31

Appendix D Required Operator Actions Form ES-D2 Op-Test No. : 201 2-301 Scenario No. : 2 Event No. : 5 Event

Description:

Normal Charging Pump (NCP) trips, Loss of Charging flow.

Time Position Applicants Action or Behavior ss Enters AOP 18007-C, Section B, LOSS OF CHARGING FLOW.

OATC B2. Initiate the Continuous Actions Page.

uO OATC B3. Trend RCP Seal Parameters listed in ATTACHMENT A.

OATC ATTACHMENT A RCP SEAL PARAMETER INDICATION uO NOTE: The following points are accessible under IPC Group 62.

PARAMETER PC POINT RCP Seal Injection Flow RCP1 F0131 RCP2 F0129 RCP3 F0127 RCP4 F0125 RCP Seal Injection Temperature T0140 (Measured at VCT Outlet)

Number 1 Seal Leakoff High Flow RCP1 F0161 RCP2 F0160 RCP3 F0159 RCP4 F0158 Number 1 Seal Inlet Temperature RCP1 T0181/T0417 RCP2 T0182/T0437 RCP3 T01831T0457 RCP4 T0184/T0477 32

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 2 Event No. : 5 Event

Description:

Normal Charging Pump (NCP) trips, Loss of Charging flow.

[ Time Position j Applicants Action or Behavior OATC B4. Check charging pumps(s) OPERATING NORMALLY:

. Discharge flow trend STABLE.

. Discharge pressure trend STABLE.

. VCT level IN NORMAL BAND.

. Bus current STABLE.

. Suction pressure STABLE.

So will report after dispatched for the NCP and its breaker:

NCP pump bearings hot and over current relays tripped for breaker 1 NAO5-08.

OATC B5. Locate and isolate any charging system leakage. (N/A)

OATC B6. Check ACCW system - IN SERVICE. (YES) uO OATC B7. Check normal charging valves OPEN: (YES)

. HV-8105

. HV-8106

. HV-81 46 or HV-81 47

. HV-8485A and B

. FV-121 33

Appendix D Required Operator Actions Form ES-D-2 Op-Test NoW: 2O12-9j Scenario No.: 2 EventNo: 5 Event

Description:

Normal Charging Pump (NCP) trips, Loss of Charging flow.

Time Position Applicants Action or Behavior OATC B8. Check normal charging flow ESTABLISHED. (NO)

RNO B8. Perform the following:

a. WHEN normal charging flowpath can be established, THEN place normal charging and letdown in service by initiating 1 3006, CHEMICAL AND VOLUME CONTROL SYSTEM.

NOTE to examiner: Step Bi 0 will be performed AFTER the OATC places Normal Charging and Letdown in service per EVENT 6.

Once event 6 is complete, return to this page for completion of the AOP for Loss of Charging actions continuing with BlO Steps for normal charging and letdown are on page # 36.

Note to examiner: EVENT 6 is OPTIONAL at NRC Chief discretion, if option not to perform, go to Main Event #7.

b. GotoStepBlO.

OATC Bi 0. Establish Seal Injection flow to all RCPs 8 to 1 3 GPM.

Bi 1 . Check RCP seal injection flow ESTABLISHED. (YES)

OATC B12. Control PRZR level - IN PROGRAM BAND.

34

Appendix D RequiredOperator Actions Form ES-D2 Op-Test No: 2012-301 Scenario No. : 2 Event No. : 5 Event

Description:

Normal Charging Pump (NCP) trips, Loss of Charging flow.

Time Position Applicants Action or Behavior ss Bi 3. Initiate the following Technical Specifications and/or Technical Requirements as necessary:

LCO3.5.2 LCQ a53 LCO3.5.5 TR 13.L2 TR 1 3.1 3 (CCP A in PTL, NCP tripped, real LCO)

TR 13t4 TR 1 3.1 .5 (CCP A in PTL, NCP tripped, real LCO)

OATC B14. Check normal charging flow ESTABLISHED.

OATC Bi 5. Return to procedure and step in effect.

NOTE to examiner: THIS COMPLETES EVENT 5 and EVENT 6 (IF event 6 was performed).

PROCEED TO EVENT 7.

35

Ai;p;na;;c D Required Operator Actions Form ESD-2 Op-Test No. : 201 2-301 Scenario No. : 2 Event No. : 6 Event

Description:

Return Normal Charging and Letdown to service after Normal Charging Pump (NCP) trip Time Position Applicants Action or Behavior OATC NOTE to Examiner Student may go to Section 4 4 2 first, but it will send him to the following section with no Charging Pump running.

13006-1, CVCS Section 4.4.13, Restart of CCP or NCP following Loss of a Charging Pump.

CAUTIONS At BOL, while borating to maintain Tavg, the calculated delta boron concentration between the RCS and the last time the CCP/NCP was placed in service may be incorrect. Experience has shown that high concentrations of borated water tend to collect in the suction piping of the idle pumps, resulting in a higher boron concentration in the CCP/NCP than the RCS. This may cause and unexpected boration and temperature reduction, when the pump is placed in service or tested.

Restart of a charging pump should not be delayed in order to flush the pump prior to start.

OATC 4.4W 1 3. 1 PRIOR to starting the pump and based on the conditions described in the first caution above, a slight boration should be anticipated and a briefing on compensatory actions to offset the boration should be conducted.

CREW CAUTION: A determination should be made that loss of the Charging Pump was not due to air/gas binding before starting the same or another pump.

OATC 4.4.13.2 Dispatch an Operatorto perform pump pre-start checks.

Note to examiner: Simbooth cue operators a CCP is ready to start.

36

AppendixD Required Operator Actions Form ES-D-2 Op-Test No. : 201 23O1 Scenario No. : 2 Event No. : 6 Event

Description:

Return Normal Charging and Letdown to service after Normal Charging Pump (NCP) trip.

Time Position Applicants Action or Behavior OATC 4.4.1 3.3 Verify VCT LEVEL 1 LI-i 85 indicates between 30 and 80%.

OATC 4.4.13.4 Verify OPEN VCT OUTLET ISOLATION Valves:

. i-LV-Oii2B

. i-LV-Oii2C OATC 4.4.13.5 Verify OPEN CCP-A & B COMMON MINIFLOW i-HV-8i 10.

OATC 4.4.13.6 IE starting a CCP perform the following:

Note to examiner: CCP-A is in PTL due to loss of Train A NSCW.

The steps for starting CCP-A are N/A. Step 4.4.13.6 for CCP-B is continued on the next page.

37

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 2012-301 Scenario No. : 2 Event No. : 6 Event

Description:

Return Normal Charging and Letdown to service after Normal Charging Pump (NCP) trip.

Time Position Applicants Action or Behavior OATC IF starting CCP-B:

a. Open CCP-B SUCTION 1 -HV-8471 B.
b. Open CCP-B MINIFLOW 1 -HV-81 1 1 B.

C, Verify OPEN CCP-A & B COMMON MINIFLOW 1-HV-81 10

d. Close CCP-B SAFETY GRADE CHG 1-HV-0190B.
e. Open CCP-B DISCHARGE ISOLATION 1-HV-8485B.
f. Open CCP DISCHARGE HEADER CROSSCONNECT 1 -HV-8438 NOTE and step 4.4.13.7 are N/A.

OATC 4.4.13.8 Set 1HC-182 for Maximum Seal Flow (0% demand).

OATC 4.4.13.9 Verify Charging Flow Control 1 FIC-121 in MAN and set to minimum.

NOTE Normal and Alternate charging paths should be alternated over plant life to equalize thermal stress. The transfer should be performed at cold shutdown conditions to avoid thermal transients. Normal charging should be in service during even-numbered fuel cycles.

Alternate charging should be in service during odd-numbered fuel cycles. Swapping nozzles at NOPT should be avoided.

38

Appendix D - - Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 2 EventNo.: 6 Event

Description:

Return Normal Charging and Letdown to service after Normal Charging Pump (NCP) trip.

Time Position Applicants Action or Behavior OATC 4.4.13.10 Verify OPEN one of the following:

NORMAL CHARGING TO LOOP 1 1-HV-8146

-OR-ALTERNATE CHARGING TO LOOP 4 1HV-8147 OATC 4.4.13.1 1 Verify OPEN CHARGING TO RCS ISOLATION Valves:

. 1-HV-8105

. 1-HV-8106 OATC 4.4. 1 3. 1 2 Verify the ALOP of the CCP to be started is running as indicated by the QMCB red indicating lamp lit.

OATC 4.4.1 3.1 3 Start the desired CCP or NCP.

CCP-A 1 HS-273A OR CCP-B 1 HS-274A NOTE to examiner: CCP-B will need to be started if the crew wishes to maintain 120 gpm letdown flow.

39

Appendix D Required Operator Actions Form ES-D2 Op-Test No. : 201 2-aOl Scenario No. : 2 Event No. : 6 Event

Description:

Return Normal Charging and Letdown to service after Normal Charging Pump (NCP) trip.

Time Position Applicants Action or Behavior OATC 4.4.1 3.1 4 IF a CCP was started, verify the selected CCP ALOP red indicating lamp goes off (on QMCB) shortly after the pump is started.

4.4.13.15 is N/A.

QATC 4.4.13.16 Simultaneously perform the following:

. Adjust Seal Flow Control 1 HC-1 82 to obtain between 8 and 13 gpm to each RCP.

. Adjust Charging Flow Control 1 FIC-1 21 to obtain the desired charging flow.

OATC 4.4. 1 3.1 7 Return to Section 4,4.2 to establish Normal Letdown and Charging.

OATC 13006-1, CVCS Section 4.4.2 Returning Normal Charging and Letdown to Service.

OATC 4.4.2.1 IF a Charging Pump is NOT in service, Go To Section 4.4.13 to start the NCP OR an available Centrifugal Charging Pump, THEN Return To this section.

40

Appendix 0 Required Operator Actions Form ES-D-2 Op-Test No : 2-301 Scenario No. : 2 Event No. : 6 Event

Description:

Return Normal Charging and Letdown to service after Normal Charging Pump (NCP) trip.

[ Time Position

[ Applicants Action or Behavior OATC NOTES: This section also applies to returning normal charging and letdown to service following termination of safety injection.

In the event letdown was isolated from the shutdown panel, a walkdown of letdown components and piping shall be performed prior to restoring normal letdown to service.

Letdown is to be established as soon as possible after initiating flow through a Charging Nozzle.

OATC 4.4.2.2 This step is N/A.

OATC 4.4.2.3 Perform the following:

a. Close LETDOWN ORIFICE Isolation Valves:

. 1-HV-8149A

. 1-HV-8149B

. 1-HV-8149C

b. Close LETDOWN ISOLATION VLV UPSTREAM AND DOWNSTREAM Valves:

. 1-LV-460

. 1-LV-459 C. Close PZR AUX SPRAY VALVE 1-HV-8145.

d. Open CVCS LETDOWN PIPE BREAK PROT ISOLATION 1 -HV-1 5214.

41

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 2 Event No. : 6 Event

Description:

Return Normal Charging and Letdown to service after Normal Charging Pump (NCP) trip.

Time Position Applicants Action or Behavior QATC 4.42.3 Continued

e. Open RCS LETDOWN LINE ISO VLV IRC 1-HV-8160.
f. Open RCS LETDOWN LINE ISO VLV ORC 1-HV-8152.
g. Place Letdown Pressure Controller 1 PlC-i 31 in MAN and adjust output to between 50% and 75%.
h. Place LETDOWN HX OUTLET TEMP 1TIC-130 in MAN and adjust output to the most current position as recorded on the Control Room Rounds Sheets.
i. Verify PRESSURIZER LEVEL 1 LR-459 greater than 17%.

NOTE: If Normal Charging and Letdown are being returned to service as directed from Section 4.4.15, one of the valves in Substep j. and both valves in Step 4.4.2.4 will already be open.

j. Verify one of the following are OPEN:

NORMAL CHARGING TO LOOP 1 1-HV-8146 (even-numbered fuel cycle)

-OR-ALTERNATE CHARGING TO LOOP 4 1-HV- 8147 (odd-numbered fuel cycle) 42

AppendixD Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 2 Event No. : 6 Event

Description:

Return Normal Charging and Letdown to service after Normal Charging Pump (NCP) trip Time Position Applicants Action or Behavior OATC 4.4.2.4 Verify CHARGING TO RCS ISOLATION Valves are OPEN:

. 1-HV-8106

. 1-HV-8105 OATC 4.4.2.5 Simultaneously perform the following:

. Adjust 1 HC-1 82 output to maintain between 8 and 13 gpm to each RCP.

. Adjust 1FIC-121 to raise CHG FLOW 1FI-121A to between 80 and 90 gpm.

OATC 4.4.2.6 Open LETDOWN ISOLATION VLV UPSTREAM AND DOWNSTREAM Valves by holding their handswitches in OPEN UNTIL the valves are fully open:

. 1 -LV-460 1 HS-460

. 1-LV-459 1HS-459 43

Appendix 0 Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 2 Event No. : 6 Event

Description:

Return Normal Charging and Letdown to service after Normal Charging Pump (NCP) trip.

Time Position Applicants Action or Behavior OATC 4.4.27 Establish Letdown flow:

a. Simultaneously open a Letdown Orifice and maintain pressure by performing the following:

. Open one LETDOWN ORIFICE Isolation Valve by holding its handswitch in the OPEN position until fully open:

1 HS-81 49B (75 gpm odd fuel cycles)

OR 1 HS-81 49C (75 gpm even fuel cycles)

OR 1HS-8149A (45 gpm)

. Adjust 1 PIC-131A to maintain LETDOWN PRESS 1 P1-i 31 A between 360 and 380 psig.

b. Record the letdown orifice that was placed in service in the Unit Control Log.

OATC 4.4.2.8 WHEN LETDOWN PRESS 1PI-131A stabilizes between 360 psig, place 1 PlC-i 31 in AUTO.

OATC 4.4.2.9 Place LETDOWN HX OUTLETTEMP 1TIC-130 in AUTO and verify it maintains temperature less than or equal to 115°F.

44

Ajpendix D Required_Operator_Actions Form ES-D-2 Op-Test NoW: 2O123O1 Scenario No.: 2 Event No. : 6 Event

Description:

Return Normal Charging and Letdown to service after Normal Charging Pump (NCP) trip.

0 Time Position Applicants Action or Behavior OATC 4.4.2.10 Verify LETDOWN REGEN HX OUT 1TI-127 indicates less than 380°F.

OATC 4.4.2.1 1 Monitor 1 LR-459 Pressurizer Level and Pressurizer Level Setpoint.

OATC 4.4.2.12 Maintain Pressurizer Level within 1% of Level Setpoint using 1FlC121.

OATC 4.4.2.13 Place Pressurizer Level Control in automatic UNLESS it is to remain in Manual under Tagout or Caution tag:

a. Verify PRZR Level Controller 1 LIC-459 in AUTO.
b. AFTER level has been stable within 1 % of setpoint for approximately 3 minutes, place 1 FIC-121 in AUTO.

OATC 4.4.2.14 This step is N/A.

END OF EVENT 6, RETURN TO EVENT 5 page # 34, step BlO.

45

A:iidix D Required Operator Actions Form ES-D-2 Op-Test No.: 201 2-301 Scenario No.: 2 Event No: 7 Event

Description:

An RCS small break LOCA will develop in the vessel head area requiring a reactor trip and safety injection. There will be complication during the LOCA. The BIT valves will fail to open automatically or manually.

SIP B will not auto start and require the OATC to manually start the pump for the only available injection flow.

Time Position Applicants Action or Behavior TEAM Diagnoses an RCS leak has developed:

Symptoms I alarms:

. INTERMEDIATE AND HIGH RADIATION ALARMS Indications:

. RE-2562 showing alarm condition on SRDC

. Charging letdown flow mismatch.

. PRZR level lowering rapidly.

. ALBO1-F06 CNMT HI MSTR 55 Note to examiner: The SS may or may not have time to briefly enter the AQP due to the severity of the leak. It is NOT expected the crew will have time to progress beyond step 3b of 1 8004-C.

55 I TEAM Enters AOP-1 8004-C section A for RCS Leakage in Mode 1.

Step Al SS checks crew in proper section (section A).

Step A2 SS directs initiation of Continuous Actions page.

46

Appendix D Required Operator Actions Form ESD-2 Op-Test No: 201 23O1 Scenario NoW: 2 Event No.: 7 Event

Description:

An RCS small break LOCA will develop in the vessel head area requiring a reactor trip and safety injection. There will be complication during the LOCA The BIT valves will fail to open automatically or manually SIP B will not auto start and require the OATC to manually start the pump for the only available injection flow.

Time Position Applicants Action or Behavior OATC Step A3 Maintains PRZR level.

Step A3.a adjusts charging flow to maintain PRZR level.

Step A3.b Checks PRZR level stable or rising. (NO)

RNO Step A3b Perform the following:

1) Isolate letdown by closing:

a) Letdown Orifice Valves.

b) Letdown Isolation Valves.

c) Excess Letdown Valves.

2) Start an additional Charging Pump as necessary.
3) IF PRZR level can NOT be maintained greater than 9%,

THEN perform the following:

a) Trip the Reactor.

b) WHEN Reactor trip verified, THEN actuate SI.

c) Go to 1 9000-C, E-0 REACTOR TRIP OR SAFETY INJECTION.

Note to examiner: The crew may trip the Reactor and actuate SI prior to reaching the procedure steps due to degrading plant conditions:

47

Appendix D Required Operator Actions Form ES-D2 Op-Test NoW: 201 2-301 Scenario No.: 2 Event No.: 7 Event Description An RCS small break LOCA will develop in the vessel head area requiring a reactor trip and safety injection. There will be complication during the LOCA. The BIT valves will fail to open automatically or manually.

SIP B will not auto start and require the OATC to manually start the pump for the only available injection flow, Time Position Applicants Action or Behavior CREW Performs Immediate Operator Actions per 1 9000-C, E-0 Reactor Trip or Safety Injection.

55 Makes a page announcement of Reactor Trip.

OATC 1 . Check Reactor Trip: (YES)

. Rod Bottom Lights LIT

. Reactor Trip and Bypass Breakers OPEN

. Neutron Flux LOWERING uO 2. Check Turbine Trip: (YES)

. All Turbine Stop Valves CLOSED uO 3. Check Power to AC Emergency Buses. (YES)

a. AC Emergency Busses AT LEAST ONE ENERGIZED.

. 4l6OAClEBusses

b. AC Emergency Busses ALL ENERGIZED.

. 41 60V AC 1 E Busses

. 480V AC 1 E Busses OATC 4. Check if SI is actuated. (YES)

. Any SI annunciators LIT

. SI ACTUATED BPLP window LIT 55 Goto Step 6.

48

Appendix D Required Operator Actions Form ES-D2 Op-Test No: 201 2-301 Scenario No.: 2 Event No.: 7 Event Description An RCS small break LOCA will develop in the vessel head area requiring a reactor trip and safety injection. There will be complication during the LOCA. The BIT valves will fail to open automatically or manually.

SIP B will not auto start and require the OATC to manually start the pump for the only available injection flow.

Time Position Applicants Action or Behavior ss 6. Initiate the Foldout Page.

CREW ss 7. Perform the following:

OATC

  • OATC Initial Actions Page (Note to examiner, page # 50) uo
  • uc Initial Actions Page (Note to examiner, page # 54)

NOTE: SS initiates step 8 after OATC/UO Initial Actions completed.

49

ppindixb Required Operator Actions Form ES-D-2 OpTest No: 201 2-301 Scenario NoW: 2 Event No.: 7 Event

Description:

An RCS small break LOCA will develop in the vessel head area requiring a reactor trip and safety injection. There will be complication during the LOCA. The BIT valves will fail to open automatically or manually.

SIP B will not auto start and require the OATC to manually start the pump for the only available injection flow.

Time Position Applicants Action or Behavior OATC PERFORMS OATC INITIAL ACTIONS 1 . Check both trains of ECCS equipment ALIGNING FOR INJECTION PHASE: (YES)

. MLB indication Note to examiner: Only train B pumps will be aligning due to Train A is in PTL due to Loss of Train A NSCW. Valves, dampers, etc. will re-align.

OATC 2. Check Containment Isolation Phase A ACTUATED. (YES)

. CIA MLB indication OATC 3. Check ECCS Pumps and NCP status:

a. CCPs RUNNING. (YES)
b. SI Pumps - RUNNING. (NO)

RNO Critical b. Start Pump B Note to examiner: SIP A is in PTL due to tag out at turnover.

c. RHR pumps - RUNNING. (YES)
d. NCP - TRIPPED. (YES)

OATC 4. Verify CCW Pumps - ONLY TWO RUNNING TRAIN B. (YES) 50

Appendix D Required Operator Actions Form ES-D-2 Op-Test Nofl: 201 2-301 Scenario Nofl: 2 Event No: 7 Event

Description:

An RCS small break LOCA will develop in the vessel head area requiring a reactor trip and safety injection. There will be complication during the LOCA The BIT valves will fail to open automatically or manually SIP B will not auto start and require the OATC to manually start the pump for the only available injection flow.

Time Position Applicants Action or Behavior OATC PERFORMS OATC INITIAL ACTIONS 5 Verify proper NSCW system operation: (YES)

a. NSCW Pumps - ONLY TWO RUNNING TRAIN B.
b. NSCW TOWER RTN HDR BYPASS BASIN hand switches - IN AUTO:

. HS-1669A OATC 6. Verify Containment Cooling Units: (YES)

a. ALL RUNNING IN LOW SPEED. (Train B)

. MLB indication

b. NSCW Cooler isolation valves OPEN. (YES)

. MLB indication OATC 7. Check Containment Ventilation Isolation.

a. Dampers and Valves CLOSED. (YES) 51

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 201 2-301 Scenario No.: 2 Event No.: 7 Event Description An RCS small break LOCA wall develop an the vessel head area requiring a reactor trip and safety injection. There will be complication during the LOCA. The BIT valves will fail to open automatically or manually.

SIP B will not auto start and require the OATC to manually start the pump for the only available injection flow.

Time Position Appaicants Action or Behavior OATC PERFORMS OATC INITIAL ACTIONS

8. Check Containment pressure REMAINED LESS THAN 21 PSIG.

(YES)

OATC Note to examiner: BIT Discharge Valves will NOT open.

9. Check ECCS flows:
a. BIT flow. (NO)

RNO

a. Align Valves using ATTACHMENT B. (Valves will NOT open)
b. RCS pressure LESS THAN 1625 P51G. (NO)

RNO

b. GotoSteplO.

OATC 1 0. Check ECCS Valve alignment PROPER INJECTION LINEUP INDICATED ON MLBs. (NO)

Note to examiner: HV-8801 A I B will NOT open. The candidate may using Attachment B to align the valves. Procedure attachment B is at the end of this event but the valves will NOT open. All other valves will be properly aligned. Note to examiner: Attachment B between pages # 61 and #2.

OATC 11 . Check ACCW pumps - AT LEAST ONE RUNNING. (YES)

OATC 12. Adjust Seal Injection flow to all RCPs 8 to 13 GPM.

52

Appendix D Required Operator Actions Form ES-D-2 Op-Test No: 201 2-301 Scenario No.: 2 Event No: 7 Event

Description:

An RCS small break LOCA will develop in the vessel head area requiring a reactor trip and safety injection. There will be complication during the LOCA The BIT valves will fail to open automatically or manually SIP B will not auto start and require the OATC to manually start the pump for the only available injection flow.

Time Position Applicants Action or Behavior OATC 1 3. Dispatch Operator to ensure one train of SPENT FUEL POOL COOLING in service per 13719, SPENT FUEL POOL COOLING AND PURIFICATION SYSTEM.

END OF OATC INITIAL ACTIONS RETURNS TO MAIN BODY OF 19000-C CONTINUING AT STEP 8, page # 57.

53

Appendix D Required Operator Actions Form ES-D-2 Op-Test No: 2012-301 Scenario No.: 2 Event No.: 7 Event

Description:

An RCS small break LOCA will develop in the vessel head area requiring a reactor trip and safety injection. There will be complication during the LOCA The BIT valves will fail to open automatically or manually.

SIP B will not auto start and require the OATC to manually start the pump for the only available injection flow Time Position Applicants Action or Behavior uQ PERFORMS UO INITIAL ACTIONS 1 Check AFW Pumps - RUNNING (YES)

. MDAFW Pumps

. TDAFW Pump, if required.

UO 2. Check NR level in at least one SG GREATER THAN 10%

(32% ADVERSE). (YES)

UQ a Check if main steamlines should be isolated: (NO)

a. Check for one of more of the following conditions:

Any steamline pressure LESS THAN OR EQUAL TO 585 PS 1G.

Containment pressure GREATER THAN 14.5 P51G.

Low Steam Pressure SI/SLI BLOCKED AND High Steam Pressure Rate ON TWO OR MORE CHANNELS OF ANY STEAMLINE.

RNO

a. GotoStep4 54

Appendix D Required Operator Actions Form ES-D2 Op-Test No.: 201 2-301 Scenario No.: 2 Event No,: 7 Event Description An RCS small break LOCA will develop in the vessel head area requiring a reactor trip and safety injection. There will be complication during the LOCA. The BIT valves will fail to open automatically or manually.

SIP B will not auto start and require the OATC to manually start the pump for the only available injection flow.

Time Position Applicants Action or Behavior uc PERFORMS UO INITIAL ACTIONS

4. Verify FW Isolation Valves closed: (YES)

. MEl Vs

. BEIVs

. MERVs

. BERVs uc 5. Verify SG Blowdown isolated: (YES)

. Place SG Blowdown Isolation Valve handswitches HS-7603A, B, C, and D in the CLOSE position.

. SG Sample Isolation Valves CLOSED uO 6. Verify Diesel Generators RUNNING (YES)

UO 7. Throttle total AEW flow as necessary to maintain SG NR levels between 10% (32% ADVERSE) and 65%.

UO 8. Verify both MFPs TRIPPED (YES) 55

Appendix O ReguiredOperator Actions Form ES-D-2 Op-Test No: 201 2-301 Scenario No: 2 Event No: 7 Event

Description:

An RCS small break LOCA will develop in the vessel head area requiring a reactor trip and safety injection There will be complication during the LOCA. The BIT valves will fail to open automatically or manually.

SIP B will not auto start and require the OATC to manually start the pump for the only available injection flow.

Time Position Applicants Action or Behavior uo 9. Check Main Generator Output Breakers OPEN. (NO)

RNO

9. Open Generator Output Breaker on affected Unit:

UNIT 1:

. Push and hold 1-PB-161710A and then place 1-HS-161710 in TRIP position.

. Push and hold 1-PB-161810A and then place 1-HS-161810 in TRIP position.

BACK TO 19000-C PROCEDURE MAIN BODY page# 57.

OATC UO 8. Initiate the Continuous Actions Page.

56

Appendix D Required Operator Actions Form ES-D-2 Op-Test No: 201 2-301 Scenario No.: 2 Event No.: 7 Event

Description:

An RCS small break LOCA will develop in the vessel head area requiring a reactor trip and safety injection. There will be complication during the LOCA. The BIT valves will fail to open automatically or manually.

SIP B will not auto start and require the OATC to manually start the pump for the only available injection flow.

Time Position Applicants Action or Behavior OATC 9. Check RCS temperature stable at or trending to 557°F

-OR-Without RCP(s) running RCS WR COLD LEG TEMPERATURES RNO (IF needed) 9 IF temperature is less than 557°F and lowering, THEN perform the following as necessary:

a. Stop dumping steam.
b. Perform the following as appropriate:

IF at least one SG NR level greater than 10%

(32% ADVERSE), THEN lower total feed flow.

-OR-IF all SG NR levels less than 10% (32% ADVERSE), THEN lower total feed flow to NOT less than 570 gpm.

c. If cooldown continues, THEN close MSIVs and BSIVs.
d. If temperature greater than 557°F and rising, THEN dump steam.

57

Appendix D Required Operator Actions Form ES-D-2 Op-Test No: 201 2-301 Scenario Nofl: 2 Event No: 7 Event Description An RCS small break LOCA will develop in the vessel head area requiring a reactor trip and safety injection. There will be complication during the LOCA The BIT valves will fail to open automatically or manually SIP B will not auto start and require the OATC to manually start the pump for the only available injection flow Time Position Appiicants Action or Behavior OATC CAUTION: A PRZR PORV Block Valve which was closed to isolate an excessively leaking or open PRZR PORV should not be opened unless used to prevent challenging the PRZR Safeties.

1 O Check PRZR PORVs, Block Valves, and Spray Valves:

a. PRZR PORVs - CLOSED AND IN AUTO. (YES)
b. Normal PRZR Spray Valves CLOSED. (YES)
c. Power to at least one Block Valve AVAILABLE (YES) d PRZR PORV Block Valves AT LEAST ONE OPEN (NO)

RNO

d. Verify open at least one PRZR PORV Block Valve when PRZR pressure is greater than 2185 psig.

OATC 1 1 Check if RCPs should be stopped:

a. ECCS Pumps - AT LEAST ONE RUNNING: (YES)

. CCPorSIPump

b. RCS pressure LESS THAN 1375 P51G. (iF YES go to step 11.c and trip RCPs. IF NOT, perform step 11.d)

RNO

b. GotoStepl2.

C. Trip the RCPs.

CRITICAL Note to Examiner: Critical if RCP Trip Criteria met at this time. it may be RCP Trip Criteria will be met by Foldout Page or in the early steps of 1 901 0-C, E-1 Loss of Reactor Or Secondary Coolant.

58

Appendix D Required Operator Actions Form ES-D-2 Op-Test No: 201 2-301 Scenario NoW: 2 Event No.: 7 Event Description An RCS small break LOCA will develop in the vessel head area requiring a reactor trip and safety injection. There will be complication during the LOCA. The BIT valves will fail to open automatically or manually.

SIP B will not auto start and require the OATC to manually start the pump for the only available injection flow Time Position Applicants Action or Behavior uo 12. Check SGs secondary pressure boundaries:

a. SG Pressures:

Any lowering in an uncontrolled manner. (NO)

-OR-Any completely depressurized. (NO)

RNO

a. GotoStepl3.

59

Appendix D Required Operator Actions Form ES-D-2 OpTest NoW: 201 23O1 Scenario No.: 2 Event NoW: 7 Event Description An RCS small break LOCA will develop in the vessel head area requiring a reactor trip and safety injectionS There will be complication during the LOCA. The BIT valves will fail to open automatically or manually.

SIP B will not auto start and require the OATC to manually start the pump for the only available injection flow.

Time Position Applicants Action or Behavior uo 13 Check SG Tubes intact:

a. Direct Chemistry to take periodic activity samples of all SGs one atatime.
b. Secondary Radiation NORMAL. (YES)

. MAIN STEM LINE MONITORS

. RE-13120(SG1)

. RE-13121 (5G2)

. RE-13122(SG3)

. RE-13119(SG4)

. CNDSR AIR EJCTR/STM RAD MONITORS:

. RE-12839

. RE-12839D (if on scale)

. RE-12839E (if on scale)

. STM GEN LIQ PROCESS RAD:

. RE-OO1 9 (Sample)

. RE-0021 (Blowdown)

. SG sample radiation:

C. Check SG levels - ANY RISING IN AN UNCONTROLLED MANNER. (NO)

RNO

c. GotoStepl4.

60

Appendix D Required Operator Actions Form ES-D-2 Op-Test No: 201 2-3O Scenario No,: 2 Event No.: 7 Event Description An RCS small break LOCA wall develop in the vessel head area requiring a reactor trip and safety injection. There will be complication during the LOCA The BIT valves will fail to open automatically or manually SIP B will not auto start and require the OATC to manually start the pump for the only available injection flow Time Position Applicants Action or Behavior CREW 14. Check if RCS is intact inside Containment (NO)

. Containment radiation NORMAL (NO)

. Containment pressure NORMAL (NO)

. Containment Emergency Recirculation Sump levels NORMAL (NO)

RNO

14. Go to 19010-C, El LOSS OF REACTOR OR SECONDARY COOLANT SS Transitions to 1 901 0-C, E-1 Loss of Reactor or Secondary Coolant.

Note to examiner: Actions for 1 901 0-C on following pages.

61

Appendix D Required_Operator_Actions Form ES-D-2 Op-Test No O1 2-301 Scenario No 2 Event No 1: 7 Event

Description:

Continuation of SB LOCA actions for Event 7 in 19010-C.

Time Position Applicants Action or Behavior OATC L Initiatethefollowing:

uc

. Continuous Actions and Foldout Page.

. Critical Safety Function Status Trees per 1 9200-C, F-C CRITICAL SAFETY FUNCTION STATUS TREE.

ss 2. Initiate NMP-EP-1 10, EMERGENCY CLASSIFICATION DETERMINATION AND INITIAL ACTION.

OATC a Maintain Seal Injection flow to all RCPs 8 to 13 GPM.

OATC 4. Check if RCPs should be stopped:

a. ECCS Pumps - AT LEAST ONE RUNNING: (YES)

. CCPorSlPump

b. RCS pressure LESS THAN 1375 P51G. (YES)

Critical c. Stop all RCPs.

Note to examiner: Critical at this time IF RCP Trip Criteria was not met previously in E-0.

62

Appendix 0 RequiredOperator Actions Form ES-D-2 Op-Test No.: 2012-301 Scenario No.: 2 Event No. : 7 Event

Description:

Continuation of SB LOCA actions for Event 7 in 19010-C.

Time IP0tk Applicants Action or Behavior OATC 5. Check ACCW Pumps - AT LEAST ONE RUNNING. (YES) uO 6. Place Containment Hydrogen Monitors in service by initiating 1 31 30, POST-ACCI DENT HYDROG EN CONTROL.

NOTE to examiners: Crew may call C & T to perform this.

uO T Check SGs secondary pressure boundaries:

a. Identify faulted SG(s):

ANY SG PRESSURE LOWERING IN AN UNCONTROLLED MANNER. (NO)

-OR-ANY SG COMPLETELY DEPRESSURIZED. (NO)

RNO

a. GotoStep8.

63

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 2 Event No. : 7 Event

Description:

Continuation of SB LOCA actions for Event 7 in 19010-C.

Time Position Applicants Action or Behavior uo 8. Check intact SG levels:

a. NR level AT LEAST ONE GREATER THAN 1 0% (32%

ADVERSE.

b. Maintain NR levels between 10% (32% ADVERSE) and 65%.

C. NR level - ANY RISING IN AN UNCONTROLLED MANNER.

(NO)

RNO C. GotoStep9.

64

Appendix D Required_Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 2 Event No. : 7 Event

Description:

Continuation of SB LOCA actions for Event 7 in 19010-C.

Time

] Position Applicants Action or Behavior uc 9. Check SG Tubes intact:

a. Direct Chemistry to take periodic activity samples of all SGs one at a time.
b. Secondary radiation NORMAL. (YES)

. MAIN STM LINE MONITORS

. RE-13120(SG1)

. RE-13121 (5G2)

. RE-13122(SG3)

. RE-13119(5G4)

. CNDSR AIR EJCTRISTM RAD MONITORS

. RE-12839C

. RE-12839D (if on scale)

. RE-i 2839E (if on scale)

. STM GEN LIQ PROCESS RAD:

. RE-OO1 9 (Sample)

. RE-0021 (Blowdown)

. SG sample radiation.

c. Check SG levels - ANY RISING IN AN UNCONTROLLED MANNER. (NO)

RNO C. GotoSteplO.

65

Appendix D Required Operator Actions Form ES-D-2 Op-Test No 2O124Oj Scenario No 2 EventNo.: 7 Event

Description:

Continuation of SB LOCA actIons for Event 7 in 1901 O-C Time Position Applicants Action or Behavior OATC 1 0. Check PRZR PORVs and Block Valves:

a. Power to PRZR PORV Block Valves AVAILABLE. (YES) b PRZR PORVs - CLOSED. (YES)
c. PRZR PORV Block Valves - AT LEAST ONE OPEN. (NO)

RNO C, IF NOT closed to isolate an excessively leaking or open PRZR PORV, AND WHEN PRZR pressure is greater than 2185 psig, THEN verify open at least one PRZR PORV Block Valve.

d. Any RCS WR CL temperature LESS THAN 220°F. (NO)

RNO

d. WHEN any RCS CL temperature lowers to less than 220°F, THEN arm COPS.

GotoStep 11.

CREW 11 . Check if ECCS flow should be reduced:

a RCS Subcooling GREATER THAN 24°F (38°F ADVERSE). (NO)

RNO

a. GotoStepl2.

66

AppendixD Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 2 Event No. : 7 Event

Description:

Continuation of SB LOCA actions for Event 7 in 19010-C.

Time Position Applicants Action or Behavior QATC 1 2. Check if Containment Spray should be stopped:

a. CS Pumps - RUNNING. (NO)

Go to Step 13.

CREW CAUTIONS:

If offsite power is lost after SI reset, action is required to restart the following ESF equipment if plant conditions require their operation.

. RHR pumps

. SI pumps

. Post-LOCA Cavity Purge Units

. Containment Coolers in low speed (Started in high speed on a UV signal)

. ESF Chilled Water Pumps (if CRI is reset) 67

Appendix D Required OperatorActions Form ES-D-2 Op-Test No.: 2012-301 Scenario No.: 2 Event No. : 7 Event

Description:

Continuation of SB LOCA actions for Event 7 in 19010-C.

Time Position J Applicants Action or Behavior OATC 1 3. Check if RHR Pumps should be stopped:

a. RHR Pumps ANY RUNNING WITH SUCTION ALIGNED TO RWST. (YES)
b. RCS pressure:

1 ) Greater than 300 psig. (YES)

2) Stable or rising. (NO)

RNO

1) GotoStepl5.

OATC 1 5. Check RCS and SG pressures:

. Pressure in all SGs STABLE OR RISING (YES)

. RCS pressure - STABLE OR LOWERING. (YES) 68

Appendix Required Operator Actions Form ES-D-2 Op-Test No 201 2-301 Scenario No 2 Event No : 7 Event

Description:

Continuation of SB LOCA actions for Event 7 in 1901 0-CS Time Positionj Applicants Action or Behavior uO 1 6. Check if DGs should be stopped:

a. AC Emergency Busses ENERGIZED BY OFFSITE POWER. (YES)
b. Reset SI, if necessary. (YES, reset SI at this time)
c. Stop any unloaded DG and place in standby by initiating 13145, DIESEL GENERATORS.
d. Check Stub Busses ENERGIZED. (NO)

. NBO1

. NB1O RNO

d. Energize Stub Busses by performing the following as necessary:

NBO1 NB1O

1) Openbreaker 1) Open breaker NBO1-O1 NB1O-O1
2) Close breaker 2) Close breaker AAO2-22 BAO3-1 8
3) Close breaker 3) Close breaker NBO1-O1 NB1O-O1 69

A;idix D Required Operator Actions Form ES-D-2 Op-Test No. : 2012-3Qj Scenario No. : 2 Event No : 7 Event

Description:

Continuation of SB LOCA actions for Event 7 in 1901 0-CS Time Position Applicants Action or Behavior OATC 1 7 Check Cold Leg recirculation capability:

a. Power available to:

Train A comDonents:

. HV-881 1A - CNMT SUMP TO RHR PMP-A SUCTION (YES)

. RHR Pump A OPERABLE (NO)

. HV-8809A - RHR PMP-A TO COLD LEG 1 & 2 ISO VLV (YES)

. RHR Heat Exchanger A OPERABLE (YES)

NOTE to examiners: Train A is NOT available due to RHR pump A is in PTL due to the Loss of NSCW.

-OR-Train B comDonents:

. HV-881 lB - CNMT SUMP TO RHR PMP-B SUCTION (YES)

. RHR Pump B OPERABLE (YES)

. HV-8809B - RHR PMP-B TO COLD LEG 3 & 4 ISO VLV (YES)

. RHR Heat Exchanger B OPERABLE (YES) 70

A 1 ndax 0 Required OperatorActions Form ES-D2 Op-Test No 201 23O1 Scenario No 2 Event No : 7 Event

Description:

Continuation of SB LOCA actions for Event 7 in 19010-C.

Time

[ Position Applicants Action or Behavior uc 1 8. Check Auxiliary Building leak detection systems:

a. PLANT VENT Radiation Monitors NORMAL: (YES)

. RE-i 2442A EFFL PART

. RE-12442B EFFL IODINE

. RE-12442C EFFL PAD

. RE-i 2444C RADIOGAS PAD

b. Auxiliary Building break detection system on QPCP ALL LEAK DETECTION STATUS LIGHTS NOT LIT. (YES)

CREW 1 9. Direct Chemistry to obtain samples:

. For boron, pH, and radioactivity:

  • RCS

. Both Containment Emergency Sumps (if cold leg recirculation has been establishedj

. For radioactivity, hydrogen and oxygen concentrations.

. Containment atmosphere 71

Appendix D Required Operator Actions Form ESD-2 Op-Test No, : 201 23O1 Scenario No. : 2 Event No, : 7 Event

Description:

Continuation of SB LOCA actions for Event 7 in 19010-C.

Time Position Applicants Action or Behavior CREW 20. Evaluate plant equipment.

a. Secure unnecessary plant equipment.
b. Within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of SI actuation, isolate NSCW Corrosion Monitor Racks:

. Close 1 202-U4-1 79

. Close 1 202-U4-1 80 (located in NSCTs on NSCW return header)

b. Repair or make available inoperable equipment which may be required.
c. Consult TSC for additional equipment to be started or actions to be taken to assist in recovery including.

. H2 Monitors

. CRDM Fans

. Within 5 days, initiate Containment inspection/cleanup if Containment Spray actuated and was terminated prior to recirculation.

72

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 2012-301. Scenario No. : 2 Event No : 7 Event

Description:

Continuation of SB LOCA actions for Event 7 in 19010-C.

[ Time Position Applicants Action or Behavior CREW 21 In the event of a Design Basis Accident, the following apply concerning conservation of Ultimate Heat Sink inventory:

. liE a DBA LOCA coincident with a LOSP has occurred, THEN secure one train of NSCW within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the initiating event per 13150, NUCLEAR SERVICE COOLING WATER SYSTEM.

. if a DBA LOCA without an LQSP has occurred and normal NSCW makeup is lost, THEN secure one train of NSCW within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the loss of makeup capability per 13150, NUCLEAR SERVICE COOLING WATER SYSTEM.

. Initiate periodic monitoring of NSCW Basin level to ensure adequate inventory is maintained for continued operation of NSCW Basin makeup.

. Consult TSC as necessary for alternate sources of NSCW Basin makeup.

73

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 2012-301 Scenario No. : 2 EventNo: 7 Event

Description:

Continuation of SB LOCA actions for Event 7 in 19010-C.

Time j Position Applicants Action or Behavior ss 22. Check is RCS cooldown and depressurization is required:

a. RCS pressure - GREATER THAN 300 PSIG. (YES)
b. Go to 1 901 2-C, ES-i .2 POST LOCA COOLDOWN AND DEPRESSURIZATION.

THE THIS IS THE END OF EVENT 7.

END AND THE END OF THE SCENARIO. (unless stopped earlier by NRC) 74

Appendix D Scenario Outline Form ES-D-1 Facility: Scenario Nofl: Op-Test Nofl: ZQi-3O1 Examiners: Operators:

Initial Conditions: The plant is at 1 00% power, MOL, steady state operations.

(Base IC # 14, snapped to IC # 183 for HL17 NRC Exam)

Equipment 005: Safety Injection Pump A is tagged out for motor repair.

Turnover: Maintain 100% power. Containment mini-purge is in service for a Containment entry on the next shift.

Preloaded Malfunctions:

TU1 OB Main Turbine EHC Pump B Auto Start Failure Overrides HS-3009 OPEN (Panel Map B-Left, HS-3009 LP-1 MS SPLY to AFW TD PMP-1 to OPEN)

Event Malt Event Event No. No. Type* Description Ti SGO2D l-UO SG # 4 NR LT fails high (LT-554).

@ 100% l-SS TS-SS LCO 33i Condition A LCO 3.3.1 Condition A, FU 13 Condition E LCO 3.3.2 Condition A LCO 3.3.2 Condition A, FU 5c Condition I LCO 3.32 FU 6b Condition D T2 CVO8 C-OATC CVCS Letdown Leak ORG (Aux. Building Isolable).

@ 25% C-SS TS-SS 3 N/ A N-OATC Places Excess Letdown in service.

N-SS T4 PRO2A l-OATC Controlling PRZR Pressure channel PT-455 fails high.

@ 100%. I-SS TS-SS LCO 3.3.1 Condition A, FU 6 Condition E, LCO 3.3.1 FU Ba Condition M, LCO 3.3.1 FU Bb Condition E, LCO 3.3.2 Condition A, FU id Condition D, LCO 3.3.2 FU Bb Condition L (One hour action),

LCO 3.4.1 .a Condition A T5 TU1 1 C-UO Main Turbine EHC Pump A trips with failure of standby EHC pump to G-SS automatically start.

Appendix D Scenario Outline Form ES-D-1 Event Maif. Event Event No No Type* Descrption T6 SGO1A R-OATC Steam Generator # 1 10 gpm SGTL requiring a rapid down power.

@3% N-UQ R-SS TS-SS LCO 3A13 Condition A T7 SGO1A M-ALL DBA SGTR on SG # 1 (45O gpm)

@45%

Ramp 180 seconds 8 Preload C-UO TDAFW steam supply valve from SG # 1 will not manually close Critical C-SS requiring closure of TDAFW Trip and Throttle valve to isolate SG # 1.

T9 PRO7 C-OATC PRZR spray valve loop 4 fails 80% open after maximum rate

@ 80% C-SS depressurization of RCS when OATC attempts to shut the valve.

Critical (N)ormal, (R)eactivity, (l)nstrument, (C)omponent, (M)ajor 2

Appendix D Scenario Outline Form ES-D-1 Event 1:

SG # 4 NR LT controlling channel fails high causing MFRV loop # 4 to throttle closed.

Verifiable Actions:

uO Performs IQA and takes manual control of SG # 4 FW control valves to restore NR level between 60-70%.

Technical Specifications:

LCO 3.3.1 Reactor Trip System (RTS) Instrumentation Condition A LCO 3.3.1 Reactor Trip System (RTS) Instrumentation EU 13 Condition E LCO 33.2 Engineered Safety Eeature Actuation System (ESEAS) Instrumentation Condition A LCO 3.3.2 Engineered Safety Eeature Actuation System (ESEAS) Instrumentation EU 5c Condition I LCO 33.2 Engineered Safety Eeature Actuation System (ESEAS) Instrumentation EU 6b Condition D Event 2:

CVCS Letdown line breaks in the Auxiliary Building that will be isolated lifting letdown relief to the PRT.

Verifiable Actions:

uO Manipulates penetration room temperature switches at QPCP to determine a leak exists.

OATC Closes Letdown Orifices HV-8149A, B, C and Letdown Isolations LV-459 and LV-460 to isolate an RCS leak to the PRT.

OATC Adjusts HC-182 and EIC-121 to establish 8 to 13 gpm seal injection flow with charging flow approximately 10 gpm greater than total seal injection flow.

Technical Specifications:

LCO 3.4.13 RCS Operational Leakage Condition A (Note: Leakage is isolated after OATC closes the Letdown Orifices and Isolations)

Event 3:

Excess Letdown will be placed in service to the seal return header to control PRZR level.

Verifiable Actions:

OATC Sets 1 HC-1 23 to closed. (0% demand).

OATC Opens Excess Letdown Isolation valves 1 -HV-81 53/ 1 -HV-81 54.

OATC Adjusts 1HC-123 to establish maximum allowable Excess Letdown flow (30 gpm).

OATC Adjusts 1 EIC-1 21 and 1 HC-1 82 to control charging and seal injection flows.

3

Appendix D Scenario Outline Form ES-D-1 Event 4:

Controlling PRZR Pressure channel PT-455 fails high resulting in PQRV 455A opening and both PRZR sprays fully open, RCS pressure will be lowering rapidly.

Verifiable Actions:

OATC Perform IQAs of 1 8001 -C by closing PRZR sprays, closing PORV 455A, and operating heaters as necessary to control PRZR pressure.

OATC Manually closes PORV Block Valve 1 HV-8000A to stop LOCA to PRT.

OATC Controls PRZR heaters and sprays to control PRZR pressure.

OATC Sets PRZR Master Controller to 25% demand.

OATC Selects channel 457 I 456 on PRZR Pressure control switch PS-455F.

OATC Places PRZR heaters and PORV 455A in AUTO and ensures proper operation.

OATC Places PRZR Pressure Master Controller in AUTO and verifies proper operation.

OATC Selects channel PT-457 as controlling channel on pressure recorder PS-4550.

Technical Specifications:

LCO 3.31 Reactor Trip System (RTS) Instrumentation Condition A LCO 33.1 Reactor Trip System (RTS) Instrumentation EU 6, Condition E LCO 3.31 Reactor Trip System (RTS) Instrumentation EU 8a, Condition M LCO 331 Reactor Trip System (RTS) Instrumentation EU 8b, Condition E LCO 33.2 Engineered Safety Eeatures Actuation System (ESEAS) Condition A LCO 33.2 Engineered Safety Eeatures Actuation System (ESEAS) EU 1 d, Condition D LCO 3.3.2 Engineered Safety Eeatures Actuation System (ESEAS) EU 8b Condition L (one hour)

LCO 3.4.1 .a RCS Pressure, Temperature, and Elow Departure from Nucleate Boiling (DNB)

Limits 4

Appendix D Scenario Outline Form ES-D1 Event 5:

Main Turbine EHC Pump A trips with failure of the standby pump to automatically start.

Verifiable Actions:

uO Starts EHC pump B prior to Main Turbine I Reactor trip on low EHC pressure of 1 100 psig.

This will prevent an unnecessary Turbine I Reactor trip and transient on the plant.

Technical Specifications:

None Event 6:

A 10 gpm SGTL will occur on SG # 1 requiring a rapid down power per 18013-C, this is to preclude the tube leak from propagating into a SGTR per the EPRI Guidelines.

Verifiable Actions:

OATC Borates as necessary for rapid down power to maintain Tavg Tref matched.

uO Reduces Turbine load at < 5% per minute to maintain Tavg Tref matched.

Event 7 8:

A DBA SGTR will occur on SG # 1 requiring a plant trip and safety injection.

Verifiable Actions:

OATC Manually trips the reactor using either QMCB hand switch, manually actuates safety injection, and adjusts seal injection to RCPs between 8 to 1 3 gpm after the SI.

uO Places SGBD hand switches in hard closed to prevent water hammer to SGBD system.

uO Throttles AFW flow to maintain SG levels 1 0 65%.The UO may perform an early operator action and isolate AFW flow to SG # 1 once SG # 1 level is > 10% NR with SS permission.

uO Isolates ruptured SG # 1 by performing the following.

. Adjusts SG # 1 ARV potentiometer set point to 7.73 (to control at 1 1 60 psig).

a Trips the TDAFW pump by closing PV-15129 (Trip and Throttle Valve) a Closes SG # 1 MSIV and Bypass valves.

a Isolates FW flow to SG # 1 (MFIV, MFRV, BFIV, BFRV, TDAFW, MDAFW valves all shut) uO Blocks Low Steam line Pressure SI and SLI when RCS pressure < 2000 psig (P-i 1 and then places the steam dumps in Steam Pressure Mode and opens the 3 cool down steam dumps

)

for a maximum rate Cooldown.

UO Closes the steam dumps after selected CETC is reached and controls CETC below this temperature (usually this is 518°F or 506°F depending on ruptured SG pressure).

OATC Depressurizes RCS with maximum PRZR spray flow to refill the pressurizer.

5

Appendix D Scenario Outline Form ES-D-1 Event 9:

OATC Trips RCP # 4 when a PRZR spray valve will not shut, trips RCP # 1 if necessary.

The scenario may be stopped after this point with chief examiner approval.

CRITICAL TASKS:

1 ) Isolates SG # 1 to limit secondary contamination and potential release environment by performing the following actions no later than the 1 9030-C procedure steps These are steps 6 through 1 1 of I 9030-C.

. Adjusts SG # 1 ARV potentiometer set point to 7.73 (to control at 1 1 60 psig).

. Trips the TDAFW pump by closing PV-1 51 29 (Trip and Throttle Valve)

. Closes SG # 1 MSIV and Bypass valves

. Isolates FW flow to SG # 1 (MFIV, MFRV, BFIV, BFRV, TDAFW, MDAFW, and SGBD and Sample valves all shut)

2) Depressurizes PRZR to refill the PRZR with ECCS injection and to limit break flow using normal PRZR spray to meet conditions of step 37 of 1 9030-C.
3) Stops RCP # 4 when PRZR spray valve will not fully close. (Stops RCP # 1 if necessary)

This prevents a loss of RCS pressure control requiring a transition to the SGTR ECA series of EOPs. Also, an uncontrolled backfill of the SG from the secondary side may occur resulting in possible loss of shutdown margin and contaminants being introduced into the primary side. This action is performed per step 38a RNO of 19030-C.

6

NUCLEAR SAFETY FOCUS ZR TARGET ZERO Protected Train: EOOS: Green Alpha LI Yellow Bravo j Orange LI ElRed Plant 1 00 % power MOL.

Conditions:

Major Activities: Maintain power operations per UOP 1 2004-C section 4.3 for power operation.

Active LCOs: El LCO 3.5.2 Condition A is in effect due to SIP A tagged out.

OOS/Degraded LI None CR Instruments:

Narrative El Containment mini-purge is in service for a planned Status: Containment Entry on next shift.

LI SIP A is tagged out for motor repair, expected return to service time is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> left on a shutdown LCO of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

L:1 The remnants of Hurricane Maya are passing through, severe weather and thunderstorms will be in the area for the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. The Severe Weather Checklist is in effect.

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 201 2-3Q! Scenario No: 3 Event Nofl: 1 Event

Description:

SG # 4 controlling level channel LT-554 fails HIGH requiring UO to take manual control of SG # 4 MFRV to control SG levels, selects an unaffected level channel, and returns SG # 4 MFRV to Auto.

Time Position Applicants Action or Behavior uo Diagnose the failure of SG # 4 controlling level channel LT-554.

Symptoms I alarms:

. ALB13-D06 STM GEN 4 HI I LO LVL DEVIATION

. ALB14-DO1 STM GEN 4 HI-HI LEVEL ALERT.

Indications:

. MFRV # 4 throttling shut

. Feed flow < steam flow on SG #4 IMMEDIATE OPERATOR ACTIONS 55 I UO El Check Steam and feed flows MATCHED ON ALL SGS.

RNO El . Take manual control of affected SG feed flow valves to restore NR level between 60% and 70%.

[ SG 4 MFRV 1 -FIC-540 placed in manual and depresses UP arrow to raise FW flow]

55 Enters AOP-l 8001 -C, Section E for Failure of SG Level Instrumentation.

SUBSEQUENT OPERATOR ACTIONS 55 1 UO E2. Selects unaffected SG level channel for control. (Selects 1 LT-549, Ch II on 1 LS-549C)

UO E3. Return SG feed flow valves control to automatic.

[ SG # 4 MFRV 1 -FIC-540 returned to auto]

Cue to Simbooth: IF asked, the Shift Manager has given permission to place the MFRV in auto.

Appendix D Required Operator Actions Form ES-D-2 Op-Test Nofl: 201 2-301 Scenario No.: 3 Event NO.: 1 Event

Description:

SG # 4 controlling level channel LT-554 fails HIGH requiri ng UO to take manual control of SG # 4 MFRV to control SG levels, selects an unaffected level channel, and returns SG # 4 MFRV to Auto.

Time Position Applicants Action or Behavior OATC I UO E4. Initiate the Continuous Actions Page.

uQ *E5 Check SG level control maintains NR level AT 65%.

ss E6 Notify I & C to initiate repairs.

Contacts SSS to perform the following:

. Notify l&C to initiate repairs

. Write a Condition Report

. Notify OPS Duty Manager of AOP entry ss E7. Bypass the affected channel per 1 3509-C, Bypass Test Instrumentation (BTI) Panel Operation.

NOTE: It is not expected the 88 will desire to bypass the channel.

ss E8. Trip affected channel bistable and place associated MASTER TEST switch in TEST position per TABLE El within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. (TS 3.3.1 & 3.3.2)

NOTE: It is not expected the 88 will trip bistables at this time.

SS E9. Initiate the applicable actions of:

. TS3.3.1

. T53.3.2 LCO 3.3.1 FU 13 CONDiTION E SG LO-LO LEVEL RX TRIP SS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more A.1 Enter the Condition referenced in Immediately Functions with Table 3.3.1-1 for the channel(s).

one or more channels inoperable.

2

ppendix D Reauired Operator Actions Form ES-D-2 Op-Test No.: 2012-301 Scenario No.: 3 Event No.: 1 Event

Description:

SG # 4 controlling level channel LT-554 fails HIGH requiring UO to take manual control of SG # 4 MFRV to control SG levels, selects an unaffected level channel, and returns SG # 4 MFRV to Auto.

E. One channel E.1 Place channel in trip. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable OR E.2 Be in MODE 3. 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> E9. cont.

LCO 33.2 EU 6b CONDiTION D SG LO-LO LEVEL AFW ACTUATION CONDITION REQUIRED ACTION COMPLETION TIME D. One channel Di Place channel in trip. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable D2.1 Be in MODE 3 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> AND D2.2 Be in MODE 4 84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br /> LCO 3.3.2 EU 5c CONDITION I P-14, FWI CONDITION REQUIRED ACTION COMPLETION TIME I. One channel Li Place channel in trip. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable OR

.2 Be in MODE 3 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> ss *E1O. Check repairs and surveillances COMPLETE.

RNO

  • E1 0 Perform the following:
a. WHEN repairs and surveillances are complete THEN perform Step El 1.
b. Return to procedure and step in effect.

END OF EVENT 1.

3

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 3 Event No. : 2 Event

Description:

CVCS Letdown line break ORC that auto isolates the HELBA valves but requires OATC actions to isolate a Letdown leak to the PRT via relief Time Position Applicants Action or Behavior j

OATC Diagnose Letdown line break ORC and CVCS relief lifting to PRT:

uo Symptoms I alarms:

ALB63-EO1 CVCS PIPE BREAK RM PROT ACTUATION ALB61 -C06 LVL A LEAK DETECTED (short time delay)

ALBO7-C05 LP LTDN HX HI TEMP (short time delay)

ALBO6-FO1 CSFST TROUBLE (short time delay)

Indications:

. Both temperature indicators for room RAO9 reading high.

. Letdown flow lowering to 0 in 1 LI-i 32C and 1 LI-i 32A.

Enters AOP 1 8007-C, Section A, TOTAL LOSS OF LETDOWN FLOW.

OATC Al . Isolate letdown relief flowpath by performing the following:

a. Close letdown orifice isolation valves:

. HV-8l49A

. HV-8149B

. HV-8l49C

b. Close letdown isolation valves:

. LV-459

. LV-460 4

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 3 EventNo.: 2 Event

Description:

CVCS Letdown line break ORC that auto isolates the HELBA valves but requires OATC actions to isolate a Letdown leak to the PRT via relief.

Time Position Applicants Action or Behavior j

OATC A2. Adjust HC-1 82 and FIC-1 21 as necessary to establish the following:

. Seal injection flow to all RCPs 8 to 13 GPM.

-AND-

. Charging flow APPROXMATELY 1 0 GPM GREATER THAN TOTAL SEAL INJECTION FLOW.

OATC A3. Check pipe break protection valves OPEN.

. HV-15214(NO)

. HV-8160 (NO)

RNO A3. Perform the following:

uO

a. Check affected unit room temperatures.

UNIT 1

. R-A07

. R-A08

. R-A09 (high room temperature for both trains)

b. IF affected room temperatures are greater than 135°F, THEN investigate reason for high temperature in rooms before opening affected valves and restoring letdown.

5

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 23O1 Scenario No. : 3 Event No. : 2 Event

Description:

CVCS Letdown line break ORC that auto isolates the HELBA valves but requires OATC actions to isolate a Letdown leak to the PRT via relief 1

Time Position Applicants Action or Behavior QATC NOTE to Simbooth: IF, personnel dispatched to check out RAO9, report back the following:

Room appears to be full of steam and the submarine door at the entrance is very hot to the touch. HP will not allow us to attempt to enter the room.

OATC A4. Check instrument air to containment ESTABLISHED. (YES)

OATC A5. Check CVCS letdown to BTRS flowpath.

a. Check TV-0381 B BTRS Demin Inlet Temperature Control OPEN. (HS-10351 DILUTE or OFF lights lit.) (OFF LIT)
b. Check HV-81 1 5 LETDOWN DIVERT TO BTRS - OPEN.

(YES)

OATC A6. Identify and correct cause for loss of letdown.

a. Check for letdown path valve failures or mispositions. (NO)
b. Check instrumentation:

. Pl-131A

. TI-130

c. CheckPIC-131.
d. Check HV-8152.
e. Check for other causes.

6

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 3 Event No. : 2 Event

Description:

CVCS Letdown line break ORC that auto isolates the HELBA valves but requires OATC actions to isolate a Letdown leak to the PRT via relief.

Time Position

} Applicants Action or Behavior OATC A7. Check normal letdown AVAILABLE. (NO)

RNO AT Perform the following:

a. Establish Excess Letdown by initiating 1 3008, CHEMICAL AND VOLUME CONTROL SYSTEM EXCESS LETDOWN.

Note to examiner: 55 should wait here for Excess Letdown to be placed in service prior to proceeding to step A9.

Note to examiner: Excess Letdown steps are on page # 10.

GO TO EVENT 3 for placing Excess Letdown in service steps, then return to step A9 once Excess Letdown has been placed in service.

b. GotoStepA9.

7

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 3 Event No. : 2 Event

Description:

CVCS Letdown line break ORC that auto isolates the HELBA valves but requires OATC actions to isolate a Letdown leak to the PRT via relief.

Time Position Applicants Action or Behavior OATC A9. Initiate the Continuous Actions Page.

uo OATC AlO. Verify PRZR level - TRENDING TO PROGRAM. (YES)

Note to examiner: The OATC should be able to turn PRZR level to a down trend with Excess Letdown in service.

8

Appendix D Required Operator Actions Form ESD-2 Op-Test No. : 201 2-301 Scenario No. : 3 EventNo.: 2 Event

Description:

CVCS Letdown line break ORC that auto isolates the HELBA valves but requires OATC actions to isolate a Letdown leak to the PRT via relief.

Time Position Applicants Action or Behavior ss Al 1 . Check normal letdown flow ESTABLISHED. (NO)

RNO Al 1 . Perlorm the following:

a. WHEN normal letdown capability is restored, THEN restore normal letdown by initiating 13006, CHEMICAL AND VOLUME CONTROL SYSTEM.
b. Evaluate the impact of continued power operation with normal letdown out of service.
c. WHEN Normal Letdown restored remove Excess Letdown by initiating 1 3008, CHEMICAL VOLUME CONTROL SYSTEM EXCESS LETDOWN.

OATC Al 2. Return to procedure and step in effect.

END OF EVENT 2, proceed to EVENT 4.

9

AppendixD Required Operator Actions Form ES-D-2 Op-Test No: 201 2-301 Scenario NoW: 3 Event No.: 3 Event

Description:

The OATC places Excess letdown in service per direction of the SS to maintain PRZR level after letdown is isolated to stop the RCS leak. The OATC will use SOP 1 3008-1 to place excess letdown in service.

Time Position Applicants Action or Behavior OATC Section 4.1 of 13008-1 is selected.

OATC NOTE: Independent Verifications performed within Section 4.1 are documented on Checklist 1.

4.1 1 Verify Reactor power is maintained 3622.6 MWT while Excess Letdown is in service and LEFM is in service. IF LEFM is NOT in service, maintain power < 3562 MWT per guidance of 12004-C.

OATC 41 2 Verify that a CVCS Charging Pump is running.

OATC 4.1 .3 Verify CLOSED RX HEAD VENT TO EXCESS LETDOWN ISOLATION 1-HV-8098.

OATC 4.1 .4 Verify flow controller EXCESS LETDOWN, 1 HC-1 23 is set to closed (0% demand).

OATC 4.1 .5 Verify OPEN RCPs Seal Leakoff Isolation valves:

. 1-HV-8100 RCPS SEAL LEAKOFF ORC ISOLATION

. 1-HV-8112 RCPS SEAL LEAKOFF IRC ISOLATION 10

AppendixD Reciuared Operator Actions Form ES-D2 Op-Test No: 201 2-301 Scenario No.: 3 Event No.: 3 Event

Description:

The OATC places Excess letdown in service per direction of the SS to maintain PRZR level after letdown is isolated to stop the RCS leak. The OATC will use SOP 1 3008-1 to place excess letdown in service.

Time Position Applicants Action or Behavior OATC 4.1.6 Verify EXCESS LETDOWN TO VCT, 1HS-8143 is in the OPEN VCT position.

OATC 4.1 .7 Verify Reactor power is maintained 3622.6 MWT while Excess Letdown is in service and LEFM is in service. IF LEFM is NOT in service, maintain power 3562 MWT per guidance of 12004-C.

OATC 4L8 Open EXCESS LETDOWN LINE Isolation Valves:

. 1-HV-8153 EXCESS LETDOWN LINE ISO VLV

. 1-HV-8154 EXCESS LETDOWN LINE ISO VLV OATC 4.1 9 Record the following:

. Pressure on indicator EXCESS LETDOWN HX OUTLET, 1PI-124.

. Temperature on indicator EXCESS LETDOWN HX OUTLET, 1TI-122.

Note to examiner: ALB63-A06 FILTERS BACKFLUSH PNL ALARM will illuminate shortly after placing Excess Letdown in service.

11

Appendix D Required Operator Actions Form ES-D-2 Op-Test No: 201 23O1 Scenario No: 3 Event No.: 3 Event

Description:

The OATC places Excess letdown in service per direction of the SS to maintain PRZR level after letdown is isolated to stop the RCS leak. The OATC will use SOP 1 3008-1 to place excess letdown in service.

Time Position Applicants Action or Behavior OATC 4.1.10 WHILE establishing excess letdown, perform the following:

. Monitor pressure rise on pressure indicator EXCESS LETDOWN HX OUTLET, 1PI-124 and verify it remains less than 50 pounds above pressure recorded in Step 4.1.8.

. Monitor temperature rise on temperature indicator EXCESS LETDOWN HX OUTLET, lTl-122 and verify it remains less than 165 degrees.

OATC 4,1 .1 1 Slowly adjust output flow controller EXCESS LETDOWN 1HC-123 to establish maximum allowable flow (estimated to be approximately 30 gpm).

OATC 4.1 .1 2 Perform the following as required to maintain desired pressurizer level:

. Adjust charging using CHARGING LINE CONTROL, 1FIC-121.

. Adjust seal injection using SEAL FLOW CONTROL, 1HC-182.

12

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 201 2-301 Scenario No.: 3 Event No.: 3 Event

Description:

The OATC places Excess letdown in service per direction of the SS to maintain PRZR level after letdown is isolated to stop the RCS leak. The OATC will use SOP 1 3008-1 to place excess letdown in service.

Time Position Applicants Action or Behavior OATC 4.1.13 jf normal letdown is isolated, align the outlet ofthe Seal Water Heat Exchanger to the Volume Control Tank spray nozzle as follows: (IV REQUIRED) (N/A if previously performed)

a. Unlock and open CVCS SEALS SEAL WATER HX OUTLET TO VCT, 1-1208-U6-104. (KEY 10P2-281)

(RA-26)

b. Close CVCS SEALS SEAL WATER HX OUTLET TO NCP SUCTION, 1-1208-U6-106. (RA-26)

OATC 4.1 .1 4 i.E directed by 55 to transfer excess letdown to the RCDT, perform the following:

a. Verity RCDT system is aligned to accept Excess Letdown flow per 1 3002-1 Reactor Drain Tank Operation.
b. Place EXCESS LETDOWN TO VCT, 1 HS-81 43 to the OPEN RCDT position.

C. Monitor temperature rise on EXCESS LETDOWN HX OUTLET 1TI-122 and verity it remains less than 165 degrees.

d. Slowly raise output on flow controller EXCESS LETDOWN, 1 HC-1 23 to establish maximum allowable flow,
e. swap to RCDT is being performed for Chemistry control or level control Step 4.2.7.
f. Perform the following as required to maintain desired pressurizer level:

. Adjust charging using CHARGING LINE CONTROL, 1 FIC-1 21.

. Adjust seal injection using SEAL FLOW CONTROL, 1HC-182.

13

Appendix D Required Operator Actions Form ES-D2 Op-Test No.: 201 2-301 Scenario No.: 3 Event NO.: 3 Event

Description:

The OATC places Excess letdown in service per direction of the SS to maintain PRZR level after letdown is isolated to stop the RCS leak. The OATC will use SOP 1 3008-1 to place excess letdown in service.

Time Position Applicants Action or Behavior OATC 4. 1 1 5 H the Seal Water Heat Exchanger Outlet was aligned to the Volume Control Tank, restore normal alignment as follows:

(IV REQUIRED)

a. Open CVCS SEALS SEAL WATER HX OUTLET TO NCP SUCTION, 1-1208-U6-106. (RA-26)
b. Close and lock CVCS SEALS SEAL WATER HX OUTLET TO VCT, 1-1208-U6-104 (KEY 1OP2-281).

(RA-26)

END OF EVENT 3, Return to EVENT 2 on page # 7, step A9.

14

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 3 Event No. : 4 Event

Description:

PRZR Pressure channel PT-455 fails high resulting in PRZR PORV 455A and both PRZR Sprays fully opening. The OATC will have to take manual action to prevent a Reactor trip and SI.

Time

[ Position Applicants Action or Behavior OATC Diagnose the high failure of PRZR Pressure channel PT-455.

Symptoms I alarms:

. ALB11-B03 PRZR HI PRESS

. ALB1 1 -COl PRZR CONTROL HI LEVEL DEV AND HEATERS ON

. ALB1 1 -C03 PRZR HI PRESS CHANNEL ALERT

. ALB12-D03 PRZR PRESS LO PORV BLOCK

. ALB12EO4 PV-0455A OPEN SIGNAL

. ALBO6-F06 CSFST TROUBLE Indications:

. PRZR Pressure channel PT-455 off scale high.

. PRZR Pressure channels PT-456, 457, and 458 rapidly lowering.

. Both PRZR Sprays full open.

OATC AOP 18001-C, Section C IMMEDIATE ACTIONS Cl . Check RCS pressure STABLE OR RISING. (NO)

RNO:

Cl . Perform the following:

. Close spray valves.

. Close affected PRZR PQRV.

. Operate PRZR heaters as necessary.

SS Enters AOP 1 8001 -C, Section C and verifies immediate operator actions properly completed.

15

Appendix D Required Operator Actions Form ES-D2 Op-Test No. : 201 2-301 Scenario No. : 3 Event No. : 4 Event

Description:

PRZR Pressure channel PT-455 fails high resulting in PRZR PORV 455A and both PRZR Sprays fully opening. The OATC will have to take manual action to prevent a Reactor trip and SI.

Time Position Applicants Action or Behavior OATC 02. Check controlling channel OPERATING PROPERLY. (NO)

RNO:

C2. Perform the following:

a. Place HS-455A in close.
b. Place PRZR spray valve controllers in manual.

OATC C3. Initiate the Continuous Actions Page.

uO OATC C4. Control PRZR pressure using heaters jj sprays BETWEEN 2220 AND 2250 PSIG.

OATC C5. Check PIC-455A Pressurizer Master Pressure Controller IN AUTO WITH OUTPUT SIGNAL APPROXIMATELY 25%.

(NO)

RNO:

C5. Place PIC-455A in manual and adjust controller output to approximately 25%.

OATC C6. Check affected channel selected on PS-455F PRZR PRESS CNTL SELECT. (YES) 16

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 23O1 Scenario No. : 3 EventNo.: 4 Event

Description:

PRZR Pressure channel PT-455 fails high resulting in PRZR PORV 455A and both PRZR Sprays fully opening. The OATC will have to take manual action to prevent a Reactor trip and Sl Time Position Applicants Action or Behavior OATC CT Select unaffected channels on PS-455F:

Failed Channel Select p455 CH457/456 P456 CH455/458 P457 CH455/456 P458 CH455/456 OATC C8. Perform the following:

a. Check PRZR pressure STABLE AT APPROXIMATELY 2235 P51G.
b. Place PRZR heaters in AUTO.
c. Place PRZR spray valve controllers in AUTO.

RNO:

a. Adjust PRZR pressure to approximately 2235 psig using PRZR heaters and sprays.

Cue to Simbooth: IF asked, the Shift Manager has given permission to place the PRZR pressure control system in auto.

OATC C9. Place PORVs in AUTO and verify proper operation.

OATC Cl 0. Return PRZR pressure Master Controller to AUTO.

17

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 23O1 Scenario No. : 3 Event No. : 4 Event

Description:

PRZR Pressure channel PT-455 fails high resulting in PRZR PORV 455A and both PRZR Sprays fully opening. The OATC will have to take manual action to prevent a Reactor trip and SI.

Time Position

[ Applicants Action or Behavior OATC Cl 1 . Select same channel on PS-455G PRZR PRESS REC SEL as selected on PS-455F.

457 QATC C12. Check P-il status light on BPLB indicates correctly for plant condition within one hour.

OFF OATC Cl 3. Notify I&C to initiate repairs.

SS will call typically call the SSS to perform the following:

. Notify Operations Duty Manager of the AOP entry

. Write a Condition Report

. Notify l&C OATC Cl 4. Bypass the affected instrument channel using 1 3509 C, BYPASS TEST INSTRUMENTATION (BTI) PANEL OPERATION, If desired.

NOTE: 55 is NOT expected to bypass failed channel.

18

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 3 Event No. : 4 Event

Description:

PRZR Pressure channel PT-455 fails high resulting in PRZR PORV 455A and both PRZR Sprays fully opening. The OATC will have to take manual action to prevent a Reactor trip and SI.

Time

[ Position Applicants Action or Behavior

]

ss C15. Trip the affected channel bistables and place the associated MASTER TEST switches in TEST position per TABLE Cl within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. (TS 3.3.1 & 3.3.2)

NOTE: SS expected to leave bistables untripped during allowed out of service time to facilitate troubleshooting by l&C.

SS C16. Initiate the applicable actions of:

. TS 3.3.1 Reactor Trip Function Condition LCO3.3.l A 6OTtxT E 8a Low PRZR pressure M 8b High PRZR pressure E

. TS 3.3.2 ESFAS Function Condition LCO3.3.2 A ld SI low PRZR pressure D 8b RI 1 Interlock L (one hour action)

. TS 3.4.1 .a DNB RCS pressure < 2199 psig B (Momentary) 19

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 3 Event No. : 4 Event

Description:

PRZR Pressure channel PT-455 fails high resulting in PRZR PORV 455A and both PRZR Sprays fully opening. The OATC will have to take manual action to prevent a Reactor trip and SI.

Time Position Applicants Action or Behavior ss CiT Check repairs and surveillances COMPLETE.

RNO:

Cl 7. Perform the following:

a. WHEN repairs and surveillances are complete, THEN perform step C18.
b. Return to procedure and step in effect.

END OF EVENT 4, proceed to EVENT 5.

20

Appendix D Required Operator Actions Form ES-D2 Op-Test No. : 201 2-301 Scenario No. : 3 Event No. : 5 Event

Description:

Main Turbine EHC pump 1 trips and the standby pump fails to automatically start on low pressure. The UO will refer to ARP-1 7033-1 for corrective actions. The standby pump will be manually started to preven ta turbine trip on low EHC pressure.

Time Position Applicants Action or Behavior uo Diagnoses trip of EHC pump:

Alarms:

ALB33-B07 480V SWGR 1 NBO2 TROUBLE ALB2O-D05 HYD FLUID LO PRESS (after several minutes)

Indications:

EHC pump 1 (HS-6539):

RedOFF Amber-ON Green-ON EHC pressure (P1-6338) <1 600 psig and lowering.

EHC Pump 1 amps (11-40073) drop to 0 amps.

UO Refers to ARP 1 7033-1 for Window B07.

(480V SWGR 1 NBO2 TROUBLE) 21

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301. Scenario No. : 3 Event No : 5 Event

Description:

Main Turbine EHC pump 1 trips and the standby pump fails to automatically start on low pressure. The UO will refer to ARP-17033-1 for corrective actions. The standby pump will be manually started to prevent a turbine trip on low EHC pressure.

Time_[ Position Applicants Action or Behavior uc ARP 17033-1 WINDOW B07 1.0 PROBABLE CAUSE 1 . One of the breakers on Switchgear 1 NBO2 tripped due to a fault.

2. Bus ground fault.
3. Potential transformer/fuse failure.
4. Loss of bus voltage from Switchgear 1 NAO4.
5. Transformer 1NBO2X winding high temperature.
6. Loss of 1 25V DC control power from Panel 1 ND21.
7. Loss of power to transformer temperature monitor.

2.0 AUTOMATIC ACTIONS NONE 22

Appendix D Required Operator Actions Form ES-D-2 OpTest No. : 201 2-301 Scenario No. : 3 Event No. : 5 Event

Description:

Main Turbine EHC pump I trips and the standby pump fails to automatically start on low pressure. The UO will refer to ARP-17033-1 for corrective actions. The standby pump will be manually started to prevent a turbine trip on low EHC pressure.

Time Position Applicants Action or Behavior uo NOTE: Loss of 1 25V DC control power results in loss of breaker remote/local remote operating capabilities and associated control circuit trip features.

3.0 INITIAL OPERATOR ACTIONS NONE 4.0 SUBSEQUENT OPERATOR ACTIONS 1 . Check for associated alarms and indications.

2. Dispatch an operator to Switchgear 1 NBO2 to check for:
a. Ground fault indications.
b. Other abnormal conditions.
3. IF alarm is due to a breaker tripping on fault or undervoltage:
a. Determine affected loads.
b. Start redundant loads, if applicable.
4. IF alarm is due to a loss of 125V DC control power, dispatch an operator to the switchgear to manually operate breakers, under the direction of the Control Room.
5. IF a bus ground fault is indicated, selectively shift to redundant loads and de-energize components to locate the ground.

23

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2012-301 Scenario No.: 3 Event No. : 5 Event

Description:

Main Turbine EHC pump 1 trips and the standby pump fails to automatically start on low pressure. The UO will refer to ARP-17033-1 for corrective actions, The standby pump will be manually started to prevent a turbine trip on low EHC pressure.

Time Position Applicants Action or Behavior uo 4.0 SUBSEQUENT OPERATOR ACTIONS (continued)

6. Initiate maintenance as required to correct cause of the alarm.

5.0 COMPENSATORY OPERATOR ACTIONS 1 . Initiate maintenance to correct problem (i.e., restore alarm).

2, IF after three days the alarm has NOT been restored, initiate a Temporary Modification per 00307-C, Temporary Modifications to clear the bad input(s).

Record this action required on Figure 5 of 1 001 8-C, Annunciator Control.

24

Appendix D Required Operator Actions Form ES.D-2 Op-Test No.: 2012-301 Scenario No.: 3 Event No. : 5 Event

Description:

Main Turbine EHC pump 1 trips and the standby pump fails to automatically start on low pressure. The UO will refer to ARP-17033-1 for corrective actions. The standby pump will be manually started to preven ta turbine trip on low EHC pressure.

Time Position Applicants Action or Behavior ARP 17020-1 WINDOW D05 1.0 PROBABLE CAUSE 1 . Failure of Electrohydraulic Control (EHC) Fluid Pumps.

2. Clogged strainers and filters in pump suction or discharge.
3. EHC Fluid System leak.

2.0 AUTOMATIC ACTIONS 1 . If pressure drops below 1 400 psig, the standby EHC Fluid Pump will start.

2. If pressure continues to drop to 1100 psig, the Turbine will trip.

3.0 INITIAL OPERATOR ACTIONS 1 . IF a reactor trip occurs, Go To 19000 C, E 0 Reactor Trip Or Safety Injection.

2. Verify standby EHC Fluid Pump is on, if needed.

4.0 SUBSEQUENT OPERATOR ACTIONS CAUTION EHC fluid is a fire resistant fluid that may be harmful to personnel. Observe proper safety precautions when in contact with this fluid.

1 . Dispatch an operator to the Hydraulic Power Unit to check for system leaks or pump failure.

2. IF equipment failure is indicated, initiate maintenance as required.

25

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 3 EventNo.: 5 Event

Description:

Main Turbine EHC pump 1 trips and the standby pump fails to automatically start on low pressureS The UO will refer to ARP-17033-1 for corrective actions. The standby pump will be manually started to prevent a

turbine trip on low EHC pressure.

Time Position Applicants Action or Behavior uc NOTE: Student notices green and amber lights for EHC pump 1 and then starts EHC pump 2 with 55 permission.

NOTE: After starting EHC pump 2 EHC pressure returns to 1600 psig.

uo Will call SSS to:

SS

. Write condition report

. Notify Maintenance END OF EVENT 5, proceed to EVENT 6.

26

Appendix D Required Operator Actions Form ES-D-2 Op-Test NoW: 2012-301 Scenario No.: 3 Event No.: 6 Event

Description:

SG 1 develops a 1 5 GPM tube leak requiring entry into AOP I 8009-C. With SGTL > 5 gpm a rapid shutdown using AOP 18013-C is required. This event will be used for the required reactivity manipulation.

Time Position Applicants Action or Behavior CREW Diagnose SG Tube Leakage:

ALARMS:

ALBO5-B03 INTMD RADIATION ALARM ALBO5-C03 HIGH RADIATION RE-0724 Primary to secondary leakage monitor (IPC)

RE-081 0 SJAE low range monitor (IPC)

RE-12839C SJAE monitor (IPC)

INDICATIONS:

Charging flow increases if in auto. (expect manual control)

PRZR level slowly lowers.

SS Enters AOP 1 8009-C, Steam Generator Tube Leak and directs actions of OATC I UO listed in the following steps. (Crew Update)

OATC I UO 1 . Initiate continuous actions page.

OATC 2. Maintains PRZR level by:

a. Adjusting charging flow.
b. Check PRZR level stable or rising.

RNOb.1) isolating letdown (only necessary if at 120 GPM.

letdown)

RNOb.2) Start additional charging pump. (will not be necessary)

RNOb.3) I.E PRZR level can NOT be maintained greater than 9%,

THEN perform the following:

a. Trip the Reactor.
b. WHEN Reactor trip verified, THEN actuate SI.
c. Go to 1 9000 C, E 0 REACTOR TRIP OR SAFETY INJECTION.

27

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 201 2-301 Scenario No.: 3 Event No.: 6 Event

Description:

SG 1 develops a 1 5 GPM tube leak requiring entry into AOP 1 8009-C. With SGTL > 5 gpm a rapid shutdown using AOP 1 801 3-C is required. This event will be used for the required reactivity manipulation.

Time Position Applicants Action or Behavior

3. Try to identify affected SG:

ss a. Direct Chemistry attempt to identify the leaking SG by initiating 31 120-C.

uo b. Check SG level indications stable or rising with relatively lower feed flow rate. (will not be able to see this)

OATC 4. Verifies VCT level maintained with automatic makeup control OATC I SS 5. Check leak rate < 5 GPM as determined by CVCS flow balance.

[charging (letdown + seal leak off)]

(Leak rate will be i5 GPM)

RNO a. Initiate 18013-C, Rapid Power Reduction.

RNO b. Be in mode 3 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

RNOc. Gotostepll.

ss Initiates a unit shutdown per AOP-1 801 3-C, Rapid Down Power.

Entry Condition Target Approx. Time

@ 3-5%/mm 17015-DOS MFPT High Vibrations <70% RTP 5-8 minutes 17015-EO1 17019-B04 Condenser Low Vacuum >2242 1 8025-C Vacuum Hg and STABLE or orCirc Water Pump Trip RISING or Loss of Utility Water 18009-C SG Tube Leak (75 gpd <50% RTP within 1 10-17 minutes with an ROC 30 hour gpd/hr) 18009-C SG Tube Leak (5 20% RTP within 1 16-27 gpm) hour & trip minutes reactor 1 8039-C Confirmed Loose Part 20% RTP quickly 1 6-27 minutes 55 determination based As determined by on the 55 plant conditions 28

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2012-301 Scenario No.: 3 Event No.: 6 Event

Description:

SG 1 develops a 1 5 GPM tube leak requiring entry into AOP 1 8009-C.

With SGTL > 5 gpm a rapid shutdown using AOP 1 801 3-C is required. This event will be used for the required reactivity manipulation.

Time Position Applicants_Action_or_Behavior ss 1 . Performs SHUTDOWN BRIEFING METHOD

. Auto rod control should be used.

. Reduce Turbine Load at approximately 3% RTP per minute (approx 36 MWe) up to 5% RTP (approx 60 MWe).

. Borate considering the calculations from the reactivity briefing sheet and BEACON.

. Maintain AFD within the doghouse.

. ss (or SRO designee) - Maintain supervisory oversight.

ii rod withdrawals will be approved by the SS.

. Approval for each reactivity manipulation is not necessary as long as manipulations are made within the boundaries established in this briefing (i.e. turbine load adjustment up to 60 MWe, etc.).

, A crew update should be performed at approximately every 100 MWe power change.

. If manpower is available, peer checks should be used for all reactivity changes.

OPERATIONAL LIMITS

. Maintain TAVG within +/-6°F of TREE. If TAVGITREF mismatch

>6°F and not trending toward a matched condition if TAVG 551 °F, then trip the reactor.

, If load reduction due to a loss of vacuum, every effort should be made to maintain the steam dumps closed. (Permissive C-9 2492 Hg).

INDUSTRYOE

. Shift supervision must maintain effective oversight and exercise conservative decision making.

. Correction of significant RCS TAVG deviations should only be via secondary plant control manipulations and j primary plant control manipulations. (i.e., do withdraw control rods or dilute).

29

Appendix D Required Operator Actions Form ES-D-2 Op-Test Nofl: 2012-301 Scenario No.: 3 Event NO.: 6 Event

Description:

SG 1 develops a 15 GPM tube leak requiring entry into AOP 18009-C. With SGTL > 5 gpm a rapid shutdown using AOP 1 801 3-C is required. This event will be used for the required reactivity manipulation.

!!i11 Position Applicants Action or Behavior OATC 2. Verify rods in AUTO.

UO 3. Reduce Turbine Load at the desired rate up to 5%/mm (60 MWEImin).

OATC 4. Borate as necessary by initiating 1 3009, CVCS REACTOR MAKEUP CONTROL SYSTEM.

Note to examiner: Boration steps from 1 3009 start on page # 32.

IF, crew Emergency Borates, steps from 13009 start on page # 38.

OATC / UO 5. Initiate the Continuous Actions Page.

OATC / UO 6. Check desired ramp rate LESS THAN Qfl EQUAL TO 5%/MIN.

OATC 7. Maintain Tavg within 6°F of Tref:

a. Monitor Tavg/Tref deviation (UT-0495).
b. Verify rods inserting as required.
c. Energize Pressurizer back-up heaters as necessary.

OATC / UO 8. Maintain reactor power and turbine power MATCHED.

a. Balance reactor power with secondary power reduction using boration and control rods.
b. Check rate of reactor power reduction ADEQUATE FOR PLANT CONDITIONS.
c. Check RCS Tavg GREATER THAN 551 °F (TS 3.4.2).
d. Check RCS Tavg WITHIN 6°F OF TREF.

30

Appendix D Required Operator Actions Form ESD-2 Op-Test No.: 201 2-301 Scenario No.: 3 Event No.: 6 Event

Description:

SG 1 develops a 1 5 GPM tube leak requiring entry into AOP 1 8009-C.

With SGTL > 5 gpm a rapid shutdown using AOP 1 801 3-C is required. This event will be used for the required reactivity manipulation.

Time Position ApplicantsAction or Behavior OATC 9. Maintain PRZR Pressure AT 2235 PSIG.

OATC 10. Maintain PRZR Level AT PROGRAM.

uO 11 . Maintain SG Level BETWEEN 60% AND 70%.

55 1 2. Notify the System Operator that a load reduction is in progress.

SS 1 3. Notify SM to make the following notifications as appropriate:

Plant Management Notifications using 1 0000-C, CONDUCT OF OPERATIONS.

91001-C, EMERGENCY CLASSIFICATION AND IMPLEMENTING INSTRUCTIONS.

00152, FEDERAL AND STATE REPORTING REQUIREMENTS.

Chemistry Technical Specification sampling for load reductions greater than 1 5% using 351 1 0 C, CHEMISTRY CONTROL OF THE REACTOR COOLANT SYSTEM.

QC to perform a NOPT inspection using 84008, RPV ALLOY 600 MATERIAL INSPECTIONS AND REPORTS for reactor shutdowns.

NOTE Event will continue until adequate power maneuver completed as determined by the NRC Chief Examiner, at that point, the SGTR will occur and the crew will trip the plant lAW 1 8009-C, step 3.b RNO.

END OF EVENT 6, proceed to EVENT 7.

31

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 3 Event No. : 6 Rapid Power Reduction boration steps Event

Description:

Rapid Power Reduction boration steps from 13009.

Time Position Applicants Action or Behavior OATC 4.2 BORATION 4.2.1 Determine the existing RCS boron concentration from Boron Meter 1 -Al-401 34 OR by sample analysis.

4.2.2 To determine the number of gallons of boric acid required to borate the RCS, perform the following.

IF borating to required boron for a xenon free cool down, obtain the maximum boron concentration for the cool down range from the PTDB Tab 1 .3.4-Ti and T2.

OR IF borating to a desired boron concentration, determine the desired change in boron concentration by subtracting the existing concentration from the desired concentration.

THEN Determine the amount of boric acid necessary to accomplish the desired change in boron concentration using PTDB Tab 2.3 and correct the obtained value using PTDB Tab 2.1.

Note to examiner: The OATC may also use a Beacon Book calculation to obtain a boron addition target for the Rapid Power Reduction. For a power reduction to 70%, this will be a boron addition of 230 gallons at 30 gpm.

OATC 4.2.3 Place VCT MAKEUP CONTROL 1 -HS-40001 B in STOP.

OATC 4.2.4 Place VCT MAKEUP MODE SELECT 1-HS-40001A in BOR.

32

Appendix D Required OperatorActions Form ES-D2 Op-Test No : 201 2-301 Scenario No. : 3 Event No. : 6 Rapid Power Reduction boration steps Event

Description:

Rapid Power Reduction boration steps from 13009.

Time Position Applicants Action or Behavior NOTE If necessary, boric acid flow may be adjusted using 1 -FIC-O1 1 0 with ss concurrence. Changes to pot setting should be logged in the Control Room Log and restored at completion of activity.

OATC 4.2.5 Adjust potentiometer on Boric Acid Blender Flow Controller 1 -FIC-Ol 1 0 as desired and verify in AUTO.

CAUTION Digital counter setting on BORIC ACID TO BLENDER integrator 1 -FQI-O1 1 0 reads in tenth-gallon increments.

OATC 4.2.6 Set BORIC ACID TO BLENDER integrator 1 -FQI-O1 1 0 to the desired amount of Boric Acid.

33

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 3 Event No, : 6 Rapid Power Reduction boration steps Event

Description:

Rapid Power Reduction boration steps from 13009.

Time Position Applicants Action or Behavior OATC 4.2.7 Verify the following:

. BA TO BLENDER 1 -HS-O1 1 OA is in AUTO.

. BLENDER OUTLET TO CHARGING PUMPS SUCT 1 -HS-O1 1 OB is in AUTO.

. One Boric Acid Transfer Pump in AUTO or START.

. RX MU WTR TO BA BLENDER 1 -FV-O1 1 1 A is closed with 1HS-O111A in AUTO.

. BLENDER OUTLET TO VCT 1 -FV-O1 1 1 B is closed with 1HS-O1I1B in AUTO.

NOTES

. Boration can be manually stopped at any time by placing 1-HS-40001B in STOP.

. VCT pressure, 1 -P1-i 1 5 should be maintained between 20 and 45 psig.

OATC 4.2.8 Place VCT MAKEUP CONTROL 1 -HS-40001 B in START and perform the following:

. Verify Boric Acid Transfer Pump is running.

. Verify 1 -FV-01 1 OB is open.

. Verify 1 -FV01 1 OA throttles open to provide desired flow on 1-FI-O11OA.

. Monitor BORIC ACID TO BLENDER integrator 1-FQI-01 10.

34

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 3 Event No. : 6 Rapid Power Reduction boration steps Event

Description:

Rapid Power Reduction boration steps from 13009.

Time Position

[ Applicants Action or Behavior OATC 4.2.9 WHEN 1 -FQI-O1 1 0 BORIC ACID TO BLENDER integrator reaches its setpoint, verify boration stops and the following valves close.

a -FV-O1 1 OA, BA TO BLENDER a 1-FV-O1 lOB, BLENDER OUTLET TO CHARGING PUMPS SUCT OATC 4.2. 1 0 Flush approximately 1 5 gallons of Reactor Makeup Water through 1 -FV-O1 1 OB by performing the flowing:

a. Place VCT MAKEUP MODE SELECT 1-HS-40001A to ALT DIL.
b. Set TOTAL MAKEUP integrator 1 -FQI-O1 1 1 for 1 3 to 15 gallons.
c. Place BLENDER OUTLET TO VCT 1 -HS-O1 1 1 B in CLOSE.
d. Place VCT MAKEUP CONTROL 1 -HS-40001 B in START.
e. Verify flow is indicated on 1 -FI-Ol 1 OB.
f. WHEN TOTAL MAKEUP integrator 1 -FQI reaches the desired setpoint, verify the following valves close:

. 1 -FV-O1 1 1 A, RX MU WTR TO BA BLENDER a 1 -FV-O1 1 OB, BLENDER OUTLET TO CHARGING PUMPS SUCT 35

Appendix D Required Operator Actions Form ES-D2 Op-Test No. : 201 2-301 Scenario No. : 3 Event No. : 6 Rapid Power Reduction boration steps Event

Description:

Rapid Power Reduction boration steps from 13009.

Time Position Applicants Action or Behavior QATC 4.21 1 Verify 1 -FIC-Ol 10 potentiometer is set to setting recorded prior to boration (or as directed by SS).

OATC 4.2.12 Align Reactor Makeup Control system for automatic operation as follows:

COMPONENT NAME POSITKN

a. 1 -HS-1 1 08 BLENDER OUTLET TO VCT AUTO
b. 1 HS-40001A VCT MAKEUP MODE SELECT AUTO c 1 -HS-40001 B VCT MAKEUP CONTROL START OATC 4.21 3 IF BA TRANSFER PUMP was placed in START at Step 4.2.7, return to AUTO or as directed by 55.

OATC 4.2.14 Monitor RCS Tavg, source range count rate, and Reactor Power as applicable.

OATC 42. 1 5 Operate the Pressurizer Back-up Heaters as necessary to equalize boron concentration between the RCS and the Pressurizer.

36

Appendix D -- fl Required Operator Actions Form ES-D-2 Op-Test No : 201 2-301 Scenario No. : 3 Event No. : 6 Rapid Power Reduction boration steps Event

Description:

Rapid Power Reduction boration steps from 13009.

Time Position Applicants Action or Behavior OATC 42.16 Verify desired boration through sample analysis or from Boron Concentration Meter 1 -1 208-T6-006. (1 -Al-401 34)

Return to EVENT 6, Rapid Power Reduction, page # 30, step 4.

37

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 3 Page 38 of 3 Event No : 6, Steps for Emergency Boration if crew opts to perform.

Event

Description:

Rapid Power Reduction Emergency Boration steps.

Time j Position Applicants Action or Behavior NOTE: Table 1 provides a convenient tool for checking Emergency Boration flow path alternatives.

OATC 49.1 Emergency Boration Through 1-HV-8104 OATC 49i .1 Start one (1) Boric Acid Transfer Pump.

OATC 4.9.1 .2 Verify a Charging Pump is running.

OATC 4.9.1.3 Open EMERGENCY BORATE valve 1-HV-8104.

NOTE: The following step assumes that with 1 2 gpm of seal return, 30 gpm will be supplied to the RCS.

OATC 4.9.1.4 Place 1-FIC-0121 in MANUAL.

OATC 4.9.1 .5 Adjust 1 -FIC-Ol 21 to maintain flow greater than 42 gpm.

NOTES:

. IPC computer point for Boric Acid flow Rate is FOl 83 (GPM).

. Computer point for Boric Acid Totalized Flow is UFO1 83 (Gallons)

OATC 4.9.1.6 Verify Emergency Boration flow 1-Fl-0183 greater than 30 gpm.

38

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 3 Page 39 of 3 Event No. : 6, Steps for Emergency Boration if crew opts to perform.

Event

Description:

Rapid Power Reduction Emergency Boration steps.

Time Position

{ Applicants Action or Behavior OATC 4.9.1 .7 If flow is less than 30 gpm, start the second Boric Acid Transfer Pump.

OATC 4.9.1 .8 Operate the Pressurizer Backup Heaters as necessary to equalize boron concentration between the RCS and the Pressurizer.

OATC 4.9.1 .9 Check plant conditions are consistent with the boration of the RCS:

RCS Tavg may be dropping.

NIS may be dropping.

OATC 4.9.1 .10 Determine the amount of boric acid required to allow termination of Emergency Boration.

NOTE: Monitor Boric Acid Flow Rate computer point FOl 83. After flow has started the totalized flow should be reset by selecting Reset Boric Acid Flow Totalizer from the IPC System Menu.

OATC 4.9.1 .1 1 When the determined amount of boric acid has been added to the RCS, close I -HV-81 04.

OATC 4.9.1 .12 Return the Boric Acid Transfer Pumps to the desired system configuration.

OATC 4.9. 1 1 3 Restore 1 -FIC-Ol 21 to the AUTO position.

39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 3 Page 40 of 3 Event No. : 6, Steps for Emergency Boration if crew opts to perform.

Event

Description:

Rapid Power Reduction Emergency Boration steps.

Time Position Applicants Action or Behavior OATC 4.9.1 .14 Direct Chemistry to sample and report the RCS boron concentration, or monitor the Boron Meter 1 -Al-401 34 if available.

Return to EVENT 6, Rapid Power Reduction, page # 30, step 4.

40

Appendix D Rectuared Operator Actions Form ES-D-2 Op-Test No.: 201 2-301 Scenario NoW: 3 Event Nofl: 7 Event

Description:

A DBA SGTR will occur on SG # 1 with complication

s. The TDAFW steam supply from SG # 1 wiN not close requiring the crew to trip the TDAF W pump using the Trip and Throttle Valve. In addition, after depressurizing the RCS with PRZR spray to refill the PRZR and lower break flow, a PRZR spray will not close requiring the crew to stop RCP#4.

Time Position Applicants Action or Behavior CREW Performs Immediate Operator Actions per 1 9000-C, E-0 Reactor Trip or Safety Injection.

SS Makes a page announcement of Reactor Trip.

OATC 1 Check Reactor Trip: (YES)

. Rod Bottom Lights LIT

. Reactor Trip and Bypass Breakers OPEN

. Neutron Flux LOWER1NG uO 2. Check Turbine Trip: (YES)

. All Turbine Stop Valves CLOSED uO 3. Check Power to AC Emergency Buses. (YES)

a. AC Emergency Busses AT LEAST ONE ENERGIZED.

. 4l6OAClEBusses

b. AC Emergency Busses ALL ENERGIZED.

. 4l6OVAClEBusses

. 48OVAClEBusses OATC 4. Check if SI is actuated. (YES)

. Any SI annunciators LIT

. SI ACTUATED BPLP window LIT 55 Goto Step 6.

41

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 201 2-301 Scenario No.: 3 Event No.: 7 Event

Description:

A DBA SGTR will occur on SG # 1 with complications. The TDAFW steam supply from SG # 1 will not close requiring the crew to trip the TDAFW pump using the Trip and Throttle Valve. In addition, after depressurizing the RCS with PRZR spray to refill the PRZR and lower break flow, a PRZR spray will not close requiring the crew to stop RCP #4.

Time Position Applicants Action or Behavior ss 6. Initiate the Foldout Page.

CREW ss 7. Perform the following:

QATC

  • OATC Initial Actions Page (Note to examiner, start page 43) uQ
  • uo Initial Actions Page (Note to examiner, start page 46)

NOTE: 55 initiates step 8 after OATCIUO Initial Actions completed.

42

Appendix D Required Operator Actions Form ES-D-2 OpTest Nofl: 201 2-301 Scenario No: 3 Event No: 7 Event

Description:

A DBA SGTR will occur on SG # 1 with complications. The TDAFW steam supply from SG # 1 will not close requiring the crew to trip the TDAFW pump using the Trip and Throttle Valve. In addition, after depressurizing the RCS with PRZR spray to refill the PRZR and lower break flow, a PRZR spray will not close requiring the crew to stop RCP #4.

Time Position Applicants Action or Behavior OATC PERFORMS OATC INITIAL ACTIONS 1 . Check both trains of ECCS equipment ALIGNING FOR INJECTION PHASE: (YES)

. MLB indication OATC 2. Check Containment Isolation Phase A ACTUATED. (YES)

. CIA MLB indication OATC 3. Check ECCS Pumps and NCP status:

a. CCPs RUNNING. (YES)
b. SI Pumps - RUNNING. (YES)
c. RHR pumps - RUNNING. (YES)
d. NCP - TRIPPED. (YES)

OATC 4. Verify CCW Pumps - ONLY TWO RUNNING TRAIN B. (YES) 43

Appendix D Required Operator Actions Form ES-D-2 Op-Test No: 201 2-301 Scenario NoV: 3 Event No.: 7 Event

Description:

A DBA SGTR will occur on SG # 1 with complications. The TDAFW steam supply from SG # 1 will not close requiring the crew to trip the TDAFW pump using the Trip and Throttle Valve In addition, after depressurizing the RCS with PRZR spray to refill the PRZR and lower break flow, a PRZR spray will not close requiring the crew to stop RCP # 4 Time Position Applicants Action or Behavior OATC PERFORMS OATC INITIAL ACTIONS

5. Verify proper NSCW system operation: (YES)
a. NSCW Pumps - ONLY TWO RUNNING PER TRAIN.
b. NSCW TOWER RTN HDR BYPASS BASIN hand switches IN AUTO:

. HS-1669A

. HS-1668A OATC 6. Verify Containment Cooling Units: (YES)

a. ALL RUNNING IN LOW SPEED. (YES)

. MLB indication

b. NSCW Cooler isolation valves OPEN. (YES)

. MLB indication OATC 7. Check Containment Ventilation Isolation.

a. Dampers and Valves CLOSED. (YES) 44

Aendix D Reguired Operator Actions Form ES-D-2 Op-Test NoW: 201 2-301 Scenario No.: 3 Event NoW: 7 Event

Description:

A DBA SGTR will occur on SG # 1 with complications.

The TDAFW steam supply from SG # 1 will not close requiring the crew to trip the TDAF W pump using the Trip and Throttle Valve. In addition, after depressurizing the RCS with PRZR spray to refill the PRZR and lower break flow, a PRZR spray will not close requiring the crew to stop RCP #4.

Time Position Applicants Action or Behavior OATC PERFORMS OATC INITIAL ACTIONS

8. Check Containment pressure REMAINED LESS THAN 21 P51G.

(YES)

QATC 9. Check ECCS flows:

a. BIT flow (YES)
b. RCS pressure LESS THAN 1625 P51G. (YES)
c. SI Pump flow. (YES)
d. RCS pressure LESS THAN 300 P51G. (NO)

RNO

d. GotoSteplO.

OATC 1 0. Check ECCS Valve alignment PROPER INJECTION LINEUP INDICATED ON MLBs. (YES)

OATC 11 . Check ACCW pumps - AT LEAST ONE RUNNING. (YES)

OATC 12. Adjust Seal Injection flow to all RCPs 8 to 13 GPM.

OATC 1 3. Dispatch Operator to ensure one train of SPENT FUEL POOL COOLING in service per 13719, SPENT FUEL POOL COOLING AND PURIFICATION SYSTEM.

END OF OATC INITIAL ACTIONS RETURNS TO MAIN BODY OF 19000-C CONTINUING AT STEP 8, page # 49.

45

Appendix D Required Operator Actions Form ES-D-2 Op-Test NoW: 201 2-301 Scenario NoV: 3 Event Nofl: 7 Event

Description:

A DBA SGTR will occur on SG # 1 with complications. The TDAFW steam supply from SG # 1 will not close requiring the crew to trip the TDAFW pump using the Trip and Throttle Valve. In addition, after depressurizing the RCS with PRZR spray to refill the PRZR and lower break flow, a PRZR spray will not close requiring the crew to stop RCP #4.

Time Position Applicants Action or Behavior uo PERFORMS UO INITIAL ACTIONS 1 Check AFW Pumps

- RUNNING. (YES)

. MDAFW Pumps

. TDAFW Pump, if required.

uo 2. Check NR level in at least one SG GREATER THAN 10%.

(32% ADVERSE). (YES) uo 3. Check if main steamlines should be isolated: (NO)

a. Check for one of more of the following conditions:

Any steamline pressure LESS THAN OR EQUAL TO 585 PS 1G.

Containment pressure GREATER THAN 14.5 P51G.

Low Steam Pressure SI/SLI BLOCKED AND High Steam Pressure Rate ON TWO OR MORE CHANNELS OF ANY STEAMLINE.

RNO

a. GotoStep4.

46

Appendix D Required Operator Actions Form ES-D-2 Op-Test No: 201 2-301 Scenario No.: 3 Event No.: 7 Event

Description:

A DBA SGTR will occur on SG # 1 with complications. The TDAFW steam supply from SG # 1 will not close requiring the crew to trip the TDAFW pump using the Trip and Throttle Valve. In addition, after depressurizing the RCS with PRZR spray to refill the PRZR and lower break flow, a PRZR spray will not close requiring the crew to stop RCP#4.

Time Position Applicants Action or Behavior uo PERFORMS UO INITIAL ACTIONS

4. Verify FW Isolation Valves closed: (YES)

. MElVs

. BEIVs

. MERVs

. BERVs uQ 5. Verify SG Blowdown isolated: (YES)

. Place SG Blowdown Isolation Valve handswitches HS-7603A, B, C, and D in the CLOSE position.

. SG Sample Isolation Valves CLOSED.

uO 6. Verify Diesel Generators RUNNING. (YES) uO 7. Throttle total AEW flow as necessary to maintain SG NR levels between 1 0% (32% ADVERSE) and 65%.

uO 8. Verify both MFPs TRIPPED. (YES) 47

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 201 2401 Scenario No: 3 Event Nofl: 7 Event

Description:

A DBA SGTR will occur on SG # 1 with complications. The TDAFW steam supply from SG # 1 will not close requiring the crew to trip the TDAFW pump using the Trip and Throttle ValveS In addition, after depressurizing the RCS with PRZR spray to refill the PRZR and lower break flow, a PRZR spray will not close requiring the crew to stop RCP # 4 Time Position Applicants Action or Behavior uo 9. Check Main Generator Output Breakers OPEN. (YES)

OATC BACK TO 19000-C PROCEDURE MAIN BODY, page # 49 uQ 48

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 201 2-301 Scenario No.: 3 Event No.: 7 Event

Description:

A DBA SGTR will occur on SG # 1 with complications. The TDAFW steam supply from SG # 1 will not close requiring the crew to trip the TDAFW pump using the Trip and Throttle Valve. In addition, after depressurizing the RCS with PRZR spray to refill the PRZR and lower break flow, a PRZR spray will not close requiring the crew to stop RCP # 4 Time Position Applicants Action or Behavior CREW 8. lntiate the Continuous Actions Page.

OATC 9. Check RCS temperature stable at or trending to 557°F.

-OR-Without RCP(s) running RCS WR COLD LEG TEMPERATURES.

RNO (IF needed>

9. IF temperature is less than 557°F and lowering, THEN perform the following as necessary:
a. Stop dumping steam.
b. Perform the following as appropriate:

IF at least one SG NR level greater than 10%

(32% ADVERSE), THEN lower total feed flow.

-OR-IF all SG NR levels less than 10% (32% ADVERSE), THEN lower total feed flow to NOT less than 570 gpm.

C. If cooldown continues, THEN close MSIVs and BSIVs.

d. If temperature greater than 557°F and rising, THEN dump steam.

49

Appendix D Required Operator Actions Form ES-D-2 Op-Test Nofl: 2012-301 Scenario No: 3 Event Nofl: 7 Event

Description:

A DBA SGTR will occur on SG # I with complications. The TDAFW steam supply from SG # 1 will not close requiring the crew to trip the TDAFW pump using the Trip and Throttle Valve. In addition, after depressurizing the RCS with PRZR spray to refill the PRZR and lower break flow, a PRZR spray will not close requiring the crew to stop RCP # 4 Time Position Applicants Action or Behavior OATC CAUTION: A PRZR PORV Slock Valve which was closed to isolate an excessively leaking or open PRZR PORV should not be opened unless used to prevent challenging the PRZR Safeties.

10. Check PRZR PORVs, Block Valves, and Spray Valves:
a. PRZR PORVs - CLOSED AND IN AUTO. (YES)
b. Normal PRZR Spray Valves CLOSED. (YES)
c. Power to at least one Block Valve AVAILABLE. (YES)
d. PRZR PORV Block Valves AT LEAST ONE OPEN. (NO)

RNO

d. Verify open at least one PRZR PORV Block Valve when PRZR pressure is greater than 2185 psig.

OATC 11 . Check if RCPs should be stopped:

a. ECCS Pumps - AT LEAST ONE RUNNING: (YES)

. CCPorSIPump

b. RCS pressure LESS THAN 1375 P51G. (NO)

RNO

b. GotoStepl2.

Note to examiner: It is expected RCP pressure will be above 1 375 psig at this time.

50

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 201 2-301 Scenario Nofl: 3 Event NoV: 7 Event

Description:

A DBA SGTR will occur on SG # 1 with complications. The TDAFW steam supply from SG # 1 will not close requiring the crew to trip the TDAFW pump using the Trip and Throttle Valve. In addition, after depressurizing the RCS with PRZR spray to refill the PRZR and lower break flow, a PRZR spray will not close requiring the crew to stop RCP #4.

Time Position Applicants Action or Behavior uo 12. Check SGs secondary pressure boundaries:

a. SG Pressures:

Any lowering in an uncontrolled manner. (NO)

-OR-Any completely depressurized. (NO)

RNO

a. GotoStepl3.

51

Appendix D Required Operator Actions Form ESD-2 Op-Test No: 201 2-301 Scenario No: 3 Event No.: 7 Event

Description:

A DBA SGTR will occur on SG # 1 with complications. The TDAFW steam supply from SG # 1 will not close requiring the crew to trip the TDAFW pump using the Trip and Throttle Valve. In addition, after depressurizing the RCS with PRZR spray to refill the PRZR and lower break flow, a PRZR spray will not close requiring the crew to stop RCP#4.

Time Position Applicants Action or Behavior uc 13 Check SG Tubes intact:

a. Direct Chemistry to take periodic activity samples of all SGs one atatime.
b. Secondary Radiation NORMAL. (NO)

. MAIN STEAM LINE MONITORS

. RE-13120(SG1)

. RE-13121 (SG2)

. RE-13122(SG3)

. RE-13119(SG4)

. CNDSR AIR EJCTR/STM RAD MONITORS:

. RE-12839

. RE-i 2839D (if on scale)

. RE-12839E (if on scale)

. STM GEN LIQ PROCESS RAD:

. RE-0019 (Sample)

. RE-0021 (Blowdown)

. SG sample radiation:

RNO

b. Go to 1 9030-C, E-3 STEAM GENERATOR TUBE RUPTURE.

Note to examiner: 1 9030-C, E-3 SGTR actions are on following attachment.

52

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 3 Event No, : 7 Event

Description:

DBA SGTR actions from 1 9030-C, E-3 STEAM GENE RATOR TUBE RUPTURE Time Position Applicants Action or Behavior GFEW 1. Initiate the following:

. Continuous Actions and Foldout Page.

. CriticalSafety Function atusTrees per 19200-C, F-OGRflEAL S\FE1Y FUNCON STA11JSTF.

2. Initiate NMP-EP-11O, EEVIGLASSlFKDAT1ON DETSMlNATlON AND INfRAL CflON.

OATC 3. Maintain Seal Injection flow to all 8 to 13 GPM.

QA1C 4. Check if FOshould be stopped:

a. BXBPumps-ATLEASTONERUNNING: (YES)

Pump

b. FtS pressure LETHAN 1 375 FSIG. (NO)

RND

b. IF FS pressure lowers to less than 1 375 psig prior to initiation of FtScooldown inStep 17.

Ti-EN stop all RDPsand return to Step in effect.

Go toStep5.

53

Appendix D Required Operator Actions Form ESD-2 Op-Test No. : 201 2-301 Scenario No. : 3 Event No, : 7 Event

Description:

DBA SGTR actions from 19030-C, E-3 STEAM GENE RATOR TUBE RUPTURE

[ Time Position Applicants Action or Behavior uc 5. Identify ruptured S3(s) by any of the following conditions.

Unexpected rise in any SG NR level.

High radiation from any S6sample.

High radiation from any SGsteamline.

High radiation from any SG blowdown line.

Note to examiner: SG # 1 level will be rising with AFW flow throttled.

However, this is a hard call for the candidate until the TDAFW steam supply is isolated in later steps since steam is being supplied to the TDAFW pump causing the level rise to NOT be as pronounced.

CAUTION: At least one S3should be maintained available for RB cooldown.

uc 6. Isolate ruptured SC(s):

Critical a. Adjust ruptured SG ARV(s) controller setpoint to 1160 psig (pot setting 7.73)

b. Oheck ruptured SC ARV(s) CLCSBD.

PV-3000 (SG 1)

R/-301 0 (SC 2)

PV-3020 (SC 3)

PV-3030 (SC 4) 54

AppendixD Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 3 EventNo.: 7 Event

Description:

DBA SGTR actions from 19030-C, E-3 STEAM GENE RATOR TUBE RUPTURE Time

[ Position Applicants Action or Behavior CAUTION: If TDAFW Pump is the only available AFVV pump, maintain at least one steam supply OPBJ.

uo 7. Close affected TDAFW Pump Steam supply valve(s):

HV-3009 (SG 1 ) LP-1 MS SFLYTO AUX FW TD PMP-1.

HV-301 9 (3 2) LP-2 MS SPLYTO AUX FW TD PMP-1.

Note to examiner: HV-3009 will NOT close.

AND Critical 7. IF at least one MDAFW Pump running, THEN trip the TDAFW Pump by closing PV-15129 using HS-15111.

uO 8. Verify SG Blowdown Isolation Valves CLOSED WITH Critical HANDSWITCHES IN CLOSE POSTION.

Note to examiner: HV-7603A.

OATC 9. Isolate flow from the ruptured SG(s) by closing its Main Critical Steamline isolation and Bypass Valves.

Note to examiner: HV-3006A I B, HV-1 3006A I B.

55

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 3 Event No. : 7 Event

Description:

DBA SGTR actions from 1 9030-C, E-3 STEAM GENE RATOR TUBE RUPTURE Time Position Applicants Action or Behavior CAUTIONS:

. This procedure should be performed in a timely manner to assure that break flow in the ruptured SG(s) is terminated before water enters the S3s main steam piping.

. Any ruptured 3 that is also faulted, should remain isolated during subsequent recovery actions unless needed for RBcooldown or S3 activity sample.

uo 10. Check ruptured SG(s) level:

a. S3 NR level - GFEA1ERTHAN 1 ?/ (32% AD\j. (YES)
b. Step feed flow to ruptured SG(s).

Close the TDAFW and MDAFW valves to SG # 1.

Critical (Note to examiner: 1 HS-51 22A and 1 HS-51 39A) uo 1 1 Check ruptu red 3(s) pressure GFEATBTfHAN 290 PSIG.

(YES)

NOTE: When the low steamline pressure SI/SLI is blocked, main steamline isolation will occur is the high steam pressure rate setpoint is exceeded.

56

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 3 Event No. : 7 Event

Description:

DBA SGTR actions from 1 9030-C, E-3 STEAM GENE RATOR TUBE RUPTURE Time Position Applicants Action or Behavior

12. Check if low steamline pressure SI/SLI should be blocked:

uo a. Steam dumps AVAILABLE. (YES)

OATC b. PFØR pressure LSTHAN 2000 FlG. (YES) uo c. High steam pressure rate alarms Q-EAR (YES)

d. Block low steam line pressure SI/SLI using the following:

uc

. HSOO68

. [-6-40069 uo 13. Align steam Dumps for cooldown:

a. IF Steam Dumps are in T AVG mode, (YES) 11-EN uc 1) Match demand on 3 Header Pressure Controller PIC-507 and SDdemand meter Ul-500.

uo 2) Transfer Steam Dumps to STM PF mode using HS-5000.

b. FtS temperatu re GFEATSTrHAN 550°F.

uo c. As Fcooldown is initiated, hold HS-0500A and I-IS-05008 in the Y1DA INTEIJDOK position until RB temperature is less than 550°F.

uo 14. Raise intact SG levels prior to maximum rate cooldown.

57

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 3 EventNo.: 7 Event

Description:

DBA SGTR actions from 1 9030-C, E-3 STEAM GENERATOR TUBE RUPTURE Time Position Applicants Action or Behavior OATC 1 5. Check at least one RDP RUNNING. (YES)

16. Determine required core exit temperature for cooldown.

Lowest Ruptured SG Core Exit Pressure (psig) Temperature (°F) 1 200 and greater 530 1100to1199 518 1 000 to 1 099 506 900 to 999 493 800 to 899 479 700 to 799 463 600 to 699 445 500 to 599 424 400 to 499 399 300 to 399 366 290 to 299 350 Note to examiner: Expect to pick either 518 or 506.

58

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 3 EventNo.: 7 Event

Description:

DBA SGTR actions from 1 9030-C, E-3 STEAM GENE RATOR TUBE RUPTURE Time Position Applicants Action or Behavior uc 17. Initiate RScooldown:

a. Dump steam to Oondenser from intact 3(s) at maximum rate using Steam Dumps by slowly raising demand on PKD-507.

QAIC 18. Check if FtScooldown should be stopped:

a. Core Exit TCs LBSTHAN FEQUIFED TEMP611JFE (NOT AT THIS TIME)

AND

a. WI-EN core exits are less than required, ThEN perform steps 18.b and 18.c.

Note to examiner: This will take several minutes to reach GET target temperate of either 518 or 506.

uc b. Stop FtScooldown.

c. Maintain sore Exit its L$SThAN QUlID TB\AP6ATUE.

Note to examiner: The UO will use steam dumps to maintain.

59

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 3 Event No. : 7 Event

Description:

DBA SGTR actions from 1 9030-C, E-3 STEAM GENE RATOR TUBE RUPTURE Time Position j Applicants Action or Behavior uo 1 9. Check intact S3 levels:

a. NR level AT LEASTOI\EGFEATBTfHAN 1 cYY

. (32% ADVffEE) 0 (YES)

b. Maintain NR levels between 1cY% (32% ADVBE) and 65%.
c. NR level ANY RlNG IN AN UNOONTRDIIED MANNBR. (NO)

AND

c. GotoStep2O.

OATC 20. Check PFØR FORs and Block Valves:

a. Power to PFR FOR! Block Valves AVAILABLE. (YES)
b. PR FORs OLCSBD. (YES)
c. PFØR FORJ Block Valves AT LEP&O1E OFEN. (NO)

AND

c. IF Block Valve NOT closed to isolate an excessively leaking or open PF RRJ, AND WI-EN PF pressure is greater than 21 85 psig, TI-EN verify open at least one PFZR PDR/ Block Valve.

60

Appendix D Required Operator Actions Form ES-D-2 Op-Test No : 201 23O1 Scenario No. : 3 Event No. : 7 Event

Description:

DBA SGTR actions from 1 9030-C, E-3 STEAM GENERATOR TUBE RUPTURE Time Position Applicants Action or Behavior CAUTIONS:

If offsite power is lost afterSl reset, action is required to restart the following Fequipment if plant conditions require their operation.

. FHRPumps

. SlPumps

. Pct-LCCACavity Purge Units

. Oontainment Doolers in low speed (Started in high speed on a UV signal)

. FQiilled Water Pumps (If ORI is reset)

OATC 21. ResetSl.

CAUTION:

Repositioning Phase A Isolation Valves may cause radiation problems throughout the plant.

QA1O 22. Reset Oontainment Isolation Phase A.

61

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 3 EventNo.: 7 Event

Description:

DBA SGTR actions from 1 9030-C, E-3 STEAM GENERATOR TUBE RUPTURE Time Position Applicants Action or Behavior uc 23. Establish Instrument Air to Containment.

a. Instrument Air pressure GFEATBRTHAN 100 FSG. (YES)
b. Open INSTRAIRCNMT VLVHV-9378. (YES)

C, Verify PFØRSpray Valves operating as required. (YES)

QAIC 24. Check if RI-F Pumps should be stopped:

a. FHR Pumps ANY RUNNING Wfl}-1 SE11ON ALIGNED TO FWT.

(YES)

b. FtS pressure GFEATBRTHAN 300 ElG. (YES)

C, Stop RHRPumps.

OATC 25. IF RB pressure lowers in an uncontrolled manner to less than 300 psig.

THEN restart RI-P Pumps.

62

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 3 EventNo.: 7 Event

Description:

DBA SGTR actions from 1 9030-C, E-3 STEAM GENERATO R

TUBE RUPTURE Time Position Applicants Action or Behavior QAIC 26. Check if FtScooldown should be stopped.

a. Core Exit TCs LTHAN FEQUIFED TEMPSWUFE. (YES, depending on how fast crew is, if NO, the crew will wait until < 51 8 or 506 and stop the cooldown per the RNO of this step)
b. Stop FtScooldown.

C. Maintain Core Exit lts L$STHAN FEQLJIFED 1BP9A11JFE CAUTION:

Ruptured SG pressure and RSsubcooling should begin to rise as FtS pressure recovers after the cooldown is stopped.

uo 27. Check ruptured SG(s) pressure STA8LECRRlNG. (YES)

OATC 28. Check FtSSubcooling GFEATSTfHAN 44°F.

(58°F ADVB) (YES)

QAIC 29. Checkall of the following:

Fcs pressure GFEATBTHAN RUPTUFD SG(s)

FFJE (YES)

PFR level - LBSTHAN 75% (52% ADVE). (YES)

30. Check Normal PFØR ray AVAIL\BLE. (YES) 63

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 2012-301 Scenario No. : 3 EventNo.: 7 Event

Description:

DBA SGTR actions from 1 9030-C, E-3 STEAM GENERATOR TUBE RUPTURE Time Position Applicants Action or Behavior OATC 31 Depressurize RS using Normal PFSpray to refill PF.

Critical a. Spray PRZR with maximum available spray.

Note to examiner: QAIC must fully open BOTH spray valves to satisfy the critical step.

b. Normal PFRSpray +/--ftflVE AT FJUClNG RDS PF$JE (YES)

C. GotoStep37.

OATC 37. Check if ANY of the following conditions are satisfied.

BOTH of the following:

Critical 1 ) RCS pressure LESS THAN RUPTURED SG(s)

PRESSU RE.

Critical 2) PRZR level GREATER THAN 9%. (37% ADVERSE)

-OR-Subcooling L$S1HAN 24oF (38°FADV)

-OR-Critical PRZR level - GREATER THAN 75% (52% ADVERSE)

Note to examiner: Due to the nature of a DBA SGTRatVogtle, it will be very close on whether it is BOTH FtP pressure & Pf level as highlighted above OR PFØI level > 75% only. The OATC will close the spray valves based on the 1 St parameter obtained.

64

Appendix D RequiredOperator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 3 Event No. : 7 Event

Description:

DBA SGTR actions from 1 9030-C, E-3 STEAM GENERATOR TUBE RUPTURE Time Position Applicants Action or Behavior OATC 38. Term mate FtS depressurization:

a. Verify Normal PFSpray valve(s) LC6BD. (NO)

RNO Critical a. IF a Normal Spray valve can NOT be closed, THEN stop RCP 4.

IF PRZR pressure continues lowering uncontrollably, THEN stop RCP 1.

Note to examiner: It is expected that RB pressure will be rising after stopping FtP # 4. If NOT, then stopping RDP # 1 will also be a critical step.

b. Verify PFRRDRV(s)OLCD. (YES)

C. Block COF.

d. checkAuxiliarySpray IN SERVIGE (NO)

RND

d. Go to step39.

QA1O 39. Check FS pressure RISING. (YES)

CAUTION BDSFLOWSF1OULD BETERMINATED when termination criteria are satisfied to prevent overfilling of the ruptured SGs.

65

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 3

( EventNo 7 Event

Description:

DBA SGTR actions from 19030-C, E-3 STEAM GENERATO R

TUBE RUPTURE Time Position Applicants Action or Behavior OATC 40. Check if ECCS flow should be terminated.

a. RCS Subcooling - GREATER THAN 24°F (38°F ADVERSE)

(YES)

b. Secondary Heat Sink:

uc Total feed flow to SGs - GREATER THAN 570 GPM AVAILABLE (YES)

-OR-NR level in at least one intact SG GREATER THAN 10%

(32% ADVERSE) (YES)

OATC c. RCS pressure - STABLE OR RISING. (YES)

d. PRZR level - GREATER THAN 9% (37% ADVERSE) (YES).

OATC 41 Stop ECCS Pumps and place in standby.

. SI Pumps

. AllbutoneCCP OATC 42. Establish charging flow:

a. Check Instrument Air AVAILABLE.
b. Open CCP normal miniflow isolation valves.

. HV-81 1 1A CCP-A MINIFLOW

. HV-8111B--CCP-B M1NIFLOW

. HV-81 10 CCP A & B COMMON MINIFLOW 66

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 3 Event No. : 7 Event

Description:

DBA SGTR actions from 1 9030-C, E-3 STEAM GENERATOR TUBE RUPTURE Time

[ Position Applicants Action or Behavior QATC 42. continued C. Close CCP alternate miniflow valves:

. HV-8508A - CCP-A RV TO RWST ISOLATION

. HV-8508B - CCP-B RV TO RWST ISOLATION

d. Verify white Pressure Control Mode light NOT LIT:

. HV-8508A - CCP-A RV TO RWST ISOLATION

. HV-8508B - CCP-B AC TO RWST ISOLATION

e. Close BIT DISCH ISOLATION VALVES:

. HV-8801A

. HV-8801B f, Set SEAL FLOW CONTROL HC-182 to maximum seal flow (HC-0182 closed).

g. Open CHARGING TO RCS ISOLATION valves:

. HV-8105

. HV-8106 OATC 43. Control charging flow to maintain PRZR level and Seal injection flow to all RCPs 8 to 13 GPM.

67

Appendix D Required Operator Actions Form ES-D2 Op-Test No. : 201 23O1 Scenario No. : 3 Event No. : 7 Event

Description:

DBA SGTR actions from 19030-C, E-3 STEA M GENERATOR TUBE RUPTURE Time Position j Applicants Action or Behavior OATC 44. Check ECCS flow not required:

a. RCS Subcooling GREATER THAN 24°F (38°F ADVERSE)

(YES)

b. PRZR level - GREATER THAN 9% (37% ADVERSE) (YES)

END OF EVENT 7, END OF SCENARIO #3.

68

Appendix D Scenario Outline Form ES-Di Facility: Scenario NoW: Op-Test No: 2012-301 Examiners: Operators:

Initial Conditions: The plant is at 61% power, BOL, steady state operations, control rods in automatic.

(Base IC # 37, snapped to IC # 1 84 for HL1 7 NRC Exam)

Equipment OOS: MFPT B tagged out for shaft repair, awaiting parts, Safety Injection Pump A is tagged out for motor repair.

Lurnover: Maintain 61% power per 12004-C, Power Operation (Mode 1), section 43. Containment mini-purge is in service for a Containment entry on the next shift.

Preloaded Malfunctions:

CVO6B Centrifugal Charging Pump Trip

- Pump 2 ELi 9B - Emergency Diesel Fails to Start 1B ESO1 - Failure of Automatic Reactor Trip PR12B PORV 456 Block Valve 8000B Auto Close Failure COliC Condensate Pump 3 Auto Start Failure SIO6B Block Auto Start on SI Pump B AFO3B MDAFW pump B coupling failure Overrides HS-40007 Neutral, (QMCB Panel C Reactor Trip Hand switch)

Event Malt Event Event No. No. Type* Description Ti NI1OC l-OATC PR Lower Detector Fails High Channel 43.

N-UO l-SS LCO 33i Condition A, FU 2a Condition D, FU 2b Condition E, TS-SS FU 3 Condition E, FU 6 Condition E, FU 16c, d, e Conditions S & R (one hour actions)

T2 0005A C-UO Condensate Pump # 1 trip with failure of Condensate Pump # 3 to C-SS automatically start.

Appendix D Scenario Outline Form ES-D-1 Event Maif. Event Event jype* Description T3 PRO4 C-OATC PORV 456 fails 30% open with HV-8000B Block Valve auto close

@30% C-SS failure.

TS-SS LCO 3.4.1 1 Condition B (one hour actions)

Note to Simbooth: RE PRO2 and PRO4 used to de-energize PQRV 456 and Block Valve 8000B.

T4 CV1 2 l-OATC VCT Level Transmitter LT-1 85 fails high.

@100% l-SS T5 ELO7A C-UO Loss of Control Building 4.16 KV SWGR 1AAO2.

C-SS TS-SS LCO 3.8.1 Conditions A, B, and E LCO 3.89 Condition A LCO 375 Condition C Note to Simbooth: RE EL22, 24, 32, 33, and 35 will be used to swap battery charger power, NYR I NYRS power, and control room lighting when requested.

T6 ELO3 C-UO Reserve Aux Transformer 1 NXRB trips on reactor trip with failure of Critical C-SS DG1B to automatically start.

T7 EW1 5A C-OATC MEPT A Shaft shears requiring a manual reactor trip.

C-SS QMCB panel C reactor trip hand switch will not work, OATC will have to use panel A2 hand switch.

T8 AEO2A M-ALL TDAEW pump trips on over speed.

Preload MDAEW pump B coupling failure.

Loss of Secondary Heat Sink.

T1O RE Simbooth This is a Remote Eunction to fail open MEPT A miniflow valve to EWO6 assist in lowering SG levels to ensure a LOHS occurs. The MEPT A mini-flow light indications are also overridden. The simbooth operator ZLBOO3 may use this trigger if necessary.

EV-5200 GLON ZLB for MEPT A Mini-flow EV-5200 green light is overridden to the RL-OEE ON position and the red light is overridden to the OEE position.

(N)ormal, (R)eactivity, (l)nstrument, (C)omponent, (M)ajor 2

Appendix D Scenario Outline Form ES-D-1 Event 1:

PR NIS Channel N43 fails high resulting in inward rod motion.

Verifiable Actions:

OATC Performs Immediate Operator Action and places control rods in manual.

uo Defeats the failed channel by selecting N43 on the following switches.

. Rod Stop Bypass switch

. Comparator Channel Defeat switch

. Power Mismatch Bypass switch

. Upper Section switch

. Lower Section switch uo Resets rate trip at N43 cabinet.

OATC Withdraws rods to restore Tavg Tref and restore AFD to program.

Technical Specifications:

LCO 3.3.1 Reactor Trip System (RTS) Instrumentation Condition A LCO 3.3.1 Reactor Trip System (RTS) Instrumentation EU 2a Condition D LCO 3.3.1 Reactor Trip System (RTS) Instrumentation EU 2b Condition E LCO 3.3.1 Reactor Trip System (RTS) Instrumentation EU 3 Condition E LCO 3.3.1 Reactor Trip System (RTS) Instrumentation EU 6 Condition E LCO 3.3,1 Reactor Trip System (RTS) Instrumentation EU 16c, d, and e Conditions S & R (one hour actions)

Event 2:

Condensate Pump # 1 trip with Condensate Pump # 3 failure to automatically start.

Verifiable Actions:

UO Manually starts Condensate Pump # 3.

Technical Specifications:

None 3

AppendixD Scenario Outline Form ES-D-1 Event 3:

PRZR PQRV 456 fails open with failure of Block Valve HV-8000B to automatically close.

Verifiable Actions:

OATC Attempts to close PORV 456, and then manually closes Block Valve HV-8000B.

Technical Specifications:

LCQ 34i1 Pressurizer Power Operated Relief Valves (PORV5), Condition B LCO 3.4.1 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits, Condition B Event 4:

VCT Level Transmitter LT-185 fails high resulting in letdown divert to the RHUT.

Verifiable Actions:

OATC Places 1-LV-1 12A from the RHUT position to the VCT position.

Technical Specifications:

None 4

Appendix D Scenario Outline Form ES-D-i EventS:

A fault occurs on 1AAO2 with DG1A starting and failing to tie.

Verifiable Actions:

uo Emergency Trips DG1A which has not tied to the bus.

uo Aligns the following equipment during performance of 1 8031 -C, section A.

. Starts CCW Train B (2 pumps)

. Reduces TDAFW pump speed to not less than 1535 rpm.

. Aligns CNMT coolers so that 4 Train B coolers are running.

. Aligns the CRDM fans so that 2 fans are running.

. Swaps CNMT Aux Coolers.

. Verifies a cavity cooling unit is running.

. Ensures a reactor makeup water pump is running or in auto.

OATC Verifies a boric acid transfer pump is running or in auto.

Technical Specifications:

These are the primary Tech Specs addressed.

LCQ 3.8.1 AC Sources Operating, Condition A (one hour action)

LCQ 3.8.1 AC Sources Operating, Condition B (one hour action)

LCO 3.8.1 AC Sources Operating, Condition E (directs LCO 3.8.9)

LCO 3.8.9 AC Sources Operating, Condition A LCO 3.7.5 Auxiliary Feedwater System, Condition C Event 6:

1 NXRB (RAT 1 B) trips open on reactor trip with failure of DG1 B to automatically start.

Verifiable Actions:

UO Performs IOA for E-O step # 3 and manually starts DG1 B to prevent entry into the loss of all AC power procedure.

5

Appendix D Scenario Outline Form ES-D-1 Event 7:

Main Feed Pump A shaft shears resulting in a total loss of feed water flow requiring a manual reactor trip due to the automatic reactor trip function will not work.

Verifiable Actions:

OATC Performs a manual reactor trip using the QMCB panel A hand switch to mitigate the effects of the reactor operating with an imminent loss of heat sink.

Technical Specifications:

None Event 8:

The TDAFW pump will trip when the UC attempts to raise TDAFW pump speed and MDAFW pump B discharge line breaks in the pump room. These events lead to a total loss of secondary heat sink.

Verifiable Actions:

uO Attempts to increase TDAFW pump speed using TDAFW speed controller 1 PDIC-5180.

uO Places MDAFW pump B in PTL at SS direction.

OATC Stops all RCPs to limit heat input to limit inventory loss in the SGs.

OATC Manually actuates SI to establish RCS feed.

OATC Manually starts SI pump B which will not auto start on the SI signal.

OATC Places all PRZR heaters in OFF/PTL.

OATC Arms COPS, opens Block Valve HV-8000B after power is restored.

OATC - Opens PRZR PORV 1 PV-455.

OATC Opens all Reactor Vessel Head Vent valves.

The scenario may be stopped at the step for Initiate Attachment D with chief examiner approval after the PORV Block Valve 1 HV-8000B has been re-energized following placing Rx. Vessel Head Vent Letdown in service.

NOTE TO SIMBOOTH: Per NRC Chief Examiner comments during Prep Week. DO NOT re-energize block valve 1 HV-8000B until the crew establishes Rx. Vessel Head Vent flow.

6

Appendix D Scenario Outline Form ES-D-1 CRITICAL TASKS:

1 ) Manually starts DG1 B per step 3 RNO of E-O to prevent a loss of all AC power.

2) Starts SI Pump B to provide RCS Feed Path during LOHS to ensure core heat removal no later than step 36 of 19231-C.
3) Opens PRZR PORV 1 PV-455 no later than step 37d of 19231-C and opens Reactor Vessel Head Vents no later than step 38a RNO of 19231-CS Calls to align a low pressure water source to at least one intact SG per direction of step 38b RNO of 19231 -C.

Note to examiner: If the SS opts to send an operator to energize PORV-456 and opens PORV-456, this will also satisfy the critical step.

NOTE TO SIMBOOTH: Per NRC Chief Examiner comments during Prep Week. DO NOT re-energize block valve 1 HV-8000B until the crew establishes Rx. Vessel Head Vent flow.

7

NUCLEAR SAFETY FOCUS Z R TARGET ZERO Protected Train: EOOS: Green Alpha LI Yellow LI Bravo Orange LIRed Plant 61 % power BOL.

Conditions:

Major Activities: Maintain power operations per UOP 1 2004-C section 4.3 for power operation. Control Rods will be maintained in automatic for transient response per Operations Management direction.

Active LCOs: D LCO 3.5.2 Condition A is in effect due to SIP A tagged out.

OOS/Degraded E None CR Instruments:

Narrative i: Containment mini-purge is in service for a planned Status: Containment Entry on next shift.

E:J SIP A is tagged out for motor repair, expected return to service time is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> left on a shutdown LCO of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

C MFPT B is tagged out for shaft replacement, expected return to service time is 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br />.

LI The remnants of Hurricane Maya are passing through, severe weather and thunderstorms will be in the area for the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. The Severe Weather Checklist is in effect.

E Power Range high level trip bistables are set at 90%.

- Required Operator Actions Form ES-D-2 OpTest No. : 201 23O1 Scenario No. : 4 Event No. : 1 Event

Description:

PR N43 fails high resulting in inward rod motion, OATC will be required to place rods in Manual per lOAs of 18002, Nuclear Instrumentation System MalfunctionS Time Position Applicants Action or Behavior OATC Diagnoses the failure of N43 Power Range NIS.

Symptoms I alarms:

. ALB1O-C02 POWER RANGE CHANNEL DEVIATION

. ALB1O-F02 POWER RANGE NEUTRON FLX RATE ALERT

. ALB1 O-E06 RADIAL TILT (after a short delay)

. ALB12-A05 TAVG 1 TREE DEVIATION (may or may not come in depending on how far rods insert).

Indications:

. Rapid inward motion of control rods in automatic control.

. Green RODS IN light illuminated on vertical section of QMCB

. Power Range Trip Status lights illuminated.

. Erratic, inconsistent or divergent indication between PR channels.

OATC IMMEDIATE OPERATOR ACTIONS Bi . Place rods in manual.

55 Enters 18002-C, NUCLEAR INSTUMENTATION SYSTEM MALEUNCTION, section B POWER RANGE DRAWER N41 N42, ,

N43, N44 MALEUNCTION.

UO B2. Terminates any load change in progress.

1

Appendix D Required Operator Actions Form ES-D2 Op-Test No. : 201 2-3Ol Scenario No. : 4 Event No. : 1 Event

Description:

PR N43 fails high resulting in inward rod motion, OATC will be required to place rods in Manual per lOAs of 1 8002, Nuclear Instrumentation System Malfunction.

Time Position Applicants Action or Behavior OATC B3. Checks THERMAL POWER - GREATER THAN OR EQUAL TO 75%.

RNO B3. GotoStepB5.

UO B5. Perform the following:

a. Select the affected channel on:

. ROD STOP BYPASS switch. (BPLP light 4-3 lights up)

. COMPARATOR CHANNEL DEFEAT switch.

. POWER MISMATCH BYPASS switch.

. UPPER SECTION switch.

. LOWER SECTION switch.

b. Reset rate trip:

NOTE: The UO will receive credit for a normal evolution for performance of step B5.

OATC B6. Restore Tavg to program.

Note to examiner: It is expected the OATC will withdraw rods to restore Tavg to program.

OATC B7. Place rods in AUTO if desired.

2

AppenchxD Required Operator Actions Form ES-D-2 Op-Test No. : 2012-301 Scenario No. : 4 Event No. : 1 Event

Description:

PR N43 fails high resulting in inward rod motion, OATC will be required to place rods in Manual per lOAs of 1 8002, Nuclear Instrumentation System Malfunction.

Time Position Applicants Action or Behavior

]

Cue to Simbooth: IF asked, the Shift Manager has given permission to place the rods in auto.

B8. Check the operable Power Range Channel(s) indicating OATC properly on NR-45. (they are) 55 B9. Notify I & C to initiate repairs.

Note to examiner: It is expected a crew member will call C & T for a work order, duty manager notification, and to contact I & C.

55 BlO. Bypass affected channel NIS and NSSS grouping using 13509-C, BYPASS TEST INSTRUMENTATION (BTI) PANEL OPERATION.

Note to examiner: It is NOT expected the 55 will BTI the channel, I & C usually likes to leave the channel as is for troubleshooting and it will be bypassed at their request.

OATC Bi 1 Within one hour, check the following interlocks are in required state for existing unit conditions: (TS 3.3. 1 ) (they are)

. P-7

. P-8

. P-9

. P-b 3

Appendix D Required_Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 4 Event No. : 1 Event

Description:

PR N43 fails high resulting in inward rod motion, OATC will be required to place rods in Manual per lOAs of 1 8002, Nuclear Instrumentation System Malfunction Time Position Applicants Action or Behavior j

ss B12. Within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, place the inoperable Power Range Channel in trip by performing the following: (TS 3.3.1)

a. Remove the AC Control Power Fuses on the affected drawer.
b. Trip Overtemperature bistable for the affected channel.

CHANNEL CAB FRAME B/S SWITCHES

/CARD N-41 1 8/22 3 TS-411C 1 8/22 4 TS-411D N-42 2 8/22 3 TS-421 C 2 8/22 4 TS-421 D N-43 3 8/22 3 TS-431 C 3 8/22 4 TS-431D N-44 4 8/22 3 TS-441C 4 8/22 4 TS-441 D ss B13. Initiate 14915, SPECIAL CONDITIONS SURVEILLANCE LOGS.

Note to examiner: The crew will call C & T to perform this. This will be data sheet 7 for One Power Range NI Channel Inoperable.

4

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 4 Event No. : 1 Event

Description:

PR N43 fails high resulting in inward rod motion, OATC will be required to place rods in Manual per lOAs of 1 8002, Nuclear Instrumentation System Malfunction.

Time Position Applicants Action or Behavior ss Bi 4. Initiate the applicable actions of the following Technical Specifications:

Table 3.3.1-1 Function 2 Table 3.3.1-1 Function 3 Table 3.3.1-1 Function 6 Table 3.3.1-1 Function 16 Note to examiner:

. FU 2a and 2b, Conditions D and E, both 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> actions.

. FU 3, Condition E, 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action.

. FU 6, Condition E, 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action.

. FU 1 6c, d, e, Conditions S and R, both 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> actions.

SS B1 5. This step is N/A at this time.

SS B16. Initiate 13501, NUCLEAR INSTRUMENTATION SYSTEM when repairs and surveillances are complete.

55 B1 7. Return to procedure and step in effect.

END OF EVENT 1 , proceed to EVENT 2.

5

AppendixD Required Operator Actions Form ES-D2 Op-Test No. : 201 23O1 Scenario No. : 4 EventNo: 2 Event

Description:

Condensate Pump # 1 trips with failure of standby Condensate Pump # 3 to automatically start. This requires entry into 1 801 6-1, Condensate and Feedwater Malfunction and the UO to manual start pump # 3.

Time Position Applicants Action or Behavior Uo Diagnoses the trip of Condensate Pump # 1.

Symptoms I alarms:

. ALB17-A02 COND P-i MOTOR OVERLOAD

. ALB33-AO1 1 3.8V SWGR 1 NAA TROUBLE

. ALB17-C02 COND PMP DISCH HDR LO PRESS ( 1 1/2 minutes)

. MFPT A SUCTION LO PRESS ( 4 minutes)

Indications:

. Green I amber lights LIT on Condensate Pump # 1 hand switch.

. Lowering pressure on 1 P1-4498 MFP A & B SUCTION.

. Feed flows < steam flows on all steam generators.

SS Enters 18016-C, CONDENSATE AND FEEDWATER MALFUNCTION section B for CONDENSATE OR HEATER DRAIN PUMP TRIP.

NOTE: Operation of three condensate pumps will result in fast opening of the Condensate Demin System Bypass Valve PV-30223.

UO Bi . Check condensate pumps TWO RUNNING. (NO)

RNO Bi . Start the standby condensate pump.

Note to examiner: There is 4 minutes to diagnose the event, make the appropriate communications, and get to the step to start the pump before the MFPT trips on low suction pressure.

6

Appendix D Required Operator Actions Form ES-D-2 0p-Test No.: 2012-301 Scenario No.: 4 Event No. : 2 Event

Description:

Condensate Pump # 1 trips with failure of standby Condensate Pump # 3 to automatically start. This requires entry into 1 801 6-1, Condensate and Feedwater Malfunction and the UO to manual start pump #3.

Time Position Applicants Action or Behavior uc B2. Check heater drain pumps TWO RUNNING. (YES)

OATC B3. Check MFP Suction Pressure GREATER THAN 275 PSIG.

(YES)

UQ B4. Initiate the Continuous Actions Page.

OATC OATC B5. Check Rated Thermal Power - NOT BEING EXCEEDED: (NO)

. DeItaT1OO%

. NIS1OO%

. UQ11181OO%MWt.

OATC B6. Check C-7 - NOT ACTUATED. (It is NOT)

OATC B7. Adjust control roads AS NECESSARY TO MATCH TAVG TREE. (no action necessary)

OATC B8. Check PRZR pressure TRENDING TO 2235 P51G. (YES)

B9. Check PRZR level - TRENDING TO PROGRAM VALUE.

(YES)

UO Bi 0. Check feed water heater extraction valves OPEN. (YES) 7

A_:J----__ Required Operator Actions Form ES-D-2 Op-Test No 201 2-301 Scenario No 4 Event No. : 2 Event

Description:

Condensate Pump # 1 trips with failure of standby Condensate Pump # 3 to automatically start. This requires entry into 1 801 6-1, Condensate and Feedwater Malfunction and the UO to manual start pump #3.

Time Position Applicants Action or Behavior uo Bi 1 Checks SGs NR levels AT 65%.

RNO 81 1 . Controls SGs levels.

Note to examiner: May have to take manual control depending upon the time to start the condensate pump.

uc B12. Check Condensate Pumps - ONLY TWO RUNNING. (YES) ss B13. Return to procedure and step in effect.

END OF EVENT 2, proceed to EVENT 3.

8

Appendix D Required Operator Actions Form ESD2 Op-Test No : 201 2-301 Scenario No. : 4 Event No. : 3 Event

Description:

PORV 456 fails partially open with failure of PORV Block Valve HV-8000B to automatically close. This will require manual action by the OATC to close the block valve and prevent a reactor trip.

Time Position Applicants Action or Behavior OATC Diagnoses PORV 456 has failed open.

Symptoms I alarms:

. ALB12-EO1 PRZR RELIEF DISCH HI TEMP

. ALB12-D03 PRZR PRESS LO PORV BLOCK

. ALB1 1 -D02 PRZR CONTROL LO PRESS AND HEATER ON

. ALB12-E02 PRZR REL TANK HI PRESS (delayed)

. ALB1O-C03 OVERPOWER DELTA T ROD BLOCK AND RUNBACK ALERT

. ALB1O-E03 OVERTEMP DELTA T ROD BLOCK AND RUNBACK ALERT Indications:

. Green I Red lights LIT on PORV 456 hand switch.

. PRZR pressure lowering on all PRZR pressure indicators.

Note to examiner: IF they receive, ALB1 O-C03 or E03, they are on the verge of a reactor trip.

OATC IMMEDIATE OPERATOR ACTIONS 1 . Verify PRZR Spray Valves CLOSED. (YES) 55 Enters 18000-C, PRESSURIZER SPRAY, SAFETY, OR RELIEF VALVE MALFUNCTION.

SUBSEQUENT OPERATOR ACTIONS OATC 2. Operate PRZR Heaters as necessary.

9

AppendixD Required Operator Actions Form ES-D-2 Op-Test No 201 2-301 Scenario No 4 Event No. : 3 Event

Description:

PORV 456 fails partially open with failure of PORV Block Valve HV8OOOB to automatically close. This will require manual action by the OATC to close the block valve and prevent a reactor trip.

Time Position Applicants Action or Behavior OATC 3. Verify PRZR PORVs - CLOSED. (NO)

RNO

3. Perform the following to isolate affected PORV as necessary.

Close affected PORV Block Valve.

Open affected PORV power supply breaker.

AD1 M-04 (PV-455)

BD1M-O4 (PV-456)

IF PRZR pressure continues to lower, THEN go to 18004-C, REACTOR COOLANT SYSTEM LEAKAGE.

Note to examiner: The OATC will have to close HV-8000B to stop.

the PRZR pressure decrease. When the block valve is closed, the PORV will go shut. The crew may or may not opt to open BD1 M-04 for PV-456.

OATC 4. Check PRZR Safety Valves - CLOSED. (YES)

OATC 5. Check PIC-455A Pressurizer Master Pressure Controller OPERATING PROPERLY. (YES)

. Reference FIGURE 1.

Note to examiner: FIGURE 1 is at the end of event description between pages 12 and 13.

10

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 4 EventNo.: 3 Event

Description:

PORV 456 fails partially open with failure of PORV Block Valve HV-8000B to automatically close. This will require manual action by the OATC to close the block valve and prevent a reactor trip.

Time Position j Applicants Action or Behavior OATC 6. Check associated instrumentation OPERATING PROPERLY.

(YES) ss 7. Comply with applicable Technical Specifications:

3.4.1 3.4.10 3.4.11 3.4.12 3.4.13 Note to examiner: It is expected the following LCOs will be entered.

LCO 3.4.1 RCS DBN parameters for pressurizer pressure, RCS average temperature, and RCS total flow rate shall be within the limits specified below:

a. Pressurizer pressure 21 99 psig.
b. RCS average temperature 592.5°F.
c. RCS total flow rate > 384,509 gpm.

APPLICABILITY: MODE 1 The NOTE does not apply for this event.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more RCS DNB A.1 Restore RCS DNB 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

parameters not within parameter(s) to within limits. limit.

11

Appendix D RequiredOperator Actions Form ES-D2 Op-Test No. : 201 2-3O1 Scenario No. : 4 Event No. : 3 Event

Description:

PORV 456 fails partially open with failure of PORV Block Valve HV-8000B to automatically close. This will require manual action by the OATC to close the block valve and prevent a reactor trip.

[ Time Position Applicants Action or Behavior ss Step 7 continued:

Note to examiner: It is expected the following LCOs will be entered.

LCO 3.4.1 1 Each PORV and associated block valve shall be OPERABLE.

APPLICABILITY: MODES 1 2, and 3. ,

The NOTE does not apply for this event.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. One PORV inoperable and B.1 Close associated block 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> not capable of being valve.

manually cycled.

AND B.2 Remove power from 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> associated block valve.

AND B.3 Restore PORV to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OPERABLE status.

55 8. Return to procedure and step in effect.

END OF EVENT 3, proceed to EVENT 4.

12

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 2012-301 Scenario No. : 4 Event No. : 4 Event

Description:

LT-185 VCT level transmitter will fail high resulting in an automatic divert of Letdown to the RHUT via LV-1 1 2A. The OATC will have to manually take control of LV-1 1 2A to stop the diversion of Letdown flow Time Position Applicants Action or Behavior OATC Diagnoses the failure of LT-1 85.

Symptoms I alarms:

. No alarms will illuminate for this event.

Indications:

. 1 LV-1 1 2A amber light lit (indicates full divert to RHUT).

. Auto makeup starts if LT-1 1 2 reaches 30% VCT level.

. LT-112 indication lowering if pulled up on IPC computer.

Note to examiner: The OATC may refer to ALBO7-E05 VCT HI/LO LEVEL for guidance for this event.

ALBO7-E05 VCT HIILO LEVEL AUTOMATIC ACTIONS:

NOTE: VCT automatic makeup should have started at 30 percent or stopped at 50 percent.

1 . Letdown flow diverts to the HUT WHEN 1 -HSO1 1 2A is in AUTO with VCT high level of 97 percent.

2. Charging Pump suction auto swaps to the Refueling Water Storage Tank (RWST) upon a Lo-Lo VCT level of 5.7 percent.
3. A summary of instrument setpoints associated with VCT levels include.

Note to examiner: Instrument setpoint table on following page.

13

Appendix D______ Required Operator Actions Form ES-D-2 Op-Test No 201 2-301 Scenario No 4 EventNo: 4 Event

Description:

LT-185 VCT level transmitter will fail high resulting in an automatic divert of Letdown to the RHUT via LV-1 1 2A. The OATC will have to manually take control of LV1 I 2A to stop the diversion of Letdown flow.

Time Position Applicants Action or Behavior

]

OATC LI-Ol 1 2 VCT LI-Ol 85 LEVEL Trip open 1 1 2A 97% Modulate 1 1 2A full divert (if LIC-0185 pot

@8.70)

Hi level alarm 92%

1 1 2A Trip Open signal 87% 1 1 2A starts to divert (if Resets LIC-Ol 85 pot @8 70)

Auto Makeup stops 50%

Auto Makeup starts 30%

Low level alarm 20% Low level alarm RWST auto swapover 5.7%(2 RWST auto swapover of 2) 14

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 2012-301 Scenario No : 4 Event No. : 4 Event

Description:

LT-185 VCT level transmitter will fail high resulting in an automatic divert of Letdown to the RHUT via LV-1 1 2A. The OATC will have to manually take control of LV-1 1 2A to stop the diversion of Letdown flow Time j Position Applicants Action or Behavior Note to examiner: The OATC may refer to ALBO7-E05 VCT HI/LO LEVEL for guidance for this event.

1 Checks VCT level using 1 -LI-Ol 85 on the QMCB and compares to 1 -Ll-O1 1 2 on the IPC or Trend Recorder XR-40053.

2. IF equipmentfailure is indicated by EITHER LT-0185 OR LT-O1 12 failed high, perform the following:

OATC a. Place 1 HS-1 1 2A to the VCT position.

NOTE: Pump cavitation may be indicated by fluctuating discharge pressure and/or erratic flow.

b. Monitor charging pump(s) for signs of cavitation. IF cavitation is observed.

(1) Isolate letdown, (2) Stop any running charging pumps, (3) Initiate 1 8007-C Section B.

c. Initiate Manual VCT Makeup per 1 3009-C.
d. Contact maintenance to initiate repairs.

OATC The OATC will need to monitor auto makeup IF it has started using 1 LT-01 1 2 on the IPC computer point to ensure makeup stops at 50% VCT level.

END OF EVENT 4, proceed to EVENT 5.

15

Appendix D Required OperatorActions Farm ES-D-2 Op-Test No: 201 2-301 Scenario No.: 4 Event NoW: 5 Event

Description:

RAT (1NXRA) supply breaker to 1AAO2 will trip open due to a fault on the bus. DG 1A will start, but will not re-energize 1AAO2 due to a Bus Fault. This will require the crew to complete the actions of AOP 1 8031 -C, Loss of Class 1 E Electrical Systems. Corrective actions include reducing AFW flow, shift electrical loads to Train B 1 E bus 1 BAO3, as well as implement tech specs for loss of AC power.

Time Position Applicants Action or Behavior CREW Diagnose loss of power to 1AAO2:

Alarms:

DG1A EMERGENCY START 4160V SWGR 1AAO2 TROUBLE Indications:

Electric fault on 1 AAO2.

Control room lighting dims due to loss of 1/2 of the lights.

1AAO2 white bus potential lights go out.

DG-1A starts.

55 Enters AOP 1 8031 -C, Loss of Class 1 E Electrical Systems.

OATC 1 .

Check power to 1 E 41 60V Emergency busses AT LEAST ONE ENERG IZED:

. 41 60V AC 1 E Busses.

OATC *2 Check Reactor power LESS THAN 100%: (YES)

. UQ1 1 1 8 LESS THAN OR EQUAL TO 1 00% MWT for the applicable unit.

. NIs LESS THAN OR EQUAL TO 100%.

. 1T LESS THAN OR EQUAL TO 100%.

16

Appendix D Required Operator Actions Form ES-D-2 Op-Test No: 2012-301 Scenario No: 4 Event No: 5 Event

Description:

RAT (1 NXRA) supply breaker to 1 AAO2 will trip open due to a fault on the bus. DG 1A will start, but will not re-energize 1AAO2 due to a Bus Fault. This will require the crew to complete the actions of AOP 1 8031 -C, Loss of Class 1 E Electrical Systems. Corrective actions include reducing AFW flow, shift electrical loads to Train B 1 E bus 1 BAO3, as well as implement tech specs for loss of AC power.

Time Position Applicants Action or Behavior uc 3. Check affected train Diesel Generator RUNNING.

UC 4. Check NSCW status on affected train:

a. PUMPS TWO RUNNING (None are running.)

RNO

4. Perform the following.
1) Trip affected DG by depressing both EMERGENCY STOP pushbuttons.
2) Go to Section A. LOSS OF POWER WITH DG FAILING TO TIE TO BUS.

17

Append ix D ReguiredOperatorActions Farm ES-D-2 Op-Test No 2012401 ScenarIo No 4 Event No: 5 Event

Description:

RAT (1NXRA) supply breaker to 1AAO2 will trip open due to a fault on the bus. DG 1A will start but wall not re energize 1AAO2 due to a Bus Fault This wall require the crew to complete the actions of AQP 1 8031 C Loss of Class 1 E Electrical Systems Corrective actions include reducing AFW flow shift electrical loads to Train B 1 E bus 1 BAO3 as well as implement tech specs for loss of AC power.

Time Position Applicants Action or Behavior 18031-C, SECTION A: LOSS OF POWER WITH DG FAILING TO TIE TO BUS uo Al . Verify NSCW pumps on unaffected train (B) TWO RUNNING.

OATC A2. Verify charging pump RUNNING:

NCR

-OR-Unaffected train CCP.

UO A3. Verify CCW pumps on unaffected train TWO RUNNING.

Note to examiner: The UO will start 2 Train B CCW pumps simultaneously.

SS I OATC A4. Check RHR status:

a. Check RHR REQUIRED FOR SHUTDOWN COOLING.

RNO A4. GotoStepA5.

OATC I UO A5. Initiate the Continuous Actions Page.

UO *A6 Check AFW status:

a. Check AFW system NEEDED TO MAINTAIN SG LEVELS. (NO) 18

Appendix D Required Operator Actions Form ES-D-2 Op-Test NoW: 201 2-301 Scenario No.: 4 Event No.: 5 Event

Description:

RAT (1NXRA) supply breaker to 1AAO2 will trip open due to a fault on the bus. DG 1A will start, but will not re-energize 1AAO2 due to a Bus Fault. This will require the crew to complete the actions of AOP 1 8031 -C, Loss of Class 1 E Electrical Systems. Corrective actions include reducing AFW flow, shift electrical loads to Train B 1 E bus 1 BAO3, as well as implement tech specs for loss of AC power.

Time Position Applicants Action or Behavior RNO uo a. Perform the following:

1) Reduce TDAFW pump speed to not less than 1535 rpm.

55 2) GotoStepA7.

NOTE: TDAFW PUMP SPEED SHOULD HA VE BEEN LOWERED IN STEP 2 MAIN BODY OF 18031-C.

uo A7. Verify ACCW pump on unaffected train RUNNING.

UC A8. Verify four CNMT cooling units on unaffected train running in high speed using 13120, CONTAINMENT BUILDING COOLING SYSTEM.

NOTE: Will start Train B CNMT Coolers 3,4, 7,8 on high speed using step 4.2.3 or 4.8.5 of SOP 13120-1:

Fan 3, 1 HS 12583D Fan 7 1 HS 12585D Fan 4, 1 HS 2583D Fan 8, 1 HS 2585D NOTE: Containment Coolers will be started simultaneously in pairs.

UO A9. Verify CRDM fans on unaffected train TWO RUNNING.

NOTE: STARTS CRDM FAN #4 by placing 1HS-12276A to StarL 19

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 201 2-301 Scenario No: 4 Event No: 5 Event

Description:

RAT (1 NXRA) supply breaker to 1 AAO2 will trip open due to a fault on the bus. DG 1A will start, but will not re-energize 1AAO2 due to a Bus Fault. This will require the crew to complete the actions of AQP 1 8031 -C, Loss of Class 1 E Electrical Systems. Corrective actions include reducing AFW flow, shift electrical loads to Train B 1 E bus 1 BAO3, as well as implement tech specs for loss of AC power.

Time Position Applicants Action or Behavior uo Al 0. Verify reactor cavity cooling unit on unaffected train ONE RUNNING.

NOTE: STARTS REACTOR CA VITY COOLING Fan #2 by placing 1HS-2651 to StarL UO Al 1 Verify SEP cooling pump on unaffected train running using 13719, SPENT EUEL POOL COOLING AND PURIEICATION SYSTEM IPC Points:

ZD3405 ZD3411 Note to examiner: Phones 555 to dispatch ABO to swap SFP trains.

UO Al 2. Verify the following unaffected train Class 1 E 480V load centers ENERGIZED:

Train B

. BBO6

. BBO7

. BB16

. NB1O UO A13. Verify unaffected MCCs energized by observing NO TROUBLE ALARMS.

20

Appendix D Required Operator Actions Form ES-D-2 Op-Test No: 201 2-3Qj. Scenario No.: 4 Event NoW: 5 Event

Description:

RAT (1 NXRA) supply breaker to 1 AAO2 will trip open due to a fault on the bus. DG 1A will start, but will not re-energize 1AAO2 due to a Bus Fault. This will require the crew to complete the actions of AOP 1 8031 -C, Loss of Class 1 E Electrical Systems. Corrective actions include reducing AFW flow, shift electrical loads to Train B 1 E bus 1 BAO3, as well as implement tech specs for loss of AC power.

Time Position Applicants Action or Behavior ss A14. Open doors that have installed door stops in the following AFFECTED Control Building rooms:

UNIT 1

. TR A B52, B55, B76 NOTE: Phones SSS to dispatch CBO to open Doors.

ss A15. Initiatethefollowing:

a. 14230, OFFSITE AC CIRCUIT VERIFICATION AND CAPACITY I CAPABILITY EVALUATION.
b. Verify SAT energized using 1 341 8-A(B), STANDBY AUXILIARY TRANSFORMER UNIT 1 (2) TRAIN A(B)

OPERATIONS.

NOTE: THIS STEP PERFORMS THE 1 HOUR ACTIONS FOR LCO 38. 1 FOR OFF-SITE SOURCES AND THE SAT.

OATC A16. Verify DRPI ENERGIZED.

21

Appendix D Required Operator Actions Form ES-D-2 Op-Test No: 201 2-301 Scenario No: 4 Event Nofl: 5 Event

Description:

RAT (1 NXRA) supply breaker to 1 AAO2 will trip open due to a fault on the bus. DG 1A will start, but will not re-energize 1AAO2 due to a Bus Fault. This will require the crew to complete the actions of AOP 1 8031 C Loss of Class 1 E Electrical Systems Corrective actions nclude reducing AFW flow, shift electrical loads to Train B 1 E bus 1 BAO3, as well as implement tech specs for loss of AC power.

Time Position Applicants Action or Behavior uo *A17 Check DC bus loads:

a. Verify 125V DC battery loads LESS THAN THE FOLLOWING LIMITS:

. AD1 B 300 AMPS expect 200 amps S BD1 B 300 AMPS expect 0 amps

. CD1B 100 AMPSexpect 80 amps

. DD1 B 80 AMPS expect 0 amps

b. Monitor all 1 E battery bus voltages REMAIN GREATER THAN 105V DC.

uo I OATC A18. Check Reactor Makeup System:

a. Unaffected boric acid transfer pump RUNNING OR SELECTED TO AUTO.

RNO

a. Manually start unaffected boric acid transfer pump as necessary.

-OR-Place unaffected pump handswitch in AUTO Places 1HS-277A in AUTO.

22

Appendix D Required Operator Actions Form ES-D2 Op-Test No: 201 2-301 Scenario No.: 4 Event No: 5 Event

Description:

RAT (1 NXRA) supply breaker to 1 AAO2 will trip open due to a fault on the bus. DG 1A will start, but will not re-energize 1AAO2 due to a Bus Fault. This will require the crew to complete the actions of AOP 1 8031 -C, Loss of Class 1 E Electrical Systems. Corrective actions include reducing AFW flow, shift electrical loads to Train B I E bus 1 BAO3, as well as implement tech specs for loss of AC power.

Time Position Applicants Action or Behavior A18 cont.

uo b. Unaffected reactor makeup water pump RUNNING Q SELECTED TO AUTO.

RNO

b. Perform the following:

. Manually start unaffected reactor make-up water pump, as necessary.

-OR-

. Place unaffected pump handswitch in AUTO.

Places 1HS-7763 in AUTO.

UO *A1 9. Verify battery charger in service for non-i E batteries:

. ND1 (OOS)

. ND2

. ND3A (QOS)

. ND3B NOTE: WILL DIRECT CONTROL BUILDING OPERATOR TO PLACE BATTERY CHARGERS IN SERVICE FOR 1ND1 AND 1ND3A USING 13406-1, 125V DC NON 1E ELECTRICAL DISTRIBUTION SYSTEM USING SECTION 4.1.3 23

Appendix 0 Required Operator Actions Form ES-D-2 Op-Test No: Q124O1 Scenario No.: 4 Event No.: 5 Event

Description:

RAT (1 NXRA) supply breaker to 1 AAO2 will trip open due to a fault on the bus. DG 1A will start, but will not re-energize 1AAO2 due to a Bus Fault. This will require the crew to complete the actions of AOP 1 8031 -C, Loss of Class 1 E Electrical Systems. Corrective actions include reducing AFW flow, shift electrical loads to Train B 1 E bus 1 BAO3, as well as implement tech specs for loss of AC power.

Time Position Applicants Action or Behavior uc A20. Transfer any de-energized NYS, NYRS, and NYR busses to alternate sources by initiating 1 3432, 1 20V AC NON 1 E INSTRUMENT DISTRIBUT1ON SYSTEM.

NOTE: 1NYRS AND 1NYR WILL NEED TO BE TRANSFERRED TO ALTERNATE POWER SOURCES.

uO A21 . Check Control Room Emergency Lighting:

a. Check bus loss of power expected duration GREATER THAN 90 MINUTES (YES).
b. Transfer emergency lighting to the unaffected unit by placing MAIN CONTOL ROOM LIGHTING LOSP TRANSFER SWITCH on AFFECTED unit to the LOSP position:

NOTE: STEP A21.b is PERFORMED LOCALLY.

24

ppendix D Required OperatorActions Form ES-D-2 Op-Test No.: 7012301 Scenario No: 4 Event No: 5 Event

Description:

RAT (1NXRA) supply breaker to 1AAO2 will trip open due to a fault on the bus. DG 1A will start, but will not re-energize 1AAO2 due to a Bus Fault. This will require the crew to complete the actions of AOP 1 8031 -C, Loss of Class 1 E Electrical Systems. Corrective actions include reducing AFW flow, shift electrical loads to Train B 1 E bus 1 BAO3, as well as implement tech specs for loss of AC power.

Time Position Applicants Action or Behavior ss A22. Initiate applicable Technical Specification requirements listed in ATTACHMENT A.

NOTE: THE FOLLOWING TS APPLYFROMATTACHMENTA (page 14 & 15).

EXAMINER MA V PROCEED TO NEXT EVENT DUE TO TIME 55 REQUIREMENTS FOR IDENTIFYING ALL REQUIRED TECHNICAL SPECIFICA TIONS FOR THIS FAILURE AND HA VE EXAMINEE IDENTIFY TS LATER.

LCO 3.7.5 CONDITION C AFW CONDITION REQUIRED ACTION COMPLETION TIME C. Two AFW trains C.1 Be in MODE 3 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> sS inoperable AND C.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> LCO 3.8.1 CONDITIONS A, B, and E AC Sources CONDITION REQUIRED ACTION COMPLETION TIME A. One required A.1 Perform SR 3.8.1 .1 for required 1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> offsite circuit OPERABLE offsite circuit, inoperable AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> AND thereafter A.2 Declare required feature(s) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from with no offsite power available discovery of no offsite inoperable when its redundant power to one train required feature(s) is inoperable. concurrent with inoperability of redundant required AND feature(s)

A.3 Restore required offsite circuit to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OPERABLE status.

AND 14 days from discovery of failure to meet LCO 25

Appendix 0 Required Operator Actions Form ES-D-2 Op-Test No: 2012-301 Scenario NoW: 4 Event No: 5 Event

Description:

RAT (1 NXRA) supply breaker to 1 AAO2 will trip open due to a fault on the bus. DG 1A will start, but will not re-energize 1AAO2 due to a Bus Fault. This will require the crew to complete the actions of AOP I 8031 -C, Loss of Class 1 E Electrical Systems. Corrective actions include reducing AFW flow, shift electrical loads to Train B 1 E bus 1 BAO3, as well as implement tech specs for loss of AC power.

Time Position Applicants Action or Behavior CONDITION REQUIRED ACTION COMPLETION TIME B. One DG 6.1 Perform SR 38.1 .1 for the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable required offsite circuit(s).

AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> AiQ Thereafter B.2 Verify SAT available. hour AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter AND B.3 Declare required feature(s) 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from supported by the inoperable DG discovery of inoperable when its required Condition B redundant feature(s) is inoperable. concurrent with inoperability of redundant required

!&iQ feature(s)

B4.1 Determine OPERABLE DG 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is not inoperable due to common cause failure.

OR B4.2 Perform SR 38.1 .2 for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OPERABLE DG.

AND NOTE Required Action B5.1 is only applicable if the combined reliability of the enhanced black-start combustion turbine generators (CTG) and the black-start diesel generator is E 95%. Otherwise, Required Action B.5.2 applies.

B5.1 Verify an enhanced blackstart 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> CTG is functional by verifying the CTG and the black-start diesel QE generator starts and achieves steady state voltage and Within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> frequency. prior to entry into Condition B 26

Appendix D Required Operator Actions Form ESD-2 Op-Test No: 201 2-301 Scenario No.: 4 Event No: 5 Event

Description:

RAT (1 NXRA) supply breaker to 1 AAO2 will trip open due to a fault on the bus. DG 1A will start, but will not re-energize 1AAO2 due to a Bus Fault. This will require the crew to complete the actions of AOP 1 8031 -C, Loss of Class 1 E Electrical Systems. Corrective actions include reducing AFW flow, shift electrical loads to Train B 1 E bus 1 BAO3, as well as implement tech specs for loss of AC power.

Time Position Applicants Action or Behavior CONDITION REQUIRED ACTION COMPLETION TIME B. OneDG inoperable (continuation> B.5.2 Start and run at least one 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> CTG while in Condition B.

OR Prior to entry into Condition B for preplanned maintenance AND B.6 Restore DG to OPERABLE 14 days from status. discovery of failure to meet LCO E. One required NOTE offsite circuit Enter applicable Conditions and inoperable Required Actions of LCO 389, Distribution Systems Operating, when Condition E is entered with no AC power source to one or more trains.

One DG inoperable E.1 Restore required offsite circuitto 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OPERABLE status.

OR E.2 Restore DG to OPERABLE status, 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> ss LCO 3.8.9 CONDITiONS A Distribution Systems CONDITION REQUIRED ACTION COMPLETION TIME A. One or more A.1 Restore AC electrical power 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> AC electrical distribution subsystems to power OPERABLE status.

distribution subsystems 1 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> from inoperable discovery of failure to meet LCO NOTE: NO LOSS OF SAFETY FUNCTION (LOSF) EXISTS.

27

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2012-301 Scenario No.: 4 Event No. : 5 Event

Description:

RAT (1NXRA) supply breaker to 1AAO2 will trip open due to afault on the bus. DG 1A will start, but will not re-energize 1AAO2 due to a Bus Fault. This will require the crew to complete the actions of AOP 1 8031 -C, Loss of Class 1 E Electrical Systems. Corrective actions include reducing AFW flow, shift electrical loads to Train B 1 E bus 1 BAO3, as well as implement tech specs for loss of AC power.

Time Position Applicants Action or Behavior A23. Check the fault condition cleared.

RNO A23. Return to Step Al.

END OF EVENT 5, proceed to MAIN EVENTS 6, 7, & 8 NOTE TO SIMBOOTH OPERATOR:

It is VERY IMPORTANT to make sure that SG levels are on the LOW side of 65% NR to ensure that the crew will go to 1 9231 -C LOHS on the Reactor trip.

28

Appendix D Required Operator Actions Form ES-D--2 Op-Test No.: 2012-301 Scenario No.: 4 Event No.: 5 Event

Description:

RAT (1 NXRA) supply breaker to 1AAO2 will trip open due to a fault on the bus. DG 1A will start, but will not re-energize 1AAO2 due to a Bus Fault. This will require the crew to complete the actions of AOP 1 8031 -C, Loss of Class 1 E Electrical Systems. Corrective actions include reducing AFW flow, shift electrical loads to Train B 1 E bus 1 BAO3, as well as implement tech specs for loss of AC power.

ATTACHMENT A Potential Applicable LCOs & TRs Requiring Short Term Response LCOITR Mode Limiting Condition Required Actions 3.1 J 1 -2 Lost Rod Pos md Immediately enter TS 3.0.3 3.4.1 5 1 -4 All RCS leak detection instrumentation Immediately enter TS 3.0.3 mop 3.7.10 All Both CREFS trains in one unit mop Immediately place other unittrains in 3.7.1 1 emergency mode 3.7.12 3.4.6 4 Required RCS loops and/or RHR trains Immediately restore reqd loops/trains to 3.4.7 5 service 3.4.8 5 3.5.3 4 Required ECCS train mop Immediately initiate restoration 3.8.2 5,6 Loss of required AC Source Immediately declare required systems w/o offsite power mop or suspend fuel movement 3.8.5 5,6 Loss of required DC Sources Immediately declare affected features mop or suspend fuel movement activities 3.9.5 6 RHR train requirements are not met for Immediately stop fuel movement and dilutions 3.9.6 refueling and restore required trains and/or water level 13.9.5 All One or both FHB HVAC trains mop Immediately verify remaining train operable or suspend fuel movement activities 1 3.1 .8 3-5 Lost required DRPI Immediately open RTBs 13.1.9 1 3.1 .2 5,6 Required boric acid injection source Immediately suspend fuel movement and/or 13.1 .4 and/or pump mop reactivity changes 3.6.3 1 -4 Both CNMT pen iso valves are mop 1 hr: Isolate affected penetrations 3.8. 1 1-4 Loss of offsite source 1 hr: Complete 14230 Loss of DG 1 hr: Verify SA T Operable 4 hr: Determine redundant safety features operable 3.4.5 3 Required RCS loops mop with RTBs 1 hr: Restore loop or open RTBs closed 3.8.4 1-4 Loss of DC source due to other than mop 2 hrs: Restore all 4 DC sources to operable battery 29

Appendix D Required Operator Actions Form ES-D-2 Op-Test No; 2012-301 Scenario NoW: 4 Event No: 5 Event

Description:

RAT (1 NXRA) supply breaker to 1 AAO2 will trip open due to a fault on the bus. DG 1A will start, but will not re-energize 1AAO2 due to a Bus Fault. This will require the crew to complete the actions of AOP 1 8031 -C, Loss of Class 1 E Electrical Systems. Corrective actions include reducing AFW flow, shift electrical loads to Train B 1 E bus 1 BAO3, as well as implement tech specs for loss of AC power.

The above Technical Specifications and the following additional Specifications should be referenced for long term required actions:

3.3.2 1-2 ESFAS instrumentation FU 6d: Loss of AFWAS from trip of both MFPs 3.3.3 1-3 PAMS instrumentation FU 19: Loss of CNMT H2 monitor heat tracing.

(Note cross train relationship; Train A heat tracing fed from Train B power.

Train B heat tracing fed from Train A power.

3.3,4 1-3 Remote shutdown system 3.4.9 1-3 Pressurizer 2 heater groups each with 1 50 kw capacity and capable of being powered from emergency source 3.4.16 All RCS activity Chemistry notified if power changed more than 15% in one hour (SR 3.4.16.2) 3.5.2 1-3 ECCS 3.6.6 1-4 CNMT spray and CNMT clrs 3.7.4 1-3 SGARVs Also affects 3.3.4 3.7.5 1-3 AFW pumps & disch vlvs 2 or more trains may be mop 3.7.7 1-4 CCW system 3.7.8 1-4 NSCW system 3.7.9 1-4 Ultimate heat sink 3.7.13 1-4 Piping pen units 3.7.14 1-4 ESF chillers 3.8.9 1-4 Distribution Systems OPERATING

- Condition A 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 13.1.3 1-4 Boration flow paths 13.1.5 1-4 Charging pumps operating 13.7.4 All Thermal barriers 3.4.12 4-6 COPS QDCM All RE-12444, RE-12442, RE-2565, RE-2562 are affected by loss of heat tracing for sample lines.

30

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 4 Event No. : 6, 7, and 8 Event

Description:

LOSP to 1 BAO3 will occur with a failure of DG1 B to auto startS MFPT A shaft will shear leading to a reactor trip and complications. The UO will manually start DG1 B per lOAs of 1 9000-C. CCP B will trip on load sequence and TDAFW pump will trip on over speed when UO attempts to raise speed. MDAFW pump B will have a coupling failure.

Time Position Applicants Action or Behavior CREW Diagnoses Loss of 1 E 41 60V Emergency Bus 1 BAO3 with failure of DG1 B to automatically start.

ss Enters 1 8031 -C Loss of Class 1 E Electrical Systems Uo 1 Check power to 1 E 4160V Emergency busses AT LEAST ONE ENERGIZED. (NO)

RNO 55 1 . Perform one of the following as applicable.

IF in Modes 1 2, or 3, trip the reactor and Go to 1 9000-C, E-0 REACTOR TRIP OR SAFETY INJECTION.

Note to examiner: It is possible the 55 may order a direct entry into E-0 since loss of both 1 E 41 60V busses is a symptom I entry condition for 1 9000-C, E-0 Reactor Trip or Safety Injection.

NOTE to Simbooth: It is IMPERATIVE to put in the MFPT Shaft Shear as soon as the board operators are distracted by the electrical malfunction to ensure 1 9231 -C is entered to follow the scenario script.

31

Appendix_D RequiredOperator Actions Form ESD-2 Op-Test No. : 201 2-301 Scenario No. : 4 Event No. : 6, 7, and 8 Event

Description:

LOSP to 1 8A03 will occur with a failure of DG1 B to auto start.

MFPT A shaft will shear leading to a reactor trip and complications. The UO will manually start DG1 B per lOAs of 1 9000-C. CCP B will trip on load sequence and TDAFW pump will trip on over speed when UO attempts to raise speed. MDAFW pump B will have a coupling failure.

Time Position Applicants Action or Behavior CREW Diagnoses that feed water flow has been lost and trips reactor.

Symptoms I alarms:

. ALB13-AO1 STM GEN 1 FLOW MISMATCH

. ALB13-BO1 STM GEN 2 FLOW MISMATCH

. ALB13-CO1 STM GEN 3 FLOW MISMATCH

. ALB13-DO1 STM GEN 4 FLOW MISMATCH Indications:

. All 4 steam generators feed flow at 0 and less than steam flow.

. All 4 steam generators narrow range levels lowering rapidly.

55 Enters 18016-C CONDENSATE AND FEEDWATER MALFUNCTION section A LOSS OF MAIN FEED PUMP.

CREW IMMEDIATE OPERATOR ACTIONS:

OATC Al . Check reactor power - LESS THAN OR EQUAL TO 70%.

(YES) 32

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 4 Event No. : 6, 7, and 8 Event

Description:

LOSP to 1 BAO3 will occur with a failure of DG1 B to auto start.

MFPT A shaft will shear leading to a reactor trip and complications. The UO will manually start DG1 B per lOAs of 1 9000-C. CCP B will trip on load sequence and TDAFW pump will trip on over speed when UO attempts to raise speed. MDAFW pump B will have a coupling failure.

[ Time Position

[ Applicants Action or Behavior uc A2. Check at least one MFP - RUNNING AND PROVIDING FLOW.

(NO)

RNO A2. Perform the following:

a. Trip the reactor.
b. Go to 19000-C, E-0 REACTOR TRIP OR SAFETY INJECTION.

Note to examiner: The crew may realize there is no feed flow and manually trip the reactor without entering 1 801 6-C.

CREW Performs Immediate Operator Actions per 1 9000-C, E-0 Reactor Trip or Safety Injection.

55 Makes a page announcement of Reactor Trip.

OATC 1 . Check Reactor Trip: (YES)

. Rod Bottom Lights LIT

. Reactor Trip and Bypass Breakers OPEN

. Neutron Flux LOWERING uO 2. Check Turbine Trip: (YES)

. All Turbine Stop Valves CLOSED 33

Appendix D_____ Required Operator Actions Form ES-D-2 Op-Test No. : 2012-301 Scenario No. : 4 Event No. : 6, 7, and 8 Event

Description:

LOSP to 1 BAO3 will occur with a failure of DG1 B to auto start.

MFPT A shaft will shear leading to a reactor trip and complications. The UO will manually start DG1 B per IOAs of 1 9000-C. CCP B will trip on load sequence and TDAFW pump will trip on over speed when UO attempts to raise speed. MDAFW pump B will have a coupling failure.

Time Position Applicants Action or Behavior uo 3. Check Power to AC Emergency Buses.

a. AC Emergency Busses AT LEAST ONE ENERGIZED (NO)

. 4l6OAClEBusses RNO uO a. IF conditions permit, CrItical THEN manually start a DG from the Control Room and check that the output breaker closes and energizes a bus.

Note to examiner: The UO should manually start DG1B.

IF DG will not start or starts but the output breaker fails to close and energize the bus, THEN Go to 1 91 00-C, ECA-0.0 LOSS OF ALL AC POWER.

b. AC Emergency Busses ALL ENERGIZED (NO)

. 41 60V AC 1 E Busses

. 480V AC 1 E Busses RNO

b. Try to restore power to de-energized AC Emergency Bus while continuing with Step 4.

34

Appendix D Required Operator Actions Form ES-D2 Op-Test No. : 201 2-301 Scenario No. : 4 Event No. : 6, 7, and 8 Event

Description:

LOSP to 1 BAO3 will occur with a failure of DG1 B to auto start.

MFPT A shaft will shear leading to a reactor trip and complications. The UO will manually start DG1 B per lOAs of 1 9000-C. CCP B will trip on load sequence and TDAFW pump will trip on over speed when UO attempts to raise speed. MDAFW pump B will have a coupling failure.

Time j Position Applicants Action or Behavior QATC 4 Check if SI is actuated. (NO)

. Any SI annunciators LIT (NO)

. SI ACTUATED BPLP window LIT (NO)

RNO

4. Check if SI is required. (NO)

IF one or more of the following conditions has occurred.

. PRZR pressure less than or equal to 1 870 psig. (NO)

. Steam line pressure less than or equal to 585 psig. (NO)

. Containment pressure greater than or equal to 3.8 psig. (NO)

. Automatic alignment of ECCS equipment to injection phase.

(NO)

THEN actuate SI and go to Step 6. (Not required)

UO 5. Perform the following to limit RCS cooldown:

a. Check NP level in at least one SG greater than 1 0%. (NO)

RNO

a. Maintain AFW flow greater than 570 gpm and go to 1 9001 -C, ES-O.1 REACTOR TRIP RESPONSE.

Note to examiner: If the UO attempts to raise TDAFW flow, the TDAFW pump will trip on overspeed at this time. MDAFW pump B coupling is failed and the pump is delivering no flow.

35

Appendix D Required OperatorActions Form ESD-2 Op-Test No. : 201 2-301 Scenario No. : 4 Event No, : 6, 7, and 8 Event

Description:

LOSP to 1 BAO3 will occur with a failure of DG1 B to auto start.

MFPT A shaft will shear leading to a reactor trip and complications. The UO will manually start DG1 B per lOAs of 1 9000-C. CCP B will trip on load sequence and TDAFW pump will trip on over speed when UO attempts to raise speed. MDAFW pump B will have a coupling failure.

Time Position Applicants Action or Behavior ss Transitions to 19001-C, ES-O.1 REACTOR TRIP RESPONSE.

OATC 1 . Initiates the following uO

. Continuous Actions and Foldout Page.

. Critical Safety Function Status Trees per 1 9200-C, F-C CRITICAL SAFETY FUNCTION STATUS TREE.

Note to examiner: Once it has been determined there is a valid RED PATH on HEAT SINK, the SS will transition to 1 9231 -C, FR-H.1 RESPONSE TO LOSS OF SECONDARY HEAT SINK.

OATC 2. IF SI actuation occurs during the procedure, THEN go to 19000-C, E-0 REACTOR TRIP OR SAFETY INJECTION.

OATC 3. Limit RCS cooldown.

a. VerifyAFWflowtoSGs.

RNO

a. Continue attempts to establish AFW flow.

Go to Step 3.e.

e. Verify SG Blowdown Isolation Valves CLOSED WITH HANDSWITCHES IN CLOSE.

36

AppenchxD Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 4 Event No. : 6, 7, and 8 Event

Description:

LOSP to 1 BAO3 will occur with a failure of DG1 B to auto start.

MFPT A shaft will shear leading to a reactor trip and complications. The UO will manually start DG1 B per lOAs of 1 9000-C. CCP B will trip on load sequence and TDAFW pump will trip on over speed when UO attempts to raise speed. MDAFW pump B will have a coupling failure.

Time Position Applicants Action or Behavior OATC 4. Check RCS temperature stable at or trending to 557°F. (YES)

With RCP(s) running - RCS AVERAGE TEMPERATURE

-OR-Without RCP(s) running RCS WR COLD LEG TEMPERATURES.

5, Check FW status:

OATC a. Average RCS temperature LESS THAN 564°F. (YES)

UO b. Verify FW isolation valves closed. (YES)

. MEl Vs

. BEIVs

. MERVs

. BERVs 37

Appendix D Required_Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 4 Event No. : 6, 7, and 8 Event

Description:

LOSP to 1 BAO3 will occur with a failure of DG1 B to auto start, MFPT A shaft will shear leading to a reactor trip and complications. The UO will manually start DG1 B per lOAs of 1 9000-C. CCP B will trip on load sequence and TDAFW pump will trip on over speed when UO attempts to raise speed. MDAFW pump B will have a coupling failure Time Position Applicants Action or Behavior uc 6. Check total feed flow capability to SGs GREATER THAN 570 GPM AVAILABLE. (NO)

RNO

6. Establish feed flow to the SGs from the following:

AFW System

-OR-Main Feedwater:

a. IF required, start a MFP by performing the following:

1 ) Check Condenser vacuum established.

2) Lower GE pot setting to zero.
3) Reset MFP.
4) Open MFP discharge valve.
5) Slowly raise MFP speed using GE pot as necessary.
b. Verify MFRVs and BFRVs controllers at 0% demand.
c. Reset FW isolation
d. Open BFIV(s) as necessary.
e. Open BFRV(s) as necessary.

38

Appendix D Required Operator Actions Form ES-D-2 Op-Test No: 20124Q1 Scenario NoW: 4 Event No. : 6, 7, and 8 Event DescrIption: LOSP to 1 BAO3 will occur with a failure of DG1 B to auto start.

MFPT A shaft will shear leading to a reactor trip and complications. The UO will manually start DG1 B per lOAs of 1 9000-C. CCP B will trip on load sequence and TDAFW pump will trip on over speed when UO attempts to raise speed. MDAFW pump B will have a coupling failure Time Position Applicants Action or Behavior NOTE to examiner: It is expected the crew will transition to 19231-C, FR-Hi Response to Loss of Secondary Heat Sink about this time if they have not already transitioned.

55 Transitions to 19231-C, FR-Hi, RESPONSE TO LOSS OF SECONDARY HEAT SINK.

CAUTION: Feed flow should NOT be re-established to any faulted SG if a non-faulted SG is available.

uO 1 . Check total feed flow capability to SG(s):

. Greater than 570 gpm available. (NO)

-AND-

. Less than 570 gpm due to Operator action. (NO)

RNO

1. GotoStep3.

39

Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-3O1 Scenario No. : 4 Event No : 6, 7, and 8 Event

Description:

LOSP to 1 BAO3 will occur with a failure of DG1 B to auto start.

MFPT A shaft will shear leading to a reactor trip and complications. The UO will manually start DG1 B per lOAs of 1 9000-C. CCP B will trip on load sequence and TDAFW pump will trip on over speed when UO attempts to raise speed. MDAFW pump B wall have a coupling failure Time Position Applicants Action or Behavior

]

3, Initiate the following:

OATC

  • Continuous Actions Page For Prior to Establishing Bleed and uc Feed.

ss

  • NMP-EP-1 10, EMERGENCY CLASSIFICATION DETERMINATION AND INITIAL ACTION.

OATC 4. Check if secondary heat sink is required:

a. RCS pressure GREATER THAN ANY NON-FAULTED SG PRESSURE. (YES)
b. RCS WR temperature GREATER THAN 350°F. (YES)

OATC 5. Check CCP status - AT LEAST ONE AVAILABLE. (NO)

RNO

5. Stop all RCPs.

Go to Step 35.

Note to examiner: CCP A is de-energized due to loss of 1 AAO2 and CCP B tripped on LOSP load sequence after reactor trip.

OATC 35. Verify SI actuated.

40

Appendix D Required Operator Actions Form ES-D-2 Op-Test No : 201 2-301 Scenario No. : 4 Event No. : 6, 7, and 8 Event

Description:

LOSP to 1 BAO3 will occur with a failure of DGI B to auto start.

MFPT A shaft will shear leading to a reactor trip and complications. The UO will manually start DG1 B per lOAs of 1 9OOO-C CCP B will trip on load sequence and TDAFW pump will trip on over speed when UO attempts to raise speedS MDAFW pump B wall have a coupling failure Time Position Applicants Action or Behavior OATC 36 Verify RCS feed path:

a. Verify ECCS Pump status:

CCPs - AT LEAST ONE RUNNING. (NO)

-OR-Critical SI Pumps - AT LEAST ONE RUNNING. (NO)

Note to examiner: The OATC will need to start SI Pump B to satisfy the critical task.

b. Verify ECCS valve alignment PROPER LINEUP INDICATED ON MLBs. (Train B only)

CAUTION: During bleed and feed operation the PRT may rupture.

41

Appendix D Required Operator Actions Form ES-D-2 Op-Test No: 2012-301 Scenario No: 4 Event No. : 6, 7, and 8 Event

Description:

LOSP to 1 BAO3 will occur with a failure of DG1 B to auto start MFPT A shaft will shear leading to a reactor trip and complications. The UO will manually start DG1 B per lOAs of 1 9000-C. CCP B will trip on load sequence and TDAFW pump will trip on over speed when UO attempts to raise speed MDAFW pump B will have a coupling failure Time Position Applicants Action or Behavior OATC 37. Establish RCS bleed path:

a. Place all PRZR Heaters in OFF/PTL.
b. Check power to PRZR PORV Block Valves AVAILABLE.

(NO)

RNO Critical b. Restore power to block valves.

Note to examiner: Block valve 1 HV-8000A has no power and is de energized in the open position, and Block valve 1 HV-8000B was closed and de-energized per Tech Spec action. The crew should dispatch someone to energize the 1 HV-8000B Block valve.

Critical C, Arm COPS and check PRZR PORV Block Valves BOTH OPEN.

RNO

d. Open both PRZR PORV Block Valves.

Note to examiner: Once power has been restored to Block Valve 1 HV-8000B, the crew should open the block valve.

Critical e. Open both PRZR PORVs.

Note to examiner: The crew should proceed to step 38 while waiting power restoration to the Block valve 1 HV-8000B and open the Rx. Vessel Head Vent Valves, then return and open Block Valve B and both PORVs. However, the crew may not re-energize the PORV since there is not a procedure step to direct this action.

42

Appendix_D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 4 EventNo.: 6,7,and8 Event

Description:

LOSP to 1 BAO3 will occur with a failure of DG1 B to auto start.

MFPT A shaft will shear leading to a reactor trip and complications. The UO will manually start DG1 B per lOAs of 1 9000-C. CCP B will trip on load sequence and TDAFW pump will trip on over speed when UO attempts to raise speed. MDAFW pump B will have a coupling failure.

Time Position Applicants Action or Behavior OATC 38. Verify adequate RCS bleed path:

. COPSARMED

. PRZR PORV Block Valves BOTH OPEN

. PRZR PORVs BOTH OPEN RNO

38. Perform the following:
a. Open Reactor Vessel Head Vent Valves:

. HV-8095A - RX HEAD VENT TO LETDOWN ISOLATION VLV

. HV-8095B - RX HEAD VENT TO LETDOWN ISOLATION VLV

. HV-8096A - RX HEAD VENT TO LETDOWN ISOLATION VLV

. HV-8096B - RX HEAD VENT TO LETDOWN ISOLATION VLV

. HV-0442A - REACTOR HEAD VEN TO PRT

. HV-0442B - REACTOR HEAD VENT TO PRT

b. Align an available low pressure water source to at least one intact SG by initiating ATTACHMENT C.

NOTE to SIMBOOTH: Do NOT restore power to Block Valve 1 HV-8000B until Rx. Vessel Head Vent flow has been established.

Note to examiner: Once an adequate bleed path has been established by opening 1 HV-8000B and both PORVs, OR one PORV with the Rx Vessel Head Vents, the scenario may be ended.

43

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2401 Scenario No. : 4 Event No : 6, 7, and 8 Event

Description:

LOSP to 1 BAO3 wiN occur with a failure of DG1 B to auto start.

MFPT A shaft will shear leading to a reactor trip and complications. The UO will manually start DG1 B per lOAs of 1 9000-C. CCP B will trip on load sequence and TDAFW pump will trip on over speed when UO attempts to raise speed. MDAFW pump B will have a coupling failure.

Time Position Applicants Action or Behavior END OF THE SCENARIO FREEZE THE SIMULATOR WITH NRC CHIEF EXAMINER CONCURRENCE.

44

Appendix 0 Scenario Outline Form ES-D-1 Facility: VqtI Scenario Nofl: Op-Test Nofl: 201 2-3Oi Examiners: Operators:

Initial Conditions: The plant is at 69% power, BOL, steady state operations, control rods in automatic.

(Base IC # 38, snapped to IC # 1 85 for HL1 7 NRC Exam)

Eqijjpment QOS None Turnover The plant is at 69% power, MFPT B has just been returned to service, a chemistry hold is in effect. Once chemistry hold lifted, per I 2004-C, Power Operation (Mode 1), raise power to 100%.

Containment mini-purge is in service for a Containment entry on the next shift. Safety Injection Pump A is tagged out for motor repair.

Preloaded Malfunctions:

IAO9B Air Compressor # 2 auto start failures.

IAO9D Air Compressor # 4 auto start failures.

cs:trip(1 ) (new malfunction) CS pump # 1 trip testmalf(2) (new malfunction) CS pump # 2 discharge valve fails to open testmalf(3) (new malfunction) Failure of containment coolers to start in slow speed.

FW17F FWI failure to close loop # 2 MFIV manual closure allowed.

SIP A Tagged Out Overrides Note to Simbooth Operator Place Containment Mini-Purge in service.

Event Mall. Event Event No No. Type* Description Ti new C-OATC Uncontrolled outward rod motion in automatic at maximum speed, Set Rod C-SS selector switch to manual will stop rod motion.

speed to tO then enter TRUE T2 N/A R-OATC Initiates power ascent from 69% per UOP-12004-C direction.

R-SS N-UQ Raises turbine load per UOP-12004-C direction.

T3 new malf C-UO Running IA compressor # 3 trips with failure of standby air (7) C-SS compressors to automatically start.

T4 CCO3A C-UO CCW Train A pipe break with trip of all CCW pumps.

@50% C-SS TS-SS LCO 3.7.7, Condition A 1

Appendix D Scenario Outline Form ES-D-1 Event Maif Event Event No No Type* Description T5 RC1 1 D TS-SS RCS Loop # 4 flow transmitter fails down scale low.

LCO 3.3i Condition A, FU1Oa Condition N T6 ELi 3D C-UO Loss of 1 20V Vital Instrument Panel DY1 B, may be re-energized from c-ss the regulated transformer.

ALB34 D07 TS-SS LCO 387 Condition A, LCO 389 Condition B 1 DD1 14 LCO 33i Condition A, FU16c, d, e Condition S, Condition R 7 N/A N-QATC Places Excess Letdown into service.

N-SS T8 new malt C-QATC PRZR Spray Valve loop # 4 fails open, manual closure allowed.

(4)=TRUE C-SS Then 455 LCO 34.1 Condition A prcvto LO T9 MSO4B M-ALL Faulted SG # 2 IRC.

0-45%

60 sec ramp 10 Preload C-OATC CS pump B discharge valve fails to automatically open.

C-SS Either opening the CS pump B discharge valve OR starting at least Critical one train of containment coolers in low speed will satisfy this step.

11 Preload C-UO Containment coolers fail to start in slow speed.

C-SS Either opening the CS pump B discharge valve OR starting at least Critical one train of containment coolers in low speed will satisfy this step.

12 Preload C-UO Failure of Loop # 2 MFIV to automatically close on faulted SG #2.

C-SS Manual isolation of loop # 2 MFIV is allowed.

Critical (N)ormal, (R)eactivity, (l)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form ES-D1 Event 1:

Uncontrolled outward rod motion of CBD while in automatic.

Verifiable Actions:

OATC Places control rods in manual to stop uncontrolled outward rod motion of CBD and uncontrolled power increase and overpower condition and/or reactor trip.

uO Restores Tavg to program by adjusting turbine load.

Technical Srecifications:

None Event 2:

Power ascent per UOP-1 2004-C, Power Operations.

Verifiable Actions:

uO Manipulates turbine controls to raise power.

OATC Adjusts RCS boron concentration and control rods as necessary to control reactor power and to maintain AFD in limits.

Technical Specifications:

None Event 3:

Air compressor # 3 trips with standby air compressors # 2 and # 4 failing to automatically start.

Verifiable Actions:

UO Starts air compressor #4 (or # 2).

Technical Specifications:

None 3

Appendix D Scenario Outline Form ES-D-1 Event 4:

ccw Train A pipe break resulting in a trip of all Train A CCW pumps.

Verifiable Actions:

uO - Starts CCW Train B.

uO Places all Train A CCW pumps in PTL.

uO Isolates makeup to Train A CCW by placing LV-1 850 Demin Water To CCW TK to close.

Technical Specifications:

LCO 3.7:7 Component Cooling Water System, Condition A Event 5:

RCS loop flow transmitter FT-444 fails low.

Verifiable Actions:

None, this is an additional Technical Specification for the 55.

Lechnical Specifications:

LCO 33i Reactor Trip System Instrumentation, Condition A, FU1Oa, Condition N INFO LCO 33.1 Reactor Trip System Instrumentation, EU lOb 4

Appendix D Scenario Outline Form ES-D-1 Event 6:

A loss of 1 20V AC vital bus 1 DY1 B will occur.

Verifiable Actions:

OATC Manually isolates letdown stopping a letdown leak to the PRT by closing the Letdown Orifice Isolation Valves and by closing the Letdown Isolation Valves.

OATC Adjusts seal injection to 8 1 3 gpm per RCP by adjusting Seal Controller HG-i 82.

OATC Maintains charging flow approximately 1 0 gpm greater than seal injection flow by controlling FIC-0121 Charging Flow Controller.

OATC Selects an unaffected channel for PRZR Pressure Control on 1 PS-455F PRZR PRESSURE CNTL SELECT.

OATC Selects unaffected channel on ITS-412T T-AVG DEFEAT SEL.

OATC Selects unaffected channel on 1TS-41 1 F DELTA T DEFEAT SEL.

uO Places ROD STOP BYPASS switch to BYPASS PRN44 position.

OATC Adjust control rods to restore Tavg to Tref.

uO Places SGBD isolation valves in closed with the hand switches in closed.

Technical Specifications:

LCO 3.3.1 Reactor Trip System (RTS) Instrumentation Condition A, FU16c,d,e Condition S and R LCO 3.8.7 Inverters Operating Condition A LCO 3.8.9 Distribution Systems Operating Condition B 5

Appendix D Scenario Outline Form ES-D-1 Event #7 Place Excess Letdown in service to control PRZR level below PRZR high level reactor trip set point.

Verifiable Actions:

OATC Places Excess Letdown in service by performing the following:

. Sets 1 HG-i 23 to closed (0% demand).

. Opens Excess Letdown Isolation valves 1 -HV-81 53 I 1 -HV-81 54.

. Adjusts 1HC-123 to establish maximum allowable Excess Letdown flow (3O gpm).

. Adjusts 1 FIC-1 21 and 1 HG-i 82 to control charging and seal injection flows.

Technical Specifications:

None Event 8:

PRZR Spray valve loop # 4 fails open.

Verifiable Actions:

OATC Manually closes loop # 4 PRZR Spray valve to prevent a reactor trip and safety injection on PRZR low pressure. Also, prevents a DNB event.

OATC Operates PRZR heaters to raise PRZR pressure.

Technical Specifications:

LCO 34i RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits, Condition A 6

Appendix D Scenario Outline Form ES-D-1 Event # 9 1 0, 1 1 12 DBA Main Steam Line break inside Containment.

Verifiable Actions:

OATC Manually actuates reactor trip from both reactor trip switches when RTB B fails to open.

OATC Manually opens Containment Spray Discharge Valve 1 HV-9001 B.

uO Manually closes MFIV for loop #2.

uO Manually starts all Containment Coolers in slow speed.

uO Manually isolates faulted SG # 2 by verifying the following valves closed:

. Main Steam line Isolation and Bypass valves

. Loop # 2 MFIV (HV-5228)

. Loop # 2 BFIV (HV15197)

. HV-5132 SG # 2 from MDAFW PMP-B

. HV-5125 SG # 2 from TDAFW

. HV-3009 (SG 2) LP-2 MS SPLY TO AUX FW TD PM P-i

. SG ARV PV-30i0(SG 2)

  • SG Sample Valves The scenario may be stopped after transition to 19010-C or 19011-C with chief examiner approvaL 7

Appendix D Scenario Outline Form ES-D-1 CRITICAL TASKS:

1 ) Start at least 4 Containment Coolers in slow speed to cooldown and depressurize Containment to prevent challenge to the Containment barrier which could result in an uncontrolled release to the environment by completion of Operator Initial Actions of 1 9OOO-C OR Opens Containment Spray Train B discharge isolation HV-9001 B to cooldown and depressurize Containment to prevent challenge to the Containment barrier which could result in an uncontrolled release to the environment per Foldout Page of 1 9000-C or step 8 of OATC Operator Initial Actions (if CNMT is > 21 5 psig).

2) Failure of Loop # 2 MFIV (HS-5228) to automatically close, manual closure required by the UO no later than step 4 of UO Initial Operator Actions. Closure of the valve will limit feed flow to the faulted SG This will limit the Containment pressure rise and challenge to the Containment barrier which could result in an uncontrolled release to the environment.
3) Isolates SG # 2 to limit RCS cool down and potential RCS Integrity (PTC) conditionS This will also limit the Containment pressure rise and challenge to the Containment barrier which could result in an uncontrolled release to the environment. These actions will be done no later than the 19020-C procedure step which calls for the action.
  • HV-301 9 (SG 2) LP-2 MS SPLY TO AUX FW TD PMP-1 -

8

,II NUCLEAR SAFETY FOCUS L

TARGETZERO Protected Train: EOOS: Green Alpha LI Yellow j Orange LI Bravo DRed Plant 69 % power BOL.

Conditions:

Major Activities: A Chemistry hold is in effect preventing power ascent. Once the Chemistry hold has been lifted, initiate power ascent UOP 1 2004-C section 4. 1 for Power Ascent at a rate not to exceed 8%

per hour. Step 4.1 .46 has been performed. Step 4.1 .47 is the next procedure plateau. Control rods are in automatic per Operations Management direction for transient response until the power ascent is initiated.

Active LCOs: 0 LCO 3.5.2 Condition A is in effect due to SIP A tagged out.

005/ Degraded 1 None CR Instruments:

Narrative LI Containment mini-purge is in service for a planned Status: Containment Entry on next shift.

LI SIP A is tagged out for motor repair, expected return to service time is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> left on a shutdown LCO of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

LI MFPT B has just been placed in service after a shaft replacement.

E: The remnants of Hurricane Maya are passing through, severe weather and thunderstorms will be in the area for the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. The Severe Weather Checklist is in effect.

0 Power Range high level trip bistables are set at 90%.

E Chemistry hold in effect, lift of Chemistry hold is imminent.

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 2012-301 Scenario No. : 5 C EventNo 1 Event

Description:

Uncontrolled Outward Rod Motion. Control rods will begin stepping out at 72 steps per minute and the OATC will take his IOA actions of 1 8003-C Rod Control Malfunction and place rods in Manual which will stop the outward rod motion.

Time Position Applicants Action or Behavior OATC Diagnoses the Uncontrolled Outward Rod Motion.

Symptoms I alarms:

. No annunciators are associated with this event.

Indications:

. Rod motion with invalid demand from the Automatic Rod Control System.

. Outward rod motion in automatic. (auto outward motion is defeated at Plant Vogtle although internal failures could cause this to happen>.

AOP-1 8003-C, Rod Control System Malfunction OATC IMMEDIATE OPERATOR ACTIONS Bi Stop uncontrolled Rod motion by performing the following:

a. Place ROD BANK SELECTOR SWITCH in MAN position.
b. Place the Rod Motion Switch in hold.
82. Check Rod motion STOPPED.

Note to examiner: Rod motion will stop when placed in manual.

1

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No, : 5 Event No. : 1 Event

Description:

Uncontrolled Outward Rod Motion. Control rods will begin stepping out at 72 steps per minute and the OATC will take his IOA actions of 1 8003-C Rod Control Malfunction and place rods in Manual which will stop the outward rod motion.

Time Position

[ Applicants Action or Behavior OATC B3. Check the following alarms EXTINGUISHED: (YES)

. ALB1O-C4 ROD BANK LO LIMIT

. ALB1O-D4 ROD BANK LO-LO LIMIT UO B4. Restore Tavg to program by adjusting turbine load.

Note to Simbooth: It may be necessary to call the SS at this time to lift the Chemistry hold so the crew will adjust Turbine load. Check with the NRC Chief via headsets at this time.

OATC B5. Maintain power distribution when greater than or equal to 50%

power.

a. AFD - WITHIN THE LIMITS OF PTDB TAB 6.0. (YES)
b. QPTR - LESS THAN OR EQUAL TO 1 .02. (YES) 55 B6. Initiate repairs of Rod Control System.

55 B7. Return to procedure and step in effect.

END OF EVENT 1 , proceed to EVENT 2.

2

Appendix D ReQuired Operator Actions Form ES-D-2 Op-Test NoW: 201 2-301 Scenario No.: 5 Event No.: 2 Event

Description:

Reactor Power Ascension from 69% RTP to 1 00% RTP.

Time Position Applicants Action or Behavior Simbooth CUE: Operations Manager directs OK to raise power with rods problem and the Chemistry hold has been lifted.

QATC Uses 1 3009-1 CVCS Reactor Makeup Control System Section 4.7 Frequent Dilutions While Controlling Reactor Power, as necessary to maintain Tavg matched with Tref during power ascension.

UC Increases turbine load in increments of 1 5 Mwe to 30 Mwe using load increase pushbutton at direction of OATC. Monitors Generator Output 1 3009-1 Section 47:

NOTES

. This section can be used during power changes when necessary to frequently dilute the RCS for temperature control. The use of this section shall be authorized by the 55.

. Frequent dilutions can raise VCT level to the point where VCT pressure reaches 40 psig. 1 -LIC-Ol 85 may be adjusted to allow divert to the RHT at a lower level to limit VCT pressure increase.

47 FREQUENT DILUTIONS WHILE CONTROLLING REACTOR POWER OATC 471 Determine the amount of Reactor Makeup Water necessary to accomplish the power change or accommodate the expected impact of Xenon. (Uses Reactivity Briefing Sheet to Determine # gallons -

Dilution)

Gals H20 OATC 4.72 Verify the Reactor Makeup System is aligned for automatic operation.

OATC 4.T3 Start one Reactor Makeup Water Pump:

RX MU WTR PMP-1 1-HS-7762 RX MU WTR PMP-2 1 -HS-7763 3

Appendix D Required Operator Actions Form ES-D-2 Op-Test No: Qj-3O1. Scenario No: 5 Event NoV: 2 Event

Description:

Reactor Power Ascension from 69% RTP to 1 00% RTP.

Time Position Applicants Action or Behavior QATC 4.7.4 Place VCT MAKEUP CONTROL 1-HS-40001B in STOP.

OATC 4:7.5 As directed by the 55, place VCT MAKEUP MODE SELECT 1-HS-40001A in either the ALT DH. or DIL position.

OATC 476 As directed by the 55, lower pot setting on 1 -LIC-Ol 85, to limit VCT pressure increase.

Initial Pot Setting: New Pot Setting:

OATC 4:7.7 Set TOTAL MAKEUP Integrator 1 -FQI-O1 1 1 for the desired amount of Reactor M/U Water.

Gals H20 OATC NOTE If VCT MAKEUP MODE SELECT 1-HS-40001A was placed in the DIL position in Step 4J5, Step 478 may be marked N/A.

478 If required, close 1 -FV-O1 1 OB as necessary to raise or maintain RCS hydrogen concentration. (N/A) 55 / OATC 4.7.9 At 55 direction, dilution flow may be adjusted to desired flow using 1-FIC-Olli (record in AUTO LOG).

Initial Pot Setting: New Pot Setting:

NOTE: EXPECTED NOT TO CHANGE DESIRED FLOW:

OATC 4J10 Place VCT MAKEUP CONTROL 1-HS-40001B in START and verify flow is indicated on 1 -FI-Ol 1 OB.

4

Appendix D Required Operator Actions Form ES-D-2 OpTest No.: 201 2-301 Scenario No.: 5 Event No.: 2 Event

Description:

Reactor Power Ascension from 69% RTP to 1 00% RTP.

Time Position Applicants Action or Behavior OATC 47.1 1 WHEN TOTAL MAKEUP Integrator 1-FQI-O1 1 1 reaches its setpoint, verify dilution stops and the following valves close:

. 1-FV-O1 1 1A RX MU WTR TO BA BLENDER

. 1-FV-O111B BLENDER OUTLETTO VCT

. 1-FV-O11OB BLENDER OUTLETTO CHARGING PUMPS SUCT OATC 4.7.12 Operate the Pressurizer Back-up Heaters as necessary to equalize Cb between the RCS and the Pressurizer.

OATC 4.7.1 3 Monitor RCS temperature, Control Bank position, or power levels as applicable.

CAUTION If frequent dilutions are to be continued past the end of the shift, step 4.7.14 should be marked N/A and this section completed to include realignment to the normal configuration. The new on coming shift can then initiate the section from the beginning to continue frequent dilution.

OATC 4.7.14 Repeat Steps 4.7.10 through 4.7.13 as necessaryto continue power ramp and/or compensate for Xenon.

NOTE: OATC WILL LEA YE CYCS MAKEUP SYSTEM ALIGNED PER 4. 7 FOR FREQUENT DILUTIONS WHILE CONTROLLING REACTOR POWER DURING POWER ASCENSION.

    • NOTE: EVENT 3 IS INITIATED WHILE OATC AND UO ARE PERFORMING ACTIONS IN EVENT 2 FOR POWER ASCENSION AT EXAMINERS DISCRETION.

5

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 5 Event No. : 3 Event

Description:

Air compressor # 3 trips with failure of air compressors # 2 or

  1. 4 to automatically start.

Time Position Applicants Action or Behavior uc Diagnose Air Compressor # 3 has tripped:

Symptoms I alarms:

ALB33-F03 1 25V DC SWGR 1 NB1 9 TROUBLE ALBO1-B05 SERVICE AIR CMPSR TROUBLE ALBO1-C06 SERVICE AIR HDR LO PRESS (delayed)

Indications:

. Green and amber light lit on AC # 3 hand switch.

UO Response to ALBO1 -B05 Dispatches an operator to Panel PMEC to implement the appropriate alarm response procedure per 1 721 0-1 Annunciator Response Procedures for ALB on PMEC Air Compressors Control Panel.

1 . Check QMCB indications AND start a standby Air Compressor if necessary to maintain service air header pressure above 100 psig.

UO Response to ALB32-F03 1 . Attempt to determine cause of alarm:

a. Check system indications on QEAB.
b. Check for associated alarms.

Note to examiner: It is obvious AC # 3 has tripped, the UO may dispatch an electrician or maintenance to trouble shoot the breaker.

6

Appendix D Required Operator Actions Form ES-D-2 Op-Test No : 201 2-301 Scenario No. : 5 Event No. : 3 Event

Description:

Air compressor # 3 trips with failure of air compressors # 2 or

  1. 4 to automatically start Time Position

[ Applicants Action or Behavior Note to Simbooth Operator: Report back that window D03 is illuminated on the PMEC panel for I .2401 .C45O3 NO. 3.

COMPRESSOR LO OIL PRESS and per the ARP the compressor motor trips at 1 2 psig oil pressure and there is lots of oil on the compressor skid from an apparent oil leak.

uc A crew member will call up air pressure trend on IPC computer.

OATC Note to examiner: The standby compressors should start at 100 psig prior to receipt of the ALBO1 -C06 alarm. It is possible the crew may start a standby compressor once instrument air pressure drops under 1 00 psig and ALBO1 -C06 will never come in.

uc Response to ALBO1 -C06 AUTOMATIC ACT1ONS 1 Service Air Dryer Inlet Isolation Valve 1 -PV-9375 closes at a service air pressure of 80 psig.

2. Any standby compressor with its hand switch in AUTO-PTL position will auto start at a discharge pressure of 1 00 psig decreasing.

7

Appendix D Required Operator Actions Form ES-D-2 OpTest No. : 201 23O1 Scenario No. : 5 Event No : 3 Event

Description:

Air compressor # 3 trips with failure of air compressors # 2 or

  1. 4 to automatically start.

Time Position Applicants Action or Behavior Response to ALBO1 -C06 continued.

SUBSEQUENT OPERATOR ACTIONS 1 . Check QMCB indications AND start a standby Air Compressor if necessary to maintain service air header pressure above 100 psig.

2. Dispatch an operator to check for system leaks OR excessive air usage.
3. IF pressure continues to fall AND CANNOT be restored, refer to 18028-C, Loss of Instrument Air.
4. Refer to 1 371 0-1 Service Air System and verify Air Compressors are operating properly.
5. IF equipment failure is indicated, initiate maintenance as required.

CAUTION: Procedure 1 371 0-1 Service Air System should be referenced prior to performing the following step if service air has isolated due to low pressure.

6. WHEN service air pressure is greater than 97 psig as read on 1 -P1-i 9380 on panel PMEC, reset 1 -PSL-9375. Switch is located on instrument rack 15 (1-1624-P5-R15) on Turbine Building level 1 near Powdex vessels.

Note to examiner: ALBOI -C06 will clear when step 6 is performed.

CREW Monitors air pressure returns to normal.

END OF EVENT 3, proceed to EVENT 4.

8

&pendIx D Required Operator Actions Form ES-D-2 Op-Test No : 201 2-301 Scenario No. : 5 Event No : 4 Event

Description:

CCW Train A will experience a pipe break with an eventual loss of surge tank level causing a trip of all CCW Train A pumps. The UO will be required to place CCW Train B in service.

Time Position Applicants Action or Behavior uo Diagnose CCW Train A pipe break:

Symptoms I alarms:

ALB61 -C06 LVL A LEAK DETECTED ALBO2-C05 CCW TRAIN A SURGE TK MAKE UP LVL ALBO2-B05 CCW TRAIN A SURGE TK HI/LO LVL ALBO2AO5 CCW TRAIN A SURGE TK LO-LO LVL ALB36-AO1 4160V SWGR 1AAO2 TROUBLE Note to examiner: ALBO2-A05 and ALB36-AO1 will illuminate when the pumps trip on Lo-Lo level.

Indications:

. Surge tank level lowering on IPC computer trend (if pulled up).

. CCW pumps Train A green and amber lights on hand switches.

. 1ZLB-1 1 CCW PMP RM A AB LVL LSH-9780 (QPCP)

. ALB61-AO1 NSCW CCW ACCW TRAIN A TEMP ALARM (on pump trips) 55 Enters 18020-C, LOSS OF COMPONENT COOLING WATER.

UO 1 Check CCW pumps in the affected train TWO RUNNING. (NO)

RNO 1 . Start two CCW pumps in the affected train.

Note to examiner: The CCW pumps wont start with the current surge tank level.

9

Appendix D Required Operator Actions Form ES-D2 Op-Test Nofl: 2012-301 Scenario No : 5 Event No : 4 Event

Description:

CCW Train A will experience a pipe break with an eventual loss of surge tank level causing a trip of all CCW Train A pumps. The UO will be required to place CCW Train B in service.

Time Position

[ Applicants Action or Behavior uc 2. Check CCW train operation:

. Flow - APPROXIMATELY 9000 GPM. (NO)

. Pressure APPROXIMATELY 90 PSIG. (NO)

RNO

2. Perform the following:
a. Stop the CCW pumps in the affected train.
b. Place the UNAFFECTED train in service by initiating 1 371 5A1B, COMPONENT COOLING WATER SYSTEM.

uc Steps for 1 371 5B-1 COMPONENT COOLING WATER SYSTEM TRAIN B.

Selects section 4.1 .2 CCW Train B Startup from Standby.

uc 4.1 .2 CCW Train B Startup from Standby.

4.1 2.1 IF the System requires venting, Go To Section 4.4.3. (N/A)

NOTE: Time Delay Relay Test may be marked N/A if no task sheet for the test is in the Survey Task Sheet Binder.

4.1 .2.2 IF Time Delay Relay Test is NOT being performed, mark steps 41.2.3, 4i.25, 4.1.29, and 4.1.2.10 N/A.

Note to examiner: All steps above will be marked N/A.

10

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 5 EventNo,: 4 Event

Description:

CCW Train A will experience a pipe break with an eventual loss of surge tank level causing a trip of all CCW Train A pumps. The UO will be required to place CCW Train B in service.

Time

[ Position Applicants Action or Behavior uo NOTES:

. The two selected CCW pumps should be started together to prevent runout.

. If Time Delay Relay Test is required, Steps 4.1 .2.4 and 4.1.2.5 should be performed simultaneously.

uc 4.1 .2.4 Simultaneously start two (2) Train B CCW Pumps:

ccw Pump 2: 1-HS-1853A ccw Pump 4: 1-HS-1855A ccw Pump 6: 1-HS-1857A uc 4.1 .2.6 Check CCW Pump Discharge Header Train B 1-Pl-1 875 rises to about 90 psig.

4.1 .2.7 Check CCW Pump Discharge Header Train B 1 -Fl-i 877 rises to about 9000 gpm.

4.1 .2.8 Notify Chemistry of CCW Train B startup so chemicals may be added if needed and proper operation of radiation monitor may be verified.

Return to 1 8020-C RNO step 2c.

11

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 5 Event Now: 4 Event

Description:

CCW Train A will experience a pipe break with an eventual loss of surge tank level causing a trip of all CCW Train A pumps. The UO will be required to place CCW Train B an service Time Position Applicants Action or Behavior uc RNO

2. Perform the following:

c* IF one train of CCW can NOT be placed in normal two pump operation, THEN attempt to place one train of CCW in single pump operation by initiating 1 371 5A18, COMPONENT COOLING WATER SYSTEM.

d. GotoStep4.

uO 4, Verify NSCW supply header flow Fl-i 640B (1 641 B)

APPROXIMATLEY 17000 GPM. (YES) uO 5, Check RHR - REQUIRED FOR SHUTDOWN COOLING. (NO)

RNO 5, Goto Step 9.

UO 9. Check affected train RHR pump INJECTING IN COLD LEG INJECTION MODE. (NO)

RNO 9, Stop affected train RHR pump if running. (N/A) 12

Appendix D RequiredOperator Actions Form ES-D-2 Op-Test No 1 : 201 2-301 Scenario No. : 5 Event No : 4 Event

Description:

CCW Train A will experience a pipe break with an eventual loss of surge tank level causing a trip of all CCW Train A pumps. The UO will be required to place CCW Train B in service.

Time Position Applicants Action or Behavior uc 1 0. Check the following:

Both extinguished:

. ALBO2(03)-A05 CCW TRAIN A(B) SURGE TK LO-LO LEVEL

. ALBO2(03)-B05 CCW TRAIN A(B) SURGE TK HI/LO LEVEL

-OR-CCW TRAIN A(B) Surge Tank level - RISING.

RNO 1 O Verify DEMIN WTR TO CCW TK-1 (2) open:

UNIT 1 LV-1850 AB-203 LV-1851 AB-202

-OR-Open RX MU WTR TO CCW TK-1 (2)

UNIT 1 LV-1848 AB-203 LV-1849 AB-202 13

Appendix D Required Operator Actions Form ES-D2 Op-Test No. : 201 2-301 Scenario No. : 5 Event No, : 4 Event

Description:

CCW Train A will experience a pipe break with an eventual loss of surge tank level causing a trip of all CCW Train A pumps. The UO will be required to place CCW Train B in service.

Time Position Applicants Action or Behavior uo 11 Check affected CCW train NO ABNORMAL LEAKAGE. (NO)

RNO 11 . Isolate the leak by performing the following:

a. Stop pumps in affected train and place control switches in PULL-TO-LOCK.
b. Isolate makeup water to the affected train surge tank.

C. Close system isolation valves as necessary.

UO 1 2. Restore the affected CCW loop to service by initiating 13715A/B, COMPONENT COOLING WATER SYSTEM.

RNO Initiate applicable ACTION items for TS3.4.6 T53.4.7 TS 3.4.8 T53.5.2 TS 3.5.3 TS 3.7.7 (this one applies, details of Tech Spec on next page)

TS3.9.5 TS 3.9.6 14

Appendix D Required Operator Actions Form ES-D-2 Op-Test No : 201 2-301 Scenario No. : 5 Event No. : 4 Event

Description:

CCW Train A will experience a pipe break with an eventual loss of surge tank level causing a trip of all CCW Train A pumps. The UO will be required to place CCW Train B in service.

Time Position j Applicants Action or Behavior ss LCO 3.7.7 Two CCW trains shall be OPERABLE.

APPLICABILITY: MODES 1 2, 3, and 4 ,

ACTIONS CONDTION REQUIRED ACTION COMPLETION TIME A. One CCW train A.1 NOTE inoperable. Enter applicable Condition and Required Actions of LCO 34.6, RCS Loops MODE 4, for residual heat removal loops made inoperable by CCW.

Restore CCW train to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OPERABLE status.

uO 1 3. Verify Spent Fuel Pool Cooling aligned to in-service train. (NO)

RNO 1 3. Place the UNAFFECTED SFPC train in service by initiating 13719, SPENT FUEL POOL COOLING AND PURIFICATION SYSTEM.

a. IF neither Train of SPF Cooling can be placed in service, THEN initiate 1 8030-C, LOSS OF SPENT FUEL POOL LEVEL OR COOLING.

Note to examiner: The crew will request the ABO to place Train B SFP Cooling in service.

15

Appendix 0 Required OperatorActions Form ES-D2 Op-Test No. : 201 2-301 Scenario No. : 5 Event No. : 4 Event

Description:

CCW Train A will experience a pipe break with an eventual loss of surge tank level causing a trip of all CCW Train A pumps. The UO will be required to place CCW Train B an service Time Position Applicants Action or Behavior uo 14 Verify Fuel Handling Building normal HVAC units IN OPERATION: (YES)

. 1 541 -A7-OO1 (002)

-AND-

. 1 541 -N7-001 (002)

15. Return to procedure and step in effect.

END OF EVENT 4, proceed to EVENT 5.

16

Appendix D Required Operator Actions Form ESD-2 Op-Test No. : 201 2-301 Scenario No. : 5 Event No : 5 Event

Description:

RCS Loop # 4 flow transmitter fails down scale low. (FT-444),

this wall result in a Tech Spec call for the 55, no operator board actions Time Position Applicants Action or Behavior OATC Diagnose RCS Loop # 4 Flow FT-444 has failed low.

Symptoms I alarms:

ALBI2-DO1 PC LOOP 4 LOW FLOW ALERT Indications:

. Fl-444 RC FLOW LOOP 4 reading 0% flow.

. RCS FLOW TRIP 90% bistable (RC LP 4 LO FLOW FB444A) is illuminated.

SS Enters 1 8001 -C, Section A for FAILURE OF RCS LOOP FLOW INSTUMENTATION.

Al . Check actual RCS flow - GREATER THAN 90% IN ALL LOOPS. (YES)

OATC A2. Identify the affected flow instrument. (FT-444) 55 A3. Notify I & C to initiate repairs.

55 A4, Bypass the affected instrument channel using 1 3509-C, BYPASS TEST INSTUMENTATION (BTI) PANEL OPERATION, if desired.

Note to examiner: It is NOT expected the 55 will bypass (BTI) at this time. I & C usually requests control room to leave instrument as is for their troubleshooting.

OATC AS. Check power level - GREATER THAN P-7. (YES) 17

Appendix D Required Operator Actions Form ES-D-2 Op-Test No : 201 2-301 Scenario No. : 5 Event No : 5 Event

Description:

RCS Loop # 4 flow transmitter fails down scale low. (FT-444),

this will result in a Tech Spec call for the SS, no operator board actions.

Time Position Applicants Action or Behavior ss A6. Trip affected channel bistable and place associated MASTER TEST switch in TEST position per TABLE Al within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

(TS 3.3.1)

Note to examiner: The 55 will usually wait to perform this until I & C has time to perform troubleshooting.

TABLE Al FRAME SSPSINPUT CAB /CARD B/S SWITCH FT-444 Failure (Channel 1)

Loop 4 Low Flow Rx Trip 1 8/65 1 FS-444A MASTER TEST SWITCH 8/76 5 OATC A7. Initiate the applicable actions of Technical Specification 3.3.1.

APPLICABLE REQUIRED FUNCTION MODES CHANNELS CONDITIONS

10. Reactor Coolant Flow Low
a. Single Loop 1 (h) 3 per loop N (h) Above the P-8 (Power Range Neutron Flux) interlock.

Note to examiner: Table for Conditions and Required Actions and Completions Times is on the following page.

18

Appendix iE Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 5 Event No. : 5 Event

Description:

RCS Loop # 4 flow transmitter fails down scale lowS (FT-444),

this will result in a Tech Spec call for the 55, no operator board actions Time Position Applicants Action or Behavior ss Step A7 continued.

ACTIONS (pontinued)

CONDITION REQUIRED ACTION COMPLETION TIME N. One Reactor Coolant Flow- N.1 Place channel in trip. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Low (single loop) channel inoperable. OR N.2 Reduce THERMAL 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> POWER to < P-8 OATC A8. Initiate the Continuous Actions Page.

55 A9. Check repairs and surveillances COMPLETE. (NO)

RNO A9. Perform the following:

a. WHEN repairs and surveillances are complete, THEN perform step AlO.
b. Return to procedure and step in effect.

19

Required Operator Actions Form ESD-2 Op-Test No. : 201 2-301 Scenario No. : 5 Event No. : 6 Event

Description:

Loss of 1 20V AC Vital Bus 1 DY1 B, the SS will enter 18032-1 for Loss of 1 20V AC Instrument Power Section D for Loss of Vital Instrument Panel 1DY1B Time j Position [ Applicants Action or Behavior CREW Diagnose Loss of Vital Instrument Panel 1 DY1 B.

Symptoms I alarms:

ALB34-B05 1 20V AC PNL 1 DY1 B TROUBLE ALB34-D07 INVERTER 1 DD1 14 TROUBLE Indications:

. Various other annunciators associated with Channel IV.

. All channel IV trip status lights (except CNMT Hl-3 PRESS and RWST LO-LO LEVEL) lit.

. Letdown flow reading o gpm on 1FI-132A and 1FI-132C.

SS Enters 1 8032-1 Loss of 1 20V AC Instrument Power Section F for Loss of Vital Instrument Panel 1 DY1 B.

NOTES:

. Letdown isolation (1 -HV-1 521 4 will close) and steam generator blowdown will occur on Pipe Break Room Protection due to loss of temperature bistables in QPP4.

. The Train B chiller will be inoperable due to loss of flow switch 1 FY-1 803, but may be started from the Train B Shutdown Panel.

The A Train chiller should be operated if Essential Chilled Water is required.

OATC Fl . Initiate the Continuous Actions Page.

UO 20

Appendix D Required Operator Actions Form ES-D-2 Op-Test No : 201 2-301 Scenario No. : 5 Event No. : 6 Event

Description:

Loss of 1 20V AC Vital Bus I DY1 B, the 55 will enter 18032-1 for Loss of 1 20V AC Instrument Power Section D for Loss of Vital Instrument Panel 1DY1B Time Position Applicants Action or Behavior OATC F2. Check 1-HV-15214 CVCS LETDOWN PIPE BREAK PROT ISOLATION OPEN.

RNO F2. Perform the following:

a. Close Letdown Orifice Isolation Valves:

. 1-HV-8149A

. 1-HV-8149B

. 1-HV-8149C

b. Close Letdown Isolation Valves:

a 1-LV-0459 a 1-LV-0460 Note to examiner: These valves will require close to terminate a CVCS Letdown leak to the PRT via relief valve.

c. Control charging to:

a Maintain seal injection flow to all RCPs 8 to 13 GPM.

a Maintain charging flow approximately 1 0 gpm greater than total seal injection flow.

d. Place Excess Letdown in service by initiating 13008, CHEMICAL AND VOLUME CONTROL SYSTEM EXCESS LETDOWN PROCEED TO EVENT 7, then return to this point after Excess Letdown has been placed in service. Excess Letdown actions are on page #31.

21

Appendix D Required Operator Actions Form ES-D-2 Op-Test No : 201 2-301 Scenario No. : 5 Event No. : 6 Event

Description:

Loss of 1 20V AC Vital Bus 1 DY1 B, the SS will enter 18032-1 for Loss of 1 20V AC Instrument Power Section D for Loss of Vital Instrument Panel 1DY1B Time Position Applicants Action or Behavior OATC F3. Select CH455/456 on 1 PS-455F PRZR PRESS CNTL SELECT.

(Already selected)

OATC F4. Select DEFEAT 442 on 1TS-412T T-AVG DEFEAT SEL.

F5. Select DEFEAT 441 on 1TS-41 iF DELTA T DEFEAT SEL.

Note to examiner: The OATC will have to take these actions.

OATC F6. Restore Tavg to program value.

a. Place ROD STOP BYPASS switch to BYPASS PRN44 position.
b. Adjust rod position t restore Tavg to Tref.

uc F7. Verify SG blowdown isolation valves CLOSED WITH HANDSWITCHES IN CLOSE.

22

AppenchxD Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 5 Event No. : 6 Event

Description:

Loss of 1 20V AC Vital Bus 1 DY1 B, the 55 will enter 18032-1 for Loss of 120V AC Instrument Power Section D for Loss of Vital Instrument Panel 1DY1B.

I Time Position

[ Applicants Action or Behavior OATC F8. Verify the following interlocks are in required state for existing unit conditions within one hour. (TS 3.3.1) (all are as required)

. P-6

. P-7

. P-8

. P-9

. P-b Note to examiner: The OATC will verify these on the BPLP status light box.

OATC F9. Dispatch operator to transfer Panel 1 DY1 B to alternate supply by initiating b 3431 1 20V AC b E VITAL INSTRUMENT DISTRIBUTION SYSTEM.

Note to examiner: 1 DY1 B can be placed on regulated transformer due to the inverter failure, there is no fault on the bus.

Note to Simbooth Operator: Place 1 DYb B on regulated transformer using Remote Function EL 29 (DYb B to Reg Transformer) when requested by the crew.

CREW Fb 0. Refer to ATTACHMENT F, TABLE b I & C LOADS

- - PANEL 1 DYb B to determine affected instrumentation.

Fb b . Refer to ATTACHMENT F, TABLE 2 PANEL 1 DYb B LOAD LIST to determine additional equipment affected.

Note to examiner: ATTACHMENT F, TABLE b and TABLE 2 are attached at the end of this event description.

23

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No : 5 Event No : 6 Event

Description:

Loss of 1 20V AC Vital Bus 1 DY1 B, the 55 will enter 18032-1 1

for Loss of 20V AC Instrument Power Section D for Loss of Vital Instrument Panel 1DYIB Time Position Applicants Action or Behavior ss F12. Initiate 18002-C, NUCLEAR INSTRUMENTATION SYSTEM uc MALFUNCTION for failed Channel IV Nls.

Note to examiner: N44 actions per 1 8002 are also attached at the end of this event starting on page # 28.

55 Fl 3. Refer to Technical Specifications and complete any applicable action statements.

APPLICABLE REQUiRED FUNCTION MODES CHANNELS CONDITIONS

16. Reactor Trip System Interlocks
c. Power Range Neutron Flux, 1 4 S P-8
d. Power Range Neutron Flux, 1 4 5 P-9
e. Power Range Neutron Flux, 1 ,2 4 R P-jo and input To_P-7 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLET1ON TIME R. One or more channels RI Verify interlock is in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable. required state for existing unit conditions.

OR R.2 Be in MODE 3 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> S One or more channels 5.1 Verify interlock is in I hour inoperable. required state for existing unit conditions.

OR 5.2 Be in MODE 3 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> 24

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 5 Event No. : 6 Event

Description:

Loss of 1 20V AC Vital Bus 1 DY1 B, the 55 will enter 18032-1 for Loss of 1 20V AC Instrument Power Section D for Loss of Vital Instrument Panel 1DY1B.

Time Position Applicants Action or Behavior ss Fl 3. Continued for Tech Spec actions.

LCO 3.8.7 The required Class 1 E 1 20 V inverters shall be OPERABLE.

The NOTE is not applicable for this event.

APPLICABILITY: MODES 1 2, 3, and 4. ,

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required inverter NOTE inoperable. Enter applicable conditions and required actions of LCO 38.9 Distribution Systems Operating with any vital bus deenergized.

A.1 Restore inverter to OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> status.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion.

AND B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> 25

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 5 Event No. : 6 Event

Description:

Loss of 1 20V AC Vital Bus 1 DY1 B, the 55 will enter 18032-1 for Loss of 1 20V AC Instrument Power Section D for Loss of Vital Instrument Panel 1DY1B.

0 Time Position Applicants Action or Behavior Fl 3. Continued for Tech Spec actions.

LCO 3.8.9 The required AC, DC, and AC vital bus electrical power distribution subsystems shall be OPERABLE.

The NOTE is not applicable for this event.

APPLICABILITY: MODES 1 2, 3, and 4. ,

4CTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. One or more AC vital bus B.1 Restore AC vital bus 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Electrical power electrical power distribution subsystems distribution subsystems to AND inoperable. OPERABLE status.

16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from discovery of failure to meet LCO D. Required Action and D.1 Be in MODE 3 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Timenotmet. AND D.2 Be in MODE 5 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> uO F14. Check loss of 1DY1B DUE TO INVERTER 1DD1I4 FAILURE. (YES) 26

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 5 Event No. : 6 Event

Description:

Loss of 1 20V AC Vital Bus 1 DY1 B, the SS will enter 18032-1 for Loss of 1 20V AC Instrument Power Section D for Loss of Vital Instrument Panel 1DY1B Time Position

{ Applicants Action or Behavior uo F15. Check 1DD1I4 Inverter REPAIRED. (NO)

RNQ F15. Perform the following:

a. WHEN 1DD1I4 repaired, THEN perform Steps F16 through F18.
b. GotoStepFl9.

uo Fl 9. Check 1 DY1 B - RESTORED TO INVERTER SUPPLY. (NO)

RNO Fl 9. WHEN 1 DY1 B restored to inverter supply, THEN perform Step F20.

END OF EVENT 6, proceed to EVENT 7.

27

endix D Required Operator Actions Form ES-D-2 Op-Test No. : 2012-301 Scenario No. : 5 Event No : 6, DY1 B actions for PR N44 Event

Description:

1 8002 PR N44 actions are required to be taken per I 8032 for Loss of 1 DY1 B.

Time Position Applicants Action or Behavior QA11D IMMEDIATE OPERATOR ACTIONS Bi Place rods in manual.

Enters 1 8002C, NUOLEAR INSTUMENTATION SYSTEM MALRJNflON, section B FOWBR RANGE DRAWER N41 N42, N43, N44 MALFUNCflON.

uc Ba Terminates any load change in progress.

QAIC 63. Checks TI-EMAL FOWBR GFEATETHAN OR EQUALTO 75%.

RNO Ba GotoStepB5.

28

AppendixD Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 5 Event No. : 6, DY1 B actions for PR N44 Event

Description:

18002 PR N44 actions are required to be taken per 18032 for Loss of 1 DY1 B.

Time j Position Applicants Action or Behavior uo B5 Perform the following:

a. Select the affected channel on:

. FODSCP BMDASSswitch.

. OOMPARATORG1ANN6 DAT switch,

. P314/BR MMA1G1 BYPASS switch.

. UPP6SEflON switch.

. LOVVBSEflON switch.

b. Fiesetratetrip.

QAIC B6. Restore Tavg to program.

Note to examiner: It is expected the QAIC will withdraw rods to restore Tavg to program, if necessary.

OA1C B7. Place rods in AUTO if desired.

OATC B8. Check the operable Power Range Channel(s) indicating properly on NR-45. (they are) 29

Appendix D Required Operator Actions Form ES-D-2 Op-Test No : 201 2-301 Scenario No. : 5 Event No. : 6, DY1 B actions for PR N44 Event

Description:

18002 PR N44 actions are required to be taken per 18032 for Loss of 1 DY1 B.

Time Position Applicants Action or Behavior

]

B17, Return to procedure and step in effect.

Note to examiner: Otheractionssuch asTechecsare addressed in the 12OVAC1DY1B procedure.

END OF EVENT 6 N44 ACTIONS, go back to Loss of DYI B AOP Page # 24, 30

Appendix D Required Operator Actions Form ES-.D-2 Op-Test No.: 2012-301 Scenario No.: 5 Event No.: 7 Event

Description:

The OATC places Excess letdown in service per direction of the SS to maintain PRZR level after letdown is isolated to stop the RCS leak to the PRT. The OATC will use SOP 1 3008-1 to place excess letdown in service.

Time Position Applicants Action or Behavior OATC Section 4.1 of 13008-1 is selected.

OATC NOTE: Independent Verifications performed within Section 4.1 are documented on Checklist 1.

4.1 .1 Verify Reactor power is maintained 3622.6 MWT while Excess Letdown is in service and LEFM is in service. IF LEFM is NOT in service, maintain power < 3562 MWT per guidance of 12004-C.

OATC 4.1 .2 Verify that a CVCS Charging Pump is running.

OATC 4.1 .3 Verify CLOSED RX HEAD VENT TO EXCESS LETDOWN ISOLATION 1 -HV-8098.

OATC 4.1 .4 Verify flow controller EXCESS LETDOWN, 1 HC-123 is set to closed (0% demand).

OATC 4.1 .5 Verify OPEN RCPs Seal Leakoff Isolation valves:

. 1-HV-8100 RCPS SEAL LEAKOFF ORC ISOLATION

. 1-HV-8112 RCPS SEAL LEAKOFF IRC ISOLATION 31

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 201 2-301 Scenario No.: 5 Event No.: 7 Event

Description:

The OATC places Excess letdown in service per direction of the SS to maintain PRZR level after letdown is isolated to stop the RCS leak to the PRT. The OATC will use SOP 1 3008-1 to place excess letdown in service.

Time Position Applicants Action or Behavior QATC 4i6 Verify EXCESS LETDOWN TO VCT, 1HS-8143 is in the OPEN VCT position.

OATC 41 J Verify Reactor power is maintained 3622.6 MWT while Excess Letdown s n service and LEFM is in service jf LEFM is QI in service, maintain power 3562 MWT per guidance of 1 2004-C.

OATC 4:1 8 Open EXCESS LETDOWN LINE Isolation Valves:

. 1 -HV-81 53 EXCESS LETDOWN LINE ISO VLV

. 1-HV-8154 EXCESS LETDOWN LINE ISO VLV OATC 4.1 .9 Record the following:

. Pressure on indicator EXCESS LETDOWN HX OUTLET, 1PI-124.

. Temperature on indicator EXCESS LETDOWN HX OUTLET, 1TI-122.

Note to examiner: ALB63-A06 FILTERS BACKFLUSH PNL ALARM will illuminate shortly after placing Excess Letdown in service.

32

Appendix D Required Operator Actions Form ES-D-2 Op-Test No: 201 2-301 Scenario No: 5 Event No.: 7 Event

Description:

The QATC places Excess letdown in service per direction of the SS to maintain PRZR level after letdown is isolated to stop the RCS leak to the PRT. The OATC will use SOP 1 3008 1 to place excess letdown in service Time Position Applicants Action or Behavior QATC 41 .10 WHILE establishing excess letdown, perform the following:

. Monitor pressure rise on pressure indicator EXCESS LETDOWN HX OUTLET, 1PI-124 and verify it remains less than 50 pounds above pressure recorded in Step 41 8.

. Monitor temperature rise on temperature indicator EXCESS LETDOWN HX OUTLET, 1TI-122 and verify it remains less than 1 65 degrees.

OATC 4:1 1 1 Slowly adjust output flow controller EXCESS LETDOWN 1 HC-1 23 to establish maximum allowable flow. (estimated to be approximately 30 gpm).

OATC 4i12 Perform the following as required to maintain desired pressurizer level:

. Adjust charging using CHARGING LINE CONTROL, 1FIC-121.

. Adjust seal injection using SEAL FLOW CONTROL, 1HC-182.

33

Appendix D Required Operator Actions Form ES-D-2 Op-Test No: 201 2-301 Scenario No: 5 Event No.: 7 Event

Description:

The OATC places Excess letdown in service per direction of the SS to maintain PRZR level after letdown is isolated to stop the ACS leak to the PRT. The OATC will use SOP 1 3008 1 to place excess letdown in service Time Position Applicants Action or Behavior QATC 4113 jf normal letdown is isolated, align the outlet of the Seal Water Heat Exchanger to the Volume Control Tank spray nozzle as follows: (IV REQUIRED) (N/A if previously performed)

a. Unlock and open CVCS SEALS SEAL WATER HX OUTLET TO VCT, 1-1208-U6-104. (KEY 10P2-281)

(RA-26)

b. Close CVCS SEALS SEAL WATER HX OUTLET TO NCP SUCTION, 1-1208-U6-106. (RA-26)

OATC 41 14 IE directed by 55 to transfer excess letdown to the RCDT, perform the following:

a. Verify RCDT system is aligned to accept Excess Letdown flow per 1 3002-1 Reactor Drain Tank Operation.
b. Place EXCESS LETDOWN TO VCT, 1 HS-81 43 to the OPEN RCDT position.
c. Monitor temperature rise on EXCESS LETDOWN HX OUTLET lTl-122 and verify it remains less than 165 degrees.
d. Slowly raise output on flow controller EXCESS LETDOWN, 1HC-123 to establish maximum allowable flow.
e. Swap to RCDT is being performed for Chemistry control or level control Step 4.2,7.
f. Perform the following as required to maintain desired pressurizer level:

. Adjust charging using CHARGING LINE CONTROL, 1 FIC-1 21.

. Adjust seal injection using SEAL FLOW CONTROL, 1HC-182.

34

Appendix D Required Operator Actions Form ES-D-2 Op-Test Nofl: 01 2-301 Scenario No: 5 Event NoV: 7 Event

Description:

The OATC places Excess letdown in service per direction of the SS to maintain PRZR level after letdown is isolated to stop the RCS leak to the PRT. The OATC will use SOP I 3008-1 to place excess letdown in service.

Time Position Applicants Action or Behavior OATC 4:1 1 5 if the Seal Water Heat Exchanger Outlet was aligned to the Volume Control Tank, restore normal alignment as follows:

(IV REQUIRED)

a. Open CVCS SEALS SEAL WATER HX OUTLET TO NCP SUCTION, 1-1208-U6-106. (RA-26)
b. Close and lock CVCS SEALS SEAL WATER HX OUTLET TO VCT 1 1 208 U6 1 04 (KEY 1 0P2 281)

(RA-26)

RETURN TO EVENT 6 on page # 21 35

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 5 Event No. : 8 Event

Description:

PRZR Spray valve for Loop 4 fails open, the OATC will have to manually close loop 4 spray to prevent a reactor trip and SI.

Time

[ Position Applicants Action or Behavior OATC Diagnose Spray Valve Loop 4 has failed open:

Symptoms I alarms:

ALB1 1 -D02 PRZR CONTROL LO PRESS AND HEATERS ON ALB12-D03 PRZR PRESS LO PORV BLOCK Indications:

. PRZR pressure lowering rapidly.

. Spray Valve Loop 4 red light lit, green light out.

. Spray Valve Loop 1 green light lit, red light out.

. Spray Valve Loop 4 controller red light lit, demand at 100%.

. PORV Block Valves 1 -HV-8000A and 1 -HV-8000B close.

Note to examiner: The crew may go directly to 1 8000-C, Pressurizer Spray, Safety Or Relief Valve Malfunction OR may use the guidance from ALB1 1 -D02 to reference them to the AOP, then transition to 1 8000-C.

36

Appendix D Required Operator Actions Form ESD-2 Op-Test No. : 2012-301 Scenario No. : 5 EventNo.: 8 Event

Description:

PRZR Spray valve for Loop 4 fails open, the OATC will have to manually close loop 4 spray to prevent a reactor trip and SI.

Time j Position { Applicants Action or Behavior QATC ALB1 1 -D02 Response 1.0 PROBABLE CAUSE 1 . Pressurizer Pressure Control System malfunction.

2. Pressurizer Spray or Relief Valve Malfunction.

2.0 AUTOMATIC ACTIONS Pressurizer Backups Heaters will energize.

3.0 INITIAL OPERATOR ACTIONS Check pressurizer pressure indications:

. If an instrument failure is indicated, intitiate 1 8001 -C, Primary Systems Instrumentation Malfunction.

. IF a failed PRZR Spray Valve, Safety Valve or PORV is indicated, intiate 18000-C, Pressurizer Spray, Safety Or Relief Valve Malfunction.

. AT 1 965 psig and lowering trip RX and go to 1 9000-C, E-0 REACTOR TRIP OR SAFETY INJECTION.

OATC IMMEDIATE OPEATOR ACTIONS 1 . Verify PRZR Spray Valves CLOSED.

Note to examiner: The OATC will manually close the Loop 4 PRZR Spray Valve by taking the controller and depressing the down arrow until the green light is lit, demand is 0, and PRZR Spray Valve has agreen only light lit.

37

Appendix D Required Operator Actions Form ES-D-2 Op-Test No : 201 2-301 Scenario No. : 5 Event No 0: 8 Event

Description:

PRZR Spray valve for Loop 4 fails open, the OATC will have to manually close loop 4 spray to prevent a reactor trip and SI.

Time Position Applicants Action or Behavior ss Enters 18000-C, PRESSURIZER SPRAY, SAFETY, OR RELIEF VALVE MALFUNCTION.

OATC 2. Operate PRZR Heaters as necessary.

OATC 3. Verify PRZR PORVs - CLOSED. (YES)

OATC 4. Check PRZR Safety Valves CLOSED. (YES)

OATC 5. Check PIC-455A Pressurizer Master Pressure Controller OPERATING PROPERLY: (YES)

. Reference FIGURE 1.

Note to examiner: FIGURE 1 attached at the end of this event.

OATC 6. Check associated instrumentation OPERATING PROPERLY.

(YES) 55 7, Comply with applicable Technical Specifications:

3.4.1 (only one applicable for this event) 3.4.10 3.4.11 3.4.12 3.4.13 38

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2012-301 Scenario No.: 5 Event No. : 8 Event

Description:

PRZR Spray valve for Loop 4 fails open, the OATC will have to manually close loop 4 spray to prevent a reactor trip and SI.

Time

[ Position Applicants Action or Behavior ss Refers to Technical Specifications LCQ 3.4.1 RCS DNB parameters for pressurizer pressure, RCS average temperature, and RCS total flow rate shall be within the limits specified below:

a. Pressurizer pressure 21 99 psig;
b. RCS average temperature 592.5 F; and
c. RCS total flow rate > 384,509 gpm.

APPLICABILITY: MODE 1 Note to examiner: The NOTE does not apply during this event.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more RCS DNB A. 1 Restore RCS DNB 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> parameters not within parmeter(s) to within limits. limit.

C. Required Action and C.1 Be in MODE 2 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

55 8. Return to procedure and step in effect.

END OF EVENT 8, proceed to EVENT 9 (THE MAJOR).

39

ppend1x D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 5 Event No. : 9 Event

Description:

Steam generator # 2 will fault IRC with complications. CS pump A will trip on start and CS pump B discharge valve will fail to automatically open but can be opened by the OATC. The containment coolers for both trains will fail to start in slow speed but can be started by the UO. Loop 2 MFIV will also fail to automatically close but can be closed by the UO.

Time Position Applicants Action or Behavior uc Diagnose Main Steam Line # 2 faulted IRC.

QATC Symptoms 1 alarms:

ALBO1-E06 CNMT HI TEMP ALBO1-F06 CNMT HI MSTR Indications:

. Containment pressure indications rapidly rising.

OATC Performs a manual reactor trip due to imminent high Containment Pressure SI at 55 38 psig on Containment Pressure.

Note to examiner: Containment pressure rises rapidly and the crew may attempt to enter 18008-C, SECONDARY COOLANT LEAKAGE but will not have time to take significant actions.

40

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 5 EventNo.: 9 Event

Description:

Steam generator # 2 will fault IRC with complications. CS pump A will trip on start and CS pump B discharge valve will fail to automatically open but can be opened by the OATC. The containment coolers for both trains will fail to start in slow speed but can be started by the UO. Loop 2 MFIV will also fail to automatically close but can be closed by the UO.

Time Position Applicants Action or Behavior CREW Performs Immediate Operator Actions per 1 9000-C, E-O Reactor Trip or Safety Injection.

SS Makes a page announcement of Reactor Trip.

QATC 1 . Check Reactor Trip: (YES)

. Rod Bottom Lights LIT

. Reactor Trip and Bypass Breakers OPEN

. Neutron Flux LOWERING uO 2. Check Turbine Trip: (YES)

. All Turbine Stop Valves CLOSED uO 3. Check Power to AC Emergency Buses (YES)

a. AC Emergency Busses AT LEAST ONE ENERGIZED.

. 4l6OAClEBusses

b. AC Emergency Busses ALL ENERGIZED.

. 41 60V AC 1 E Busses

. 480V AC 1 E Busses 41

Appendix D Required Operator Actions Form ESD-2 Op-Test No. : 201 2-301 Scenario No. : 5 Event No. : 9 Event

Description:

Steam generator # 2 will fault IRC with complications. CS pump A will trip on start and CS pump B discharge valve will fail to automatically open but can be opened by the OATC. The containment coolers for both trains will fail to start in slow speed but can be started by the UO. Loop 2 MFIV will also fail to automatically close but can be closed by the UO.

Time Position Applicants Action or Behavior QATC 4 Check if SI is actuated. (YES)

. Any 51 annunciators LIT

. SI ACTUATED BPLP window LIT 55 Goto Step 6.

55 6. Initiate the Foldout Page.

CREW 55 L Perform the following:

QATC

  • OATC Initial Actions Page uc
  • uo Initial Actions Page NOTE: 55 initiates step 8 after OATC/UO Initial Actions completed.

42

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 5 Event No. : 9 Event

Description:

Steam generator # 2 will fault IRC with complications. CS pump A will trip on start and CS pump B discharge valve will fail to automatically open but can be opened by the OATC. The containment coolers for both trains will fail to start in slow speed but can be started by the UO. Loop 2 MFIV will also fail to automatically close but can be closed by the UO.

Time 1: Position Applicants Action or Behavior OATC PERFORMS OATC INITIAL ACTIONS 1 Check both trains of ECCS equipment

. ALIGNING FOR INJECTION PHASE:

(YES)

. MLB indication OATC 2. Check Containment Isolation Phase A ACTUATED. (YES)

. CIA MLB indication QATC 3 Check ECCS Pumps and NCP status:

a. CCPs RUNNING. (YES)
b. SI Pumps RUNNING. (YES)
c. RHA pumps - RUNNING. (YES)
d. NCP - TRIPPED. (YES)

QATC & Verify CCW Pumps - ONLY TWO RUNNING EACH TRAIN. (YES, Train B only) 43

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 5 Event No. : 9 Event

Description:

Steam generator # 2 will fault IRC with complications. CS pump A will trip on start and CS pump B discharge valve will fail to automatically open but can be opened by the OATC. The containment coolers for both trains will fail to start in slow speed but can be started by the UO. Loop 2 MFIV will also fail to automatically close but can be closed by the UO Time Position

[ Applicants Action or Behavior OATC PERFORMS OATC INITIAL ACTIONS 5 Verity proper NSCW system operation: (YES)

a. NSCW Pumps ONLY TWO RUNNING EACH TRAIN.
b. NSCW TOWER RTN HDR BYPASS BASIN hand switches - IN AUTO:

. HS-1668A

. HS-1669A OATC 6. Verify Containment Cooling Units: (NO)

UO Critical a. ALL RUNNING IN LOW SPEED

. MLB indication

b. NSCW Cooler isolation valves OPEN (YES)

. MLB indication Note to examiner: The UO will go back to the HVAC Panel and start all Containment Cooling Units in LOW speed.

OATC L Check Containment Ventilation Isolation:

a. Dampers and Valves CLOSED (YES) 44

Appendix D Required Operator Actions Form ES-D-2 Op-Test No : 201 2-301 Scenario No. : 5 Event No.: 9 Event

Description:

Steam generator # 2 will fault IRC with complications. CS pump A will trip on start and CS pump B discharge valve will fail to automatically open but can be opened by the OATC. The containment coolers for both trains will fail to start in slow speed but can be started by the UO. Loop 2 MFIV will also fail to automatically close but can be closed by the UO Time Position

[ Applicants Action or Behavior OATC PERFORMS OATC iNiTiAL ACTiONS

8. Check Containment pressure REMAiNED LESS THAN 21 P51G.

(NO)

RNO

8. Verify the following:
a. Containment Spray actuated.

Critical b. Containment Spray Pump discharge valves open. (NO, for Train B)

Note to examiner: The OATC will open Containment Spray Pump Discharge Isolation HV-9001 B to satisfy the Critical Step

c. Containment Spray Pumps running. (B only)

QATC 9, Check ECCS flows:

a. BIT flow. (YES)
b. RCS pressure LESS THAN 1625 P51G. (YES)
c. SI Pump flow. (YES)
d. RCS pressure - LESS THAN 300 P51G. (NO)

RNO

d. GotoSteplO.

45

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 5 Event No. : 9 Event

Description:

Steam generator # 2 will fault IRC with complications. CS pump A will trip on start and CS pump B discharge valve will fail to automatically open but can be opened by the OATC. The containment coolers for both trains will fail to start in slow speed but can be started by the UO. Loop 2 MFIV will also fail to automatically close but can be closed by the UO.

Time Position Applicants Action or Behavior OATC PERFORMS OATC INITIAL ACTIONS 1 0. Check ECCS Valve alignment PROPER INJECTION LINEUP INDICATED ON MLBs. (YES)

OATC 11 . Check ACCW Pumps - AT LEAST ONE RUNNING. (YES)

OATC 1 2. Adjust Seal Injection flow to all RCPs 8 TO 1 3 GPM.

OATC 1 3. Dispatch Operator to ensure one train of SPENT FUEL POOL COOLING in service per 13719, SPENT FUEL POOL COOLING AND PURIFICATION SYSTEM.

END OF OATC INITIAL OPERATOR ACTIONS, return to E-O Step 8 46

AppenchxD Required Operator Actions Form ES-D-2 Op-Test No : 201 2-301 Scenario No. : 5 Event No.: 9 Event

Description:

Steam generator # 2 will fault IRC with complications. CS pump A will trip on start and CS pump B discharge valve will fail to automatically open but can be opened by the OATC. The containment coolers for both trains will fail to start in slow speed but can be started by the UO. Loop 2 MFIV will also fail to automatically close but can be closed by the UO.

Time

{ Position Applicants Action or Behavior uo uo INITIAL ACTIONS 1 . Check AFW Pumps - RUNNING. (YES)

. MDAFW Pumps.

. TDAFW Pump, if required.

uc 2. Check NP level in at least one SG GREATER THAN 10%.

(32% ADVERSE).

RNO

2. Establish AFW flow greater than 570 gpm by starting pumps and aligning valves as necessary.

uc 3. Check if main steamlines should be isolated: (YES)

a. Check for one or more of the following conditions:

Any steamline pressure LESS THAN OR EQUAL TO 585 P51G.

Containment pressure GREATER THAN 14.5 P51G.

Low Steam Pressure SI/SLI BLOCKED AND High Steam Pressure Rate ONE TWO OR MORE CHANNELS OF ANY STEAMLINE.

b. Verify Main Steamline Isolation and Bypass Valves CLOSED. (YES) 47

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 5 EventNo: 9 Event

Description:

Steam generator # 2 will fault IRC with complications. CS pump A will trip on start and CS pump B discharge valve will fail to automatically open but can be opened by the OATC. The containment coolers for both trains will fail to start in slow speed but can be started by the UO. Loop 2 MFIV will also fail to automatically close but can be closed by the UO.

Time Position Applicants Action or Behavior

]

uc uo INITIAL ACTIONS 4, Verify FW Isolation Valves closed: (NO)

CrItical

  • MFIVs (Loop 2 MFIV will be open)
  • BFIVs
  • BFRVs Note to examiner: MFIV Loops # 2 will be open, the UC will manually close MFIV # 2 to satisfy the critical step.

uc 5 Verify SG Blowdown isolated. (YES)

  • Place SG Blowdown isolation Valve handswitches HS-7603A, B, C, and D in the CLOSE position.

Note to examiner: The UC will place the HS-7603 valves in the hard closed position.

  • SG Sample Isolation Valves CLOSED.

uO 6. Verify Diesel Generators RUNNING. (YES) uO 7. Throttle total AFW flow as necessary to maintain SG NR levels between 1 0% (32% ADVERSE) and 65%.

48

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 5 Event No. : 9 Event

Description:

Steam generator # 2 will fault IRC with complications. CS pump A will trip on start and CS pump B discharge valve will fail to automatically open but can be opened by the OATC. The containment coolers for both trains will fail to start in slow speed but can be started by the UO. Loop 2 MFIV will also fail to automatically close but can be closed by the UO Time Position Applicants Action or Behavior uc 8. Verify both MFPs TRIPPED. (YES>

uc 9. Check Main Generator Output Breakers OPEN. (YES)

END OF UO INITIAL ACTIONS, return to step 8 of E-O 49

Appendix D Required Operator Actions Form ES-D-2 Op-Test No : 201 2-301 Scenario No. : 5 Event No : 9 Event

Description:

Steam generator # 2 will fault IRC with complications. CS pump A will trip on start and CS pump B discharge valve will fail to automatically open but can be opened by the OATC. The containment coolers for both trains will fail to start in slow speed but can be started by the UO. Loop 2 MFIV will also fail to automatically close but can be closed by the UO.

Time Position j Applicants Action or Behavior OATC 1 9000-C, E-O actions beginning with step 8.

uc

8. Initiate the Continuous Actions Page.

OATC 9. Check RCS temperature stable at or trending to 557°F. (NO)

RNO 9, IF temperature is less than 557oF and lowering, (it is)

THEN perform the following as necessary:

a. Stop dumping steam.
b. Perform the following as appropriate:

IF at least one SG NR level greater than 1 0%. (32%

ADVERSE),

THEN lower total feed flow.

-OR-If all SG NR levels less than 10% (32% ADVERSE),

THEN lower total feed flow to NOT less than 570 gpm.

c. If cooldown continues, THEN close MSIVs and BSIVs.
d. lftemperature greaterthan 557oF and rising, THEN dump steam.

50

AppendixD Required Operator Actions Form ES-D-2 Op-Test No : 201 2-301 Scenario No. : 5 EventNo.: 9 Event

Description:

Steam generator # 2 will fault IRC with complications. CS pump A will trip on start and CS pump B discharge valve will fail to automatically open but can be opened by the OATC The containment coolers for both trains will fail to start in slow speed but can be started by the UO. Loop 2 MFIV will also fail to automatically close but can be closed by the UO.

Time Position Applicants Action or Behavior OATC CAUTION: A PRZR PORV Block Valve which was closed to isolate an excessively leaking or open PRZR PORV should not be opened unless used to prevent challenging the PRZR Safeties.

1 0. Check PRZR PORVs, Block Valves, and Spray Valves:

a. PRZR PORVs - CLOSED AND IN AUTO. (YES)
b. Normal PRZR Spray Valves CLOSED. (YES)
c. Power to at least one Block Valve AVAILABLE. (YES)
d. PRZR PORV Block Valves AT LEAST ONE OPEN. (NO)

RNO

d. Verify open at least one PRZR PORV Block Valve when PRZR pressure is greater than 21 85 psig.

uc 11 . Check if RCPs should be stopped.

a. ECCS Pumps - AT LEAST ONE RUNNING: (YES)

. CCPorSlPump

b. RCS pressure LESS THAN 1375 P51G. (YES)
c. Stop all RCPs.

51

AppendaxD Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 5 Event No. : 9 Event

Description:

Steam generator # 2 will fault IRC with complications. CS pump A will trip on start and CS pump B discharge valve will fail to automatically open but can be opened by the OATC. The containment coolers for both trains will fail to start in slow speed but can be started by the UO. Loop 2 MFIV will also fail to automatically close but can be closed by the UO Time Position Applicants Action or Behavior uc 1 2. Check SGs secondary pressure boundaries:

a. SG Pressures:

Any lowering in an uncontrolled manner. (YES)

-OR-Any completely depressurized.

b. Go to 1 9020-C, E-2 FAULTED STEAM GENERATOR ISOLATION.

55 Transitions to 19020-C, E-2 FAULTED STEAM GENERATOR ISOLATION.

52

Appendix D Required Operator Actions Form ES-D-2 Op-Test No 1 2-301 Scenario No 5 Event No 1 : 9 (E-2 Actions)

Event

Description:

1 9020-C E-2 actions for Faulted Steam GeneratorS Time Position Applicants Action or Behavior CREW 1 Initiate critical safety function status trees per 1 9200-C, F-C CRITICAL SAFETY FUNCTION STATUS TREE.

55 2. Initiate NMP-EP-110, EMERGENCY CLASSIFICATION DETERMINATION AND INITIAL ACTION.

Note to examiner: The 55 will call the Simbooth to have the Shift Manager implement NMP-EP-1 10.

OATC CAUTION: At least one SG should be available for RCS cooldown.

UO 3. Verify Main Steamline Isolation and Bypass Valves CLOSED.

(YES)

UO 4. Check SGs secondary pressure boundaries:

a. Identify intact SG(s): (# 1 , 3, and 4 are intact)

. SG pressures ANY STABLE OR RISING (YES)

b. Identify faulted SG(s).

ANY SG PRESSURE LOWERING IN AN UNCONTROLLED MANNER.

(YES, SG #2)

-OR-ANY SG COMPLETELY DEPRESSURIZED. (maybe by now, SG #2) 53

A:jindix - Required Operator Actions Form ES-D-2 Op-Test No 201 2-301 Scenario No 5 Event No : 9 (E-2 Actions)

Event

Description:

1 9020-C E-2 actions for Faulted Steam GeneratorS Time 1: Position Applicants Action or Behavior uc 5 Isolate Main Feedwater to the faulted SG(s):

. Close affected MFIVs:

HV-5227 (SG I)

HV-5228 (SG 2)

HV-5229 (SG 3)

HV-5230 (SG 4)

. Close affected BFIVs:

HV-15196 (SG 1)

HV- 15197 (SG 2)

HV- 15198 (SG 3)

HV- 15199 (SG 4) uc 6. Isolate Auxiliary Feedwater to the faulted SG(s):

. Close affected MDAFW Pump Throttle Valves:

HV-51 39 - SG 1 FROM MDAFW PMP-A Critical HV-51 32 - SG 2 FROM MDAFW PMP-B HV-51 34 - SG 3 FROM MDAFW PMP-B HV-5137 - SG 3 FROM MDAFW PMP-A

. Close affected TDAFW Pump Throttle Valves:

HV-5122 - SG 1 FROM TDAFW Critical HV-51 25 - SG 2 FROM TDAFW HV-5127 - SG 3 FROM TDAFW HV-5120 - SG 3 FROM TDAFW Note to examiner: The valves bolded above are critical at this time IF not already previously closed.

uo 7. Check at least one MDAFW Pump RUNNING AND CAPABLE OF FEEDING SG(s) NEEDED FOR RCS COOLDOWN. (YES) 54

Aj;j;endix D Required Operator Actions Form ES-D-2 Op-Test No 201 2-301 Scenario No 5 Event No : 9 (E-2 Actions)

Event

Description:

1 9020-C E-2 actions for Faulted Steam Generator.

Time Position Applicants Action or Behavior uc 8. Close affected TDAFW Pump Steam Supply Valve(s):

HV-3009 (SG 1) LP-1 MS SPLY TO AUX FW TD PMP-1 Critical HV-3019 (SG-2) LP-2 MS SPLY TO AUX FW TD PMP-1 uQ 9 Verify affected SG ARV(s) CLOSED:

PV-3000 (SG 1)

PV-3010 (SG 2)

PV-3020 (SG 3)

PV-3030 (SG 4) uO 10 Align SGBD valves:

. Place SG Blowdown Isolation Valve handswitches in CLOSE position.

. Close sample valves.

HV-9451 (SG 1)

HV-9452 (SG 2)

HV-9453 (SG 3)

HV-9454 (SG 4) uO 1 1 Verify faulted SG(s) remains isolated during subsequent recovery actions unless needed for RCS cooldown or SG activity sampling.

uO 12. Check CST level - GREATER THAN 15%. (YES) 55

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 5 Event No.: 9 (E-2 Actions)

Event

Description:

1 9020-C E-2 actions for Faulted Steam Generator.

Time Position Applicants Action or Behavior uc 13 Initiate checking if SG Tubes intact:

a. Direct Chemistry to take periodic activity samples of all SGs one at a time.
b. Secondary radiation NORMAL. (YES)

. MAIN STM LINE MONITORS

. RE-13120(SG1)

. RE-13121 (SG 2)

. RE-13122(SG3)

. RE-13119(5G4)

. CNDSR AIR EJCTR/STM RAD MONITORS:

. RE-12839C

. RE-12839D (if on scale)

. RE-12839E (if on scale)

. STM GEN LIQ PROCESS RAD:

. RE-OO1 9 (Sample)

. RE-0021 (Blowdown)

. SG sample radiation.

C, Check SG levels - ANY RISING IN AN UNCONTROLLED MANNER (NO)

RNO

c. GotoStepl4.

56

Appendix D Required Operator Actions Form ESD-2 Op-Test No. : 201 2-301 Scenario No. : 5 Event No, : 9 (E-2 Actions)

Event

Description:

1 9020-C E-2 actions for Faulted Steam Generator.

Time Position Applicants Action or Behavior OATC 14. Check if ECCS flow should be reduced:

a. RCS Subcooling GREATER THAN 24°F. (38°F ADVERSE) (YES)
b. Secondary Heat Sink: (YES)

Total feed flow to intact SGs GREATER THAN 570 GPM.

-OR-Narrow range level in at least one intact SG GREATER THAN 10%.

(32% ADVERSE)

c. RCS pressure STABLE or RISING. (YES)
d. PRZR level - GREATER THAN 9%. (37% ADVERSE) (Maybe)
e. Goto 19011-C, ES-li SI TERMINATION.

RNO

e. GotoStepl5.
15. Go to 19010-C, E-1 LOSS OF REACTOR OR SECONDARY COOLANT.

Note to examiner: Depending on the timing and how fast the crew makes it through the procedures, PRZR level may be above 37% ADVERSE or NOT.

IF > 37%, the crew will go to 1 901 1 -C, SI TERMINATION.

IF < 37% ADVERSE, the crew will transition to 19010-C, E-1 LOSS OF REACTOR OR SECONDARY COOLANT.

END OF SCENARIO, freeze the simulator if NRC Chief Examiner concurs.

57

Appendix D Scenario Outline Form ES-D-1 Facility: Vpqti Scenario Nofl: j Op-Test No: O12-3O1 Examiners: Operators:

Initial Conditions: The plant is at 100% power, BOL, steady state operations, control rods in automatic.

(Base IC # 10, snapped to IC # 186 for HL17 NRC Exam)

Equipment OOS: Safety Injection Pump A is tagged out for motor repair.

Turnover: The plant is at 100% power, Containment mini-purge is in service for a Containment entry on the next shift.

Preloaded Malfunctions:

ACO3B ACCW Pump-2 Hand switch Auto Contact Failure AFO5A, B, C Failure of all AFW pumps to automatically start ESO1- Failure of Automatic Reactor Trip ESO2 Failure of Manual Reactor Trip TU18 Auto Turbine Trip Failure Overrides Note to Simbooth: Place Containment Mini-Purge in service.

Event MaIf. Event Event No. No. Type* Description Ti ACO2A C-UO ACCW Pump # 1 locked rotor with failure of the standby ACCW pump C-SS to automatically start.

T2 RCO8A l-OATC RCP Loop 1 HL NR RTD fails high resulting in inward rod motion.

@ 100% I-SS TS-SS LCO 3.3.1 , Condition A, FU 6, 7 Condition E and LCO 3.3.2 Condition A, FU 5b Condition I T3 RM-006 TS-SS Cnmt Bldg Oper Lev Rad hi Range, RE-006 fails to 100%.

LCO 3.3.3 Condition A, FU 14, Condition B 1

Appendix D Scenario Outline Form ES-D-1 Event MaIL Event Event No IYPZ T4 PRO3A l-OATC Controlling PRZR level channel LT-459 fails low over 10 minutes (56 5 0%) I SS resulting in FIC 0121 raising charging flow Ramp 600 sec TS-SS LCO 33.1 Condition A, FU 9, Condition M INFO LCO 333 FU 6 LCO 33.4 Condition A, FU 8 T5 FW14 I-UO FW pressure transmitter PT-508 fails slowly high resulting in MFPT

@ 1 00% l-SS speed reducing and lowering FW flows and SG levels.

Ramp6O Seconds 6 N/A R-OATC Power reduction due to MFPT B high vibrations.

N-UO R-SS T7 ELO6A M-ALL Loss of 1 3.8kV bus 1 NAA resulting in loss of 2 RCPs and 2 Condensate Pumps, 1 circulating water pump ATWT. -

T8 RDO7 with C-OATC ATWT Auto rod motion fails after 1 minute.

69sec C-SS delay Critical 9 Preload C-UO Turbine Auto Trip failure requiring Manual Trip.

C-SS Critical 10 Preload C-UO MDAFW and TDAFW pumps fail to automatically start.

C-SS Critical Ti 1 MSO6D CREW Main Steam Safety for Loop # 4 fails 50% open requiring an eventual

@50% transition to E-2 to attempt to isolate the faulted SG # 4.

(N)ormal, (R)eactivity, (l)nstrument, (C)omponent, (M)ajor Event 1:

ACCW pump # 1 will trip due to a locked rotor and ACCW pump # 2 will fail to automatically start.

Verifiable Actions:

uO Starts standby ACCW pump #2.

Technical Specifications:

None 2

Appendix D Scenario Outline Form ES-D-1 Event 2:

RCS Loop 1 NR HL RTD fails high resulting in inward rod motion.

Verifiable Actions:

OATC Performs IQA of 18001-C section B and verifies rods are in manual.

OATC Selects affected loop # 3 on both the Tavg and Delta T defeat switches.

OATC Withdraws rods to match Tavg Tref.

Technical Specifications:

LCO 3.3.1 Reactor Trip System (RTS) Instrumentation Condition A LCO 3.3.1 Reactor Trip System (RTS) Instrumentation EU 6 Condition E LCO 3.3.1 Reactor Trip System (RTS) Instrumentation EU 7 Condition E LCQ 3.3.2 Engineered Safety Eeature Actuation System (ESEAS) Instrumentation Condition A LCO 3.3.2 Engineered Safety Eeature Actuation System (ESEAS) Instrumentation EU 5b Condition I Event 3:

Containment High Range Radiation monitor RE-006 fails high.

Verifiable Actions:

None, this is a Technical Specification call for the SS.

Technical Specifications:

LCQ 3.3.3 Post Accident Monitoring (PAM) Instrumentation Condition A LCO 3.3.3 Post Accident Monitoring (PAM) Instrumentation, EU 14, Condition B 3

Appendix D Scenario Outline Form ES-D-1 Event 4:

Controlling Pressurizer level channel PT-459 fails high over 10 minutes resulting in a reduction in charging flow as FIC-0121 throttles closed.

Verifiable Actions:

OATC Manually controls charging flow using FIC-0121 OR manually isolates letdown if flashing of letdown occurs.

Technical Specifications:

LCO 33i Reactor Trip System (RTS) Instrumentation Condition A LCO 33.1 Reactor Trip System (RTS) Instrumentation, EU 9, Condition M NEC LCO 333 Post Accident Monitoring Instrumentation, EU 6 LCO 3.34 Remote Shutdown System, Condition A Event 5:

Eeed water pressure transmitter PT-508 fails high resulting in lowering MEPT speed, lowering FW flow to all SGs, and all SG levels lowering.

Verifiable Actions:

uO Performs lOAs of 1 801 6-C, Section E and takes manual control of the EW valves and MEPT speed controls to control SG levels between 60 to 70%.

Technical Specifications:

None Event 6:

A power reduction will commence due to MEPT B high vibration.

Verifiable Actions:

OATC Borates and adjusts control rods to maintain Tavg Tref matched and AED on target.

UO Lowers turbine load for power reduction.

Technical Specifications:

None 4

Appendix 0 Scenario Outline Form ES-D-1 Event 7, 8. 9. 10:

A loss of 1 38 kV bus 1 NAA occurs. This results in a loss of 2 RCPs, the two running condensate pumps and tnp of both MFPTs An ATWT will occur with fatlure of manual or automatic trip Main Steam Safety Valve for Loop # 4 will fail open requiring an eventual transition to 1 9020-C to attempt to isolate the faulted SG # 4.

Verifiable Actions:

OATC Manually inserts control rods upon failure of automatic inward rod motion.

uO Manually trips the turbine.

uO Manually starts all AFW pumps.

CRITICAL TASKS:

1 ) Manually inserts control rods per lOAs of 1 921 1 -C to reduce reactor power during an ATWT with a coincident loss of heat sink to protect core integrity.

2) Manually trip the turbine no later than step 2 RNO of 19211-C to conserve SG levels for adequate heat removal.
3) Starts MDAFW pumps and/or the TDAFW pump no later than step 3 RNO of 19211-C to Establish > 570 gpm AFE flow to maintain SG inventory for adequate heat removal.

5

NUCLEAR SAFETY FOCUS Z R

  • TARGET ZERO Protected Train: EOOS: Green Alpha LI Yellow LI Bravo LI Orange LiRed Plant 1 00 % power BOL.

Conditions:

Major Activities: Maintain power operations per UOP 1 2004-C section 4.3 for power operation.

Active LCOs: E LCO 3.5.2 Condition A is in effect due to SIP A tagged out.

OOS/Degraded U None CR Instruments:

Narrative E: Containment mini-purge is in service for a planned Status: Containment Entry on next shift.

EJ SIP A is tagged out for motor repair, expected return to service time is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> left on a shutdown LCO of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

El The remnants of Hurricane Maya are passing through, severe weather and thunderstorms will be in the area for the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. The Severe Weather Checklist is in effect.

AppendixD Required Operator Actions Form ES-D-2 OpTest No : 201 2-301 Scenario No. : 6 Event No. : 1 Event

Description:

ACCW Pump # 1 will trip with ACCW Pump # 2 failing to automatically start. The UO will manually start ACCW Pump #2.

Time j Position Applicants Action or Behavior OATC Diagnose the trip of ACCW Pump # 1 with ACCW Pump # 2 failing to automatically start.

Symptoms I alarms:

a ALBO4-A02 ACCW KO HDR PRESS a ALBO4-B02 ACCW RX COOLANT DRN TK HX LO FLOW a ALBO4-C02 ACCW EXCESS LTDN HX LO FLOW a ALBO4-D02 ACCW RTN HDR FROM RCP LO FLOW a ALBO4-A03 ACCW RCP 1 CLR LO FLOW a ALBO4-B03 ACCW RCP 2 CLR LO FLOW a ALBO4-C03 ACCW RCP 3.CLR LO FLOW a ALBO4-D03 ACCW RCP 4 CLR LO FLOW a ALBO7-D03 LTDN HX OUT HI TEMP a ALBO7-F04 LTDN HX HI TEMP DEMIN DIVERT a ALB36-AO1 41 60V SWGR 1 AAO2 TROUBLE Indications:

a ACCW Pump # 1 green and amber light lit.

a High temperature on any heat exchanger serviced by ACCW.

a FV-129 Divert (amber light lit) bypassing CVCS demins.

OATC NOTES:

a ACCW pumps are removed from the 4. 1 6KV Class 1 E buses following simultaneous loss of offsite power and safety injection.

a ACCW flow to the Seal Water Heat Exchanger is not required if RCS temperature remains less than 135°F.

1

Aj;endax D Required Operator Actions Form ES-D-2 Op-Test No 201 2-3O1 Scenario No 6 Event No. : 1 Event

Description:

ACCW Pump # 1 will trip with ACCW Pump # 2 failing to automatically start The UO will manually start ACCW Pump # 2 Time Position j Applicants Action or Behavior J

ss Enters 18022-C, LOSS OF AUXILIARY COMPONENT COOLING WATER.

uO 1 Check ACCW pumps - AT LEAST ONE RUNNING. (NO)

RNO 1 Perform the following.

a. Start an ACCW pump. (YES)
b. IF an ACCW pump can NOT be started, THEN perform the following: (N/A)
1) Trip the Reactor. (N/A)
2) WHEN Reactor is verified tripped, THEN stop all RCPs. (N/A)
3) Initiate 1 9000-C, E-0 REACTOR TRIP OR SAFETY INJECTION. (N/A)
4) Goto Step 3.

uO 2. Check ACCW SPLY HDR PRESS P1-1977 - GREATER THAN 135 P51G. (YES)

UO 3. Check if ACCW flow exists through the letdown heat exchanger.

. TV-130-OPEN. (YES)

. ALBO7-D03 LTDN HX OUT HI TEMP - EXTINGUISHED (YES) 2

Appendix D Required OperatorActions Form ES-D-2 Op-Test No. : QJ 2-301 Scenario No. : 6 Event No. : 1 Event

Description:

ACCW Pump # 1 wiN trip with ACCW Pump # 2 failing to automatically start. The UO will manually start ACCW Pump #2.

Time Position Applicants Action or Behavior OATC 4. Initiate the Continuous Actions Page.

uc uc 5. Check ACCW Surge Tank Level (IC L2700) GREATER THAN 20% AND STABLE OR RISING. (YES) uO 6. Check if RCPs should be stopped: (NO, all parameters are met)

a. Check the following RCP parameters. (using plant computer):

. Motor bearing (upper or lower radial or thrust)

GREATER THAN 195°F.

. Motor stator winding GREATER THAN 31 1°F.

. Seal water inlet GREATER THAN 230°F.

. Loss of ACCW - GREATER THAN 1 0 MINUTES.

RNO

a. Perform the following:
1) IF any parameter limit is exceeded, THEN perform Step 6.b.
2) Goto Step 7.

3

fenciIx Required Operator Actions Form ES-D-2 Op-Test No.: 2012401 Scenario No. : 6 EventNo.: 1 Event

Description:

ACCW Pump # 1 will trip with ACCW Pump # 2 failing to automatically start. The UO will manually start ACCW Pump #2.

Time Position Applicants Action or Behavior uc 7. Check RCP thermal barrier outlet valves OPEN. (YES)

. HV-19051 ACCW RCP-1 THERMAL BARRIER RTN VLV

. HV-1 9053 ACCW RCP-2 THERMAL BARRIER RTN VLV

. HV-19055 ACCW RCP-3 THERMAL BARRIER RTN VLV

. HV-1 9057 ACCW RCP-4 THERMAL BARRIER RTN VLV

. HV-2041 ACCW RCPS THERMAL BARRIER RTN VLV uO 8. Check ACCW heat exchangers outlet temperature (IPC T2701 ) LESS THAN 1 20°F. (YES) uO 9, Check ACCW containment isolation valves OPEN. (YES)

. HV-1 979 ACCW SPLY HDR ORC ISO VLV

. HV-1978 ACCW SPLY HDR IRC ISO VLV

. HV-1974 ACCW RTN HDR IRC ISO VLV

. HV-1975 ACCW RTN HDR ORC ISO VLV 4

Appendix D Required Operator Actions Form ES-D-2 Op-Test No 201 2-301 Scenario No 6 Event No. : 1 Event

Description:

ACCW Pump # 1 will trip with ACCW Pump # 2 failing to automatically start. The UO will manually start ACCW Pump #2.

Time

} Position Applicants Action or Behavior uc 1 0. Check if ACCW is restored to service.

a. Components cooled by ACCW TEMPERATURES RETURNING TO NORMAL. (YES)
b. Restore charging and letdown using 13006, CHEMICAL AND VOLUME CONTROL SYSTEM. (N/A)
c. Return to procedure and step in effect.

END OF EVENT 1 , proceed to EVENT 2.

5

Appendix D Required Operator Actions Form ES-D-2 Op-Test No: 201 240J. Scenario No: 6 Event No: 2 Event

Description:

RCS NR Temperature Instrument TE-41 1 A Fails High (Thot) on loop # 1.

This will require the OATC to perform lOAs by placing rods in MANUAL.

The crew will then enter AOP-1 8001 section B Failure of RCS Narrow Range Temperature Instrumentation to complete the corrective actions for this failure.

Time Position Applicants Action or Behavior Diagnose NR Temperature Instrument Failure:

(Loop 1 THOT TE-41A fails high)

Symptoms I alarms:

OATC ALB12-A03 RC LOOP Delta T/AUCT Delta T HI-tO DEV ALB12-A04 AC LOOP TAVG/AUCT TAVG HI-tO DEV ALB12-A05 TAVG TREF DEVIATION ALB12-A06 OVERTEMP IXT ALERT ALB12-804 AUCT TAVG HIGH ALB12-B06 OVERPOWER i\T ALERT ALBO6-FO1 CSFST TROUBLE ALB1O-C03 OVERPOWER zT ROD BLOCK AND RUNBACK ALERT ALB1O-E03 OVERTEMP z\T ROD BLOCK AND RUNBACK ALERT Indications:

. Loop 1 Tavg I T indications deviating from other loops.

. 1 FIC-0121 Charging Flow Controller raising to maximum demand.

. Rapid inward Control Rod motion.

18001-c Section B OATC IMMEDIATE OPERATOR ACTION Bi . Place ROD BANK SELECTOR SWITCH in MAN position.

55 Verifies immediate operator action step Bi with OATC.

55 Enters AOP 1 8001 -C, Section B.

OATC Subseauent Actions B2. Restore TAVG to program band.

OATC B3. Select affected loop on TS-41 2T TAVG DEFEAT SEL.

Defeats 412 6

Appendix D Required Operator Actions Form ES-D-2 Op-Test NoW: 201 2-301 Scenario Nofl: 6 Event No.: 2 Event

Description:

RCS NA Temperature Instrument TE-411A Fails High (Thot) on loop # 1.

This will require the OATC to perform IQAs by placing rods in MANUAL.

The crew will then enter AOP-18001 section B Failure of RCS Narrow Range Temperature Instrumentation to complete the corrective actions for this failure.

Time Position Applicants Action or Behavior Cue to Simbooth: IF asked, the Shift Manager has given permission to place the charging flow controller in auto.

B4. Select affected loop on TS-41 1 F DELTA T DEFEAT SEL.

Defeats 411 OATC B5. Place ROD BANK SELECTOR SWITCH in AUTO position, if desired.

SS B6. Notify I & C to initiate repairs.

Calls SS to perform the following:

. Notify Operations Duty of AOP entry

. Write a Condition Report

. Notify Maintenance of the failure SS B7. Bypass the affected instrument channel using 13509-C, BYPASS TEST INSTRUMENTATION (BTI) PANEL OPERATION, if desired.

NOTE: Expect the SS will NOT bypass the channeL SS B8. Trip the affected channel bistables and place the associated MASTER TEST switches in TEST position per TABLE B1 within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. (TS 3.3.1 & 3.3.2)

NOTE: The 88 is expected to leave bistables untripped during the allowed out of service time to facilitate l&C trouble shooting of the failed channeL 7

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 201 23O1 Scenario No.: 6 Event No,: 2 Event

Description:

RCS NR Temperature Instrument TE-41 1A Fails High (Thot) on loop # 1.

This will require the OATC to perform lOAs by placing rods in MANUAL.

The crew will then enter AORI 8001 section B Failure of ACS Narrow Range Temperature Instrumentation to complete the corrective actions for this failure.

Time Position Applicants Action or Behavior ss B9. Initiate the applicable actions of:

. TS3.3.1

. TS3.3.2 ss LCO 3.3.1 Function 6, 7 Condition E OTAT Trip, OPAT CONDITION REQUIRED ACTION COMPLETION TIME A. One or more A.1 Enter the Condition referenced in Immediately Functions with Table 3.3.1 -1 for the channel(s).

one or more channels inoperable.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> ss E. One channel Inoperable.

E.1 Place channel in trip.

OR E.2 Be in MODE 3. 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> LCO 3.3.2 Function 5b. Condition I FWI CONDITION REQUIRED ACTION COMPLETION TIME A. One or more A.1 Enter the Condition referenced in Immediately Functions with Table 3.3.2-1 for the channel(s) or one or more train(s).

required channels inoperable.

I. One channel 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />

.1 Place channel in trip.

Inoperable.

OR 1.2 Be in MODE 3. 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> OATC I UO Bi 0. Initiate the Continuous Actions Page.

8

Appendix D Required Operator Actions Form ES-D-2 Op-Test No: 201 2-301 Scenario No.: 6 Event No.: 2 Event

Description:

RCS NR Temperature Instrument TE-41 1A Fails High (Thot) on loop # 1.

This will require the OATC to perform IQAs by placing rods in MANUAL.

The crew will then enter AOP-18001 section B Failure of RCS Narrow Range Temperature Instrumentation to complete the corrective actions for this failure.

Applicants Action or Behavior ss *B1 1 . Check repairs and surveillances COMPLETE. (NO)

RNO

  • B1 1 . Perform the following:
a. WHEN repairs and surveillances are complete, THEN perform Step B12.
b. Return to procedure and step in effect.

ENDOFEVENT2.

9

Appendix D Required Operator Actions Form ESD-2 Op-Test No: 2012-301 Scenario NoV: 6 Event No: 3 Event

Description:

Containment Rad Monitor RE-006 Fails High.

Time Position Applicants Action or Behavior OATC Alarm/Indications uc ALBO5-B03 INTMD RADIATION ALARM ss ALBO5-C03 HIGH RADIATION ALARM Safety Related Display Consol (SRDC)-RE-006, Intermediate & High Alarm IPC RE-006 Step Change to High Rad uo 17005-1 B03 INTMD RADIATION ALARM OATC PROBABLE CAUSE An alert condition on one or more of the Radiation Monitor Channels.

AUTOMATIC ACTIONS NONE INITIAL OPERATOR ACTIONS NONE SUBSEQUENT OPERATOR ACTIONS 1 Check the Safety Related Display Console (QRM2), the RMS Communications Console (QRM1) and the Plant Computer to determine the monitor in alarm and Go To 17100-1, Annunciator Response Procedure For The Process And Effluent Radiation Monitor System (RMS) or 17102-1, Annunciator Response Procedure For The Safety Related Display Control QRM2 as appropriate.

Note to examiner: The Communications Console (COMS)

QRM1 is NOT modeled in the Vogtle simulator.

17005-1 C03 HIGH RADIATION ALARM OATC UO PROBABLE CAUSE A high alarm on one or more of the Radiation Monitor Channels.

AUTOMATIC ACTIONS None for RE-006.

10

iix D - Required Operator Actions Form ES-D-2 Op-Test No.: 2012-301 Scenario No.: 6 Event No.: 3 Event

Description:

Containment Rad Monitor RE-006 Fails High.

Time Position Applicants Action or Behavior INITIAL OPERATOR ACTIONS NONE SUBSEQUENT OPERATOR ACTIONS 1 . Check the Safety Related Display Console (QRM2), the RMS Communications Console (QRM1) and the Plant Computer to determine the monitor in alarm and Go To 1 71 00-1 Annunciator Response Procedure For The Process And Effluent Radiation Monitor System (RMS) or 1 71 02-1 Annunciator Response Procedure For The Safety Related Display Console QRM2 as appropriate Note to examiner: The Communications Console (COMS)

QRM1 is NOT modeled in the Vogtle simulator.

UO 17102-1 RE-0006 (RED LAMP LIT) (HIGH)

UO PROBABLE CAUSE SS High radiation in Containment.

AUTOMATIC ACTIONS NONE INITIAL OPERATOR ACTIONS 1 . Initiate evacuation of Containment IF the alarm is due to unexpected or unexplained radiation increases, Qfl jf appropriate HP controls are J.QI in place for the radiological conditions indicated.

2. jf the alarm is due to expected radiation increases from preplanned evolutions fjQ appropriate HP controls are in place, THEN request HP and Chemistry to investigate the cause of alarm and sample Containment atmosphere. if required, initiate evacuation of Containment.

11

Appendix D Required Operator Actions Form ES-D-2 OpTest No.: 201 2-301 Scenario No.: 6 Event NoW: 3 Event

Description:

Containment Rad Monitor RE-006 Fails High.

j!!!:ii Position Applicants Action or Behavior SUBSEQUENT OPERATOR ACTIONS 1 . If required, verify that the Containment has been evacuated and all personnel accounted for.

2. Refer to NMP-EP-1 1 0, Emergency Classification and Implementing Instructions.
3. Notify Chemistry to independently determine radiation level on the operating deck in the Containment.
4. IF sampling and analysis determine that channel has malfunctioned:
a. Comply with Technical Specifications LCO 3.3.3.
b. Request Chemistry to deactivate the channel.

COMPENSATORY OPERATOR ACTIONS NONE 55 Initiate the applicable actions of:

. TS: 3.3.3 Post Accident Monitoring (PAM) Instrumentation Condition B One required channel inoperable.

SS LCO 3.3.3 PAMS FU 14 CONDITION B 55 CONDITION REQUIRED ACTION COMPLETION TIME B. One required B.1 Restore the channel 30 days Channel inoperable. To OPERABLE status.

End of Event 3.

12

Appendix ó Required Operator Actions Form ES-D-2 Op-Test No. : 2012-301 Scenario No. : 6 Event No. : 4 Event

Description:

PRZR level channel LT-459 will slowly fail low over 10 minutes. The OATC will take manual control of FIC-0121 to stabilize charging flow and PRZR level, swap control channels, return charging flow to automatic.

Time Position Applicants Action or Behavior OATC Diagnose PRZR LT-459 is slowly failing low affecting charging flow:

Symptoms I alarms:

ALB1 1 -DOl PRZR LO LEVEL DEVIATION ALBO8-F06 RCP SEAL WATER INJ LO FLOW (may come in after swapping controlling PRZR LT channels)

Indications:

. PRZR LT-459 drifting low over time.

. Charging flow FIC-0121 rising to maximum as indicated PRZR program level is high relative to LT-459.

. PRZR level on other 2 channels rising.

55 Enters AOP 18001-C, Section D, FAILURE OF PRZR LEVEL INSTRUMENTATION.

OATC Dl . Initiate the Continuous Actions Page.

UO 13

Appendix D Required Operator Actions Form ES-D-2 Op-Test NoW: 2012-301 Scenario Nofl: 6 Event No. : 4 Event

Description:

PRZR level channel LT-459 will slowly fail low over 10 minutes. The OATC will take manual control of FIC-Ol 21 to stabilize charging flow and PRZR level, swap control channels, return charging flow to automatic Time Position Applicants Action or Behavior OATC D2. Check PRZR level - TRENDING TO PROGRAM LEVEL. (NO)

RNO D2. IF PRZR level instrument fails high, THEN pertorm the following as necessary:

Adjust charging to prevent letdown from flashing.

-OR-Isolate letdown.

IF PRZR level instrument fails low, THEN maintain charging flow approximately 10 gpm greater than total seal injection flow.

Note to examiner: If the crew blindly follows the step for maintaining charging flow 1 0 gpm greater than total seal injection flow, they will probably flash letdown. The crew will need to manually control charging flow to control PRZR level.

OATC D3. Maintain Seal Injection flow to all RCPs 8 TO 13 GPM.

OATC D4. Select an unaffected channel on LS-459D PRZR LVL CNTL SELECT. (selects 461 I 460)

OATC D5. Select same channel on LS-459E PRZR LVL REC SEL as selected on LS-459D. (selects 461) 14

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : O1 2-301 Scenario No : 6 Event No. : 4 Event

Description:

PRZR level channel LT-459 will slowly fail low over 10 minutes. The OATC will take manual control of FIC-01 21 to stabilize charging flow and PRZR level, swap control channels, return charging flow to automatic Time j Position Applicants Action or Behavior OATC D6. Restore letdown flow by initiating I 3006, CHEMICAL AND VOLUME CONTROL SYSTEM, if required. (N/A)

OATC D7. Check if PRZR heaters should be restored to service. (NO)

PRZR level controlling channel FAILED LOW.

RNO D7. GotoStepD9.

Note to examiner: The channel fails low over 1 0 minutes, the crew will have plenty of time to adjust charging and defeat the failed channel prior to letdown isolation. Swapping channels in time will prevent the letdown isolation.

OATC D9. Return PRZR level control to AUTO.

Cue to Simbooth: IF asked, the Shift Manager has given permission to place the PRZR level control system in auto.

OATC D1O. Check PRZR level is maintained at program by auto control.

RNO D1O. Maintain PRZR level at program using manual control.

55 Dl 1 Notify I & C to initiate repairs.

15

Appendix D Required Operator Actions Form ES-D2 Op-Test No. : 201 2-301 Scenario No. : 6 Event No. : 4 Event

Description:

PRZR level channel LT-459 will slowly fail low over 10 minutes. The OATC will take manual control of FIC-0121 to stabilize charging flow and PRZR level, swap control channels, return charging flow to automatic.

Time Position f Applicants Action or Behavior ss D12. Bypass the affected instrument channel using 13509-C, BYPASS TEST INSTRUMENTATION (BTI) PANEL OPERATION, if desired.

Note to examiner: The 55 will notBTl the channel at this time.

I & C will request to leave the channel in the normal state until they have an opportunity to troubleshoot.

QATC D13. Trip affected channel bistable and place associated MASTER TEST switch in TEST position per TABLE Dl within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

(TS 3.3.1) uo TABLE Dl CAUTIONS

. Only one channel should be tripped.

. The bistable input is placed in the tripped state by positioning the selector switch on the specified test card to TEST.

. The bistable input identified by the switch number should agree with the location specified by CAB, CARD, and B/S before tripping a bistable input. If a discrepancy exists, CAB-CARD-B/S should be used, not switch number.

. Bypassing another channel for Surveillance Testing with a channel inoperable is permitted provided the inoperable channel is in the tripped condition and the channel being tested is not bypassed for more than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

16

Appendix D Required Operator Actions Form ESD-2 Op-Test No : 201 2-301 Scenario No. : 6 Event No. : 4 Event

Description:

PRZR level channel LT-459 will slowly fail low over 10 minutes. The OATC will take manual control of FIC-0121 to stabilize charging flow and PRZR level, swap control channels, return charging flow to automatic.

Time Position Applicants Action or Behavior uc [ INPUT Jr LT-459 Failure (Channel 1)

CAB /CARD B/S SWITCH I High Level Reactor Trip 1 8/47 1 LS-459A 4]ERTESTSWITCH 8/73 7 END OF TABLE Dl ss D14. Initiate the applicable actions of Technical Specification 3.3.1.

SS Tech Spec3.3.l r FUNCTION APPLICALBE MODES REQUIRED CHANNELS CONDITIONS

9. Pressurizer Water 1(f) 3 M Level High (0 Above the P7 (Low Power Reactor Trips Block) interlock.

Table 3.34-1 (Page 1 of 1)

Remote Shutdown System Instrumentation and Controls Tech Spec 3.3.4 FUNCTION I INSTRUMENT REQUIRED OR CONTROL PARAMETER NUMBER OF CHANNELS MONITORING INSTRUMENATION

8. Pressurizer Level 2 CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required Al Restore required Function 30 days.

Function inoperable. to OPERABLE status.

B. Required Action and B.1 Be in MODE 3 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Timenotmet. AND B.2 Be in MODE 4 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 17

AppendixD Required Operator Actions Form ES-D-2 Op-Test No : O12-3OI Scenario No. : 6 Event No. : 4 Event

Description:

PRZR level channel LT-459 will slowly fail low over 10 minutes The OATC will take manual control of FIC-0121 to stabilize charging flow and PRZR level, swap control channels, return charging flow to automatic.

Time Position Applicants Action or Behavior ss Table 3.3.3-1 (page 1 of 1)

Post Accident Monitoring Instrumentation Tech Spec 3.3.3 FUNCTION REQUIRED CHANNELS CONDITIONS

6. Pressurizer Level 2 B, G, H, J Note to examiner: Tech Spec 3.33 Function 6 is an INFO LCO.

SS D15. Check repairs and surveillances COMPLETE.

RNO D15. Perform the following:

a. WHEN repairs and surveillances are complete, THEN perform step D16.
b. Return to procedure and step in effect.

END OF EVENT 4, proceed to EVENT 5.

18

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 2012-301 Scenario No. : 6 Event No. : 5 Event

Description:

FW flow transmitter FT-508 fails slowly high over time. This will result in MFPT speed lowering and FW flow less than steam flow. The UO will have to take manual control of MFPT Master Speed controller to control FW flow Time Position Applicants Action or Behavior uo Diagnose PT-508 failing high:

Symptoms I alarms:

ALB13-A06 STM GEN 1 HI/LO LVL DEVIATION ALB13-B06 STM GEN 2 HI/LO LVL DEVIATION ALB13-C06 STM GEN 3 HI/LO LVL DEVIATION ALB13-D06 STM GEN 4 HI/LO LVL DEVIATION ALBO6-FO1 CSFST TROUBLE Indications:

. PT-508 pressure slowly rising.

. MFPT speeds slowly lowering.

. Steam flow I feed flow mismatches on all SGs.

OATC IMMEDIATE OPERATOR ACTIONS El . Check steam and feed flows MATCHED ON ALL SGs. (NO)

RNO El . Take manual control of the following as necessary to restore NR level between 60% and 70%.

. SG feed flow valves. (Note: Not expected to use valves)

. MFP(s) speed. (Note: Expected to raise MFPT speed)

SS Enters 18016-C CONDENSATE AND FEEDWATER MALFUNCTION Section E, FAILURE OF MFP SPEED CONTROL.

19

Appendix D - Required Operator Actions Form ES-D-2 Op-Test No : 201 2-30I Scenario No. : 6 Event No. : 5 Event

Description:

FW flow transmitter FT-508 fails slowly high over time. This will result in MFPT speed lowering and FW flow less than steam flow. The UO will have to take manual control of MFPT Master Speed controller to control FW flow Time Position Applicants Action or Behavior uc E2. Initiate the Continuous Actions Page.

OATC uc E3. Maintain SG NR levels - GREATER THAN 41% and LESS THAN 79%. (YES) uc E4. Check SlC-509A, B, and C MFPT SPEED CONTROL OPERATING PROPERLY.

. ALB15-C05 MFPT LOSS OF FW SIGNAL -

EXTINGUISHED.

. Controller(s) maintaining stable MFPT speed. (NO)

. Controller(s) maintaining MFP discharge pressure/SG pressure differential BETWEEN 100 AND 225 PSI. (NO)

RNO 20

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 23O1 Scenario No. : 6 Event No. : 5 Event

Description:

FW flow transmitter FT-SOB fails slowly high over time. This will result in MFPT speed lowering and FW flow less than steam flow. The UO will have to take manual control of MFPT Master Speed controller to control FW flow Time Position Applicants Action or Behavior uo E4 RNO continued.

E4. Perform one of the following:

Adjust MFPT speed as necessary to maintain MFP discharge pressure/SG pressure differential between 100 and 225 psi.

-OR-Transfer control to the GE Pot by performing the following:

Adjust SC-3151(3152) MFPT A(B) SPEED CHANGER to obtain zero deviation on Sl-3153 (3154).

b. Transfer control by placing MFPT-A(B) MOTOR SPEED CHANGER HS-3151 (3152) in MANUAL.

Adjust SC-3151(3152) to maintain MFP discharge pressure /SG pressure differential between 1 00 and 225 psig.

UO E5. Check PT-507 - OPERATING PROPERLY. (YES)

UO E6. Notify I & C to initiate repairs.

UO E7. Return feed flow controls to AUTO as necessary. (NO) 21

AppendixD Required Operator Actions Form ES-D-2 Op-Test No. : O1 2-301. Scenario No. : 6 Event No : 5 Event

Description:

FW flow transmitter FT-508 fails slowly high over timeS This will result in MFPT speed lowering and FW flow less than steam flow. The UO will have to take manual control of MFPT Master Speed controller to control FW flow Time

] Position Applicants Action or Behavior ss E8. Check repairs and surveillances COMPLETE. (NO)

RNO E8. Perform the following:

a. WHEN repairs and surveillances are complete, THEN perform Step E9.
b. Return to procedure and step in effect.

END OF EVENT 5, proceed to EVENT 6.

22

AppendixD Required Operator Actions Form ES-D-2 Op-Test No : 201 2-301 Scenario No. : 6 Event No 6, actions per ARP 17015-05 Event

Description:

MFPT B turbine vibration will rise to > 6 mils requiring entry into I 801 3-C Rapid Power Reduction and trip of MFPT B.

Time Position Applicants Action or Behavior uo Diagnose vibration problems with MFPT B.

Symptoms I alarms:

. ALB15-D05 MFPT B HI VIB Indications:

. MFPT B Turbine and pump vibrations rising on IPC points.

CREW ALB15-D05 NOTE Turbine and pump vibration may be monitored at the Bentley Nevada cabinet near MFP B or on the following Plant Computer points.

EQ Bentley Nevada 1 B MFPT H.P. Bearing Vibration: X. X0221 X. 1 XIS-531 OX Y,,. X0251 Y,,. 1 XIS-531 OY 1 B MFPT L.P. Bearing Vibration: X. X0222 X. 1 XIS-531 1 X Y,,. X0252 Y,,. 1 XIS-531 1 V 1 B MFP INBD Bearing Vibration: X. X0259 X. 1 XIS-4922X Y,,. X0262 V,,. 1 XIS-4922Y 1 B MFP OUTBD Bearing Vibration: X. X0261 X. 1 XIS-4923X Y X0262 Y,,. 1 XIS-4923V 23

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-3Qj Scenario No : 6 C Event No 6, actions per ARP 17015-05 Event

Description:

MFPT B turbine vibration will rise to > 6 mils requiring entry into 18013-C Rapid Power Reduction and trip of MFPT B.

0 Time Position Applicants Action or Behavior uo 1.0 PROBABLE CAUSE

  • 1 .

Bearing malfunction due to loss of oil or improper cooling.

2. Bowed shaft.

uo 2.0 AUTOMATIC ACTIONS NONE uO 3.0 INITIAL OPERATION ACTIONS NONE 24

Appendix 0 Required Operator Actions Form ES-D-2 Op-Test No. : 2Q1239 I.

Scenario No. : 6 Event No. : 6, actions per ARP 17015-05 Event Description MFPT B turbine vibration will rise to > 6 mils requiring entry into 18013-C Rapid Power Reduction and trip of MFPT B Time Position Applicants Action or Behavior uc 4.0 SUBSEQUENT OPERATOR ACTIONS NOTE: A handheld vibration instrument may be used to determine levels locally.

1 . Dispatch an operator to MFPT B to investigate.

2. On the Plant Computer, perform the following:
a. Select the ATSI CRT Trend Display and print out a trend of the desired current Turbine parameters to determine the alarm condition.

NOTES

. Elevated or fluctuating bearing drain temperatures may be an indication of bearing loading and can indicate a bearing is failing.

. Engineering and Maintenance should be promptly notified if any bearing drain temperatures are elevated.

. Bearing oil temperatures should be maintained between 110°F and 125°F.

b. Monitor lube oil and bearing oil temperatures of pump and turbine.
3. IF MFP TURBINE bearing vibration rises to 5 mils or greater, immediately reduce power and trip MFPT B per the following:

. 1 801 3-C Rapid Power Reduction.

. 1 801 6-C Condensate And Feedwater Malfunction.

25

AppendixD Required Operator Actions Form ES-D-2 Op-Test No.: 2O1Q1 Scenario No: 6 Event No : 6, actions per ARP 1 701 5-05 Event

Description:

MFPT B turbine vibration will rise to > 6 mils requiring entry into 18013-C Rapid Power Reduction and trap of MFPT B Time Position Applicants Action or Behavior uc 4.0 SUBSEQUENT OPERATOR ACTIONS (continued) 4* IF MFP TURBINE bearing vibration rises to 5 mils or greater, request Engineering and Maintenance to initiate local vibration monitoring and recom mended compensatory actions identified in Step 7.

5 IF MFP PUMP bearing vibration rises to 55 mils or greater, reduce power and stop MFPT B per 1 2004-C, Power Operation (Mode 1)

6. IF MFP PUMP bearing rises to 6 mils or greater, rapidly reduce power and stop MFP B per 1 801 3-C Rapid Power Reduction.
7. IF MFP Turbine/Pump vibrations are elevated AND with Engineering concurrence, perform the following to reduce vibrations:
a. Monitor lube oil and bearing oil temperatures on Plant Computer and maintain bearing oil temperatures between 1 1 0°F and 1 25°F by adjusting cooling water flow.

26

AppendixD RequircdOperator Actions Form ES-D-2 Op-Test No. : 201 23O1 Scenario No. : 6 Event No. : 6, actIons per ARP 17015-05 Event

Description:

MFPT B turbine vibration will rise to > 6 mils requiring entry into 1 801 3-C Rapid Power Reduction and trip of MFPT B.

Time Position Applicants Action or Behavior uo 42 SUBSEQUENT OPERATOR ACTIONS (continued)

CAUTIONS:

. Raising the speed of MFP A will lower the speed on the MFP B.

MFP A should not exceed 5900 rpm and MFP B speed should not drop below 5100 rpm.

. A bias potentiometer setpoint should not be lowered to less than 5.0. Having a setpoint of less than 5O will lower the maximum speed of the affected MFP.

b. Reduce speed of MFP B by increasing MFP A speed as follows:

(1) Slowing increase speed on MFP A by increasing the bias potentiometer on 1 SIC-509B (if in auto) or by increasing speed demand on 1 SIC-509B (if in manual).

Allow speed on MFP B to decrease (if SIC-509C is in auto) or decrease speed demand (if SIC-509C is in manual).

(2) Continue to lower speed on MFP B until the vibration alarm clears or 51 00 rpm is reached.

27

AppendixD Required Operator Actions Form ES-D-2 Op-Test Nofl: 2012-301 Scenario No.: 6 Event No.: 6, actions per ARP 17015-05 Event

Description:

MFPT B turbine vibration will rise to > 6 mils requiring entry into 18013-C Rapid Power Reduction and trip of MFPT B.

Time Position Applicants Action or Behavior UO 4. SUBSEQUENT OPERATOR ACTIONS (continued)

NOTES:

Operational experience shows that pumps usually run with less vibration at higher seal water temperatures.

Optimal seal water temperatures are between 1 40°F and 160°F with Inboard/Outboard temperature difference less than 5°F.

Maintenance I & C support may be required for adjustment of MFP seal water temperature controls.

c. Adjust the MFP B seal water controls to reduce vibrations as follows:

(1) Establish constant communications with Control Room.

(2) Select the setpoint display screen on 1 -TIC-5237A and 1 -TIC-5237B.

CAUTION: Setpoint changes should be made in increments no greater than 0.4 degrees.

(3) Use the up and down arrows to select the required temperature setpoint.

(4) Press setpoint key on 1 -TIC-5237A and 1 -TIC-5237B WHEN temperature adjustment is completed.

(5) Monitor SGFP Turbine and Pump vibrations.

28

Appendix D RequiredOperator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 6 Event No. : 6, actions per ARP 17015-05 Event

Description:

MFPT B turbine vibration will rise to > 6 mils requiring entry into 18013-C Rapid Power Reduction and trip of MFPT B.

Time Position Applicants Action or Behavior uo SUBSEQUENT OPERATOR ACTIONS (continued)

NOTE Turbine and pump vibration may be monitored at the Bentley Nevada cabinet near MFP B or on the following Plant Computer points.

iEQ Bentley Nevada lB MFPT HP. Bearing Vibration: X. X0221 X. 1XIS-5310X Y,, X0251 Y,. 1 XIS-531 OY 1 B MFPT L.P. Bearing Vibration: X. X0222 X. 1 XIS-531 1 X Y,,. X0252 Y,,. 1 XIS-531 1 Y I B MFP INBD Bearing Vibration: X. X0259 X. 1 XIS-4922X Y,,. X0262 y,,. 1 XIS-4922Y 1 B MFP OUTBD Bearing Vibration: X. X0261 X. 1 XIS-4923X Y X0262 Y,. 1 XIS-4923Y uO (6) IF further temperature adjustment is required to reduce vibration, repeat steps 2 through 5.

(7) WHEN temperature adjustment is no longer required, ensure 1 -T-V5237A and 1 -TV-5237B are controlling as required.

d. Adjust the MFPT B Seal Water Supply Bypass 1-1305-U4-628 and 1 -1 305-U4-629 IF required.

(1) Install caution tags on valves stating the following or equivalent:

MFP seal water bypass valves throttled to reduce vibration on MFP B 29

AppendixD____ Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 6 Event No: 6, actions per ARP I 7015-05 Event

Description:

MFPT B turbine vibration will rise to > 6 mils requiring entry into 18013-C Rapid Power Reduction and trip of MFPT B.

Time Position Applicants Action or Behavior uo SUBSEQUENT OPERATOR ACTIONS (continued)

8. Scan ALB15 and ALB16 for associated alarms and take appropriate actions.

30

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 6 Event No. : 6 Event

Description:

MFPT B turbine vibration will rise to > 5 mils requiring entry into 18013-C Rapid Power Reduction and trip of MFPT B Time Position Applicants Action or Behavior ss 18013-C, RAPID POWER REDUCTION actions.

Entry Condition Target Approx. Time @ 3-5% mm 17015-D05 MFPT High Vibrations <70% RTP 6 10 minutes 17015-EO1 1 Perform SHUTDOWN BRIEFING.

SHUTDOWN BRIEFING SS METHOD

. Auto rod control should be used.

. Reduce Turbine Load at approximately 3% RTP per minute (approx 36 MWe) up to 5% RTP (approx 60 MWe).

. Borate AFD within the doghouse.

. 55 (or SRO designee> Maintain supervisory oversight.

. All rod withdrawals will be approved by the 55.

. Approval for each reactivity is not necessary as long as manipulations are made within the boundaries established in this briefing (i.e. turbine load adjustment up to 60 MWe, etc.

S A crew update should be performed at approximately every 1 00 MWe power change.

. If manpower is available, peer checks should be used for all reactivity changes.

OPERATiONAL LIMiTS

. Maintain Tavg within +/- 6°F of Tref. IF TAVG/TREF mismatch >6°F and not trending toward a matched condition or if Tavg 551°F, then trip the reactor.

. If load reduction due to a loss of vacuum, every effort should be made to maintain the steam dumps closed. (Permissive C-9 24.92 Hg).

INDUSTRY OE

. Shift supervision must maintain effective oversight and exercise conservative decision making.

. Correction of significant RCS Tavg deviations should only be via secondary plant control manipulations and not primary plant control manipulations (i.e., do not withdraw control rods or dilute),

31

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 6 Event No. : 6 Event

Description:

MFPT B turbine vibration will rise to > 5 mils requiring entry into 18013-C Rapid Power Reduction and trip of MFPT B Time Position Applicants Action or Behavior OATC 2. Verify rods in AUTO.

UO 3. Reduce Turbine Load at the desired rate up to 5% mm. (60 MWe/min).

OATC 4. Borate as necessary by initiating 1 3009, CVCS REACTOR MAKEUP CONTROL SYSTEM.

Note to examiner: Step from 1 3009-C for boration are at the end of this event starting on page # 36 OATC 5. Initiate the Continuous Actions Page.

OATC 6. Check desired ramp rate - LESS THAN OR EQUAL TO 5%/MIN.

32

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 2012-301 Scenario No. : 6 Event No. : 6 Event

Description:

MFPT B turbine vibration will rise to > 5 mils requiring entry into 18013-C Rapid Power Reduction and trip of MFPT B.

Time Position j Applicants Action or Behavior OATC 7. Maintain Tavg within 6oF of Tref:

a. Monitor TavglTref deviation (UT-0495).
b. Verify rods inserting as required.

C. Energize Pressurizer back-up heaters as necessary.

OATC 8. Maintain reactor power and turbine power MATCHED.

a. Balance reactor power with secondary power reduction using boration and control rods.
b. Check rate of power reduction ADEQUATE FOR PLANT CONDITIONS.
c. Check RCS Tavg GREATER THAN 551°F (TS 3.4.2).
d. Check RCS Tavg WITHIN 6oF OF TREF.

OATC 9. Maintain PRZR Pressure AT 2235 P51G.

OATC 1 0. Maintain PRZR Level at - PROGRAM.

OATC 1 1 Maintain SG Level

. BETWEEN 60% AND 70%.

OATC 1 2. Notify the System Operator that a load reduction is in progress.

33

Appendix D Required Operator Actions Form ES-D2 Op-Test No. : 201 2-301 Scenario No. : 6 EventNo.: 6 Event

Description:

MFPT B turbine vibration will rise to > 5 mils requiring entry into 1 801 3-C Rapid Power Reduction and trip of MFPT B.

Time Position Applicants Action or Behavior ss Notify SM to make the following notifications as appropriate:

Management Notifications using 1 0000-c, CONDUCT OF OPERATIONS 10, EMERGENCY CLASSIFICATION DETERMINATION AND INITIAL ACTION FEDERAL AND STATE REPORTING REQUIREMENTS.

Technical Specification sampling for load reductions greater than 15% using 35110-C, CHEMISTRY CONTROL OF THE REACTOR COOLANT SYSTEM.

to perform a NOPT inspection using 84008, RPV ALLOY 600 MATERIAL INSPECTIONS AND REPORTS for reactor shutdowns.

NOTE UO Attempts should be made to keep steam dumps closed if power reduction is required for Condenser problem.

UO 1 4. Check Steam Dumps - CLOSED.

UO 1 5. Check Turb/Gen to remain online. (YES) 34

AppendixD Required Operator Actions Form ES-D-2 Op-Test No. : Q24Q Scenario No. : 6 Event No : 6 Event

Description:

MFPT B turbine vibration will rise to > 5 mils requiring entry into 18013-C Rapid Power Reduction and trip of MFPT B.

Time Position Applicants Action or Behavior ss 1 6. Check desired plant conditions achieved.

Adequate load reduction.

-OR Plant conditions no longer required shutdown.

RNO 1 6. WHEN desired plant conditions are achieved, THEN Go to Step 17.

uo 17. Perform the following:

a. Stabilize power level.
b. Place rods in MANUAL and match Tavg with Tref.

C. Maintain stable plant conditions.

d. Go to 12004-C, POWER OPERATION (MODE 1) Section 4.2 and perform actions from the starting power level to ending power level.

UO IF NOT ENDED PREVIOUSLY, END OF EVENT 6, proceed to EVENT 7, the main event.

35

Appendix D Required_Operator Actions Form ES-D-2 Op-Test Nofl: 2012-301 Scenario No.: 6 Event No. : 6 Rapid Power Reduction boration steps.

Event

Description:

Rapid Power Reduction boration steps from 13009.

Time Position Applicants Action or Behavior OATC 4.2 BORATION 4.2.1 Determine the existing RCS boron concentration from Boron Meter 1-AI-40134 OR by sample analysis.

4.2.2 To determine the number of gallons of boric acid required to borate the RCS, perform the following.

IF borating to required boron for a xenon free cool down, obtain the maximum boron concentration for the cool down range from the PTDB Tab 1 .3.4-Ti and T2.

OR IF borating to a desired boron concentration, determine the desired change in boron concentration by subtracting the existing concentration from the desired concentration.

THEN Determine the amount of boric acid necessary to accomplish the desired change in boron concentration using PTDB Tab 2.3 and correct the obtained value using PTDB Tab 2.1.

Note to examiner: The OATC may also use a Beacon Book calculation to obtain a boron addition target for the Rapid Power Reduction. For a power reduction to 70%, this will be a boron addition of 230 gallons at 30 gpm.

OATC 4.2.3 Place VCT MAKEUP CONTROL 1 -HS-40001 B in STOP.

OATC 4.2.4 Place VCT MAKEUP MODE SELECT 1-HS-40001A in BOR.

36

Appendix D RequIred Operator Actions Form ES-D-2 Op-Test No O1 2-301 Scenario No 6 Event No. : 6 Rapid Power Reduction boration steps Event

Description:

Rapid Power Reduction boration steps from 13009.

Time Position Applicants Action or Behavior NOTE If necessary, boric acid flow may be adjusted using 1 -FIC-Ol 1 0 with ss concurrence. Changes to pot setting should be logged in the Control Room Log and restored at completion of activity.

OATC 4.2.5 Adjust potentiometer on Boric Acid Blender Flow Controller 1 -FIC-O1 1 0 as desired and verify in AUTO.

CAUTION Digital counter setting on BORIC ACID TO BLENDER integrator 1 -FQI-O1 1 0 reads in tenth-gallon increments.

OATC 4.2.6 Set BORIC ACID TO BLENDER integrator 1 -FQI-O1 1 0 to the desired amount of Boric Acid.

37

AppenchxD Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 6 Event No : 6 Rapid Power Reduction boration steps 1 Event

Description:

Rapid Power Reduction boration steps from 13009.

Time Position Applicants Action or Behavior OATC 4.27 Verify the following:

. BA TO BLENDER 1 -HS-O1 1 OA is in AUTO.

. BLENDER OUTLET TO CHARGING PUMPS SUCT 1 -HS-O1 1 OB is in AUTO.

. One Boric Acid Transfer Pump in AUTO or START.

RX MU WTR TO BA BLENDER 1 -FV-O1 1 1 A is closed with 1HS-O111A in AUTO.

. BLENDER OUTLET TO VCT 1 -FV-O1 1 1 B is closed with 1HS-O111B in AUTO.

NOTES

. Boration can be manually stopped at any time by placing 1-HS-40001B in STOP.

. VCT pressure, 1 -P1-i 1 5 should be maintained between 20 and 45 psig.

OATC 4.2.8 Place VCT MAKEUP CONTROL 1 -HS-40001 B in START and perform the following:

. Verify Boric Acid Transfer Pump is running.

. Verify 1 -FV-01 1 OB is open.

. Verify 1 -FV01 1 OA throttles open to provide desired flow on 1-Fl-O11OA.

. Monitor BORIC ACID TO BLENDER integrator 1-FQI-01 10.

38

Appendix D Required OperatorActions Form ES-D-2 Op-Test No 201 2-301 Scenario No 6 Event No. : 6 Rapid Power Reduction boration steps.

Event

Description:

Rapid Power Reduction boration steps from 13009.

Time Position

[ Applicants Action or Behavior OATC 4.2.9 WHEN 1 -FQI-O1 1 0 BORIC ACID TO BLENDER integrator reaches its setpoint, verify boration stops and the following valves close.

. 1-FV-O1 bA, BA TO BLENDER

. 1 -FV-O1 1 OB, BLENDER OUTLET TO CHARGING PUMPS SUCT OATC 4.2.10 Flush approximately 15 gallons of Reactor Makeup Water through 1 -FV-O1 1 OB by performing the flowing:

a. Place VCT MAKEUP MODE SELECT 1-HS-40001A to ALT DIL.
b. Set TOTAL MAKEUP integrator 1-FQI-O1 1 1 for 13 to 15 gallons.
c. Place BLENDER OUTLET TO VCT 1 -HS-O1 1 1 B in CLOSE.
d. Place VCT MAKEUP CONTROL 1 -HS-40001 B in START.
e. Verify flow is indicated on 1 -FI-Ol 1 OB.
f. WHEN TOTAL MAKEUP integrator 1 -FQI reaches the desired setpoint, verify the following valves close:

. 1-FV-O111A, RX MU WTRTO BA BLENDER

. 1-FV-O1 lOB, BLENDER OUTLET TO CHARGING PUMPS SUCT 39

Required Operator Actions Form ES-D-2 Op-Test No 201 2-301 Scenario No 6 Event No. : 6 Rapid Power Reduction boration steps.

Event

Description:

Rapid Power Reduction boration steps from 13009.

Time Position Applicants Action or Behavior OATC 4.21 1 Verify 1 -FIC-Ol 1 0 potentiometer is set to setting recorded prior to boration (or as directed by SS).

OATC 4.2.12 Align Reactor Makeup Control system for automatic operation as follows:

COMPONENT NAME POSITION

a. 1 41S-1 1 OB BLENDER OUTLET TO VCT AUTO
b. 1 HS-40001 A VCT MAKEUP MODE SELECT AUTO c 1 415-40001 B VCT MAKEUP CONTROL START OATC 4.213 IF BA TRANSFER PUMP was placed in START at Step 4.2.7, return to AUTO or as directed by 55.

OATC 42.1 4 Monitor RCS Tavg, source range count rate, and Reactor Power as applicable.

OATC 4.2. 1 5 Operate the Pressurizer Back-up Heaters as necessary to equalize boron concentration between the RCS and the Pressurizer.

40

Appendix D Required Operator Actions Form ES-D-2 Op-Test No Q2-3QJ Scenario No 6 Event No. : 6 Rapid Power Reduction boration steps.

Event

Description:

Rapid Power Reduction boration steps from 13009.

Time Position Applicants Action or Behavior QATC 42.16 Verify desired boration through sample analysis or from Boron Concentration Meter 1 -1 208-T6-006. (1 -Al-401 34).

Return to EVENT 6, Rapid Power Reduction, page #32 41

Append,xD Required Operator Actions Form ES-D2 Op-Test No: 2012-30J Scenario No.: 3 Event No.: 6, 13615-1 Steps for Shutdown of MFPT B at power (section 4.3.3).

Event

Description:

Rapid Power Reduction Shutdown MFPT B steps.

Time Position Applicants Action or Behavior uc 4.33 Shutdown of MFPT-B At Power NOTE: When removing a Main Feed Pump from service Tech Spec LCO 3.3.2 EU 6d. condition J should be entered when pump is no longer feeding forward until pump is tripped at Step 4.3.1.5 55 Enters LCO 3.3.2 EU 6d, Condition J UO 4.3.3.1 When directed to shut down the first MFPT per the controlling Unit Operating Procedure (UOP), perform the following:

a. Verify MFPT-A is in AUTO.
b. Observe that the load shifts from MFP-B to MFP-A while performing the following:

(1 ) Place MEPT-B Speed Controller, 1 -SlC-509C, in MAN.

(2) Slowly adjust 1 -SlC-509C to minimum speed.

UO 4.3.3.2 Transfer Speed Control from 1 -SIC-509C to Motor Speed Changer Potentiometer, 1 -SC-31 52, as follows:

a. Monitor MFPT-B auto/man Transfer Deviation on 1-1-3 154.
b. Slowly adjust 1 -SC-31 52 to obtain zero deviation on 1-1-3 154.
c. Transfer control by placing MFPT-B Motor Speed Changer, 1-HS-3152 in MAN.

42

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 3 Event No. : 6, 1 361 5-1 Steps for Shutdown of MFPT B at power (section 43.3).

Event

Description:

Rapid Power Reduction Shutdown MFPT B steps.

Time Position Applicants Action or Behavior uo 43.3.3 Slowly lower MFPT-B speed (1 -Sl-531 7) to between 1200 and 1 250 rpm by adjusting Motor Speed Changer Potentiometer 1 -SC-31 52.

uo 4.3.3.4 Open the MFPT-B drains:

. MFPT-B HPSV Above Seat Drain 1 -HV-31 06, using 1 -HS-31 06

. MFPT-B HPSV Below Seat Drain 1-HV-3108, using 1 -HS-31 08.

. MFPT-B LPSV Above Seat Drain 1 -HV-31 1 8, using 1-HS-31 18

. MFPT-B LPSV Below Seat Drain 1-HV-3122, using 1 -HS-31 22

. MFPT-B First Stage Drain 1 -HV-31 20, using 1 -HS-31 20.

uO 4.33.5 Trip MFPT-B using 1-HS-3170.

uO 4.3.3.6 Observe HPSV 1 -XV-5369 and LPSV 1 -XV-5367 close.

UO 4.3.3.7 Set Motor Speed Changer Potentiometer, 1 -SC-31 52, to zero (fully counterclockwise).

UO 4.3.3.8 Verify MFP B Discharge valve, 1 -HV-5209, closed.

43

AppendixD Required_Operator Actions Farm ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 3 Event NoW: 6, 13615-1 Steps for Shutdown of MFPT B at power (section 4.3.3).

Event

Description:

Rapid Power Reduction Shutdown MFPT B steps.

Time Position Applicants Action or Behavior uo 4.3.39 Open MFP A and B Casing Warmup Isolations.

. 1 -1 305-U4-592

. 1 -1 305-U4-579 uO NOTE: Opening the links in the following step will prevent an auto start of the third Condensate pump on Low MFP Suction Pressure.

4.3.3. 1 0 If the MFP-B suction valve, 1 -1 305-U4-033, will be closed, open the following links, and caution tag the MFP-B Trip/Reset 1 -HS-31 70.

PUMP PANEL TERMINAL LINK(S)

BOARD MFP-B 1NCPR13 TB-A 14 MFP-B 1NCPR13 TB-A 15 MFP-B Trip/Reset switch, 1 -HS-31 70 uO 4.3.3.1 1 If MFPT-B is being removed from service and tagged out for maintenance, proceed to Section 4.3.4.

uO 4.3.3.12 This step is NOT APPLICABLE at this time.

44

Appendix D Required Operator Actions Form ES-D-2 Op-Test No : 201 2-301 Scenario No. : 6 Event No. : 7 Event

Description:

ATWT with failure of auto rod motion, Turbine auto trip, auto start of all AFW pumps, and faulted Steam Generator(s) as Safeties lift and fail to reseat when the Turbine trips.

Time Position Applicants Action or Behavior a:Ew RecognizesATWTcondition by various first outs, electrical board and other QMOB annunciators. (too various to list)

OAIC IMMEDIATE OPERATOR ACTIONS

1. CheckReactorTrip. (NO)

. Rod Bottom Lights LIT (NO)

. Reactor Trip and Bypass Breakers OPEN. (NO)

. Neutron Flux LOWBRING. (NO)

RND 1 Trip Reactor using both Reactor trip handswitches.

IF Reactor NOT tripped, THEN go to 1 921 1 -C, FR-Si FFONSETO NUOLEAR POVVB GB\EATION I A1W[

SB Transitions to 1 921 1 -C, FR-Si FFONSETO NUOLEAR POWB NETION I A]W[

NOTE This Functional Restoration Procedure should NOT be implemented if both 41 60V AC emergency buses are de-energized, 1 91 00-C should be entered.

CAUTION RDFshould not be tripped with Reactor power greater than 5%.

45

Appendix D Required Operator Actions Form ESD-2 OpTest No. : 201 2-301 Scenario No. : 6 Event No. : 7 Event

Description:

ATWT with failure of auto rod motion, Turbine auto trip, auto start of all AFW pumps, and faulted Steam Generator(s) as Safeties lift and fail to reseat when the Turbine trips Time Position

] Applicants Action or Behavior QATC IMMEDIATE OPERATOR ACTIONS

1. VerifyReactor trip:

. Rod Bottom Lights UT. (NO)

. Reactor Trip and Bypass Breakers OPEN. (NO)

. Neutron Flux LOWBlNG. (NO)

RNO 1 Trip Reactor using both Reactor trip handswithes.

Critical IF Reactor NOT tripped, THEN insert Control Rods.

Note to examiner: Control rods will initiate inserting at 72 step per minute when the UO trips the Main Turbine, however, after 1 minute, auto rod motion will fail and the QAIC will have to insert rods manually at 48 steps per minute. Manual insertion of Control rods is CRITICAL.

uc IMMEDIATE OPERATOR ACTIONS Critical 2. VerifyTurbine trip:

a. All Turbine Stop Valves CLOSED.

Note to examiner: The Turbine will not automatically trip, it will only trip when performed manually by the UO.

46

Acquired Operator Actions Form ES-D-2 Op-Test No. : 2012-301 Scenario No. : 6 Event No. : 7 Event

Description:

ATWT with failure of auto rod motion, Turbine auto trip, auto start of all AFW pumps, and faulted Steam Generator(s) as Safeties lift and fail to reseat when the Turbine trips.

Time Position ApplicantsAction or Behavior uo 3. Check AFW Pumps - RUNNING: (NO)

. MDAFW pumps (NO)

. TDAFVVPump, if required. (NO)

RNO CrItIcal Start Pumps.

Critical Open Steam Supply valve HV-5106.

Note to examiner: The TDAFW pump is required to be started as at least 2 S3 levels will be < 1 O/ NR uo 4. EmergencyboratetheRS:

a. Start at least one Boric Acid Transfer Pump.
b. Verify aCharging Pump is running.
c. Open EMEN BORATE valve HV-81 04.

Note to examiner: The UC will be asked to perform this step.

47

Appendix D____ Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 6 EventNo.: 7 Event

Description:

ATWT with failure of auto rod motion, Turbine auto trip, auto start of all AFW pumps, and faulted Steam Generator(s) as Safeties lift and fail to reseat when the Turbine trips.

Time

] Position Applicants Action or Behavior uo Step 4continued.

d. Verify charging flow GFEA1ERTHAN 42 GPM. (may not)
e. Verify boric acid flow GFEATBTfHAN 30 GPM.

Note to examiner: Due to high RB pressure during the ATWT, it may be necessary to take control of FKD-0121 to raise charging flow to > 42 gpm.

f. Oheck FS pressure - LETHAN 2335 FSK3. (YES)

RNOjust in case)

f. Oheck PFR RDFWs and Block Valves open.

IF valves NOT open, Ti-EN reduce FtSpressure to less than 2135 psig by performing the following:

1) Arm OCFS
2) Open PF FOR/s and Block Valves as necessary.

48

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 6 Event No. : 7 Event

Description:

ATWT with failure of auto rod motion, Turbine auto trip, auto start of all AFW pumps, and faulted Steam Generator(s) as Safeties lift and fail to reseat when the Turbine trips Time Position Applicants Action or Behavior QA1ID 5. CheckContainment Ventilation Isolation:

a. Dampers and Valves OLC6.

. cM MW indication. (may be) uc RNO(just in case)

a. Perform the following:
1) Qose Dampers and Valves.
2) Start Piping Pen Units.

Note to examiner: lfSl has occurred, the RNO will be unnecessary, if SI has NOT occurred, the UO will perform the RNO steps at the I-ft/AC panel.

CVI dampers I valves are listed on page # 54 & 55.

QA1O 6. Initiate the following:

UC

. continuous Action Page.

. NMP-EP-1 10, EMENcYGLASSlFKATKDN Dt-iMlNATlON AND ll\fl1AL CflQN.

OATC 7 Check forSl:

a. SI signal EX1SOR/C11JATED. (NO)
b. Initiate ATTPiDHMENTA. (If, YES)

Note to examiner: A1TDHMEN1A included at end of this event, in the event an SI has actuated.

49

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 23O1 Scenario No. : 6 Event No. : 7 Event

Description:

ATWT with failure of auto rod motion, Turbine auto trip, auto start of all AFW pumps, and faulted Steam Generator(s) as Safeties lift and fail to reseat when the Turbine trips.

Time j Position Applicants Action or Behavior QATC 8. Check the following trips have occurred:

a. Reactortrip.(NO)

FO

a. Locally trip the Reactor trip and Bypass breakers, IF the trip breakers will NOT open, TI-EN tn the Control Rod Drive MG Set output breakers at the Reactor Trip Switchgear.

Note to examiner: The crew is expected to call someone to perform this action: The Simbooth Operator will open the trip breakers two minutes after receiving the request.

b. TurbineTrip. (YES)

OAIC 9. Check Reactor power:

a. LTHAN 5%. (NO)
b. lR SIJR LBSTRAN 0 DPM (NO)
c. GotoStep24.

Note to examiner: This step is a continuous action, when the trip breakers open, the crew should go to step 24 to exit this procedure.

uO 1 0. Check Main Generator Output Breakers OPEN. (YES) 50

Appendix D Required Operator Actions Form ESD2 Op-Test No. : 2012-301 ScenarIo No. : 6 Event No. : 7 Event

Description:

ATWT with failure of auto rod motion, Turbine auto trip, auto start of all AFW pumps, and faulted Steam Generator(s) as Safeties lift and fail to reseat when the Turbine trips.

Time Position Applicants Action or Behavior J

uo ii. CheckSG levels:

a. NR level- ATLEASTO1\EGEATRTHAN 1k. (32%ADVBE RNO
a. Verify total feed flow greater than 1 260 gpm.

IF NOT, Ti-EN start pumps and align valves as necessary.

IF all SG(s) NR levels less than 1 cY/

0 (32% ADVS TI-EN maintain total feed flow greater than 1260 gpm.

b. Maintain NR levels between 1 O% (32% ADV) and 65%.

uO Oheck GSr level GFEATBflHAN 1 5%. (YES) 51

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : Oi2-3Q1 Scenario No : 6 Event No, : 7 Event

Description:

ATWT with failure of auto rod motion, Turbine auto trip, auto start of all AFW pumps, and faulted Steam Generator(s) as Safeties lift and fail to reseat when the Turbine trips Time Position Applicants Action or Behavior QAIC 13. Verifyall dilution pathsLATED.

. RX MU WFRTO BA BLENDE, Rii 1 1 A OLCS. -

. Dpatch operator to verify C\S RX MU WTRTO CDPA ISO, 1208-U4-183 LOOKBDGLOSBD.

UNIT 1 (A8-A47)

UNIT 2 (AB-A82)

RNO

13. Dpatch operator to close:

. cvcs AX M/U wmsuuno DitS iso, i 208-U4-1 77.

UNET 1 (AB-A47)

UNIT2 (AB-A82)

Note to examiner: The Simbooth Operator will open the trip breakers as requested after2 minutesorafterstep 13, whichevercomesfirst. This is to ensure scenario progresses as expected.

OATC 24. Maintain emergency boration to provide adequate shutdown margin for subsequent conditions.

25. Initiate Critical Safety Function Status Tress per 1 9200-C, F-O CRITCAL SFEW FUNON STA11JSTF 52

Appendix D Required Operator Actions Form ES-D2 Op-Test No. : 201 23O1 Scenario No. : 6 Event No. : 7 Event

Description:

ATWT with failure of auto rod motion, Turbine auto trip, auto start of all AFW pumps, and faulted Steam Generator(s) as Safeties lift and fail to reseat when the Turbine trips Time Position Applicants Action or Behavior

26. Return to procedure and step in effect.

Note to examiner: The actions for E-O are on the following pages.

53

Appendix D_________ Required Operator Actions Form ESD2 OpTest No : 2012-301 Scenario NoW: 6 Event No. : 7 Event

Description:

ATWT with failure of auto rod motion, Turbine auto trip, auto start of all AFW pumps, and faulted Steam Generator(s) as Safeties lift and fail to reseat when the Turbine trips.

[iime Positionh Applicants Action or Behavior VALVE # DESGRIPTION LOGATION HV-12975 CNMT AIR RAD MON SPLY ISO IRC QPCP HV-12976 CNMT AIR RAD MON SPLY SO ORC QPCP HV-12977 CNMT AIR RAD MON RTN ISO ORC QPCP HV-12978 CNMT AIR RAD MON RTN ISO IRC QPCP HV2626A CTB NORM PURGE SPLY IRC ISO VLV- MAIN QHVC (C31)

(Normally de-energized shut)

HV-26268 CTB NORM PURGE SPLY IRC ISO VLV-MINI QHVC ((C32)

HV-2627A CTB NORM PURGE SPLY ORC ISO VLV- MAIN QHVC (D31)

(Normally de-energized shut)

HV-2627B CTB NORM PURGE SPLY ORG ISO VLV-MINI QHVC (D32)

HV-2628A CTB NORM PURGE EXH IRC ISO VLV- MAIN QHVC (A33)

(Normally de-energized shut)

HV-2628B CTB NORM PURGE EXH IRC ISO VLV-MINI QHVC ((A34)

HV-2629A CTB NORM PURGE EXH ORG ISO VLV- MAIN QHVC (B33)

(Normally de-energized shut)

HV-2629B CTB MINI PURGE EXH ORG ISO VLV-MINI QHVG (B34)

HV-2624A GTB POST LOGA PURGE EXH IRG ISO VLV QHVG (A35)

HV-2624B GTB POST LOGA PURGE EXH IRG ISO VLV QHVG (B35) 54

AppendaxD Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 6 EventNo.: 7 Event

Description:

ATWT with failure of auto rod motion, Turbine auto trip, auto start of all AFW pumps, and faulted Steam Generator(s) as Safeties lift and fail to reseat when the Turbine trips.

L Time j Posi{ Applicants Action or Behavior HV-12604 PIPING PEN RM OUTLET ISO DMPR QHVC (C22)

HV-12605 PIPING PEN RM INLET ISO DMPT QHVC (822)

HV-12606 PIPING PEN RM INLET ISO DMPR QHVC (823)

HV-12607 PIPING PEN RM OUTLET ISO DMPR QHVC (C23)

HV-12596 RECYCLE HOLD-UP TK-1 ISO VENT VLV QHVC (E22)

HV-12597 RECYCLE HOLD-UP TK-1 ISO VENT VLV QHVC (E23)

HS-2548 PIPING PEN RM FLTR & EXH FAN 1 QHVC (A22)

HV-2549 PIPING PEN RM FLTR & EXH FAN 2 QHVC (A23) 55

AppendixD Required OperatorActions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 6 Event No : 7 Faulted SG (Code Safety Open on SG #4)

Event

Description:

During the ATWT, SG Safeties will lift on all SG(s), however, safety valve Loop # 4 will fail to reseat. These are the actions for EO.

Time Position Applicants Action or Behavior CREW Performs Immediate Operator Actions per 1 9000-C, E-0 Reactor Trip or Safety Injection 55 Makes a page announcement of Reactor Trip.

OATC 1 . Check Reactor Trip: (YES)

. Rod Bottom Lights LIT

. Reactor Trip and Bypass Breakers OPEN

. Neutron Flux LOWERING uO 2. Check Turbine Trip: (YES)

. All Turbine Stop Valves CLOSED uO 3$ Check Power to AC Emergency Buses. (YES)

a. AC Emergency Busses AT LEAST ONE ENERGIZED.

. 41 60 AC 1 E Busses

b. AC Emergency Busses ALL ENERGIZED.

. 416OVAC 1E Busses

. 480V AC 1 E Busses 55

AppendixD Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 6 Event No. : 7 Faulted SG (Code Safety Open on SG #4)

Event

Description:

During the ATWT, SG Safeties will lift on all SG(s), however, safety valve Loop # 4 will fail to reseat, These are the actions for E-O.

Time Position Applicants Action or Behavior OATC 4. Check if SI is actuated. (YES)

. Any SI annunciators LIT

. SI ACTUATED BPLP window LIT SS Goto Step 6.

55 6. Initiate the Foldout Page.

CREW SS 7. Perform the following:

OATC

  • QATC Initial Actions Page UC
  • UC Initial Actions Page NOTE: 55 initiates step 8 after OATC/UO Initial Actions completed.

56

Appendix D RequiredOperator Actions Form ESD-2 Op-Test No. : 201 2-301 Scenario No. : 6 Event No 7 Faulted SG (Code Safety Open on SO #4)

Event Description During the ATWT, SG Safeties will lift on all SG(s), however, safety valve Loop # 4 will fail to reseat These are the actions for E-O Time Position Applicants Action or Behavior OATC PERFORMS OATC INiTiAL ACTIONS 1 Check both trains of ECCS equipment ALIGNING FOR INJECTION PHASE:

(YES)

. MLB indication OATC 2. Check Containment Isolation Phase A ACTUATED. (YES)

. CIA MLB indication OATC 3 Check ECCS Pumps and NCP status:

a. CCPs RUNNING. (YES)
b. SI Pumps - RUNNING. (YES)

Note to Examiner: SIP A is tagged out.

c. RHR pumps - RUNNING. (YES)
d. NCP - TRIPPED. (YES)

OATC 4. Verify CCW Pumps - ONLY TWO RUNNING EACH TRAIN.

57

Appendix 0 RequiredOperator Actions Form ES-D-2 Op-Test No. : O12-3O1 Scenario No. : 6 Event No. : 7 Faulted SG (Code Safety Open on SG #4)

Event

Description:

During the ATWT, SG Safeties will lift on all SG(s), however, safety valve Loop # 4 wall fail to reseat These are the actions for E-O Time Position Applicants Action or Behavior QATC PERFORMS OATC iNITiAL ACTIONS 5 Verify proper NSCW system operation: (YES)

a. NSCW Pumps - ONLY TWO RUNNING EACH TRAIN.
b. NSCW TOWER RTN HDR BYPASS BASIN hand switches - IN AUTO:

. HS-1668A

. HS-1669A OATC 6. Verify Containment Cooling Units: (YES)

UO

a. ALL RUNNING IN LOW SPEED.

. MLB indication

b. NSCW Cooler isolation valves OPEN. (YES)

. MLB indication OATC L Check Containment Ventilation Isolation.

a. Dampers and Valves CLOSED. (YES) 58

AppendixD Required Operator Actions Form ESD-2 Op-Test No. : 201 2-301 Scenario No. : 6 Event No. : 7 Faulted SG (Code Safety Open on SG #4)

Event

Description:

During the ATWT, SG Safeties will lift on all SG(s), however, safety valve Loop # 4 will fail to reseat These are the actions for E-O Time

[ Position Applicants Action or Behavior OATC PERFORMS OATC iNiTiAL ACTIONS

8. Check Containment pressure REMAINED LESS THAN 21 PS 1G.

(YES)

OATC 9. Check ECCS flows:

a. BIT flow. (YES)
b. RCS pressure LESS THAN 1625 P51G. (YES)
c. SI Pump flow. (YES)
d. RCS pressure - LESS THAN 300 P51G. (NO)

RNO

d. GotoSteplO.

59

Appendix D Required Operator Actions Form ES-D-2 Op-Test 0No : 2Q1Z-3O1 Scenario No : 6 Event No. : 7 Faulted SG (Code Safety Open on SG #4)

Event Description During the ATWT, SG Safeties will lift on all SG(s), however, safety valve Loop # 4 will fail to reseat These are the actions for E-O Time Position Applicants Action or Behavior OATC PERFORMS OATC iNiTIAL ACTiONS 1o Check ECCS Valve alignment PROPER INJECTION LINEUP INDICATED ON MLBs. (YES)

OATC 11 . Check ACCW Pumps - AT LEAST ONE RUNNING. (YES)

OATC 1 2. Adjust Seal Injection flow to all RCPs 8 TO 1 3 GPM.

OATC 1 3. Dispatch Operator to ensure one train of SPENT FUEL POOL COOLING in service per 1 371 9, SPENT FUEL POOL COOLING AND PURIFICATION SYSTEM.

END OF OATC INITIAL OPERATOR ACTIONS, return to E-O Step 8.

60

AppendixD Required Operator Actions Form ES-D2 Op-Test No. : 201 2-301 Scenario No. : 6 Event No. : 7 Faulted SG (Code Safety Open on SG #4)

Event

Description:

During the ATWT, SG Safeties will lift on all SG(s), however, safety valve Loop # 4 will fail to reseat. These are the actions for E-O.

Time

[ Position Applicants Action or Behavior

]

uc uO INITIAL ACTIONS 1 . Check AFW Pumps - RUNNING. (YES)

. MDAFW Pumps

. TDAFW Pump, if required.

UO 2. Check NR level in at least one SG GREATER THAN 10%

(32% ADVERSE)

RNO

2. Establish AFW flow greater than 570 gpm by starting pumps and aligning valves as necessary.

UO 3. Check if main steamlines should be isolated: (YES)

a. Check for one or more of the following conditions:

Any steamline pressure LESS THAN OR EQUAL TO 585 P51G.

Containment pressure GREATER THAN 14.5 P51G.

Low Steam Pressure SI/SLI BLOCKED AND High Steam Pressure Rate ONE TWO OR MORE CHANNELS OF ANY STEAMLINE.

b. Verify Main Steamline Isolation and Bypass Valves CLOSED. (YES) 61

Appendix D Required Operator Actions Form ES-D--2 Op-Test No : 201 2-301 Scenario No. : 6 Event No. : 7 Faulted SG (Code Safety Open on SG #4)

Event

Description:

During the ATWT, SG Safeties will lift on all SG(s), however, safety valve Loop # 4 wall fail to reseat These are the actions for E-O Time Position Applicants Action or Behavior uc uo INITIAL ACTIONS 4 Verify FW Isolation Valves closed: (YES)

. MEl Vs

. BEIVs

. MERVs

. BFRVs uc 5 Verify SG Blowdown isolated. (YES)

. Place SG Blowdown isolation Valve handswitches HS-7603A, B, C, and D in the CLOSE position.

Note to examiner: The UC will place the HS-7603A valves in the hard closed position.

. SG Sample Isolation Valves CLOSED. (YES) uo 6. Verify Diesel Generators RUNNING. (YES) uo 7. Throttle total AEW flow as necessary to maintain SG NR levels between 1 0% (32% ADVERSE) and 65%.

62

AppendixD Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 6 Event No. : 7 Faulted SG (Code Safety Open on SG #4)

Event

Description:

During the ATWT, SG Safeties will lift on all SG(s), however, safety valve Loop # 4 will fail to reseat. These are the actions for E-O.

Time Position

[ Applicants Action or Behavior uc 8. Verify both MFPs TRIPPED. (YES) uo 9. Check Main Generator Output Breakers OPEN. (YES)

END OF UO INITIAL ACTIONS, return to step 8 of E-O.

63

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 2012401.. Scenario No. : 6 Event No. : 7 Faulted SG (Code Safety Open on SG #4)

Event

Description:

During the ATWT, SG Safeties will lift on all SG(s), however, safety valve Loop # 4 wall fail to reseat These are the actions for E-O Time Position Applicants Action or Behavior OATC 1 9000-C, E-O actions beginning with step 8.

uo

8. Initiate the Continuous Actions Page.

OATC 9. Check RCS temperature stable at or trending to 557°F. (NO)

RNO

9. IF temperature is less than 557oF and lowering, (it is)

THEN perform the following as necessary:

a. Stop dumping steam.
b. Perform the following as appropriate:

IF at least one SG NR level greater than 10% (32%

ADVERSE),

THEN lower total feed flow.

-OR-If all SG NR levels less than 10% (32% ADVERSE),

THEN lower total feed flow to NOT less than 570 gpm.

c. If cooldown continues, THEN close MSIVs and BSlVs.
d. Iftemperature greaterthan 557oF and rising, THEN dump steam.

64

Appendix D Required OperatorActions Form ES-D2 Op-Test No. : 201 2-301 Scenario No. : 6 Event No. : 7 Faulted SG (Code Safety Open on SG #4)

Event Description During the ATWT, SG Safeties will lift on all SG(s), however, safety valve Loop # 4 will fail to reseat. These are the actions for E-O.

Time Position Applicants Action or Behavior OATC CAUTION: A PRZR PORV Block Valve which was closed to isolate an excessively leaking or open PRZR PORV should not be opened unless used to prevent challenging the PRZR Safeties.

1 0. Check PRZR PORVs, Block Valves, and Spray Valves:

a. PRZR PORVs - CLOSED AND IN AUTO. (YES)
b. Normal PRZR Spray Valves CLOSED (YES)
c. Power to at least one Block Valve AVAILABLE. (YES)
d. PRZR PORV Block Valves - AT LEAST ONE OPEN. (NO)

RNO

d. Verify open at least one PRZR PORV Block Valve when PRZR pressure is greater than 21 85 psig.

UO 11 . Check if RCPs should be stopped.

a. ECCS Pumps - AT LEAST ONE RUNNING: (YES)

. CCP or SI Pump

b. RCS pressure LESS THAN 1375 P51G. (NO)

RNO

b. Go to Step 12.

65

AppendixD Required Operator Actions Form ES-D-2 Op-Test No. : 2Q2-gQ1 Scenario No. : 6 Event No. : 7 Faulted SG (Code Safety Open on SG #4)

Event

Description:

During the ATWT, SG Safeties wiN lift on all SG(s), however, safety valve Loop # 4 will fail to reseat These are the actions for E-O Time Position Applicants Action or Behavior uc 12. Check SGs secondary pressure boundaries:

a. SG Pressures:

Any lowering in an uncontrolled manner. (YES)

-OR-Any completely depressurized.

b. Go to 1 9020-C, E-2 FAULTED STEAM GENERATOR ISOLATION.

SS Transitions to 19020-C, E-2 FAULTED STEAM GENERATOR ISOLATION 66

Appendix D Required OperatorActions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 6 Event No. : 7 (E-2 Actions)

Event

Description:

19020-C E-2 actions for Faulted Steam Generator.

Time Position Applicants Action or Behavior CREW 1 . Initiate critical safety function status trees per 1 9200-C, F-O CRITICAL SAFETY FUNCTION STATUS TREE.

SS 2. Initiate NMP-EP-110, EMERGENCY CLASSIFICATION DETERMINATION AND INITIAL ACTION.

Note to examiner: The 55 will call the Simbooth to have the Shift Manager implement NMP-EP-1 10.

OATC CAUTION: At least one SG should be available for RCS cooldown.

UO 3. Verify Main Steamline Isolation and Bypass Valves CLOSED.

(YES)

UO 4. Check SGs secondary pressure boundaries:

a. Identify intact SG(s): (# 1 , 2, and 3 are intact)

. SG pressures - ANY STABLE OR RISING (YES)

b. Identify faulted SG(s)

ANY SG PRESSURE LOWERING IN AN UNCONTROLLED MANNER.

(YES, SG #4)

-OR-ANY SG COMPLETELY DEPRESSURIZED. (maybe by now, SG #4) 67

AppenchxD Required Operator Actions Form ES-D-2 Op-Test No Q1 2-Q Scenario No 6 Event No. : 7 (E-2 Actions)

Event

Description:

1 9020-C E-2 actions for Faulted Steam Generator.

Time Position Applicants Action or Behavior uo 5 Isolate Main Feedwater to the faulted SG(s):

. Close affected MFIVs:

HV-5227 (SG 1)

HV-5228 (SG 2)

HV 5229 (SG 3)

HV-5230 (SG 4)

. Close affected BFIVs:

HV-15196 (SG 1)

HV- 15197 (SG 2)

HV- 15198 (SG 3)

HV- 15199 (SG 4) uo 6. Isolate Auxiliary Feedwater to the faulted SG(s):

. Close affected MDAFW Pump Throttle Valves:

HV-5139 - SG 1 FROM MDAFW PMP-A HV-51 32 - SG 2 FROM MDAFW PMP-B HV-51 34 - SG 3 FROM MDAFW PMP-B Critical HV-5137 - SG 4 FROM MDAFW PMP-A

. Close affected TDAFW Pump Throttle Valves:

HV-5122 - SG 1 FROM TDAFW HV-51 25 - SG 2 FROM TDAFW HV-5127 - SG 3 FROM TDAFW CritIcal HV-5120 - SG 4 FROM TDAFW Note to examiner: The valves bolded above are critical at this time IF not already previously closed.

uO 7. Check at least one MDAFW Pump RUNNING AND CAPABLE OF FEEDING SG(s) NEEDED FOR RCS COOLDOWN. (YES) 68

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2301 Scenario No. : 6 Event No. : 7 (E-2 Actions)

Event

Description:

19020-C E-2 actions for Faulted Steam Generator.

Time Position

{ Applicants Action or Behavior uo 8. Close affected TDAFW Pump Steam Supply Valve(s):

HV-3009 (SG 1) LP-1 MS SPLY TO AUX FW TD PMP-1 HV-301 9 (SG-2) LP-2 MS SPLY TO AUX FW TD PM P-i Note to examiner: This step is N/A.

uO 9. Verify affected SG ARV(s) CLOSED:

PV-3000 (SG 1)

PV-30i0 (SG 2)

PV-3020 (SG 3)

PV-3030 (SG 4) uO 10. Align SGBD valves:

. Place SG Blowdown Isolation Valve handswitches in CLOSE position.

. Close sample valves.

HV-945i (SG 1)

HV-9452 (SG 2)

HV-9453 (SG 3)

HV-9454 (SG 4) uO 1 1 Verify faulted SG(s) remains isolated during subsequent recovery actions unless needed for RCS cooldown or SG activity sampling.

uO 12. Check CST level - GREATER THAN 15%. (YES) 69

Appendix D Required Operator Actions Form ESD-2 Op-Test No. : 2012-301 Scenario No. : 6 Event No.: 7 (E-2 Actions)

Event

Description:

1 9020-C E-2 actions for Faulted Steam Generator.

Time Position Applicants Action or Behavior uo 13. Initiate checking if SG Tubes intact:

a. Direct Chemistry to take periodic activity samples of all SGs one at a time.
b. Secondary radiation NORMAL. (YES)

. MAIN STM LINE MONITORS

. RE-13120(SG1)

. RE-13121 (SG 2)

. RE-13122 (SG 3)

. RE-13119(SG4)

. CNDSR AIR EJCTR/STM RAD MONITORS:

. RE-12839C

. RE-12839D (if on scale)

. RE-12839E (if on scale)

. STM GEN LIQ PROCESS RAD:

. RE-OO1 9 (Sample)

. RE-0021 (Blowdown)

. SG sample radiation.

C. Check SG levels - ANY RISING IN AN UNCONTROLLED MANNER.

(NO)

RNO C. GotoStepl4.

70

Appendix Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 6 Event No. : 7 (E-2 Actions)

Event

Description:

1 9020-C E-2 actions for Faulted Steam Generator.

Time j Position Applicants Action or Behavior OATC 14. Check if ECCS flow should be reduced:

a. RCS Subcooling GREATER THAN 24°F. (38°F ADVERSE) (YES)
b. Secondary Heat Sink: (YES)

Total feed flow to intact SGs GREATER THAN 570 GPM.

-OR-Narrow range level in at least one intact SG GREATER THAN 10%.

(32% ADVERSE)

c. RCS pressure STABLE or RISING (YES)
d. PRZR level - GREATER THAN 9%. (37% ADVERSE) (YES)
e. Goto 19011-C, ES-li SI TERMINATION.

END OF SCENARIO it desired, freeze the simulator if NRC Chief Examiner concurs.

IF the NRC Chief would like to see more, steps for SI termination are attached through step 5a.

71

ii;dax D Required OperatorActions Form ES-D-2 Op-Test No. : O12-3O1 Scenario No. : 6 Event No. : 7 Event

Description:

Steps for 19011-C, ES-li SI Termination through step 5b.

Time j Position Applicants Action or Behavior ss Enters 1 901 1 -C, ES-i .1 SI Termination.

QATC 1 . Initiate the following:

uc

. Continuous Actions and Foldout Page.

. Critical Safety Function Status Trees per 1 9200-C, F-C CRITICAL SAFETY FUNCTION STATUS TREE.

SS 2. Initiate NMP-EP-1 10, EMERGENCY CLASSIFICATION AND DETERMINATION AND INITIAL ACTION.

CREW CAUTIONS If offsite power is lost after SI reset, action is required to restart the following equipment if plant conditions require their operation.

. RHR Pumps

. SI Pumps

. Post-LOCA Cavity Purge Units

. Containment Coolers in low speed (started in high speed on a UV signal)

. ESF Chilled Water Pumps (If CR1 is reset)

OATC 3. Reset SI.

OATC 4. Verify only one CCP - RUNNING.

Note to examiner: It is expected both CCPs will be running, usually the crew will stop COP A.

72

AppendixD Required Operator Actions Form ES-D-2 Op-Test No.: 2O123O1 Scenario No.: 6 Event No. : 7 Event

Description:

Steps for 19011-C, ES-1.1 SI Termination through step 5b.

Time Position j Applicants Action or Behavior uo 5. Check SGs secondary pressure boundaries:

a. Any SG - FAULTED. (YES, #4)
b. Faulted SG - COMPLETELY DEPRESSURIZED. (NO)

RNO

b. Do NOT continue with this procedure until faulted SG(s)

COMPLETELY DEPRESSURIZED.

Return to Step 5a.

Note to examiner: It is expected SG # 4 will still be showing steam flow at this time, this will be the end of the scenario.

END OF EVENT 7, END OF THE SCENARIO.

73

Apendix D Scenario Outline Form ES-D-1 Facility: Vqti Scenario NoW: 7 Op-Test NoV: 2012-301 Exam iners: Operators:

Initial Conditions: The plant is at 29% power, BOL, steady state operations, control rods in manual.

(Base IC # 36, snapped to IC # 1 87 for HL1 7 NRC Exam)

Equipment OOS Safety Injection Pump A is tagged out for motor repair Turnover: The plant is at 29% power, Containment mini-purge is in service for a Containment entry on the next shift, raise power at < 8% per hour.

Preloaded Malfunctions ES1 9A Block CVI Actuation Train A ES19B Block CVI Actuation Train B ES1O Train A Main Steam Line Isol Auto Actuation Failure ES1 1 Train B Main Steam line Isol Auto Actuation Failure 5108A RWST Sludge Mixing Valve 1 0957 Failure SIOBB RWST Sludge Mixing Valve 1 0958 Failure RD17D (i(-14) @ 36 steps RD17H (D-4) @ 24 steps RDI7L (G-13) @ 30 steps PR12B PORV 456 Block Valve 8000B Auto Closure Failure Overrides HV-81 04 Emergency Borate valve shut.

Note to Simbooth: Place Containment Mini-Purge in service.

Event Malf Event Event No No Type* Description 1 N/A R-OATC Raises power in accordance with UOP-12004-C.

R-SS N-UO T2 SGO5D C-UO SG # 4 Steam Flow indicator fails high.

@ 1 00% C-SS 1

Aendix D Scenario Outline Form ES-D-1 Event Maif Event Event No. No. Type* Description T3 CVO4 I-OATC Loss of Cooling to Letdown Heat Exchanger (TE-Ol 30 fails low) l-SS T4 new malf TS-SS NSCW Cooling Tower Fan # 1 on Train A trips with ambient wet-bulb (9) temperature > 63°F LCO 379 Ultimate Heat Sink (UHS) Condition B T5 PRO2B l-QATC PRZR PT-456 fails high resulting in PQRV 456 failing open and block

@ 100% I-SS valve HV-8000B failure to auto close.

TS-SS LCO 3.3.1 Condition A, FU 6 Condition E, LCO 3.3i FU Ba Condition M, LCO 33.1 FU 8b Condition E LCO 33.2 Condition A, FU Id Condition D, LCO 3.3.2 FU 8b Condition L, LCO 3.4.1 Condition A T6 RF C-UO RWST sludge mixing line pipe break with auto closure failure.

TKO2 C-SS 95-88% TS-SS LCO 3.54 Condition B and Condition D (1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> action) 1200 sec TR 1 3.1 .7 Condition D (Immediate TR action) ramp T7 FWO4C C-OATC MFRV # 3 fails shut, requiring reactor trip, 3 stuck rods.

10 Preload C-OATC Emergency borate due to 3 stuck rods with failure of HV-81 04 to C-SS open.

T8 SGO1 C M-ALL Ruptured Faulted SG IRC with failure of CVI to occur.

@45%

T9 FWO6C M-ALL Ruptured Faulted SG IRC with failure of CVI to occur.

@40%

11 Preload C-UO CVI actuation failure requiring manual alignment.

C-SS Critical 12 Preload C-UO Main Steam Line Auto Actuation Failure C-SS Critical (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form ES-D-1 Event 1:

Raise reactor power in accordance with UQP-1 2004-C.

Verifiable Actions:

OATC Adjust RCS boron concentration and use control rods to raise reactor power.

uO Raises turbine load to raise power.

Technical Specificatns None Event 2:

Steam Generator # 4 controlling steam flow FI-542 will fail low resulting in a reduction in FW flow.

Verifiable Actions:

uO Takes manual control of the SG # 4 feed flow valves and MFP(s) speed to control SG NR levels between 60 and 70%.

uO Selects an unaffected channel for control.

uO Returns MFP(s) speed controls to auto.

uO Return SG feed flow valves to auto.

Technical Specifications:

None Event 3:

The temperature instrument TE-Ol 30 will fail low causing TV-01 30 temperature control valve to the Letdown Heat Exchanger to close causing temperature to rise. An automatic divert of CVCS Letdown around the CVCS demins on high temperature will occur (TV-01 29). Letdown will be diverted straight to the VCT.

Verifiable Actions:

OATC Verifies TV-01 30 is open to control cooling water flow to the Letdown Heat Exchanger.

OATC Realigns TV-0129 through the demins. (if high temperature divert occurred)

Technical Specifications:

None 3

Appendix D Scenario Outline Form ES-D-1 Event 4:

NSCW Train A Cooling Tower Fan # 1 trips with wet bulb temperature > 63°F Verifiable Actions None, Technical Specification call by the 55.

Technical Specifications:

LCO 379 Ultimate Heat Sink (UHS) Condition B Event 5:.

PRZR pressure channel PT-456 fails high resulting in PORV 456 failing open and lowering RCS pressure with failure of the block valve to automatically close.

Verifiable Actions:

OATC Manually closes PORV 456 per lOAs ofi 8001 -C, Primary Instrument Malfunction, energizes PRZR heaters, places spray valves to shut.

OATC Selects controlling channel to 455 I 458 on PS-455F PRZR PRESS CNTL SELECT.

OATC Places PRZR heaters and spray in AUTO.

OATC - Places PORV in AUTO.

Technical Specifications:

LCO 33.1 Reactor Trip System (RTS) Instrumentation Condition A LCO 33:1 Reactor Trip System (RTS) Instrumentation FU 6, Condition E LCO 33i Reactor Trip System (RTS) Instrumentation FU 8a, Condition M LCO 33.1 Reactor Trip System (RTS) Instrumentation FU 8b, Condition E LCO 332 Engineered Safety Features Actuation System (ESFAS) Instrumentation Condition A LCO 3.3.2 Engineered Safety Features Actuation System (ESFAS) Instrumentation FU1d, Condition D LCO 33.2 Engineered Safety Features Actuation System (ESFAS) Instrumentation FU8b, Condition L LCO 34i RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits 4

Appendix D Scenario Outline Form ES-D-i Event 6:

An RWST leak occurs with failure of RWST sludge mixing pump valves to automatically close.

Verifiable Actions uO Manually closes RWST Sludge Mixing Isolation Valves (HV-10957 I HV-10958) to isolate the RWST leak to preserve RWST inventory.

Technical Specifications:

LCQ 354 Refueling Water Storage Tank (RWST) Condition B and Condition D (1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> action)

TR 13t7 Borated Water Sources Operating Condition D (Immediate TR action) gent 7 10:

Main Feed regulating valve to SG # 3 will fail shut requiring a manual reactor trip by the crew.

Following the trip, 3 control rods will be stuck partially out requiring an emergency boration.

HV-8104 Emergency Boration valve will not open from the QMCB.

Verifiable Actions:

OATC Initiates an emergency boration of the RCS from the RWST through the Normal Charging flow path by opening 1 FV-1 1 OA and 1 FV-1 1 OB and adjusting charging flow to obtain the required boration flow rate of 30 gpm and required charging flow rate of 42 gpm.

Event 8g hg 12:

SGTR on SG # 3 post reactor trip. Steam Generator # 3 will develop a DBA SGTR over time after the emergency boration has been completed by the OATC. This will require an SI by the crew.

The diagnosis of the SGTR is complicated by the MFRV # 3 failing closed earlier in the scenario and SG # 3 level will be low relative to the other 3 SGs. The crew will be alerted by the SJAE I SPE rad monitor (RE-i 2839) and be required to use SG level rise and balancing of AFW flow to diagnose the ruptured 5G.

Verifiable Actions:

uO Balances I isolates AFW flows to determine the ruptured SG # 3.

OATC Manually actuates SI due to lowering PRZR level and RCS pressure in order to maintain RCS inventory.

Technical Specifications:

None 5

Appendix D Scenario Outline Form ES-D-1 Event 9:

Main feed water line break IRC on the ruptured SG # 3.

Verifiable Actions:

uO The UC will manually isolate the main steam lines.

CRITICAL TASKS:

1 ) Manually isolate the Main Steam lines no later than step # 3 of 1 9020-C to limit blow down due to SG # 3 fault to one SG This limits the Containment pressure rise and challenge to the Containment barrier.

2) Manually closes at least one CVI damper in each flow path to prevent a radiation release flow path from the RCS via SG # 3 to the environment. CVI isolation must be performed no later than the Initial Operator Actions of 1 9000-C.
3) Manually isolate SG # 3 to limit blow down to one SG limiting CNMT pressure rise and Challenge to the Containment. This also limits RCS cool down and possible PTS condition by closing the following valves. These will be done no later than the procedurally directed steps of 1 9020-C.
  • MFIVs
  • BFIVs

NUCLEAR SAFETY FOCUS Z TARGET ZERO ProtectedTrain: EOOS: Green Alpha LI Yellow LI Bravo LI Orange LIRed Plant 29 % power BOL.

Conditions:

Major Activities: Initiate power ascent UOP 12004-C section 4.1 for Power Ascent at a rate not to exceed 8% per hour. Step 4.1 .40 has been performed. Step 4.1 .41 is the next procedure plateau.

Active LCOs: E1 LCO 3.5.2 Condition A is in effect due to SIP A tagged out.

005/ Degraded LI None CR Instruments:

Narrative 0 Containment mini-purge is in service for a planned Status: Containment Entry on next shift.

LI SIP A is tagged out for motor repair, expected return to service time is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> left on a shutdown LCO of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

LI MFPT B will be placed in service at 55% power per UOP step 4.1.45.

n The remnants of Hurricane Maya are passing through, severe weather and thunderstorms will be in the area for the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. The Severe Weather Checklist is in effect.

D Power Range high level trip bistables are set at 90%.

Appendix D ReQuired Operator Actions Form ES-D-2 Op-Test No.: 201 2-301 Scenario No.: 7 Event No.: 1 Event

Description:

Reactor Power Ascension from 29% RTP and higher, UOP 12004-C, step 41 .41 is the next plateau.

Time Position Applicants Action or Behavior OATC Uses 1 3009-1 CVCS Reactor Makeup Control System Section 4.7 Frequent Dilutions While Controlling Reactor Power, as necessary to maintain Tavg matched with Tref during power ascension.

UO Increases turbine load in increments of 1 5 Mwe to 30 Mwe using load increase pushbutton at direction of OATC. Monitors Generator Output.

1 3009-1 Section 47:

NOTES

. This section can be used during power changes when necessary to frequently dilute the RCS for temperature control. The use of this section shall be authorized by the 55.

. Frequent dilutions can raise VCT level to the point where VCT pressure reaches 40 psig. 1 -LIC-Ol 85 may be adjusted to allow divert to the RHT at a lower level to limit VCT pressure increase.

OATC 4.7 FREQUENT DILUTIONS WHILE CONTROLLING REACTOR POWER 4.71 Determine the amount of Reactor Makeup Water necessary to accomplish the power change or accommodate the expected impact of Xenon. (Uses Reactivity Briefing Sheet to Determine # gallons -

Dilution)

Gals H20 NOTE: EACH OATC WILL USE NUMBER HE/SHE IS COMFORTABLE WITH (100 1000 Gallons)

OATC 4.T2 Verify the Reactor Makeup System is aligned for automatic operation.

OATC 4.7.3 Start one Reactor Makeup Water Pump:

AX MU WTR PMP-1 1-HS-7762 AX MU WTA PMP-2 1 -HS-7763

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 201 2301 Scenario No.: 7 Event No.: 1 Event

Description:

Reactor Power Ascension from 29% RTP and higher, UOP 12004-C, step 4t41 is the next plateau.

Time Position Applicants Action or Behavior OATC 4.7.4 Place VCT MAKEUP CONTROL 1 -HS-40001 B in STOP.

OATC 4.T5 As directed by the 55, place VCT MAKEUP MODE SELECT 1-HS-40001A in either the ALT DIL or DIL position.

OATC 4.76 As directed by the SS, lower pot setting on 1-LIC-0185, to limit VCT pressure increase.

Initial Pot Setting:_______ New Pot Setting:

OATC 4:7.7 Set TOTAL MAKEUP Integrator 1 -FQI-O1 1 1 for the desired amount of Reactor M/U Water.

Gals H20 OATC NOTE If VCT MAKEUP MODE SELECT 1-HS-40001A was placed in the DIL position in Step 4.7.5, Step 4.7.8 may be marked N/A.

4.7.8 If required, close 1 -FV-O1 1 08 as necessary to raise or maintain RCS hydrogen concentration. (N/A)

Note to examiner: If ALT DIL selected, FV-1 lOB will be closed.

55 / OATC 4.7.9 At SS direction, dilution flow may be adjusted to desired flow using 1 -FIC-Ol 1 1 (record in AUTO LOG).

Initial Pot Setting: New Pot Setting:

NOTE: EXPECTED NOT TO CHANGE DESIRED FLOW:

OATC 4.7.10 Place VCT MAKEUP CONTROL 1-HS-40001B in START and verify flow is indicated on 1 -FI-Ol 1 OB.

2

Appendix D Required Operator Actions Form ES-D-2 Op-Test No: 201 2-301 Scenario Nofl: 7 Event No: I Event

Description:

Reactor Power Ascension from 29% RTP and higher, UOP 12004-C, step 4L41 is the next plateau.

Time Position Applicants Action or Behavior QATC 411 1 WHEN TOTAL MAKEUP Integrator 1-FQI-O1 1 1 reaches its setpoint, verify dilution stops and the following valves close:

. 1 -FV-O1 1 1 A AX MU WTA TO BA BLENDER

. 1 -FV-O1 1 1 B BLENDER OUTLET TO VCT

. 1-FV-O11OB BLENDER QUTLETTO CHARGING PUMPS SUCT OATC 47i2 Operate the Pressurizer Back-up Heaters as necessary to equalize Cb between the RCS and the Pressurizer.

QATC 47.1 3 Monitor RCS temperature, Control Bank position, or power levels as applicable.

CAUTION If frequent dilutions are to be continued past the end of the shift, step 4714 should be marked N/A and this section completed to include realignment to the normal configuration. The new on coming shift can then initiate the section from the beginning to continue frequent dilution.

OATC 47 i 4 Repeat Steps 47i 0 through 4J. 1 3 as necessary to continue power ramp and/or compensate for Xenon.

NOTE: OATC WILL LEAVE CVCS MAKEUP SYSTEM ALIGNED PER 4. 7 FOR FREQUENT DILUTIONS WHILE CONTROLLING REACTOR POWER DURING POWER ASCENSION.

3

Appendix D Required Operator Actions Form ES-D-2 Op-Test No: 201 2-3Qj Scenario NoV: 7 Event Nofl: I Event

Description:

Reactor Power Ascension from 29% RTP and higher, UQP 12004-C, step 41 41 is the next plateau.

Time Position Applicants Action or Behavior

    • NOTE: EVENT 2 IS INITIATED WHILE OATC AND UO ARE PERFORMING ACTIONS 1N EVENT 2 FOR POWER ASCENSION AT EXAMINERS DISCRETIONS 4

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 7 Event No. : 2 Event

Description:

SG # 4 Steam Flow channel Fl-542 fails high.

Time Position Applicants Action or Behavior uo Diagnose SG Loop # 4 Flow Fl-542 has failed high.

Symptoms I alarms:

ALB13-DO1 STM GEN 4 FLOW MISMATCH Indications:

. FI-542 reading off scale high.

. Steam flow indication on Fl-542 reading higher than feed flow.

uO IMMEDIATE OPERATOR ACTIONS Gi . Check steam and feed flows MATCHED ON ALL SGs. (NO)

RNO Gi . Take manual control of the following as necessary to restore NR level between 60% and 70%.

. Affected SG feed flow valves. (UO throttles closed loop 4 MFRV)

. MFP(s) speed. (reduces MFPT speed using the Master Controller)

Note to examiners: It is expected the operator will take manual control of MFRV # 4 and the MFPT Master Controller. Steam flow failing high will result in the MFRV # 4 opening and the MFPT Master Controller speeding up the feed pumps. The operator will control SG # 4 levels and MFP speed with these controllers.

SS Enters AOP 18001-C, SYSTEMS INSTRUMENTATION MALFUNCTION, section G for FAILURE OF STEAM GENERATOR FLOW INSTRUMENTATION.

5

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 7 Event No, : 2 Event

Description:

SG # 4 Steam Flow channel Fl-542 fails high.

Time j Position [ Applicants Action or Behavior SUBSEQUENT OPERATOR ACTIONS uo G2. Select an unaffected control channel.

Note to examiner: The UC will select F543 on 1 FS-542C selector switch.

uc G3. Return MFP(s) speed controls to AUTO.

Cue to Simbooth: IF asked, the Shift Manager has given permission to place the MFRV and MFPT speed controllers in auto.

UO G4. Return SG feed flow valves to AUTO.

Cue to Simbooth: IF asked, the Shift Manager has given permission to place the MFRV and MFPT speed controllers in auto.

UO G5. Initiate the Continuous Actions Page.

OATC UO G6. Check SG level control maintains NR level AT 65%.

55 G7. Notify I & C to initiate repairs.

6

Appendix D Required Operator Actions Form ES-D-2 Op-Test No,: 2012-301 Scenario No.: 7 Event No. : 2 Event

Description:

SG # 4 Steam Flow channel Fl-542 fails high.

Time Position Applicants Action or Behavior ss G8. Check repairs and surveillances COMPLETE. (NO)

RNO G8. Perform the following:

a. WHEN repairs and surveillances are complete, THEN perform step G9.
b. Return to procedure and step in effect.

Note to examiner: There are no Technical Specification actions for this malfunction.

END OF EVENT 2, proceed to EVENT 3.

7

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 7 Event No. : 3 Event

Description:

TE-0130 fails low, this controls ACCW cooling to the Letdown Heat Exchanger. With TE-Ol 30 failed low, TV-O1 30 will throttle shut raising the actual Letdown Heat Exchanger temperature. The OATC will have to manually control TVO1 30 to control ACCW flow to the Letdown Heat Exchanger Time Position

[ Applicants Action or Behavior OATC Diagnose TE-0130 has failed low.

Symptoms 1 alarms:

ALBO7-F04 LTDN HX HI TEMP DEMIN DIVERT ALBO7-B04 (VOLUME CONTROL TANK OUTLET TEMP HI (delayed, or may not come in)

Indications:

. TE-Ol 30 reading down scale low.

. TE-Ol 30 red UP arrow LIT. (indicates attempting to raise letdown temperature).

. Amber light on 1 HS-1 29 LETDOWN TO DEMIN I VCT LIT. -

OATC ALBO7-F04 response actions:

AUTOMATIC ACTIONS:

Letdown flow is diverted away from the Mixed Bed Demineralizers directly to the Reactor Coolant Filter.

OATC INITIAL OPERATOR ACTIONS 1 . Check letdown temperature on 1 -TI-Ol 30 on the QMCB. (failed)

2. IF necessary, initiate 18007-C, Chemical Volume Control System Malfunction. (not necessary, letdown is not lost)
3. Check for ACCW normal operation. (TV-O1 30 not normal) 8

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 7 Event No. : 3 Event

Description:

TE-Ol 30 fails low, this controls ACCW cooling to the Letdown Heat Exchanger. With TE-Ol 30 failed low, TV-O1 30 will throttle shut raising the actual Letdown Heat Exchanger temperature. The OATC will have to manually control TV-O1 30 to control ACCW flow to the Letdown Heat Exchanger.

Time Position Applicants Action or Behavior OATC SUBSEQUENT OPERATOR ACTION 1 . Attempt to balance charging and letdown flow.

2. WHEN letdown temperature is restored, return 1-TV-0129 to the DEMIN position.
3. IF instrument or equipment failure has occurred, initiate maintenance as required.

COMPENSATORY OPERATOR ACTIONS NONE Note to examiner: The OATC can control cooling flow to the VCT using TV-O1 30. For 1 20 gpm letdown flow, this is normally set to 51% (note dry erase board on SS throne). It is expected the OATC will take manual control of TV-0130 to control cooling flow.

End of 1 7007-F04 actions.

OATC ALBO7-B04 actions (LTDN HX HI TEMP DEMIN DIVERT)

PROBABLE CAUSE 1 . Low Auxiliary Component Cooling Water (ACCW) flow through the Letdown Heat Exchanger.

2. Low ACCW flow through the Excess Letdown Heat Exchanger or Seal Water Heat Exchanger if aligned to the Volume Control Tank (VCT).

9

Appendix D Required Operator Actions Form ES-D-2 OpTest No. : 201 2-301 Scenario No. : 7 Event No. : 3 Event

Description:

TE-0130 fails low, this controls ACCW cooling to the Letdown Heat Exchanger. With TE-Ol 30 failed low, TV-01 30 will throttle shut raising the actual Letdown Heat Exchanger temperature. The OATC will have to manually control TV-01 30 to control ACCW flow to the Letdown Heat Exchanger

[ Time Position Applicants Action or Behavior OATC AUTOMATIC ACTIONS NONE DsJITIAL OPERATOR ACTIONS Check normal operation of ACCW and, if necessary, initiate 1 8022-C, Loss of Auxiliary Component Cooling Water.

OATC SUBSEQUENT OPERATOR ACTIONS NOTE Seal water injection flow to the Reactor Coolant Pumps (RCPs) should be maintained less than 130°F.

1 . Monitor VCT outlet temperature using 1 -TI-Ol 1 6 on the QMCB.

2. Check letdown flow using 1 -FI-Ol 32 and temperature using 1 -TI-Ol 30 on the QMCB.
3. Adjust the charging or letdown flow if necessary to reduce the letdown temperature.
4. Return to normal operation as soon as possible per 1 3006-1, CvCS Startup and Normal Operation.
5. IF equipmentfailure is indicated, initiate maintenance as required.

COMPENSATORY OPERATOR ACTIONS NONE End of 17007-B04 actions.

10

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 7 Event No : 3 Event

Description:

TE-Ol 30 fails low, this controls ACCW cooling to the Letdown Heat ExchangerS With TE-0130 failed low, TV-0130 will throttle shut raising the actual Letdown Heat Exchanger temperature. The OATC will have to manually control TV-O1 30 to control ACCW flow to the Letdown Heat Exchanger Position Applicants Action or Behavior

2!

ss AOP-18022-C, LOSS OF AUXILIARY COMPONENT COOLING WATER symptoms and steps.

Symptoms I alarms:

. High temperature on any heat exchanger serviced by ACCW.

Note to examiner: The 55 may look at 1 8022-C due to the reference from ALBO7-B04 if received.

OATC NOTES

. ACCW pumps are removed from the 4. 1 6KV Class 1 E buses following simultaneous loss of offsite power and safety injection.

. ACCW flow to the Seal Water Heat Exchanger is not required if RCS temperature is less than I 50°F and Seal Water Heat Exchanger Return Temperature remains less than 135°F.

11

fI;;t;aix!?_ Required Operator Actions Form ES-D-2 Op-Test No.: 2012-301 Scenario No.: 7 Event No.: 3 Event

Description:

TE-0130 fails low, this controls ACCW cooling to the Letdown Heat Exchanger. With TE-0130 failed low, TV-0130 will throttle shut raising the actual Letdown Heat Exchanger temperature. The OATC will have to manually control TV-O1 30 to control ACCW flow to the Letdown Heat Exchanger.

Time Position Applicants Action or Behavior OATC 1 . Check ACCW pumps - AT LEAST ONE RUNNING. (YES)

2. Check ACCW SPLY HDR PRESS P1-1977 - GREATER THAN 135 P51G. (YES)
3. Check if ACCW flow exists through the letdown heat exchanger.

(YES)

. TV-0130 OPEN.

. ALBO7-D03 LTDN HX OUT HI TEMP - EXTINGUISHED.

OATC 4. Initiate the Continuous Actions Page.

UO OATC 5. Check ACCW Surge Tank Level (IPC L2700) GREATER THAN 20% AND STABLE OR RISING. (YES) 12

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 2012-301 Scenario No. : 7 EventNo.: 3 Event

Description:

TE-Ol 30 fails low, this controls ACCW cooling to the Letdown Heat Exchanger. With TE-Ol 30 failed low, TV-01 30 will throttle shut raising the actual Letdown Heat Exchanger temperature. The OATC will have to manually control TV-01 30 to control ACCW flow to the Letdown Heat Exchanger Time

[ Position Applicants Action or Behavior QATC 6. Check if RCPs should be stopped:

a. Check the following RCP parameters (using plant computer>:

. Motor bearing (upper or lower radial or thrust) GREATER THAN 195°F.

. Motor stator winding GREATER THAN 31 1°F.

. Seal water inlet GREATER THAN 230°F.

. Loss of ACCW - GREATER THAN 10 MINUTES.

Note to examiner: All parameters listed are met, the RCPs do NOT require stopping.

a. Perform the following.
1) IF any parameter limit is exceeded, THEN perform step 6rnb.
2) Goto Step 7.

13

fPendIx D Required Operator Actions Form ES-D-2 Op-Test No : 2012-301 Scenario No. : 7 Event No. : 3 Event

Description:

TE-Ol 30 fails low, this controls ACCW cooling to the Letdown Heat Exchanger. With TE-Ol 30 failed low, TV-Cl 30 will throttle shut raising the actual Letdown Heat Exchanger temperature. The OATC will have to manually control TV-01 30 to control ACCW flow to the Letdown Heat Exchanger Time Position Applicants Action or Behavior OATC 7. Check RCP thermal barrier outlet valves OPEN. (YES)

. HV-19051 ACCW RCP-1 THERMAL BARRIER RTN VLV

. HV-1 9053 ACCW RCP-2 THERMAL BARRIER RTN VLV

. HV-1 9055 ACCW RCP-3 THERMAL BARRIER RTN VLV

. HV-1 9057 ACCW RCP-4 THERMAL BARRIER RTN VLV

. HV-2041 ACCW RCPS THERMAL BARRIER RTN VLV Note to examiner: All the above listed valves are open as required.

OATC 8. Check ACCW heat exchangers outlet temperature (IPC T2701 ) -

LESS THAN 1 20°F. (YES)

OATC 9. Check ACCW containment isolation valves OPEN. (YES)

. HV-1 979 ACCW SPLY HDR ORG ISO VLV

. HV-1978 ACCW SPLY HDR IRC ISOL VLV

. HV-1974 ACCW RTN HDR IRC ISO VLV

. HV-1 975 ACCW RTN HDR ORC ISO VLV Note to examiner: All the above listed valves are open as required.

14

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 7 EventNo.: 3 Event

Description:

TE-Ol 30 fails low, this controls ACCW cooling to the Letdown Heat Exchanger. With TE-Ol 30 failed low, TV-O1 30 will throttle shut raising the actual Letdown Heat Exchanger temperature. The OATC will have to manually control TV-O1 30 to control ACCW flow to the Letdown Heat Exchanger.

Time Position j Applicants Action or Behavior OATC 1 0. Check if ACCW is restored to service.

a Components cooled by ACCW TERMPERATURES RETURNING TO NORMAL. (YES)

b. Restore charging and letdown using 13006, CHEMICAL AND VOLUME CONTROL SYSTEM. (N/A) ss c. Return to procedure and step in effect.

END OF EVENT 3, proceed to EVENT 4.

15

Aendix D Required Operator Actions Form ES-D-2 Op-Test No 201 2-301 Scenario No 7 Event No : 4 Event

Description:

Trip of NSCW Train A Cooling Tower Fan # 1 , wet bulb temperature will be > 63°F requiring a Tech Spec LCO entry.

Time Position Applicants Action or Behavior CREW Diagnose trip of NSCW Train A Tower Fan # 1.

Symptoms I alarms:

ALB36-B02 480V SWGR 1 AB1 5 TROUBLE Indications:

. Green and amber light on NSCW CT Fan # 1 LIT Note to examiner: The fan green and amber light will be the only indication in the control room the fan has tripped and is not readily in their peripheral vision area.

IF, they dont see the light and dispatch someone to AB15 to investigate, the Simbooth Operator will report back after several minutes that breaker 1 AB1 5-05 is tripped for NSCW FAN-i .

UO ALB36-B02 actions.

PROBABLE CAUSE 3, One of the breakers on Switchgear 1AB1 5 tripped due to a fault.

AUTOMATIC ACTIONS NONE INITIAL OPERATOR ACTIONS NONE 16

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 7 Event No. : 4 Event

Description:

Trip of NSCW Train A Cooling Tower Fan # 1 , wet bulb temperature will be > 63°F requiring a Tech Spec LCO entry.

Time Position Applicants Action or Behavior uo ALB36-B02 actions continued.

SUBSEQUENT OPERATOR ACTIONS 1 . N/A due to not a loss of bus voltage.

2. Dispatch an operator to Switchgear 1A815 to check for:
a. Existing relay targets.
b. Other abnormal conditions.
c. Transformer winding high temperatures (referto 13429-1 to check max temperature indication).

Note to examiner. The Simbooth Operator will report back after several minutes that breaker 1 AB1 5-05 is tripped for NSCW FAN-i .

Note to examiner: Steps 3, 4, 5, and 6 of ARP are N/A for this event.

uO 7. IF alarm is in due to overcurrenttrip of Breakers 1AB15-05, 06, 08, OR 13, (NSCW TRAIN A Cooling Tower Fans), THEN the Breaker TRIP/RESET pushbutton must be depressed and the applicable fan QMCB Handswitch must be placed in STOP THEN released to clear the alarm and amber light on associated fan handswitch.

Note to examiner: If requested, the ABO will report the TRIP/RESET pushbutton does NOT appear to be resetting.

17

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2012-301 Scenario No.: 7 Event No : 4 Event

Description:

Trip of NSCW Train A Cooling Tower Fan # 1 , wet bulb temperature will be > 63°F requiring a Tech Spec LCO entry.

[ Time Position Applicants Action or Behavior ss COMPENSATORY OPERATOR ACTIONS

1. Initiate maintenance to correct problem (i.e., restore alarm>.
2. IF after three days the alarm has NOT been restored, intiate a Temporary Modification per 00307-C, Temporary Modifications to clear the bad input(s). Record this action required on Figure 5 of 1 001 8-C, Annunciator Control.

ss Technical Specifications:

3,7,9 Ultimate Heat Sink (UHS3 LCO 3.7.9 The UHS shall be OPERABLE. With ambient wet-bulb temperature > 63°F, four fans and four spray cells per train shall be OPERABLE. With ambient wet-bulb temperature 63°F, three fans and four spray cells per train shall be OPERABLE.

APPLICABILITY: MODES 1 2, 3, and 4. ,

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. One NSCW cooling 8.1 Restore fan(s) and spray 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> tower with one or more cell(s) to OPERABLE required fans and/or status.

spray cells inoperable.

D Required Action and Di Be in MODE 3 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Timenotmet. AND OR D.2 Be in MODE 5 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

UHS inoperable for reasons other then Conditions A, B, or C 18

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2O12-3O1 Scenario No.: 7 EventNo.: 4 Event

Description:

Trip of NSCW Train A Cooling Tower Fan # 1 , wet bulb temperature will be > 63°F requiring a Tech Spec LCO entry.

Time Position Applicants Action or Behavior ss Technical Specification 3.7.9 UHS continued.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 379.5 Verify ambient wet-bulb temperature 63°F In accordance with the when one NSCWE town fan is out-of-service and Surveillance daily high temperature (dry bulb> is forecasted to Frequency Control be>48°F. Programl Note to examiner: IF asked to perform the wet bulb surveillance, the Simbooth Operator will report back after several minutes that ambient wet-bulb temperature is 78°F. This will ensure that LCO entry is required.

The SS may request someone to perform OSP-14150-C, Wet Bulb Temperature With Psychrometer. This takes 5 1 0 minutes, report back the temperature as stated about (78°F).

END OF EVENT 4, proceed to EVENT 5.

19

Appendix D Required Operator Actions Form ES-D-2 Op-Test NO.: 2012-301 Scenario No.: 7 Event No : 5 Event

Description:

PRZR pressure channel P1-456 will fail high with the PORB Block Valve HV-8000B failing to close in automatic on low RCS pressure of 2185 psig. The OATC will be required to manually close PORV 456 or HV-8000B to prevent a Reactor tripS Time Position Applicants Action or Behavior OATC Diagnose the high failure of PRZR Pressure channel PT-456.

Symptoms I alarms:

. ALB11-B03 PRZR HI PRESS

. ALB1 1 -C03 PRZR HI PRESS CHANNEL ALERT

. ALB12-D03 PRZR PRESS LO PORV BLOCK

. ALB12-EO1 PRZR RELIEF DISCH HI TEMP

. ALB12-F04 PV-0456A OPEN SIGNAL Indications:

. PRZR Pressure channel PT-456 offscale high.

. PRZR Pressure channels PT-455, 457, and 458 rapidly lowering.

. Both PRZR Sprays fully shut.

. All PRZR heaters on.

OATC AOP 18OO1-C Section C IMMEDIATE ACTIONS Cl . Check RCS pressure STABLE OR RISING. (NO)

RNO:

Cl . Perform the following:

. Close spray valves.

. Close affected PRZR PORV.

. Operate PRZR heaters as necessary.

CREW Enters AOP 1 8001 -C, Section C and verifies immediate operator actions properly completed.

20

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 7 Event No. : 5 Event

Description:

PRZR pressure channel P1-456 will fail high with the PORB Block Valve HV-8000B failing to close in automatic on low RCS pressure of 2185 psig. The OATC will be required to manually close PORV 456 or HV-8000B to prevent a Reactor trip.

Time

[ Position Applicants Action or Behavior OATC C2. Check controlling channel OPERATING PROPERLY.

(YES)

OATC C3, Initiate the Continuous Actions Page.

OATC C4. Control PRZR pressure using heaters sprays BETWEEN 2220 AND 2250 PSIG.

OATC C5. Check PIC-455A Pressurizer Master Pressure Controller IN AUTO WITH OUTPUT SIGNAL APPROXIMATELY 25%.

(NO)

RNO:

CS. Place PIC-455A in manual and adjust controller output to approximately 25%.

OATC C6. Check affected channel selected on PS-455F PRZR PRESS CNTL SELECT. (YES) 21

AppendixD ReqinredOperator Actions Form ES-D-2 OpTest No. : 201 2-301 Scenario No : 7 Event No. : 5 Event

Description:

PRZR pressure channel P1-456 will fail high with the PORB Block Valve HV-8000B failing to close in automatic on low RCS pressure of 2185 psig. The OATC will be required to manually close PORV 456 or HV-8000B to prevent a Reactor trip.

Time Position Applicants Action or Behavior QATC C7. Select unaffected channels on PS-455F:

Failed Channel Select P455 CH457/456 P456 CH455/458 P457 CH455/456 P458 CH455/456 OATC 08. Perform the following:

a. Check PRZR pressure - STABLE AT APPROXIMATELY 2235 P51G.
b. Place PRZR heaters in AUTO.
c. Place PRZR spray valve controllers in AUTO.

RNO:

a. Adjust PRZR pressure to approximately 2235 psig using PRZR heaters and sprays.

OATC C9. Place PORVs in AUTO and verify proper operation.

OATC Cl 0. Return PRZR pressure Master Controller to AUTO.

22

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 7 Event No. : 5 Event

Description:

PRZR pressure channel P1-456 will fail high with the PORB Block Valve HV-8000B failing to close in automatic on low RCS pressure of 2185 psig. The OATC will be required to manually close PORV 456 or HV-8000B to prevent a Reactor trip.

Time

[ Position Applicants Action or Behavior QATC Cl 1 . Select same channel on PS-455G PRZR PRESS REC SEL as selected on PS-455F.

455 OATC 012. Check P-li status light on BPLB indicates correctly for plant condition within one hour.

OFF 55 C13. Notify l&C to initiate repairs.

55 will call typically call the 555 to perform the following:

. Notify Operations Duty Manager of the AOP entry

. Write a Condition Report

. Notify l&C 55 Cl 4. Bypass the affected instrument channel using 1 3509 C, BYPASS TEST INSTRUMENTATION (BTI) PANEL OPERATION, if desired.

NOTE: SS is NOT expected to bypass failed channel.

23

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 23O1 Scenario No. : 7 Event No. : 5 Event

Description:

PRZR pressure channel P1-456 will fail high with the PORB Block Valve HV-8000B failing to close in automatic on low RCS pressure of 2185 psig. The OATC will be required to manually close PORV 456 or HV-8000B to prevent a Reactor tripS Time Position Applicants Action or Behavior ss C15. Trip the affected channel bistables and place the associated MASTER TEST switches in TEST position per TABLE Cl within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.. (TS 3.3.1 & 33.2)

NOTE: 55 expected to leave bistables untripped during allowed out of service time to facilitate troubleshooting by l&C.

ss Cl6. Initiate the applicable actions of:

. TS3.3.l ReactorTrip Function Condition 6OTIXT E 8a Low PRZR pressure M 8b High PRZR pressure E

. TS 33.2 ESFAS Function Condition ld SI low PRZR pressure D 8b RI 1 Interlock L (one hour action)

. TS 34i a DNB RCS pressure < 2199 psig B (Momentary)

Note to examiner: The SS may look at Tech Specs for the Block Valve HV-8000B which did not close in automatic. There is no Tech Spec requirement for the Block Valve to work in automatic. Manual operation only is required per Tech Spec Bases of 3.4.1 1.

24

Appendix D Required Operator Actions Form ESD2 Op-Test No.: 2012-301 Scenario No.: 7 Event No, : 5 Event

Description:

PRZR pressure channel P1-456 will fail high with the PORB Block Valve HV-8000B failing to close in automatic on low RCS pressure of 2185 psig. The OATC will be required to manually close PORV 456 or HV-8000B to prevent a Reactor trip.

Time Position Applicants Action or Behavior ss C17. Check repairs and surveillances COMPLETE.

RNO:

C17. Perform the following:

a. WHEN repairs and surveillances are complete, THEN pertorm step C18.
b. Return to procedure and step in effect, END OF EVENT 5, proceed to EVENT 6.

25

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 7 Event No. : 6 Event

Description:

The RWST will develop a leak resulting in lowering RWST level below the Tech Spec limit. After receipt of a QMCB annunciators, the UO will find the RWST Sludge Mixing Isolation Valves have failed to automatically close.

The UO will close the valves on the QPCP and the leak will be terminated.

Time

[ Position Applicants Action or Behavior OATC Diagnose RWST level is actually lowering on all channels.

Symptoms I alarms:

ALBO6-E04 RWST LQ LEVEL Indications:

. RWST level lowering on Ll-0990, 0991 0992, and 0993 to less than 95%..

OATC ALBO6-E04 actions.

PROBABLE CAUSE 1 Filling of Accumulators.

2. Adding water to the Spent Fuel Pool.
3. Safety Injection (SI) actuation.
4. System leakage.

uo AUTOMATIC ACTIONS RWST Sludge Mixing Isolation Valves 1 -HV-1 0957 (Train B, 1 -LT-0991 ) an I -HV-1 0958 (Train A, 1 -LT-0990) close.

Note to examiner: These valves are located on the QPCP and will NOT close for this event. The UO will have to manually close the valves to isolate the leak.

26

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 7 Event No. : 6 Event

Description:

The RWST will develop a leak resulting in lowering RWST level below the Tech Spec limit. After receipt of a OMCB annunciators, the UO will find the RWST Sludge Mixing Isolation Valves have failed to automatically close.

The UO will close the valves on the QPCP and the leak will be terminated Time Position Applicants Action or Behavior OATC ALBO6-E04 actions continued.

uc INTIAL OPERATOR ACTIONS NONE uO SUBSEQUENT OPERATOR ACTIONS 1 IF in Modes 1 2, 3, or 4, and SI is not in progress, stop any operation that could be removing water from the RWST.

2. IF a system leak is indicated, dispatch personnel to locate and isolate the leak.

Note to examiner. The UO closing either HV-1 0957 or HV-1 0958 will isolate the leak for this event.

3. Restore RWST level to normal per 1 3701 -1 Boric Acid System.

SS 4. Refer to Technical Specification LCO 3.5.4 and TR 13.1.7.

COMPENSATORY OPERATOR ACTIONS NONE 27

Appendix D Required Operator Actions Form ES-D-2 Op-Test No : 201 2-301 Scenario No. : 7 Event No : 6 Event

Description:

The RWST will develop a leak resulting in lowering RWST level below the Tech Spec limit After receipt of a QMCB annunciators, the UO will find the RWST Sludge Mixing Isolation Valves have failed to automatically close.

The UO will close the valves on the QPCP and the leak will be terminated Time

[ Position Applicants Action or Behavior ss 354 Refueling Water Storage Tank (RWST).

LCO a5.4 The RWST shall be OPERABLE.

APPLICABILITY: MODES 1 2, 3, and 4. ,

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. One or more sludge 8.1 Restore the valve(s) to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> mixing pump isolation OPERABLE status.

valves inoperable.

D. RWST inoperable for Di Restore RWST to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> reasons other than OPERABLE status.

Condition A or B.

E. Required Action and El Be in MODe 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A or D AND not met.

E.2 Be in MODE 5 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

Note to examiner: Closing the RWST sludge mixing isolations HV-1 0957 and HV-1 0958 satisfies Condition B.

28

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No, : 7 Event No. : 6 Event

Description:

The RWST will develop a leak resulting in lowering RWST level below the Tech Spec limit. After receipt of a QMCB annunciators, the UO will find the RWST Sludge Mixing Isolation Valves have failed to automatically close.

The UO will close the valves on the OPCP and the leak will be terminated Time

[ Position Applicants Action or Behavior ss TR 1 3:1 .7 Borated Water Sources Operating.

TR 13.1 .7 The following borated water source(s) shall be OPERABLE as required byTR13.*L3:

a. Boric acid storage tank.
b. The refueling water storage tank (RWST).

APPLICABILITY: MODES 1 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. RWST inoperable. Di Enter applicable Conditions Immediately.

of RWST Technical Specification 35.4.

END OF EVENT 6, proceed to EVENT 7, the main event.

29

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 7 Event No. : 7 Event

Description:

Main Feed Regulating Valve for loop # 3 fails shut requiring a Reactor trip. When the Reactor trips, 3 rods will stick out requiring an Emergency Boration by the OATC.

Time Position Applicants Action or Behavior uc Diagnose MFRV Loop # 3 has failed shut.

Symptoms I alarms:

ALB13-CO1 STM GEN 3 FLOW MISMATCH ALB13-C06 STM GEN 3 HI/LO LVL DEVIATION (short delay)

ALB13-C03 STM GEN 3 LO LEVEL (a little longer delay)

ALB1 3-C05 STM GEN 3 LO-LO LVL ALERT (auto trip set point)

Indications:

. Feed flow reading 0 gpm for SG # 3 (1 Fl-530A I 531A).

. Level lowering rapidly on SG # 3 (1 Ll-538, 539, 537, & 553).

. MFRV # 3 green light only lit on ZLB-004.

. MFRV # 3 demand at 1 00% and red up arrow lit on 1 FIC-530.

Enters 18016-C CONDENSATE AND FEEDWATER MALFUNCTION section D MAIN FEEDWATER VALVE MALFUNCTION.

30

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-3Qi Scenario No. : 7 Event No : 7 Event

Description:

Main Feed Regulating Valve for loop # 3 fails shut requiring a Reactor tripS When the Reactor trips, 3 rods will stick out requiring an Emergency Boration by the OATC.

Time Position Applicants Action or Behavior uc IMMEDIATE OPERATOR ACTIONS Dl . Check proper operation of BFRVs and MFRVs.

RNO Dl . Perform the following:

. Control SG levels using the following as necessary.

MFRVs BFRVs

. IF SG levels cannot be maintained greater than 41%.

-OR-Less than 79%,

THEN perform the following:

1 ) Trip the reactor.

2) Go to 1 9000-C, E-0 REACTOR TRIP OR SAFETY INJECTION.

Note to examiner: At > 29% power, the BFRV will NOT be able to maintain SG levels and the Reactor will be tripped manually by the OATC or will trip automatically on SG # 3 LO-LO LEVEL.

OATC Dl RNO Manually trips the Reactor due to impending loss of level inSG#3.

31

Appendix D Required Operator Actions Form ES-D-2 Op-Test No : 2012-301 Scenario No : 7 Event No. : 7 Event

Description:

Main Feed Regulating Valve for loop # 3 fails shut requiring a Reactor trip. When the Reactor trips, 3 rods will stick out requiring an Emergency Boration by the OATC.

Time Position Applicants Action or Behavior CREW Transitions to 19000-C, E-O REACTOR TRIP OR SAFETY INJECTION.

CREW Performs Immediate Operator Actions per 1 9000-C, E-0 Reactor Trip or Safety Injection.

55 Makes a page announcement of Reactor Trip.

OATC 1 . Check Reactor Trip: (YES)

. Rod Bottom Lights LIT

. Reactor Trip and Bypass Breakers OPEN

. Neutron Flux LOWERING uO 2. Check Turbine Trip: (YES)

S All Turbine Stop Valves CLOSED uO 3, Check Power to AC Emergency Buses. (YES)

a. AC Emergency Busses AT LEAST ONE ENERGIZED.

. 4l6OAClEBusses

b. AC Emergency Busses ALL ENERGIZED.

a 41 60V AC 1 E Busses a 480V AC 1 E Busses 32

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 2012-301 Scenario No. : 7 Event No. : 7 Event

Description:

Main Feed Regulating Valve for loop # 3 fails shut requiring a Reactor trip. When the Reactor trips, 3 rods will stick out requiring an Emergency Boration by the OATC.

Time Position Applicants Action or Behavior uo 4. Check if SI is actuated. (NO)

. Any SI annunciators LIT

. SI ACTUATED BPLP window - LIT RNO

4. Check if SI is required. (NO)

IF one or more of the following conditions has occurred.

. PRZR pressure has less than or equal to 1 870 psig.

. Steam line pressure less than or equal to 585 psig.

. Containment pressure greater than or equal to 3.8 psig.

. Automatic alignment of ECCS equipment to injection phase.

THEN actuate SI and go to Step 6.

UO 5. Perform the following to limit RCS cooldown:

a. Check NR level in at least one SG greater than 10%.

RNO

a. Maintain AFW flow greater than 570 gpm and go to 1 9001 -C, ES-Ol REACTOR TRIP RESPONSE.
b. Reduce AFW flow.

55 c. Go to 19001-C, ES-0.1 REACTOR TRIP RESPONSE.

33

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 7 Event No. : 7 Event

Description:

Main Feed Regulating Valve for loop # 3 fails shut requiring a Reactor trip. When the Reactor trips, 3 rods will stick out requiring an Emergency Boration by the OATC.

Time Position Applicants Action or Behavior CREW Transitions to 19001-C, ES-Ol REACTOR TRIP RESPONSE.

OATC 1. Initiate the following:

uO

. Continuous Actions and Foldout Page.

. Critical Safety Function Status Trees per 1 9200-C, F-C CRITICAL SAFETY FUNCTION STATUS TREE.

CREW 2. IF SI actuation occurs during this procedure, THEN go to 19000-C, E-0 REACTOR TRIP OR SAFETY INJECTION.

34

fendlx D Required Operator Actions Form ESD-2 Op-Test No. : 201 2-301 Scenario No, : 7 EventNo.: 7 Event

Description:

Main Feed Regulating Valve for loop # 3 fails shut requiring a Reactor trip. When the Reactor trips, 3 rods will stick out requiring an Emergency Boration by the OATC.

Time Position Applicants Action or Behavior uc 3. Limit RCS cooldown:

a. Verify AFW flow to SGs.
b. Trip both MFPs.
c. Check SGs NR level - AT LEAST ONE GREATER THAN 10%.

OATC 4. Check RCS temperature stable at or trending to 557°F.

With RCP(s) running - RCS AVERAGE TEMPERATURE.

-OR-Without RCP(s) running RCS WR COLD LEG TEMPERATURES.

35

Appendix D Required Operator Actions Form ES-D2 Op-Test No. : 201 2-301 Scenario No. : 7 Event No. : 7 Event

Description:

Main Feed Regulating Valve for loop # 3 fails shut requiring a Reactor trip. When the Reactor trips, 3 rods will stick out requiring an Emergency Boration by the OATC.

Time Position Applicants Action or Behavior uo 5. Check FW status:

a. Average RCS temperature LESS THAN 564°F. (YES)
b. Verify FW isolation valves closed. (YES)

. MEl Vs

. BEIVs

. MERVs

. BERVs uQ 6. Check total feed flow capability to SGs GREATER THAN 570 GPM AVAILABLE. (YES)

OATC 7. Check all Rods EULLY INSERTED. (NO, 3 are stuck out)

RNO

7. IE two or more Rods NOT fully inserted, THEN EMERGENCY BORATE 154 ppm for each Rod not fully inserted by initiating 1 3009, CVCS REACTOR MAKEUP CONTROL SYSTEM.

Verify adequate shutdown margin as required by Technical Specification SR 3.1 .1 .1.

Note to examiner: Once OATC initiates emergency boration flow, a DBA SGTR will occur on SG # 3. E. Boration steps are on page

  1. 39 of this event.

36

Appendix_D Required Operator Actions Form ES-D-2 Op-Test No : 201 2-301 Scenario No. : 7 Event No : 7 Event

Description:

Main Feed Regulating Valve for loop # 3 fails shut requiring a Reactor trip. When the Reactor trips, 3 rods will stick out requiring an Emergency Boration by the OATC.

Time Position Applicants Action or Behavior uc 8. Check Main Generator Output Breakers OPEN. (YES) ss 9. Perform thefollowing:

a. Check 1 8009-C, STEAM GENERATOR TUBE LEAK - IN EFFECT.

RNO

a. GotoStep9d.
d. Check other AOPs IN EFFECT. (NO)
e. Initiate actions of AQPs in conjunction with remaining actions of this procedure.

UC 10. Check PRZR level control:

a. Instrument Air AVAILABLE. (YES)

Note to examiner: The DBA SGTR will have initiated by now. The crew will actuate SI and go to E-O on lowering PRZR level and pressure.

37

Appendix D Required Operator Actions Form ES-D-2 Op-Test No : 201 2-301 Scenario No. : 7 EventNo: 7 Event

Description:

Main Feed Regulating Valve for loop # 3 fails shut requiring a Reactor trip. When the Reactor trips, 3 rods will stick out requiring an Emergency Boration by the OATC Time Position Applicants Action or Behavior QATC 4.9 EMERGENCY BORATION NOTE Table 1 provides a convenient tool for checking Emergency Boration flow path alternatives.

Note to examiner: The path through HV-81 04 is the preferred path.

The next preferred path is the next section in the procedure, etc.

OATC 4.9.1 Emergency Boration Through 1-HV-8104.

OATC 4.9.1 .1 Start one (1) Boric Acid Transfer Pump.

4.9.1 .2 Verify a Charging Pump is running.

4.9.1.3 Open EMERGENCY BORATE valve 1-HV-8104.

Note to examiner: 1 -HV-81 04 will NOT open, the candidate should proceed to section 4.9.2 Emergency Boration Through The Normal Charging Flow Path.

OATC 4.9.2 Emergency Boration Through The Normal Charging Flow Path.

OATC 4.9.2.1 Start one (1) Boric Acid Transfer Pump.

OATC 4.9.2.2 Verify a Charging Pump is running.

38

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2012-301 Scenario No.: 7 EventNo.: 7 Event

Description:

Main Feed Regulating Valve for loop # 3 fails shut requiring a Reactor trip. When the Reactor trips, 3 rods will stick out requiring an Emergency Boration by the OATC.

I Time Position Applicants Action or Behavior OATC 4.9.2.3 Open the following valves:

. 1 -FV-O1 1 OA, BA TO BLENDER

. 1 -FV-O1 1 OB, BLENDER OUTLET TO CHARGING PUMPS SUCT NOTE The following step assumes that with 1 2 gpm of seal return, 30 gpm will be supplied to the RCS.

OATC 4.9.2.4 Place 1-FIC-0121 in MANUAL.

OATC 4.92.5 Adjust 1 -FIC-Ol 21 to maintain flow greater than 42 gpm.

OATC 4.9.2.6 Verify Emergency Boration flow 1 -FI-Ol 1 OA is greater than 3Ogpm.

OATC 4.9.2.7 IF flow is less than 30 gpm, start the second Boric Acid Transfer Pump.

OATC 4.9.2.8 Operate the Pressurizer Backup Heaters as necessary to equalize boron concentration between the RCS and the Pressurizer.

39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 2012-301 Scenario No.: 7 Event No : 7 Event

Description:

Main Feed Regulating Valve for loop # 3 fails shut requiring a Reactor trip. When the Reactor trips, 3 rods will stick out requiring an Emergency Boration by the OATC.

Time Position j Applicants Action or Behavior OATC 4.92.9 Check plant conditions are consistent with RCS boration:

RCS Tavg may be dropping.

NIS may be dropping.

END OF EVENT 7, proceed to EVENT 8, the MAIN EVENT.

40

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No : 7 Event No : 8 Event

Description:

DBA SGTR on SG # 3 followed by a FW Line Break after transition to 1 9030-C, E-3 Steam Generator Tube Rupture. Based on the Foldout Page of 1 9030-C, the crew will transition back to 1 9020-C to isolate the faulted steam generator, then back to 1 9030-C and eventually transition to 1 91 31 -C, ECA-3.1 SGTR WITH LOSS OF REACTOR COOLANT: SUBCOOLED RECOVERY DESIRED.

Time Position Applicants Action or Behavior OATC Actuates SI due to inability to maintain PRZR level > 9% per Foldout Page of 19001-C, ES-O.1 REACTOR TRIP RESPONSE.

CREW Performs Immediate Operator Actions per 1 9000-C, E-0 Reactor Trip or Safety Injection.

55 Makes a page announcement of Reactor Trip and Safety Injection.

OATC 1 . Check Reactor Trip: (YES)

. Rod Bottom Lights LIT

. Reactor Trip and Bypass Breakers OPEN

. Neutron Flux LOWERING uO 2. Check Turbine Trip: (YES)

. All Turbine Stop Valves CLOSED.

uO 3, Check Power to AC Emergency Buses. (YES)

a. AC Emergency Busses AT LEAST ONE ENERGIZED.

. 4l6OAClEBusses

b. AC Emergency Busses ALL ENERGIZED.

. 41 60V AC 1 E Busses

. 480V AC 1 E Busses 41

AppendixD Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 7 EventNo.: 8 Event

Description:

DBA SGTR on SG # 3 followed by a FW Line Break after transition to 1 9030-C, E-3 Steam Generator Tube Rupture. Based on the Foldout Page of 1 9030-C, the crew will transition back to 1 9020-C to isolate the faulted steam generator, then back to 1 9030-C and eventually transition to 1 91 31 -C, ECA-3.1 SGTR WITH LOSS OF REACTOR COOLANT: SUBCOOLED RECOVERY DESlRED Time Position

[ Applicants Action or Behavior OATC 4 Check if SI is actuated. (YES)

. Any SI annunciators LIT

. SI ACTUATED BPLP window LIT 55 Go to Step 6.

SS 6. Initiate the Foldout Page.

CREW 55 7. Perform the following:

OATC

  • OATC Initial Actions Page Uo
  • Uo Initial Actions Page NOTE: SS initiates step 8 after OATC/UO Initial Actions completed.

42

Appendix D Required Operator Actions Form ES-D-2 Op-Test No : 201 2-301 Scenario No. : 7 Event No. : 8 Event

Description:

DBA SGTR on SG # 3 followed by a FW Line Break after transition to 1 9030-C, E-3 Steam Generator Tube Rupture. Based on the Foldout Page of 1 9030-C, the crew will transition back to 1 9020-C to isolate the faulted steam generator, then back to 1 9030-C and eventually transition to 1 91 31 -C, ECA-3.1 SGTR WITH LOSS OF REACTOR COOLANT: SUBCOOLED RECOVERY DESIRED.

Time Position

[ Applicants Action or Behavior OATC PERFORMS OATC INITIAL ACTIONS 1 . Check both trains of ECCS equipment ALIGNING FOR INJECTION PHASE: (YES)

. MLB indication OATC 2. Check Containment Isolation Phase A ACTUATED. (YES)

. CIA MLB indication OATC 3. Check ECCS Pumps and NCP status:

a. COPs RUNNING. (YES)
b. SI Pumps - RUNNING. (YES)

Note to Examiner: SIP A is tagged out.

c. RHR pumps - RUNNING. (YES)
d. NCP - TRIPPED. (YES)

OATC 4. Verify CCW Pumps ONLYTWO RUNNING EACH TRAIN.

(YES) 43

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 7 Event No. : 8 Event

Description:

DBA SGTR on SG # 3 followed by a FW Line Break after transition to 1 9030-C, E-3 Steam Generator Tube Rupture. Based on the Foldout Page of 1 9030-C, the crew will transition back to 1 9020-C to isolate the faulted steam generator, then back to 1 9030-C and eventually transition to 1 91 31 -C, ECA-31 SGTR WITH LOSS OF REACTOR COOLANT: SUBCOOLED RECOVERY DESlRED Time Position Applicants Action or Behavior OATC PERFORMS OATC INITIAL ACTIONS 5, Verify proper NSCW system operation: (YES)

a. NSCW Pumps - ONLY TWO RUNNING EACH TRAIN.
b. NSCW TOWER RTN HDR BYPASS BASIN hand switches -

IN AUTO:

. HS-1668A

. HS-1669A OATC 6. Verify Containment Cooling Units:

UO

a. ALL RUNNING IN LOW SPEED. (YES)

. MLB indication

b. NSCW Cooler isolation valves OPEN. (YES)

. MLB indication 44

-Iiaix--b - - Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 7 Event No. : 8 Event

Description:

DBA SGTR on SG # 3 followed by a FW Line Break after transition to 1 9030-C, E-3 Steam Generator Tube Rupture. Based on the Foldout Page of 1 9030-C, the crew will transition back to 1 9020-C to isolate the faulted steam generator, then back to 1 9030-C and eventually transition to 1 91 31 -C, ECA-3.1 SGTR WITH LOSS OF REACTOR COOLANT: SUBCOOLED RECOVERY DESIRED.

Time Position Applicants Action or Behavior PERFORMS OATC INITIAL ACTIONS OATC 7. Check Containment Ventilation Isolation.

a. Dampers and Valves CLOSED. (NO)

. CVI MLB indication Critical a. Perform the following:

1 ) Close Dampers and Valves.

2) Start Piping Pen Units.

Note to examiner. CVI dampers on pages 57 and 58.

OATC 8. Check Containment pressure REMAINED LESS THAN 21 P51G. (YES)

QATC 9. Check ECCS flows:

a. BIT flow. (YES)
b. RCS pressure LESS THAN 1625 P51G. (NO)

RNO

d. GotoSteplO.

45

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 7 Event No : 8 Event

Description:

DBA SGTR on SG # 3 followed by a FW Line Break after transition to 1 9030-C, E-3 Steam Generator Tube Rupture. Based on the Foldout Page of 1 9030-C, the crew will transition back to 1 9020-C to isolate the faulted steam generator, then back to 1 9030-C and eventually transition to 1 91 31 -C, ECA-3.1 SGTR WITH LOSS OF REACTOR COOLANT: SUBCOOLED RECOVERY DESIRED.

Time Position Applicants Action or Behavior OATC PERFORMS OATC INITIAL ACTIONS 10$ Check ECCS Valve alignment PROPER INJECTION LINEUP INDICATED ON MLBs. (YES)

OATC 11 . Check ACCW Pumps - AT LEAST ONE RUNNING. (YES)

OATC 1 2. Adjust Seal Injection flow to all RCPs 8 TO 1 3 GPM.

OATC 1 3. Dispatch Operator to ensure one train of SPENT FUEL POOL COOLING in service per 13719, SPENT FUEL POOL COOLING AND PURIFICATION SYSTEM.

END OF OATC INITIAL OPERATOR ACTIONS, return to E-O Step 8.

46

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 7 Event No. : 8 Event

Description:

DBA SGTR on SG # 3 followed by a FW Line Break after transition to 1 9030-C, E-3 Steam Generator Tube Rupture. Based on the Foldout Page of I 9030-C, the crew will transition back to 1 9020-C to isolate the faulted steam generator, then back to 1 9030-C and eventually transition to 1 91 31 -C, ECA-3.1 SGTR WITH LOSS OF REACTOR COOLANT: SUBCOOLED RECOVERY DESIRED.

[ Time Position Applicants Action or Behavior uo uo INITIAL ACTIONS I . Check AFW Pumps - RUNNING. (YES)

. MDAFW Pumps

. TDAFW Pump, if required.

uo 2. Check NR level in at least one SG GREATER THAN 10%.

(32% ADVERSE)

RNO

2. Establish AFW flow greater than 570 gpm by starting pumps and aligning valves as necessary.

47

Appendix D Required Operator Actions Form ES-D--2 Op-Test No. : 201 2-301 Scenario No. : 7 Event No. : 8 Event

Description:

DBA SGTR on SG # 3 followed by a FW Line Break after transition to 1 9O3OC, E-3 Steam Generator Tube Rupture. Based on the Foldout Page of 1 9030-C, the crew will transition back to 1 9020-C to isolate the faulted steam generator, then back to 1 9030-C and eventually transition to 1 91 31 -C, ECA-3.1 SGTR WITH LOSS OF REACTOR COOLANT: SUBCOOLED RECOVERY DESIRED.

Time Position Applicants Action or Behavior uO INITIAL ACTIONS uc 3. Check if main steamlines should be isolated: (NO)

a. Check for one or more of the following conditions:

Any steamline pressure LESS THAN OR EQUAL TO 585 P51G.

Containment pressure GREATER THAN 14.5 P51G.

Low Steam Pressure SI/SLI BLOCKED AND High Steam Pressure Rate ONE TWO OR MORE CHANNELS OF ANY STEAMLINE.

RNO

a. GotoStep4.

UO 4. Verify FW Isolation Valves closed: (YES)

. MEl Vs

. BElVs

. MERVs

. BERVs 48

Appendix_D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 7 Event No. : 8 Event

Description:

DBA SGTR on SG # 3 followed by a FW Line Break after transition to 1 9030-C, E-3 Steam Generator Tube Rupture. Based on the Foldout Page of 1 9030-C, the crew will transition back to 1 9020-C to isolate the faulted steam generator, then back to 1 9030-C and eventually transition to 1 91 31 -C, ECA-3.1 SGTR WITH LOSS OF REACTOR COOLANT: SUBCOOLED RECOVERY DESIRED.

Time

[ Position Applicants Action or Behavior uO INITIAL ACTIONS uc 5 Verify SG Blowdown isolated. (YES)

. Place SG Blowdown isolation Valve handswitches HS-7603A, B, C, and D in the CLOSE position.

Note to examiner: The UO will place the HS-7603A valves in the hard closed position.

. SG Sample Isolation Valves CLOSED. (YES) uO 6. Verify Diesel Generators RUNNING. (YES) uO 7. Throttle total AFW flow as necessary to maintain SG NR levels between 1 0% (32% ADVERSE) and 65%.

Note to examiner: IF the UO suspects a SGTR into SG # 3, he may request to isolate AFW flow to SG # 3 to assist in determining which SG is ruptured.

uO 8. Verify both MFPs TRIPPED. (YES) uO 9. Check Main Generator Output Breakers OPEN. (YES)

END OF UO INITIAL ACTIONS, return to step 8 of E-0.

49

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 7 Event No. : 8 Event

Description:

DBA SGTR on SG # 3 followed by a FW Line Break after transition to 1 9030-C, E-3 Steam Generator Tube Rupture. Based on the Foldout Page of 19030-C, the crew will transition back to 19020-C to isolate the faulted steam generator, then back to 1 9030-C and eventually transition to 1 91 31 -C, ECA-3.1 SGTR WITH LOSS OF REACTOR COOLANT: SUBCOOLED RECOVERY DESIRED.

Time Position Applicants Action or Behavior OATC 1 9000-C, E-0 actions beginning with step 8.

uc

8. Initiate the Continuous Actions Page.

OATC 9. Check RCS temperature stable at or trending to 557°F. (NO)

RNO

9. IF temperature is less than 557°F and lowering, (it is)

THEN perform the following as necessary:

a. Stop dumping steam.
b. Pertorm the following as appropriate:

IF at least one SG NR level greater than 1 0% (32%

ADVERSE),

THEN lower total feed flow.

-OR-If all SG NR levels less than 10% (32% ADVERSE),

THEN lower total feed flow to NOT less than 570 gpm.

c. If cooldown continues, THEN close MSIVs and BSIVs.
d. If temperature greater than 557°F and rising, THEN dump steam.

50

Appendix D Required Operator Actions Form ES-D-2 Op-Test No : 201 2-301 Scenario No. : 7 Event No. : 8 Event

Description:

DBA SGTR on SG # 3 followed by a FW Line Break after transition to 1 9030-C, E-3 Steam Generator Tube Rupture. Based on the Foldout Page of 1 9030-C, the crew will transition back to 1 9020-C to isolate the faulted steam generator, then back to 1 9030-C and eventually transition to 1 91 31 -C, ECA-3.1 SGTR WITH LOSS OF REACTOR COOLANT: SUBCOOLED RECOVERY DESlRED Time Position Applicants Action or Behavior OATC CAUTION: A PRZR PORV Block Valve which was closed to isolate an excessively leaking or open PRZR PORV should not be opened unless used to prevent challenging the PRZR Safeties.

1 0. Check PRZR PORVs, Block Valves, and Spray Valves:

a. PRZR PORVs - CLOSED AND IN AUTO. (YES)
b. Normal PRZR Spray Valves - CLOSED. (YES)
c. Power to at least one Block Valve AVAILABLE. (YES)
d. PRZR PORV Block Valves - AT LEAST ONE OPEN. (NO)

RNO

d. Verify open at least one PRZR PORV Block Valve when PRZR pressure is greater than 21 85 psig.

Note to examiner: PORV B must be manually cycled to control at 2185 psig.

51

AppendaxD Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 7 Event No. : 8 Event

Description:

DBA SGTR on SG # 3 followed by a FW Line Break after transition to 1 9030-C, E-3 Steam Generator Tube Rupture. Based on the Foldout Page of 1 9030-C, the crew will transition back to I 9020-C to isolate the faulted steam generator, then back to 1 9030-C and eventually transition to 1 91 31 -C, ECA-3 1 SGTR WITH LOSS OF REACTOR COOLANT SUBCOOLED RECOVERY DESlRED Time Position Applicants Action or Behavior OATC 11 . Check if RCPs should be stopped.

a. ECCS Pumps - AT LEAST ONE RUNNING: (YES)

. CCPorSlPump

b. RCS pressure LESS THAN 1375 P51G. (NO)

RNO

a. GotoStepl2.

uc 1 2. Check SGs secondary pressure boundaries:

a. SG Pressures:

Any lowering in an uncontrolled manner. (NO)

-OR-Any completely depressurized.

RNO

a. GotoStepl3.

52

pendix D Required Operator Actions Form ES-D-2 Op-Test No. : 2-301 Scenario No. : 7 Event No. : 8 Event

Description:

DBA SGTR on SG # 3 followed by a FW Line Break after transition to 1 9030-C, E-3 Steam Generator Tube Rupture. Based on the Foldout Page of 1 9030-C, the crew will transition back to 1 9020-C to isolate the faulted steam generator, then back to 1 9030-C and eventually transition to 1 91 31 -C, ECA-3.1 SGTR WITH LOSS OF REACTOR COOLANT: SUBCOOLED RECOVERY DESIRED.

Time Position Applicants Action or Behavior uc 1 3. Check SG Tubes intact:

a. Direct Chemistry to take periodic activity samples of all SGs one at a time.
b. Secondary radiation NORMAL. (YES, possible to see on a couple of rad monitor trends but none will be in alert)

. MAIN STM LINE MONITORS:

. RE-13120(SGI)

. RE-13121 (5G2)

. RE-13122 (SG 3)

. RE-13119(SG4)

. CNDSR AIR EJCTRISTM RAD MONITORS:

. RE-12839C

. RE-i 2839D (if on scale)

. RE-i 2839E (if on scale)

. STEM GEN LIQ PROCESS RAD:

. RE-OO1 9 (Sample)

. RE-0021 (Blowdown)

. SG sample radiation.

c. Check SG levels ANY RISING IN AN UNCONTROLLED MANNER. (YES)
d. Go to 1 9030-C, E-3 STEAM GENERATOR TUBE RUPTURE.

53

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 7 Event No. : 8 Event

Description:

DBA SGTR on SG # 3 followed by a FW Line Break after transition to 1 9030-C, E-3 Steam Generator Tube Rupture. Based on the Foldout Page of 1 9030-C, the crew will transition back to 1 9020-C to isolate the faulted steam generator, then back to 1 9030-C and eventually transition to 1 91 31 -C, ECA-3.1 SGTR WITH LOSS OF REACTOR COOLANT: SUBCOOLED RECOVERY DESIRED.

[ Time Position Applicants Action or Behavior NOTE to Simbooth: Report back in 20 minutes that SG # 3 shows activity in the samples IF REQUESTED previously.

ss ss transitions to 19030-C, E-3 STEAM GENERATOR TUBE RUPTURE.

NOTE to Simbooth: Once 55 has transitioned to E-3, enter the faulton SG #3.

54

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 7 Event No. : 8 Event

Description:

DBA SGTR on SG # 3 followed by a FW Line Break after transition to 1 9030-C, E-3 Steam Generator Tube Rupture. Based on the Foldout Page of 1 9030-C, the crew will transition back to 1 9020-C to isolate the faulted steam generator, then back to 1 9030-C and eventually transition to 1 91 31 -C, ECA-3.1 SGTR WITH LOSS OF REACTOR COOLANT: SUBCOOLED RECOVERY DESIRED.

ie Position Applicants Action or Behavior VALVE # DESCRIPTION LOCATION HV12975 CNMT AIR RAD MON SPLY ISO IRC QPCP HV-12976 CNMT AIR RAD MON SPLY ISO ORC QPCP HV-12977 CNMT AIR RAD MON RTN ISO ORC QPCP HV-12978 CNMT AIR RAD MON RTN ISO IRC QPCP HV-2626A CTB NORM PURGE SPLY IRC ISO VLV- MAIN QHVC (C31)

(Normally de-energized shut)

HV-2626B CTB NORM PURGE SPLY IRC ISO VLV-MINI QHVC ((C32)

HV-2627A CTB NORM PURGE SPLY ORC ISO VLV- MAIN QHVC (D31)

(Normally de-energized shut)

HV-26278 CTB NORM PURGE SPLY ORC ISO VLV-MINI QHVC (D32)

HV-2628A CTB NORM PURGE EXH IRC ISO VLV- MAIN QHVC (A33)

(Normally de-energized shut)

HV-2628B CTB NORM PURGE EXH IRC ISO VLV-MINI QHVC ((A34)

HV-2629A CTB NORM PURGE EXH ORC ISO VLV- MAIN QHVC (B33)

(Normally de-energized shut)

HV-2629B CTB MINI PURGE EXH CRC ISO VLV-MINI QHVC (834)

HV-2624A CTB POST LOCA PURGE EXI-1 IRC ISO VLV QHVC (A35)

HV-2624B CTB POST LOCA PURGE EXH IRC ISO VLV QHVC (835) 55

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 7 Event No, : 8 Event

Description:

DBA SGTR on SG # 3 followed by a FW Line Break after transition to 1 9030-C, E-3 Steam Generator Tube Rupture. Based on the Foldout Page of 1 9030-C, the crew will transition back to 1 9020-C to isolate the faulted steam generator, then back to 1 9030-C and eventually transition to 1 91 31 -C, ECA-3.1 SGTR WITH LOSS OF REACTOR COOLANT: SUBCOOLED RECOVERY DESIRED.

r Time PositionJ HV-12604 Applicants Action or Behavior PIPING PEN RM OUTLET ISO DMPR QHVC (C22)

HV-12605 PIPING PEN PM INLET ISO DMPT QHVC (822)

HV-12606 PIPING PEN RM INLET ISO DMPR QHVC (823)

HV-12607 PIPING PEN AM OUTLET ISO DMPR QHVC (C23)

HV-12596 RECYCLE HOLD-UP TK-1 ISO VENT VLV QHVC (E22)

HV-12597 RECYCLE HOLD-UP TK-1 ISO VENT VLV QHVC (E23)

HS-2548 PIPING PEN RM FLTR & EXH FAN 1 QHVC (A22)

HV-2549 PIPING PEN RM FLTR & EXH FAN 2 QHVC (A23) 56

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 7 Event No. : 8 Event

Description:

DBA SGTR actions from 1 9030-C, E-3 STEAM GENERATOR TUBE RUPTURE to be followed by a Feedline Break IRC Time Position Applicants Action or Behavior CREW 1. Initiatethe following:

. Continuous Actions and Foldout Page.

. Critical Safety Function Status Trees per I 9200-C, F-C CRITICAL SAFETY FUNCITON STATUS TREE.

SS 2. Initiate NMP-EP-1 10, EMERGENCY CLASSIFICATION DETERMINATION AND INITIAL ACTION.

OATC 3, Maintain Seal Injection flow to all RCPs 8 to 1 3 GPM.

OATC 4. Check if RCPs should be stopped:

a. ECCS Pumps - AT LEAST ONE RUNNING: (YES)

CCP or Sip Pump

b. RCS pressure LESS THAN 1375 P51G. (NO)

RNO

b. IF RCS pressure lowers to less than 1375 psig prior to initiation of RCS cooldown in Step 17.

THEN stop all RCPs and return to Step in effect.

Goto Step 5.

57

Appendix_D Required Operator Actions Form ES-D-2 Op-Test No : 201 2-301 Scenario No. : 7 Event No. : 8 Event

Description:

DBA SGTR actions from 1 9030-C, E-3 STEAM GENERATOR TUBE RUPTURE to be followed by a Feedline Break IRC Time Position Applicants Action or Behavior uc 5 Identify ruptured SG(s) by any of the following conditions.

Unexpected rise in any SG NR leveL High radiation from any SG sample.

High radiation from any SG steamline.

High radiation from any SG blowdown line.

Note to examiner: SG # 3 level will be rising with AFW flow throttled.

Note to examiner: Once SG # 3 has been identified, the Simbooth Operator will insert a DBA Feedwater line break on SG # 3 that will require a transition back to 1 9020-C, E-2 FAULTED STEAM GENERATOR ISOLATION and then back to 19030-C. IF identified earlier in E-O, the Simbooth operator will initiate the FW line break as soon as E-3 is entered.

uc Recognize rising steam flow on SGs 1 2, and 4 and lowering RCS OATC pressure.

55 Transitions to 19020-C, E-2 FAULTED STEAM GENERATOR ISOLATION based on Foldout Page Criteria.

58

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 2O1 2-301 Scenario No : 7 Event No : 8 (E-2 Actions)

Event

Description:

1 9020-C E-2 actions for Faulted Steam Generator.

Time Position Applicants Action or Behavior CREW 1 Initiate critical safety function status trees per 1 9200-C, F-C CRITICAL SAFETY FUNCTION STATUS TREE.

55 2. Initiate NMP-EP-1 10, EMERGENCY CLASSIFICATION DETERMINATION AND INITIAL ACTION.

Note to examiner: The 55 will call the Simbooth to have the Shift Manager implement NMP-EP-1 10.

OATC CAUTION: At least one SG should be available for RCS cooldown.

UO 3. Verify Main Steamline Isolation and Bypass Valves CLOSED.

(NO)

Note to examiner: Auto actuation of the Main Steamline and Critical Bypasses is defeated. The UO will have to manually actuate SLl to satisfy the critical step.

UO 4. Check SGs secondary pressure boundaries:\

a. Identify intact SG(s): (# 1 , 2, and 4 are intact)

. SG pressures ANY STABLE OR RISING. (YES)

b. Identify faulted SG(s).

ANY SG PRESSURE LOWERING IN AN UNCONTROLLED MANNER, (YES, SG #3)

-OR-ANY SG COMPLETELY DEPRESSURIZED. (maybe by now, SG #3) 59

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 7 Event No. : 8 (E-2 Actions)

Event

Description:

19020-C E-2 actions for Faulted Steam Generator.

Time Position Applicants Action or Behavior uc 5. Isolate Main Feedwater to the faulted SG(s):

. Close affected MFIVs:

HV-5227 (SG 1)

HV-5228 (SG 2)

HV-5229 (SG 3)

HV-5230 (SG 4)

. Close affected BFIV5:

HV-15196 (SG 1)

HV- 15197 (SG 2)

HV- 15198 (SG 3)

HV- 15199 (SG 4) uc 6. Isolate Auxiliary Feedwater to the faulted SG(s):

. Close affected MDAFW Pump Throttle Valves:

HV-51 39 - SG 1 FROM MDAFW PMP-A HV-5132 - SG 2 FROM MDAFW PMP-B Critical HV-5134 - SG 3 FROM MDAFW PMP-B HV-5137 - SG 3 FROM MDAFW PMP-A

. Close affected TDAFW Pump Throttle Valves:

HV-5122 - SG 1 FROM TDAFW HV-5125 - SG 2 FROM TDAFW Critical HV-51 27 - SG 3 FROM TDAFW HV-51 20 - SG 3 FROM TDAFW Note to examiner: The valves bolded above are critical at this time IF not already previously closed.

60

Appendix D Actions Form ESD-2 Op-Test No 201 2-3O Scenario No 7 Event No. : 8 (E-2 Actions)

Event

Description:

19020-C E-2 actions for Faulted Steam Generator.

Time Position Applicants Action or Behavior uc 7. Check at least one MDAFW Pump - RUNNING AND CAPABLE OF FEEDING SG(s) NEEDED FOR RCS COOLDOWN. (YES) uc 8. Close affected TDAFW Pump Steam Supply Valve(s): (N/A)

HV-3009 (SG 1 ) LP-1 MS SPLY TO AUX FW TD PM P-i HV-30i9 (SG-2) LP-2 MS SPLY TO AUX FW TD PMP-i uc 9 Verify affected SG ARV(s) CLOSED:

PV-3000 (SG 1)

PV-30i0 (SG 2)

PV-3020 (SG 3)

PV-3030 (SG 4) uO io Align SGBD valves:

. Place SG Blowdown Isolation Valve handswitches in CLOSE position.

. Close sample valves.

HV-945i (SG 1)

HV-9452 (SG 2)

HV-9453 (SG 3)

HV-9454 (SG 4) uO 1 1 Verify faulted SG(s) remains isolated during subsequent recovery actions unless needed for ACS cooldown or SG activity sampling.

uO 12. Check CST level - GREATER THAN 15%. (YES) 61

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 7 Event No. : 8 (E.2 Actions)

Event

Description:

1 9020-C E-2 actions for Faulted Steam Generator.

Time Position Applicants Action or Behavior uc 13. Initiate checking if SG Tubes intact:

a. Direct Chemistry to take periodic activity samples of all SGs one at a time.
b. Secondary radiation NORMAL. (NO)

. MAIN STM LINE MONITORS

. RE-13120(SG1)

. RE-13121 (SG 2)

. RE-13122(5G3)

. RE-13119(SG4)

. CNDSR AIR EJCTR/STM RAD MONITORS:

. RE-12839C

. RE-12839D (if on scale)

. RE-12839E (if on scale)

. STM GEN LIQ PROCESS RAD:

. RE-0019 (Sample)

. RE-0021 (Blowdown)

. SG sample radiation.

c. Check SG levels - ANY R1SING IN AN UNCONTROLLED MANNER.

(YES) 55

d. Go to 1 9030-C, E-3 STEAM GENERATOR TUBE RUPTURE.

55 Transitions back to 19030-C, E-3 STEAM GENERTOR TUBE RUPTURE.

62

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 2Q Scenario No. : 7 Event No, : 8 Event

Description:

DBA SGTR actions from 1 9030-C, E-3 STEAM GENERATOR TUBE RUPTURE after return from 19020-C, E-2 FAULTED STEAM GENERATOR ISOLATION following feed line break Time Position Applicants Action or Behavior CREW 1 . Initiate the following:

. Continuous Actions and Foldout Page.

. Critical Safety Function Status Trees per 1 9200-C, F-C CRITICAL SAFETY FUNCITCN STATUS TREE.

55 2. Initiate NMP-EP-1 10, EMERGENCY CLASSIFICATION DETERMINATION AND INITIAL ACTION.

OATC 3. Maintain Seal Injection flow to all RCPs 8 to 13 GPM.

OATC 4. Check if RCPs should be stopped:

a. ECCS Pumps - AT LEAST ONE RUNNING: (YES)

CCP or Sip Pump

b. RCS pressure - LESS THAN 1375 P51G. (YES)
c. Stop all RCPs.

63

Appendix D Required Operator Actions Form ES-D-2 Op-Test Nofl: 2012-301 Scenario No : 7 Event No. : 8 Event

Description:

DBA SGTR actions from 1 9030-C, E-3 STEAM GENERATOR TUBE RUPTURE after return from 19020-C, E-2 FAULTED STEAM GENERATOR ISOLATION following feed line break.

Time Position Applicants Action or Behavior uc 5. Identify ruptured SG(s) by any of the following conditions.

Unexpected rise in any SG NR level.

High radiation from any SG sample.

High radiation from any SG steamline.

High radiation from any SG blowdown line.

Note to examiner: SG # 3 will have been previously identified.

CAUTION: At least one SG should be maintained available for RCS cooldown.

uc 6. Isolate ruptured SG(s):

a. Adjust ruptured SG ARV(s) controller setpoint to 1 1 60 psig (pot setting 7.73)
b. Check ruptured SG ARV(s) CLOSED.

PV-3000 (SG 1)

PV-3010 (SG 2)

PV-3020 (SG 3)

PV-3030 (SG 4) 64

AppendixD Required Operator Actions Form ES-D-2 Op-Test No. : 201 2-301 Scenario No. : 7 EventNo.: 8 Event

Description:

DBA SGTR actions from 1 9030-C, E-3 STEAM GENERATOR TUBE RUPTURE after return from 19020-C, E-2 FAULTED STEAM GENERATOR ISOLATION following feed line break Time Position Applicants Action or Behavior CAUTION: If TDAFW Pump is the only available AFW pump, maintain at least one steam supply OPEN.

uO T Close affected TDAFW Pump Steam supply valve(s): (N/A)

HV-3009 (SG 1 ) LP-1 MS SPLY TO AUX FW TD PMP-1.

HV-301 9 (SG 2) LP-2 MS SPLY TO AUX FW TD PMP-1.

uO 8. Verify SG Blowdown Isolation Valves CLOSED WITH HANDSWITCHES IN CLOSE POSTION.

OATC 9. Isolate flow from the ruptured SG(s) by closing its Main Steamline isolation and Bypass Valves.

65

Appendix D Required Operator Actions Form ES-D-2 Op-Test No. : 201 23O1 Scenario No. : 7 Event No : 8 Event

Description:

DBA SGTR actions from 1 9030-C, E-3 STEAM GENERATOR TUBE RUPTURE after return from 19020-C, E-2 FAULTED STEAM GENERATOR ISOLATION following feed line break.

[ Time Position

[ Applicants Action or Behavior CAUTIONS:

. This procedure should be performed in a timely manner to assure that break flow in the ruptured SG(s) is terminated before water enters the SGs main steam piping.

. Any ruptured SG that is also faulted, should remain isolated during subsequent recovery actions unless needed for RCS cooldown or SG activity sample.

uc 10. Checkruptured SG(s) level:

a. SG NR level - GREATER THAN 10% (32% ADVERSE).

(NO)

b. Stop feed flow to ruptured SG(s).

Note to examiner: AFW flow should remain isolated to SG # 3 due to the CAUTIONS above.

uo 11 Check ruptured SG(s) pressure GREATER THAN 290 P51G.

(NO)

RNO 55 1 t Go to 19131-C, ECA-3.1 SGTR WITH LOSS OF REACTOR COOLANT SUBCOOLED RECOVERY DESIRED.

END OF EVENT 8, END OF THE SCENARIO.

66