ML13324A525

From kanterella
Jump to navigation Jump to search
Revises Phase 1 Rept Faaa 84-3-13 Re Connecting Rods of Tdi in-line Generators,To Read 5,000 Psi Peak Oil Pressure Instead of 500.Correct Pressure Used in Analysis.No Changes to Conclusions Warranted
ML13324A525
Person / Time
Site: Perry, Catawba, Harris, Grand Gulf, River Bend, Vogtle, San Onofre, Comanche Peak, Rancho Seco, Midland, Bellefonte, 05000000, Washington Public Power Supply System, Shoreham
Issue date: 12/19/1984
From: Ray C
DUKE POWER CO., TDI (TRANSAMERICA DELAVAL, INC.) OWNERS GROUP
To: Harold Denton
Office of Nuclear Reactor Regulation
References
OGTP-658-N-55, NUDOCS 8412260311
Download: ML13324A525 (1)


Text

DUKE POWER COMPANY TELEPHONE: AREA 704 GENERAL OFFICES 373.4011 422 SOUTH CHURCH STREET CHARLOTTE, N. C. 28242 December 19, 1984 OGTP-658-N-55 H. R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Re:

TDI Diesel Generator Owners Group Phase I Report:

Review of Connecting Rods of TDI Inline DSR-48 Emergency Diesel Generators - FaAA 84-3-13 File:

MTS-4086

Dear Mr. Denton:

Please note that the last sentence on page 2-4 of the subject report should read as follows:

"This load is 34,100 lbs. with a 5000 psi peak oil pressure."

The originally reported value of 500 psi was misstated. Support packages and actual calculations were reviewed and the results show that the correct pressure was used in the analysis and no changes to the conclusions are warranted.

This information is also being forwarded to Battelle Pacific Northwest Labor atories by copy of this letter.

Should you have any questions, please do not hesitate to contact us.

C. L. Ray, Jr.

Technical Program Director TDI Diesel Generator Owners Group CLR/RJD/cr cc:

Owners Group Executive Contacts Owners Group Alternate Contacts C. H. Berlinger R. Caruso Battelle Northwest (5 copies)

DUKE I MANAGEMENT AND POWER I TECHNICAL SERVICES 8412260311 B41219 PDR ADOCK 05000206 S

PDR