EXELON GENERATION COMPANY, LLC DOCKET NO. 50-304 ZION NUCLEAR POWER STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 174 License No. DPR-48

1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Exelon Generation Company, LLC (the licensee) dated June 18, 2012, as supplemented by letter dated June 5, 2013, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, Facility Operating License No. DPR-48 is amended as follows:

Paragraph 2.C.(6) is added to read as follows: (6) The licensee shall fully Implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provision of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Zion Nuclear Power Station Security Plan," with revisions submitted through September 22, 1993; "Zion Nuclear Power Station Training and Qualification Plan," with revision submitted through March 2, 1993; "Zion Nuclear Power Station Safeguards Contingency Plan," with revisions Enclosure 1

2 submitted through December 4, 1992; and the "Zion Nuclear Power Station Independent Spent Fuel Storage Installation Physical Security Plan."..(revised 10-11-88, Am. 102; revised 12-13-13: Am. 174).

3. This license amendment is effective on the date of issuance and shall be implemented prior to the start of spent fuel transfer operations to the Zion Independent Spent Fuel Storage Installation.

FOR THE U.S. NUCLEAR REGULATORY COMMISSION

/RA/ A. Mohseni for Andrew Persinko, Deputy Director Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs

Attachment:

Changes to the License Date of Issuance:

ATTACHMENT 1 TO LICENSE AMENDMENT NO. 174 FACILITY OPERATING LICENSE NO DPR-48 DOCKET NO. 50-304 Replace the following pages of the Facility Operating License No. DPR-48 with the enclosed revised page.

Remove Insert License Page 4 License Page 4

C. This license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations: 10 CFR Part 20, Section 30.34 of 10 CFR Part 30, Section 40.41 of 10CFR Part 40, Sections 50.54 and 50.59 of 10 CFR Part 50, and Section 70.32 of 10 CFR Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:

(1) Deleted.

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 174, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

(3) Deleted 3-11-83; Am. 72.

(4) Deleted.

(5) Deleted.

(6) The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provision of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Zion Nuclear Power Station Security Plan,"

with revisions submitted through September 22, 1993; "Zion Nuclear Power Station Training and Qualification Plan," with revision submitted through March 2,1993; "Zion Nuclear Power Station Safeguards Contingency Plan," with revisions submitted through December 4, 1992: and the "Zion Nuclear Power Station Independent Spent Fuel Storage Installation Physical Security Plan."

(revised 10-11-88; Am. 102: revised 12-13-13; Am. 174).

(7) Spent Fuel Pool Modification The licensee is authorized to modify the spent fuel pool as described in the application dated January 15, 1992, as supplemented October 2 and 16, 1992.

Amendment No. 51, 58, 72, 102, 128, 136, 167, 174