October 31, 2013 Louis P. Cortopassi, Site Vice President Omaha Public Power District Fort Calhoun Station FC-2-4 P.O. Box 550 Fort Calhoun, NE 68023-0550
SUBJECT:
Revision to Schedule - Planned Inspection of TI-2515/186 Inspection of Procedures and Processes for Responding to Potential Aircraft Threats at Fort Calhoun Station
Dear Mr. Cortopassi:
In previous correspondence, the U.S. Nuclear Regulatory Commission (NRC) documented that the inspection using Temporary Instruction (TI)-2515/186 would be conducted on the week of October 21, 2013 (Accession Number ML13054A003). Recent changes in the inspection schedule onsite necessitated the rescheduling of the TI-2515/186 inspection. In communications on October 7, 2013, Mr. S. Hedger, Operator Licensing Branch, and Mr. E.
Matzke, Licensing, made arrangements for the NRC to conduct the TI-2515/186 inspection at Fort Calhoun Station. This inspection is now planned for the week of April 7, 2014. The NRC inspectors request to observe a tabletop or control room simulator exercise, combined with plant walkthroughs with plant operators to allow inspection of TI-2515/186 attributes. Mr. E. Matzke has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0011. The public reporting burden for this collection of information is estimated to average four hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
UNITED STATES NUCLEAR REGULATORY COMMISSION RE G IO N I V 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. S. Hedger at 817-200-1556, or me at 817-200-1159.
Sincerely,
/RA/
Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety Docket No. 50-285 License No. DPR-40 cc: Electronic Distribution for Fort Calhoun Station
ADAMS ACCESSION NUMBER: ML13304B607 SUNSI Review Completed: __SDH__ ADAMS:
Yes No Initials: __SDH__
Publicly Available Non-Publicly Available Sensitive Non-Sensitive OE:OB C:OB SHedger VGaddy
/RA/
/RA/
10/31/2013 10/31/2013