ML13302B678

From kanterella
Jump to navigation Jump to search
NRC Staff'S Response to the Atomic Safety and Licensing Board'S Order of October 8, 2013
ML13302B678
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 10/29/2013
From: Sherwin Turk
NRC/OGC
To:
Atomic Safety and Licensing Board Panel
SECY RAS
Shared Package
ML13302B676 List:
References
50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01, RAS 25274
Download: ML13302B678 (3)


Text

October 29, 2013 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR OPERATIONS, INC. ) Docket Nos. 50-247-LR/286-LR

)

(Indian Point Nuclear Generating )

Units 2 and 3) )

NRC STAFFS RESPONSE TO THE ATOMIC SAFETY AND LICENSING BOARDS ORDER OF OCTOBER 8, 2013 In accordance with the Atomic Safety and Licensing Boards (Board) Order (Directing Parties to Review Exhibit List) (Order), issued on October 8, 2013, 1 the NRC Staff (Staff) herewith provides its suggested revisions to the Boards proposed Official Exhibit List for Track One Contentions (Exhibit List).

The Staffs suggested revisions, set forth in the Attachment hereto, 2 consist of (a) proposed exhibits that were omitted in the Boards proposed Exhibit List, 3 (b) proposed revisions to the titles of exhibits listed by the Board, and/or (c) proposed revisions to the list of applicable contentions to which each exhibit pertains. In accordance with the Boards direction that an explanation be provided for each proposed revision, the Staffs suggested revisions to 1

Pursuant to the Commissions Corrected Notice of October 17, 2013, the Boards deadline of October 21, 2013, for the parties filing of proposed revisions to the Exhibit List was deferred by eight days, until October 29, 2013.

2 The Attachment hereto utilizes the format of the Boards proposed exhibit list, with modifications to the titles of two columns: (Date Stricken or Excluded, and Other/Comment) (emphasis added).

3 Principal among these are the Staffs Safety Evaluation Report (Exhibit NYS00326A-F) and the ACRS letter (Exhibit NYS000325) related to license renewal of IP2/IP3, which the Staff is required to introduce into evidence in this proceeding pursuant to 10 C.F.R. § 2.337(g).

the Boards Exhibit List are identified in redline/strikeout and the reason for each suggested revision is provided in column nine of the Attachment hereto (Other/ Comment).

For the reasons stated in the Attachment hereto, the Staff respectfully requests that the proposed revisions identified in that Attachment be incorporated in the Boards Official Exhibit List for Track One Contentions.

Respectfully submitted,

/Signed (electronically) by/

Sherwin E. Turk Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1533 E-mail: sherwin.turk@nrc.gov Dated at Rockville, Maryland this 29th day of October 2013

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR OPERATIONS, INC. ) Docket Nos. 50-247/286-LR

)

(Indian Point Nuclear Generating )

Units 2 and 3) )

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (as revised), I hereby certify that copies of the foregoing NRC STAFFS RESPONSE TO THE ATOMIC SAFETY AND LICENSING BOARDS ORDER OF OCTOBER 8, 2013, dated October 29, 2013, have been served upon the Electronic Information Exchange (the NRCs E-Filing System), in the above- captioned proceeding, this 29th day of October, 2013.

/Signed (electronically) by/

Sherwin E. Turk Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1533 E-mail: sherwin.turk@nrc.gov