Initial License Examination As-Administered RO Admin JPMs
ML13291A031
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/27/2013
From: David Reeser
Operations Branch III
To: Jennings T
Exelon Generation Co
David Reeser
Shared Package
ML11354A434 List:
References
Download: ML13291A031 (64)


Text

CLINTON POWER STATION Job Performance Measure Perform CPS 9820.01 Core Thermal Limits JPM Number: JPM402 Revision Number: 01 Date: 06/14/13 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM402 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 16

JPM Number: JPM402 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 04/09/10 New JPM. Previously JPM982001.

01 06/14/13 Updated to new template.

Page 3 of 16

JPM Number: JPM402 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. This JPM can be performed in a classroom or other secure area with the 3D cases generated per step 2.
2. The following can be used as necessary to recreate the 3D Case printouts with out of spec MFLCPR and MFLPD:
a. Initialize to a full power IC.
b. Insert Malfunction M3D_FLCPR_V_10 to a final value of 1.012 to raise MFLCPR for fuel assembly 21-18 to a value greater than 1.0.
c. Insert Malfunction M3D_FLPD_V_2 to a final value of 1.083 to raise MFLPD for fuel assembly 23-32 to a value greater than 1.0.
d. Print out a 3D case.
e. Verify MFLCPR and MFLPD are > 1.0.
3. Freeze Simulator.

Page 4 of 16

JPM Number: JPM402 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • Perform CPS 9820.01 rev. 33e, Power Distribution Limits, with no deviation from the procedure.
  • Identifies highest values of MFLCPR and MFLPD are > 1.0.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • Perform CPS 9820.01 Rev. 33e, Power Distribution Limits .

PROCEDURAL/

REFERENCES:

  • CPS 9820.01, Power Distribution Limits, Rev. 33e
  • CPS 9820.01D001, Power Distribution Limits Data Sheet, Rev. 32e EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • Provide the examinee with the following items when providing the initiating cue:

o Copy of the Initial Conditions and Initiating Cue page (back page of the JPM) o Blank copy of CPS 9820.01 Power Distribution Limits o Blank copy of CPS 9820.01D001 Power Distribution Limits Data Sheet o Copy of WC-AA-111 Attachment 10 Surveillance WO Disposition Sheet with Shift Authorization to Start Work blank filled in.

o Blank copy of WC-AA-111 Attachment 11 Initial Sheet

  • Provide the examinee with the attached 3D case when the examinee indicates that a 3D case would be demanded.

Page 5 of 16

JPM Number: JPM402 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are the B RO.

The plant is at full power with RR Pumps A and B operating in fast speed.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

The Control Room Supervisor directs you to perform the daily surveillance CPS 9820.01, Power Distribution Limits.

Report to the CRS after completing the task.

START TIME:

Page 6 of 16

JPM Number: JPM402 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS 9820.01 Power Distribution Limits 5.1 Notify Shift Management prior to performing procedure.

Standard: Notifies Shift Management prior to performing procedure. Enters start date, start time, and initials CPS 9820.01D001, Power Distribution Limits Data Sheet.

Cue: Acknowledge notification.

Comments SAT UNSAT Comment Number 5.2 Verify Core Thermal Power is 21.6% of RTP.

Standard: Verifies Core Thermal Power is 21.6% of RTP.

Initials CPS 9820.01D001, Power Distribution Limits Data Sheet step 5.2.

Cue:

Comments Per the initiating cue, the reactor is operating at full power.

SAT UNSAT Comment Number Page 7 of 16

JPM Number: JPM402 - Rev 01 Clinton Power Station Job Performance Measure (JPM) 5.3 Check the applicable entry condition.

Standard: Determines that the applicable entry condition is Daily Surveillance. Checks the Daily Surveillance box on CPS 9820.01D001, Power Distribution Limits Data Sheet.

Cue:

Comments The entry condition was given in the initiating cue.

SAT UNSAT Comment Number 5.4 Verify 3D Case ID has an 'M' in 2nd character.

Standard: Determines that second character of 3D CASE ID is an 'M'. Initials CPS 9820.01D001, Power Distribution Limits Data Sheet step 5.4.

Cue: Provide examinee with the attached 3D case when examinee indicates how case would be obtained.

Comments The case ID number appears in the upper right hand corner of the 3D case on page 1, below the date.

SAT UNSAT Comment Number 5.5 Check applicable RR pump status.

Standard: Checks 2 RR pumps in operation box on CPS 9820.01D001, Power Distribution Limits Data Sheet step 5.5.

Cue:

Comments RR Pump status is provided in the initiating cue.

SAT UNSAT Comment Number Page 8 of 16

JPM Number: JPM402 - Rev 01 Clinton Power Station Job Performance Measure (JPM) 5.6 Check applicable 3D Case OPTION line items: ARTS, 2 LOOPS ON, MANUAL FLOW, 1 LOOP ON Standard: Reviews the 3D Case and determines that ARTS, 2 LOOPS ON, and MANUAL FLOW is printed.

Checks ARTS, 2 LOOPS ON, and MANUAL FLOW boxes on CPS 9820.01D001, Power Distribution Limits Data Sheet step 5.6.

Cue:

Comments This information is located to the right of OPTION on the 3D Case.

SAT UNSAT Comment Number 5.7 IF Core flow used by 3D Monicore is inaccurate, THEN Substitute total core flow from recorder B33-R613 on P678 or from the method specified by the Reactor Engineer into B33NA001.

Standard: No action required; step is not applicable for this JPM.

Cue: If the examinee asks the SRO if core flow is accurate, cue him/her that core flow instrumentation is operating normally.

Comments SAT UNSAT Comment Number Page 9 of 16

JPM Number: JPM402 - Rev 01 Clinton Power Station Job Performance Measure (JPM) 8.1 Calculate core thermal limits by running an Official 3D Case.

Standard: Examinee obtains official 3D case and completes PS 5.4 through 5.7.

Cue: Provide examinee with a copy of the 3D case after examinee indicates how case would be obtained.

Comments SAT UNSAT Comment Number

  • 8.2 From the 3D Case determine the highest MAPRAT value.

Initial CPS 9820.01D001 if MAPRAT 1.0.

Standard: Determines the highest MAPRAT value is 1.0. Initials for step 8.2 on CPS 9820.01D001, Power Distribution Limits Data Sheet.

Cue:

Comments SAT UNSAT Comment Number Page 10 of 16

JPM Number: JPM402 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

  • 8.3 From the 3D Case determine the highest MFLCPR value.

Initial CPS 9820.01D001 if MFLCPR 1.0.

Standard: Determines that the highest MFLCPR value is >1.0. Does NOT initial CPS 9820.01D001, Power Distribution Limits Data Sheet. Documents out of specification value in the Comments/Deficiencies section of 9820.01D001 and initiates a condition report.

Cue: If examinee reports MFLCPR value is > 1.0, acknowledge the report and then cue him/her to complete the surveillance.

Comments One location will have a MFLCPR value > 1.0 (21-18). May insert a note documenting what was observed.

SAT UNSAT Comment Number

  • 8.4 From the 3D Case determine the highest MFLPD value.

Initial CPS 9820.01D001 if MFLPD 1.0.

Standard: Determines that the highest value of MFLPD is >1.0. Does NOT initial CPS 9820.01D001, Power Distribution Limits Data Sheet. Documents out of specification value in the Comments/Deficiencies section of 9820.01D001 and initiates a condition report.

Cue: If examinee reports MFLPD value is > 1.0, acknowledge the report and then cue him/her to complete the surveillance.

Comments One location has MFLPD value > 1.0 (23-32). May insert a note documenting what was observed SAT UNSAT Comment Number Page 11 of 16

JPM Number: JPM402 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

  • 8.5 Immediately contact Shift Management if any of the following conditions occur so that corrective action may be taken in accordance with the appropriate ITS:
  • MLCPR is > 1.0.

Standard: Notifies Shift Management that MFLCPR and MFLPD are out of specification.

Cue: Acknowledge notification.

If earlier 3D printouts are requested state the previous 3D cases are within limits.

Comments SAT UNSAT Comment Number 8.6 Notify Shift Management of surveillance completion.

Standard: Notifies Shift Management of surveillance completion. Enters stop date, stop time, and initials CPS 9820.01D001, Power Distribution Limits Data Sheet.

Cue: Acknowledge notification.

Comments SAT UNSAT Comment Number Page 12 of 16

JPM Number: JPM402 - Rev 01 Clinton Power Station Job Performance Measure (JPM) 8.7 A copy of 3D Case used shall be signed, dated, labeled "9820.01", and attached to CPS 9820.01D001, Power Distribution Limits Data Sheet.

Standard: Attaches a signed, dated, labeled copy of the 3D Case used to CPS 9820.01D001, Power Distribution Limits Data Sheet.

Cue:

Comments SAT UNSAT Comment Number Examinee completes WC-AA-111 Attachment 10 Surveillance WO Disposition Sheet.

Standard: Examinee records the following information in WC-AA-111 Attachment 10:

  • Unit - 01
  • Procedure - 9820.01 or 9820.01D001
  • Work Started - enters Name, Date, and Time
  • Work Stopped - enters Name, Date, and Time
  • Surveillance Found Within Acceptance Criteria - circles NO Cue:

Comments SAT UNSAT Comment Number Page 13 of 16

JPM Number: JPM402 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

Examinee completes WC-AA-111 Attachment 11 Initial Sheet.

Standard: Examinee records the following information in WC-AA-111 Attachment 11:

  • Procedure No. - 9820.01 or 9820.01D001
  • Enters printed Name and Initial Cue:

Comments SAT UNSAT Comment Number TERMINATING CUES:

Daily surveillance CPS 9820.01, Power Distribution Limits is complete.

STOP TIME:

Page 14 of 16

JPM Number: JPM402 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

EO RO SRO STA SRO Cert JPM

Title:

Perform CPS 9820.01 JPM Number: JPM402 Revision Number: 01 Task Number and

Title:

982001.01 / Evaluate Core Thermal Limits during Power Operations K/A System K/A Number Importance (RO/SRO)

Generic 2.1.19 3.9 3.8 Ability to use plant computers to evaluate system or component status.

Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

CPS 9820.01, Power Distribution Limits, rev. 33e CPS 9820.01D001, Power Distribution Limits Data Sheet, rev. 32e EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 15 of 16

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are the B RO.

The plant is at full power with RR Pumps A and B operating in fast speed.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

The Control Room Supervisor directs you to perform the daily surveillance CPS 9820.01, Power Distribution Limits.

Report to the CRS after completing the task.

Page 16 of 16

CLINTON POWER STATION Job Performance Measure Perform a License Maintenance Check JPM Number: JPM409 Revision Number: 01 Date: 06/14/13 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM409 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 10

JPM Number: JPM409 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 8/31/2010 New JPM.

01 06/14/13 Updated to new template with current dates on Initiating Cue and on Attachment 1 Page 3 of 10

JPM Number: JPM409 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

REFERENCES:

  • OP-AA-105-102, NRC Active License Maintenance, Rev. 9 EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
  • Provide the examinee with a copy of the ESOMs Log Entries (Report of Hours) (JPM Page 9) after the initiating cue has been acknowledged by the examinee.

Page 4 of 10

JPM Number: JPM409 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The plant is operating at rated thermal power.

Today is 8/20/2013.

INITIATING CUE:

You have been asked to complete a license maintenance check on yourself prior to going home on your relief week IAW OP-AA-105-102 and the ESOMS log attachment.

Given your current status, determine the latest date you can stand watch.

START TIME:

Page 5 of 10

JPM Number: JPM409 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS OP-AA-105-102, NRC Active License Maintenance

  • 1 Examinee determines the minimum number of shifts of watch standing for credit for proficiency have NOT been met.

Standard: Examinee reviews the ESOMs log entries and verifies that only 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> can be credited for proficiency (lines 1, 2, 4 and 5)

Cue:

Comments SAT UNSAT Comment Number

  • 2 Examinee determines their license will be active until September 30, 2013.

Standard:

Cue: Determine the number of watches needed to maintain proficiency until the end of the 4th quarter of 2013.

Comments Step 2 and 3 can be performed in any order.

SAT UNSAT Comment Number Page 6 of 10

JPM Number: JPM409 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

  • 3 Examinee determines they need a total of twenty more hours of watch standing in order to maintain their license active. Any one of the following combinations is acceptable:
  • two twelve hours shifts
  • one twelve hour and one eight hour shift
  • three eight hour shifts Standard: The hours that are less than 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> do not count and the examinee determines that they need a minimum of two shifts before the quarter expires to keep their license active.

Cue:

Comments SAT UNSAT Comment Number TERMINATING CUES:

Examinee has completed performing a license maintenance check.

STOP TIME:

Page 7 of 10

JPM Number: JPM409 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

EO RO SRO STA SRO Cert JPM

Title:

License Maintenance Check JPM Number: JPM409 Revision Number: 01 Task Number and

Title:

LP85801.2.1.4 Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, no solo operation, maintenance of active license status, 10CFR55, etc.

K/A System K/A Number Importance (RO/SRO)

Generic 2.1.04 3.3 N/A Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, no-solo operation, maintenance of active license status, 10CFR55, etc.

Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 14 minutes Actual Time Used: minutes

References:

OP-AA-105-102, NRC Active License Maintenance, Rev. 9 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 8 of 10

JPM Number: JPM409 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

ESOMs Log Entries (Report of Hours)

Hours Worked Start Time Finish Time Description Date Your Name 8 0700 1500 A RO 7/10/13 Here Your Name 12 0700 1900 A RO 7/11/13 Here Your Name 6 0700 1300 Emergent call 7/12/13 Here home Your Name 8 2300 0700 B RO 8/8/13 Here Your Name 8 2300 0700 B RO 8/9/13 Here Your Name 4 1500 1900 Hold over 8/14/13 Here from cyclic training Your Name 4 1500 1900 Hold over 8/15/13 Here from cyclic training Your Name 6 0700 1300 Call in for 8/16/13 Here emergent surveillance completion SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 9 of 10

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The plant is operating at rated thermal power.

Today is 8/20/2013.

INITIATING CUE:

You have been asked to complete a license maintenance check on yourself prior to going home on your relief week IAW OP-AA-105-102 and the ESOMS log attachment.

Given your current status, determine the latest date you can stand watch.

Page 10 of 10

CLINTON POWER STATION Job Performance Measure Perform a Manual Jet Pump Operability JPM Number: JPM512 Revision Number: 01 Date: 06/14/13 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM512 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 24

JPM Number: JPM512 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 12/05/05 New format and numbering convention, revalidated. This replaces JPM 012202J005. Revision number reset to 00.

01 06/14/13 Updated to new template and numbering convention. This replaces 90410101LAN01.

Page 3 of 24

JPM Number: JPM512 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. None Page 4 of 24

JPM Number: JPM512 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • CPS No. 9041.01 Jet Pump Operability Test has been completed satisfactorily.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • Calculator PROCEDURAL/

REFERENCES:

  • CPS No. 9041.01, Jet Pump Operability Test, Rev 36c
  • CPS No. 9041.01D001, Jet Pump Operability Test Data Sheet, Rev. 34b EVALUATOR INSTRUCTIONS:
  • This JPM can be performed in a classroom or other secure area. Data sheets (JPM pages 19-
21) are provided to the examinee with the values to be used to perform the surveillance. The data sheets are NOT to be provided to the examinee until the examinee describes where/how data for the surveillance is obtained in JPM step 1.
  • A MCR Panel map is provided on page 22 to be used by the examinee to identify where data for this surveillance can be obtained.
  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.

Page 5 of 24

JPM Number: JPM512 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are the extra RO.

The reactor is operating at 96% power.

The computerized method of performing CPS No. 9041.01 is not available at this time.

RR Pumps A and B are operating in fast speed.

APRM calibrations are NOT in progress.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

The CRS has directed you to perform CPS No. 9041.01 Jet Pump Operability Test.

Report to the CRS after completing the task.

NOTE TO EVALUATOR When the Initiating Cue has been read by the student and acknowledged, provide the following to the student.

  • CPS No. 9041.01, Jet Pump Operability Test, Rev 36c
  • CPS No. 9041.01D001, Jet Pump Operability Test Data Sheet, Rev. 34b
  • Calculator START TIME:

Page 6 of 24

JPM Number: JPM512 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS No. 9041.01, Jet Pump Operability Test CPS No. 9041.01D001, Jet Pump Operability Test Data Sheet JPM Step 1 Examinee indicates where/how data would be obtained to perform 9041.01 /

9041.01D001.

Standard:

  • Examinee indicates that data for this surveillance can be obtained by requesting computer point data from any one of the following PPC monitors:

o 1H13-P680-5009 o 1H13-P870-5013 o Operator workstations between 1H13-P601 and 1H13-P870 in the MCR (three locations) (not shown on the MCR panel map)

Cue: Request the examinee to indicate where/how data would be obtained to perform 9041.01 / 9041.01D001. When complete, provide examinee with data sheets on pages 19-21.

Comments SAT UNSAT Comment Number Page 7 of 24

JPM Number: JPM512 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

Section 5.0 Examinee performs all section 5.0 Prerequisites.

Prerequisites Standard: Examinee records the following:

9041.01 - Places a check in the box for step 5.1, 5.1.1.1, 5.2, and 5.3 9041.01D001:

  • Initials step 5.1.1
  • Places a check in the box to the right of step 5.1.1.1
  • NAs step 5.1.2
  • Records reactor power in step 5.2
  • Notifies SMngt of test start. Records time and date, and initials the performer blank of step 5.3.

Cue: Report that authorization has been granted Report that ESOMs log entries will be made by the B RO.

Comments SAT UNSAT Comment Number

  • 8.1.1 (Record) Use computer points B33DA013 (Loop A) and B33DA014 (Loop B) to determine operating Recirculation Loop A and B Flow in GPM.

Standard: Examinee records the following:

9041.01 - Places a check in the box for step 8.1.1 9041.01D001 - Examinee records 32,500 gpm for Recirc Loop A flow and 31,000 gpm for Recirc Loop B flow.

Cue:

Comments Recording data on the data sheet is the only portion of the step that is critical.

SAT UNSAT Comment Number Page 8 of 24

JPM Number: JPM512 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

Standard: Examinee records the following:

9041.01 - circles RVDT and places a check in both boxes for step 8.1.2.

9041.01D001:

  • 61% in the position blanks for FCVs B33-F060A and B33-F060B on CPS No. 9041.01D001 step 8.1.2.

Cue: Data on previously provided data sheet.

Comments Recording data on the data sheet is the only portion of the step that is critical.

SAT UNSAT Comment Number 8.1.3.1 If slow speed Recirc Pumps, then use the following:

ESTABLISHED ESTABLISHED Loop A Flow 7600 gpm Loop B Flow 7900 gpm Standard: Not applicable - RR Pumps are operating in Fast speed per the cue.

Cue:

Comments SAT UNSAT Comment Number Page 9 of 24

JPM Number: JPM512 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

  • 8.1.3.2 If fast speed Recirc Pumps, using Figure 1a (1b) [RVDT] or 1c (1d) [LVDT],

and the FCV position from step 8.1.2, determine the following:

Determine the Established Recirculation Loop and/or B flow using step 8.1.3.2 as follows:

ESTABLISHED ESTABLISHED Loop A Flow _____ gpm Loop B Flow _____ gpm Standard: Examinee records the following:

9041.01 - places a check in the box for step 8.1.3.2 9041.01D001:

  • Recirc Loop A: 28,000 - 29,000 gpm
  • Recirc Loop B: 29,000 - 30,000 gpm Cue:

Comments Any value recorded between the minimum and maximum flow values above is satisfactory.

Recording RR Pump Loop flow is the only critical portion of the step.

SAT UNSAT Comment Number Page 10 of 24

JPM Number: JPM512 - Rev 01 Clinton Power Station Job Performance Measure (JPM) 8.1.3.3 If in SINGLE LOOP, using Figure 1e (1f) [RVDT] or 1g (1h) [LVDT] and the FCV position from step 8.1.2, determine the following:

ESTABLISHED ESTABLISHED Loop A Flow _____ gpm Loop B Flow _____ gpm Standard: Examinee records NA in both blanks for 9041.01D001 step 8.1.3.3.

Cue:

Comments SAT UNSAT Comment Number Page 11 of 24

JPM Number: JPM512 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

  • 8.1.4 Calculate the % deviation of the indicated loop flow from the established loop using the data sheet formula.

Standard: Examinee calculates Loop Flow % Deviation using the formula listed in CPS No. 9041.01D001 step 8.1.4 and records the following values:

  • Recirc Loop A:

o Indicated flow - 32,500 gpm o Established flow - 28,000 - 29,000 gpm o Loop Flow % Deviation - 16.1% - 12.1%

  • Recirc Loop B:

o Indicated flow - 31,000 o Established flow - 29,000 - 30,000 gpm o Loop Flow % Deviation - 6.9% - 3.3%

Examinee checks the box for step 8.1.4 in 9041.01 Cue: If the examinee reports that the A RR Loop % deviation is outside the +/-10%

acceptance value, acknowledge the report and cue the examinee to complete the surveillance and report any remaining data outside the acceptance criteria of 9041.01.

Comments Recording data in 9041.01D001 is the only critical portion of the step.

SAT UNSAT Comment Number Page 12 of 24

JPM Number: JPM512 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

CPS No. 9041.01, Jet Pump Operability Test 8.2 Indicated Total Core Flow versus Established Total Core Flow

  • 8.2.1 (Record) Indicated Total Core Flow.

Standard: Examinee records the following:

9041.01 - places a check in the box for step 8.2.1 9041.01D001 - Examinee records the numeral 77 in the blank for Indicated Total Core Flow on CPS No. 9041.01D001 step 8.2.1.

Cue:

Comments Recording data on the data sheet is the only portion of the step that is critical.

SAT UNSAT Comment Number

  • 8.2.2 (Record) Calculate Total Recirc Flow.

Standard: Examinee records the following:

9041.01 - places a check in the box for step 8.2.2 9041.01D001:

  • Examinee enters the numerals 32,500 in the Loop A flow blank and 31,000 in the Loop B flow blank, and then enters the numeral 63,500 in the Total Recirc Loop Flow blank.

Cue:

Comments Recording data on the data sheet is the only portion of the step that is critical.

SAT UNSAT Comment Number Page 13 of 24

JPM Number: JPM512 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

  • 8.2.3 (Record) Determine and record the Established Total Core Flow.

Standard: Examinee uses Figure 2a from 9041.01 to determine Established Core Flow and records the numeral 81-83 in the blank on CPS No. 9041.01D001 step 8.2.3 (any value within this range is acceptable).

9041.01 - examinee places a check in the box for step 8.2.3.1.

Cue:

Comments Any value recorded between the minimum and maximum flow values above is satisfactory.

Recording data on 9041.01D001 is the only critical portion of the step.

SAT UNSAT Comment Number

  • 8.2.4 (Record) Calculate Core Flow % Deviation.

Standard: Examinee records the following:

9041.01 - places a check in the box for step 8.2.4 9041.01D001:

  • Indicated flow - 77 mlbm/hr
  • Established flow 83 mlbm/hr
  • Core Flow % Deviation - -4.9% to -7.2%

Cue:

Comments Any value recorded between the minimum and maximum established flow values above is satisfactory.

Recording data on the 9041.01D001 data sheet is the only critical portion of the step.

SAT UNSAT Comment Number Page 14 of 24

JPM Number: JPM512 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

CPS No. 9041.01, Jet Pump Operability Test 8.3 Indicated Jet Pump Flow/dP Versus Established Jet Pump Flow/dP 8.3.1 (Record) Using computer points B33NA009 - 028, or P619 indications, record for each jet pump for the operating loops, the indicated diffuser-to-lower plenum Jet Pump flow or Jet Pump dP Standard: Examinee records the following:

9041.01 - places a check in the box for step 8.3.1 9041.01D001- Jet Pump Flows using values provided on the data sheet in the first column of CPS No. 9041.01D001 Table 1: JP Flow/dp and Deviation Data Table Cue: Provide Data Sheet for Section 8.3 Comments SAT UNSAT Comment Number NOTE For TWO LOOP operation, if the results of steps 8.1.4 and 8.2.4 are acceptable, the surveillance results are acceptable, and steps 8.3.2, 8.3.3, 8.3.4 may be omitted (N/Ad).

For SINGLE LOOP operation, these steps should be performed for the operating jet pumps, but acceptance criteria has not been established.

Page 15 of 24

JPM Number: JPM512 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

  • 8.3.2 & 8.3.3 (Record) Calculate the Average Jet Pump Flow for each recirc loop using Formula #1 or Average Jet Pump dP (P619 dP meter scales are in %) for each recirc loop using Formula #2.

Standard: Examinee records the following values on 9041.01D001 Table 1 JP Flow / dP and DEVIATION DATA Table:

  • Sum 1-10: 38.34
  • 8.3.2 Average JP Flow: 3.834
  • Sum 11-20: 39.56
  • 8.3.2 Average JP Flow: 3.956 JP 1 4.1% JP 11 3.6%

JP 2 4.1% JP 12 3.6%

JP 3 -2.7% JP 13 -2.4%

JP 4 -2.7% JP 14 -2.4%

JP 5 4.1% JP 15 3.6%

JP 6 -2.7% JP 16 3.6%

JP 7 -2.7% JP 17 -2.4%

JP 8 4.1% JP 18 -2.4%

JP 9 -2.7% JP 19 -2.4%

JP 10 -2.7% JP 20 -2.4%

  • Columns for Jet Pump dP % and % DEV dP (8.3.1 and 8.3.3) should be NAd.

For 9041.01 - the examinee should place a check in the box for step 8.3.2 & 8.3.3, and record the following values for Formula #1 in step 8.3.2:

  • Sum of JP 1 Thru 10 flows - 38.34
  • Average of JP 1 Thru 10 flows - 3.834
  • Sum of JP 11 Thru 20 flows - 39.56
  • Average of JP 1 Thru 10 flows - 3.956
  • Blanks for Formula #2 should be NAd Cue:

Comments The values recorded by the examinee may be slightly different than the values listed above based on rounding methods, if used.

Page 16 of 24

JPM Number: JPM512 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

SAT UNSAT Comment Number 8.3.4 (Initial) Compare jet pump flow or dP to acceptance criteria.

Standard:

  • 9041.01D001 - Examinee should initial each blank in the 8.3.4 column of 9041.01D001 Table 1 after comparing the values recorded in 9041.01D001 Table 1 step 8.3.3 data with the values for Fast Speed (80-100% Power) in Table 1 of 9041.01 (lower right hand table).
  • For 9041.01 - the examinee should place a check in the box for step 8.3.4.1.

Cue:

Comments SAT UNSAT Comment Number 8.4 (Initial) If an Engineering evaluation was performed, are jet pumps OPERABLE?

Standard: Step is NA - an engineering evaluation was not performed.

Cue:

Comments Step can be NAd SAT UNSAT Comment Number Page 17 of 24

JPM Number: JPM512 - Rev 01 Clinton Power Station Job Performance Measure (JPM) 8.5 (Initial) Notify SMngt at test completion.

Standard: Examinee records the following:

9041.01 - checks the box for step 8.5 9041.01D001 - date, time and initials Cue: Acknowledge completion.

Comments SAT UNSAT Comment Number TERMINATING CUES:

CPS No. 9041.01 Jet Pump Operability Test completed satisfactorily.

STOP TIME:

Page 18 of 24

JPM Number: JPM512 - Rev 01 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

EO RO SRO STA SRO Cert JPM

Title:

Perform a Manual Jet Pump Operability JPM Number: JPM512 Revision Number: 01 Task Number and

Title:

904101.01, Perform the Jet Pump Operability Test K/A System K/A Number Importance (RO/SRO)

Generic 2.2.12 3.7 4.1 Knowledge of surveillance procedures.

Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 40 minutes Actual Time Used: minutes

References:

CPS No. 9041.01, Jet Pump Operability Test, Rev. 36C CPS No. 9041.01D001, Jet Pump Operability Test Data Sheet, Rev. 34B EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 19 of 24

Clinton Power Station Job Performance Measure (JPM)

Data Sheet for Section 5 Reactor Power 96%

Loop A Flow 38.0 Mlbm/Hr Loop B Flow 38.6 Mlbm/Hr Page 20 of 24

Clinton Power Station Job Performance Measure (JPM)

Data for Section 8.1 and 8.2 B33DA013 INDICATED Loop A Flow 32,500 gpm B33DA014 INDICATED Loop B Flow 31,000 gpm B33DA009 B33-F060A Recirc FCV Position RVDT 61%

B33DA010 B33-F060B Recirc FCV Position RVDT 61%

B33NA001 Indicated Total Core Flow 77.0 Mlbm/Hr Page 21 of 24

Clinton Power Station Job Performance Measure (JPM)

Jet Pump Flow for Section 8.3 Jet Pump Number Jet Pump Flow (mlb/hr)

JP 1 3.99 JP 2 3.99 JP 3 3.73 JP 4 3.73 JP 5 3.99 JP 6 3.73 JP 7 3.73 JP 8 3.99 JP 9 3.73 JP 10 3.73 JP 11 4.10 JP 12 4.10 JP 13 3.86 JP 14 3.86 JP 15 4.10 JP 16 4.10 JP 17 3.86 JP 18 3.86 JP 19 3.86 JP 20 3.86 Page 22 of 24

Clinton Power Station Job Performance Measure (JPM)

Page 23 of 24

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are the extra RO.

The reactor is operating at 96% power.

The computerized method of performing CPS No. 9041.01 is not available at this time.

RR Pumps A and B are operating in fast speed.

APRM calibrations are NOT in progress.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

The CRS has directed you to perform CPS No. 9041.01 Jet Pump Operability Test.

Report to the CRS after completing the task.

Page 24 of 24

CLINTON POWER STATION Job Performance Measure Perform a Locked High Radiation Area Entry JPM Number: JPM513 Revision Number: 00 Date: 06/14/13 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM513 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 14

JPM Number: JPM513 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 04/16/2002 This is a new RO Administrative JPM.

01 07/03/02 Unknown update 00 06/14/13 This revision updates JPM 995555.0301 to the current numbering system, new template, and current procedures.

It also resets the Revision number to 00.

Page 3 of 14

JPM Number: JPM513 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • Area survey maps (if not using current plant survey data)

PROCEDURAL/

REFERENCES:

  • RP-AA-210, DOSIMETRY ISSUE, USAGE, AND CONTROL, Rev. 22
  • RP-AA-403, ADMINISTRATION OF THE RADIATION WORK PERMIT PROGRAM, Rev. 03
  • RWP 10014550 RT and CT HRA/LHRA Area Generic
  • Survey Map for RWCU Pump Room A EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
  • When the initiating cue has been read to the examinee and the examinee acknowledges the cue, provide the examinee with a copy of the survey map attached to the back of the JPM. Do NOT provide the examinee with the RWP until JPM step 3.

Page 4 of 14

JPM Number: JPM513 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

Reactor Water Cleanup Pump A is running.

A report was received in the Main Control Room from a non-licensed area operator that there is a puddle of oil on the floor near the A RWCU Pump and that the oil bubbler appears to be low.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

Review the attached Survey Map for the A RWCU Pump Room and determine the radiological requirements for entering this room to locate the source of the oil leakage.

START TIME:

Page 5 of 14

JPM Number: JPM513 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS RP-AA-403, Administration of the Radiation Work Permit Program Step 4.6.1 RP-AA-460, Controls for High and Very High Radiation Areas Step 4.7

  • JPM Step 1 Examinee determines the posting requirements for the A RWCU Pump Room.

Standard: Identifies the intended location on the map and determines:

  • the highest contamination levels in the room at 40,000 dpm/100cm2 at point 2 requiring the room to be posted as a Contamination Area (CA)

Cue:

Comments Evaluator - Provide the examinee with the survey map but NOT the RWP for this step.

SAT UNSAT Comment Number Page 6 of 14

JPM Number: JPM513 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

  • JPM Step 2 Examinee determines the location of the area containing the highest dose rate in the A RWCU Pump Room.

Standard: Reviews the survey map and determines the highest dose rate is in the northeast corner of the A RWCU Pump Room (annotated by 1100).

Cue: Ask the examinee to identify the location of the highest dose rate in the A RWCU Pump Room.

Comments SAT UNSAT Comment Number

  • JPM Step 3 Examinee determines the RWP requirements for entering the A RWCU Pump room.

Standard: Minimum requirements:

1. Logged onto RWP10014550
2. DLR and Electronic Dosimeter
3. A specific HRA/LHRA briefing
4. A full set of protective clothing must be worn consisting of coveralls, hardhat cover, cotton liners, 1 pair rubber gloves, rubber shoe covers and booties
5. Continuous RP coverage Cue:
  • Provide the attached RWP 10014550 to the examinee and request the examinee to determine the RWP requirements for entering the A RWCU Pump Room.
  • Provide a cue to the examinee to walk through the process for performing the job including entering the A RWCU Pump Room.

Comments SAT UNSAT Comment Number Page 7 of 14

JPM Number: JPM513 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

JPM Step 4 Examinee completes RP-AA-1008 Attachment 1 Radiation Worker Pocket RWP Data Sheet (Trip Ticket)

Standard: Examinee records the following information:

  • Name
  • RWP #: 10014550
  • Specific Component / Location or Area: RWCU Pump Room A
  • Work to Be Performed: Investigate oil leak / low oil bubbler level on the A RWCU Pump
  • ED Dose Alarm: 1000 mrem/hr
  • Dose Rate Alarm: 1200 mrem/hr
  • Expected Dose Rate Range: 0 - 1100 mr/hr
  • Expected Contamination Levels: 0 - 40,000 dpm/100 cm2
  • My dose goal: 80 mrem
  • High Radiation Area: YES circled
  • Name of the RP Technician who performed the HRA briefing recorded Cue: Provide RP-AA-1008 Attachment 1 to the examinee and request the examinee to fill out the required information on the trip ticket.

Comments SAT UNSAT Comment Number TERMINATING CUES:

The proper method for entering a Locked High Radiation Area (LHRA) and Contamination Area (CA) for the area has been demonstrated STOP TIME:

Page 8 of 14

JPM Number: JPM513 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

EO RO SRO STA SRO Cert JPM

Title:

Perform a Locked High Radiation Area Entry JPM Number: JPM513 Revision Number: 00 Task Number and

Title:

995555.03, Complete in-plant radiological practices for a locked high radiation area K/A System K/A Number Importance (RO/SRO)

Generic 2.3.7 3.5 3.6 Ability to comply with radiation work permit requirements during normal or abnormal conditions.

Suggested Testing Environment: Plant/Classroom Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

  • RP-AA-210, Dosimetry Issue, Usage, And Control, Rev. 22
  • RP-AA-403, Administration Of The Radiation Work Permit Program, Rev. 03
  • RWP 1000422, RT and CT HRA/LHRA Area Generic
  • Survey Map for RWCU Pump Room A EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 9 of 14

Clinton Power Station Job Performance Measure (JPM)

Clinton Power Station Radiation Work Permit RWP#: 10014550 Rev: 0 Worker Information RWP

Description:

Investigate oil leak in RWCU Pump Room A Unit: Building: Elevation: Location:

1 All All Various Equipment: Various RWP Dose 100 mrem Approval: 80 mrem ED Dose Alarm:

1000 mrem/hr Dose Rate Alarm:

Exposure Monitoring Requirements Respiratory Protection Required DLR and Electronic Dosimeter Radiation Protection shall evaluate for engineering control and respiratory protection per RP-AA-401 Teledosimetry may be used in lieu of standard ED.

Special Instructions Protective Clothing Requirements This RWP allows High Radiation and Locked High Radiation Protective Clothing ( 100,000 dpm/100 cm2)

Area access: A specific HRA/LHRA briefing is required to enter. Coveralls, Hardhat cover, cotton liners, 1 pair rubber gloves, rubber shoe covers and booties Electronic Dosimeters should be checked at approximately 15 minute intervals or more often in higher radiation areas. Protective Clothing (< 10,000 dpm/100 cm2)

Radiation Worker Pocket Data Sheet Trip Ticket will be RP APPROVAL REQUIRED used by each individual for each entry.

Modesty garments, rubber shoe covers and booties, cotton TIP area entry controlled by RP-AB-460 TIP AREA ACCESS liners, 1 pair rubber gloves Contact RP prior to accessing areas above 7 ft. Company modesty garments shall be worn under PCs.

Stop Work Limits:

Protective Clothing (> 100,000 dpm/100 cm2)

1. GA dose rates =/> 1000 mr/hr PCs consists of:
2. GA contamination levels =/> 200k dpm/100cm2 Full hood, hard hat cover, coveralls, shoe covers, shoe
3. Airborne radioactivity =/> 0.3 DAC rubbers, glove liners, 1 pair rubber gloves. Additional protective clothing (e.g. paper suit, nylon, rubber) may be prescribed based upon contamination form (i.e. wet, dry or greasy material) or extended activities in contaminated areas (>100,000 dpm/100cm2)

Company modesty garments shall be worn under PCs Page 10 of 14

Clinton Power Station Job Performance Measure (JPM)

Clinton Power Station Radiation Work Permit RWP#: 10014550 Rev: 0 Radiation Protection Information Survey Frequency Requirements: Shielding Recommended:

Radiation : R None Contamination: R Temporary Airborne: R Permanent Pre-Job Briefing Notes:

RPT Coverage / Comments:

Initial Continuous RP for LHRA entry Intermittant Continuous Page 11 of 14

Clinton Power Station Job Performance Measure (JPM)

Clinton Power Station Radiation Work Permit RWP#: 10014550 Rev: 0 Continuation Sheet Continuation Sheet When using remote communication devices (Telex, PCS phone) items should be inside PCs or secured in a pouch.

Teledosimetery should be secured inside pocket unless directed by Radiation Protection Page 12 of 14

Clinton Power Station Job Performance Measure (JPM)

A Page 13 of 14

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

Reactor Water Cleanup Pump A is running.

A report was received in the Main Control Room from a non-licensed area operator that there is a puddle of oil on the floor near the A RWCU Pump and that the oil bubbler appears to be low.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

Review the attached Survey Map for the A RWCU Pump Room and determine the radiological requirements for entering this room to locate the source of the oil leakage.

Page 14 of 14