ML13270A137

From kanterella
Jump to navigation Jump to search
Hearing Request and Petition to Intervene by the Environmental Law and Policy Center
ML13270A137
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 09/23/2013
From: Gleckner A, Vickers J
Environmental Law & Policy Ctr
To:
Atomic Safety and Licensing Board Panel
SECY/RAS
References
2013-0169, RAS 25070
Download: ML13270A137 (37)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD PANEL In the Matter of Docket Nos. 50-454, 50-455, 50-456, 50-Exelon Generation Company, LLC 457; 2013-0169 (Notice of Renewal of Operating Licenses for the Braidwood Nuclear Station, Units 1 and 2 and Byron Nuclear Station, Units 1 and 2)

HEARING REQUEST AND PETITION TO INTERVENE BY THE ENVIRONMENTAL LAW AND POLICY CENTER Pursuant to 10 C.F.R. § 2.714 and a notice published by the Nuclear Regulatory Commission (NRC) at 78 Fed. Reg. 44603 (July 24, 2013), Petitioner Environmental Law and Policy Center (ELPC) hereby requests a hearing and petition to intervene in the above-captioned proceeding. As demonstrated below, Petitioner has representational standing, through its members, to make this hearing request.

Description of Proceeding This proceeding concerns an application by the Exelon Generating Company, L.L.C.

(Exelon) for a relicensing of Byron Nuclear Station Units 1 and 2 (Byron) and Braidwood Nuclear Station Units 1 and 2 (Braidwood). Exelon filed its application with the NRC on May 29, 2013. The NRC published a notice of opportunity to request a hearing on July 24, 2013, at 78 Fed Reg. 44603. If granted, the License Renewals would allow Exelon to continue operating Byron and Braidwood for an additional 20 years.

1

Description of Petitioner ELPC is a Midwest not-for-profit environmental quality and economic development advocacy organization with 1500 members across Illinois. Among other goals, ELPC promotes clean, renewable energy resources and energy efficiency, works to reduce pollution in the energy sector, and protects water quality and supply. Since its founding in 1993, ELPC has been actively involved in numerous national, regional and state energy and environmental issues.

Standing Under the Federal Register notice and 10 C.F.R. § 2.309, a request for hearing must:

set forth with particularity the interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding, taking into consideration the limited scope of matters that may be considered pursuant to 10 CFR parts 51 and 54.

In addition, the request for hearing must address: (1) the nature of the petitioners right under the Atomic Energy Act to be made a party to the proceeding, (2) the nature and extent of the petitioners property, financial, or other interest in the proceeding, and (3) the possible effect of any order that may be entered in the proceeding on the petitioners interest. Id.

Other standing requirements are found in NRC case law. The Atomic Safety and Licensing Board (ASLB) summarized these standing requirements as follows:

In determining whether a petitioner has sufficient interest to intervene in a proceeding, the Commission has traditionally applied judicial concepts of standing. See Metropolitan Edison Co. (Three Mile Island Nuclear station, Unit 1), CLI-83-25, 18 NRC 327, 332 (1983) (citing Portland General Electric Co.

(Pebble Springs Nuclear Plant, Units 1 and 2), CLI-76-27, 4 NRC 610 (1976)).

Contemporaneous judicial standards for standing require a petitioner to demonstrate that (1) it has suffered or will suffer a distinct and palpable harm that constitutes injury-in-fact within the zone of interests arguably protected by the governing statutes (e.g., the Atomic Energy Act of 1954 (AEA), the National Environmental Policy Act of 1969 (NEPA)); (2) the injury can be fairly traced to the challenged action; and (3) the injury is likely to be redressed by a favorable decision. See Carolina Power & Light Co. (Shearon Harris Nuclear Power Plants), LBP-99-25, 50 NRC 25, 29 (1999). An organization that wishes to 2

intervene in a proceeding may do so either in its own right by demonstrating harm to its organizational interests, or in a representational capacity by demonstrating harm to its members. See Hydro Resources, Inc. (2929 Coors Road, Suite 101, Albuquerque, NM 87120), LBP-98-9, 47 NRC 261, 271 (1998). To intervene in a representational capacity, an organization must show not only that at least one of its members would fulfill the standing requirements, but also that he or she has authorized the organization to represent his or her interests. See Private Fuel Storage, L.L.C. (Independent Fuel Storage Installation), LBP-98-7, 47 NRC 142, 168, affd on other grounds, CLI-98-13, 48 NRC 26 (1998).

Pacific Gas & Electric Co. (Diablo Canyon Power Plant Independent Spent Fuel Storage Installation), LBP-02-23, 56 NRC 413, 426 (2002).

Petitioners standing to participate in this proceeding is demonstrated by the declarations of the following members of Petitioner organizations, who have authorized Petitioner to represent their interests in this proceeding.

Gerald Paulson, ELPC member (Exhibit 1)

Jim Slama, ELPC member (Exhibit 2)

Jesse Auerbach, ELPC member (Exhibit 3)

Petitioners members seek to protect their own health, safety and lives, public health safety, and the environment by challenging the issuance of Exelons requested License Renewals. Petitioner seeks to ensure that the NRC does not issue a License Renewal unless Exelon demonstrates full compliance with the Atomic Energy Act and the National Environmental Policy Act (NEPA) and the Administrative Procedure Act (APA), as well as with applicable Illinois state law.

Specific Aspects of the Subject Matter As To Which Petitioner Seeks to Intervene As required by the Federal Register notice, Petitioner set forth below the specific aspects of the subject matter of this proceeding as to which they wish to intervene:

1. Whether Exelons Environmental Report and the NRC have failed to provide a rigorous exploration and objective evaluation of all reasonable renewable energy resource and 3

energy efficiency alternatives, and clean coal alternatives, in the form of a need for power analysis, to the granting of the requested License Renewals for Byron and Braidwood, as required by the NEPA, 42 U.S.C. § 4321 et seq.

2. Whether Exelons request to License Renewal as much as fourteen years in advance of the current expiration date of the current licenses is reasonable under NEPA and the APA.

Petitioners Contentions are submitted as Exhibit 4.

The NRC will need to determine, based on the foregoing and the contentions to be raised by the Petitioner, whether (1) in light of the final balance of conflicting factors regarding the environmental impacts of the proposed action, as well as reasonable alternatives, the appropriate action by the NRC will be to require a need for power analysis in the Environmental Report and/or to deny the requested License Renewals and (2) whether License renewal as much as fourteen years in advance of the expiration of current licenses is appropriate.

Conclusion For the foregoing reasons, Petitioner has demonstrated standing to request a hearing on the proposed issuance of License Renewals of the Braidwood and Byron nuclear facilities and submitted two admissible contentions. Therefore, Petitioner should be admitted as intervenors.

Respectfully submitted, Digitally signed by Justin Vickers DN: o=U.S. Nuclear regulatory Commission, Justin Vickers ou=www.verisign.com/repository/CPS Incorp. by Ref.,LIAB.LTD(c)99, title=Staff Attorney, cn=Justin Vickers, email=jvickers@elpc.org Date: 2013.09.23 16:16:21 -05'00' Attorneys on Behalf of Petitioner Environmental Law and Policy Center:

Justin Vickers Allen Gleckner 35 East Wacker Drive, Suite 1600 Chicago, Illinois 60601 (312) 673-6500 jvickers@elpc.org September 23, 2013 4

(;+,%,7

(;+,%,7

(;+,%,7

EXHIBIT 4 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD PANEL In the Matter of Docket Nos. 50-454, 50-455, 50-456, 50-Exelon Generation Company, LLC 457; 2013-0169 (Notice of Renewal of Operating Licenses for the Braidwood Nuclear Station, Units 1 and 2 and Byron Nuclear Station, Units 1 and 2)

CONTENTIONS INCLUDED WITH PETITION TO INTERVENE BY THE ENVIRONMENTAL LAW AND POLICY CENTER In accordance with the Nuclear Regulatory Commissions (NRC or Commission)

Rules of Practice for Domestic Licensing Proceedings in 10 C.F.R. Pt. 2, and the Commissions Notice of Docketing and Opportunity to Request a Hearing and to Petition for Leave to Intervene (78 FR 44603), Petitioner Environmental Law and Policy Center (ELPC) hereby submits contentions challenging the adequacy of Exelon Generating Companys (Exelon) May 29, 2013 application for license renewal for Braidwood Units 1 and 2 (Braidwood) and Byron Units 1 and 2 (Byron). As demonstrated below, each of the contentions satisfy the NRCs admissibility requirements set forth in 10 CFR 2.309(f).

CONTENTIONS ENVIRONMENTAL CONTENTION 1: Failure to Include Need for Power Analyses in the Braidwood and Byron Environmental Reports The Environmental Reports (ERs) for Braidwood and Byron claim that Exelon satisfies 10 C.F.R. 51.45(b)(3), which requires a discussion of alternatives that is sufficiently complete to aid the Commission in developing and exploring . . . appropriate alternatives . . . concerning

alternative uses of available resources, pursuant to the National Environmental Policy Act (NEPA). Braidwood ER at 7-3; Byron ER at 7-3. Exelons analysis, however, is premised on material legal flaws that lead it to improperly reject potentially better, lower-cost, safer and environmentally preferable energy efficiency, renewable energy resource, and distributed generation resource alternatives. Exelons Braidwood and Byron ERs, therefore, do not provide the basis for the rigorous exploration and objective evaluation of all reasonable alternatives to the relicensings that NEPA requires.

Basis: Exelons evaluation of reasonable alternatives for Braidwoods and Byrons license renewals is deficient because it is improperly constrained by 10 CFR 51.53(c)(2), which provides, in clear violation of NEPA, that the application need not analyze the need for power at the stations. There is, therefore, a germane dispute with Exelon on a material issue of law, thereby making this an admissible contention. 10 C.F.R. 2.309(f)(1)(vi).

The need for power is at the heart of the purpose and need statement, which, in turn, serves as the baseline by which the reasonableness of various alternatives is measured. Without an analysis of whether, how much, and what type of energy is needed upon expiration of the current Braidwood and Byron licenses, there is no way to accurately weigh alternatives against one another or to conclude whether it is appropriate to renew the licenses. It is impossible to engage in the rigorous and objective evaluation of alternatives required by NEPA without first analyzing the need for power. The NRC must determine how to apply its regulations in a manner that complies with NEPA. Otherwise, the NRC must revisit its regulations or take other necessary administrative actions so that the ER and EIS processes are conducted in a manner that fully complies with NEPA.

2

The need for power analysis is required to satisfy NEPAs cost/benefit analysis requirement. See e.g., In re Louisiana Energy Services, L.P. (Claiborne Enrichment Center) 47 NRC 77 (1998); Calvert Cliffs Coordinating Committee, Inc. v. AEC, 449 F.2d 1109 (D.C. Cir.

1971) (economic and technical benefits of planned action must be assessed and then weighed against the environmental costs.); Ill. Commerce Com. v. Interstate Commerce Com., 848 F.2d 1246, 1259 (D.C. Cir. 1988) (NEPA was intended to ensure that decisions about federal actions would be made only after responsible decision-makers had fully adverted to the environmental consequences of the actions, and had decided that the public benefits flowing from the actions outweighed their environmental costs) (quoting, Jones v. District of Columbia Redevelopment Land Agency, 499 F.2d 502,512 (D.C. Cir. 1974), cert denied, 423 U.S. 937 (1975)). Failure to include any cost/benefit analysis in the ERs - which takes the form of a need for power analysis in licensing ERs - clearly violates this requirement.

While the NRCs regulations purport to foreclose an analysis of the need for power, Exelon identifies a need for power, which it then uses to reject alternatives. In its Purpose and Need for Action, Exelon points to the NRCs clarification of the purpose of renewal as allowing power generation . . . to meet future system generating needs. Braidwood ER at 1-3 (citing, U.S. Nuclear Regulatory Commission. 1996. Environmental Review for Renewal of Nuclear Power Plant Operating Licenses. Final Rule. Federal Register 61(109): 28467-28497.

Washington, DC. June 5, 1996); Byron ER at 1-3 (citing, U.S. Nuclear Regulatory Commission.

1996. Environmental Review for Renewal of Nuclear Power Plant Operating Licenses. Final Rule. Federal Register 61(109): 28467-28497. Washington, DC. June 5, 1996). Exelon goes on to state that the continued operation of Braidwood and Byron would be preferable to the construction and operation of new base-load generation capacity (Braidwood ER at 8-3; Byron 3

ER at 8-3) without first properly providing a justification for the need to replace the stations base-load capacity. In fact, Exelon states that [f]or the purposes of this Environmental Report, alternative generating technologies were evaluated to identify candidate technologies that would be capable of replacing the Braidwood annual average base-load capacity, including MUR, of approximately 2,394 MWe by the end of the first licensed units term in 2026. Further, Exelons analyses assume not only that the Braidwood and Byron base-load generation will be necessary over the next more than thirty years, it assumes that the stations will actually increase their output, thereby assuming a change in the need for power going forward without actually conducting a need for power analysis. Braidwood ER at 7-7 (Exelon projects that Braidwood will increase its approximate annual net mean generation by 34 MWe); Byron ER at 7-7 (Exelon projects that Byron will increase its approximate annual net mean generation by 34 MWe). An examination of the actual need for power could lead to significantly different conclusions regarding the need for Braidwood and Byron in the future and the environmental impacts that alternatives would have as compared to the continuing operation of the units. For example, if Illinois actually needs additional peak-load capacity, then alternative resources such as solar power would fare much better.

The Commission should require Exelon to conduct need for power analyses for the Braidwood and Byron facilities before issuing license renewals.

CONTENTION 2: License Renewal of Braidwood and Byron Is Premature The Braidwood Environmental Report states:

The existing license for Unit 1 will expire on October 31, 2024. The existing license for Unit 2 will expire on November 6, 2026. And that [t]he renewed operating licenses would allow an additional 20 years of operation for the Byron units beyond their current licensed operating period. The renewed license for Byron Unit 1 would expire on October 31, 2044, and the renewed license for Byron Unit 2 would expire on November 6, 2046. Braidwood ER at 1-3.

4

Similarly, the Byron Environmental Report states:

The existing license for Unit 1 will expire on October 17, 2026. The existing license for Unit 2 will expire on December 18, 2027. And that [t]he renewed license for Braidwood Unit 1 would expire on October 17, 2046, and the renewed license for Braidwood Unit 2 would expire on December 18, 2047. Byron ER at 1-3.

It is premature to relicense nuclear facilities with existing permits that will not expire for eleven to fourteen years. The Commission should require Exelon to wait until closer to the license expiration dates before seeking renewal.

Basis: Exelons request for relicensing more than ten years in advance of the expiration of the existing licenses will result in EISs that will be stale by the time the existing licenses expire. This will result in the need for supplemental EISs at additional cost and time to the Commission. There is, therefore, a germane dispute with Exelon on a material issue of law or fact, thereby making this an admissible contention. 10 C.F.R. 2.309(f)(1)(vi).

While NEPA does not explicitly state when an environmental impact statement is in need of post-decision supplementation, the White House Council on Environmental Quality (CEQ) promulgated 40 CFR 1502.9(c), which requires agencies to prepare supplements to either draft or final environmental impact statements if . . . there are significant new circumstances or information relevant to environmental concerns and bearing on that proposed action or its impacts. Further, CEQ stated, in its Forty Most Asked Questions on CEQ NEPA Regulations, that the rule of thumb for reviewing stale EISs is that EISs that are more than 5 years old should be carefully reexamined. 46 Fed. Reg. 18026 (Mar. 23, 1981), attached as Attachment 1.

By seeking license renewal far in advance of the expiration of the existing Braidwood and Byron licenses, Exelon has virtually ensured that the EISs for all four units at issue in this case will be more than five years old well before the renewed licenses take effect. While this long lead time should give the Commission pause under any circumstances, Exelons failure to 5

properly evaluate the need for these facilities going forward, as well as the planned and future changes in safety regulations following the disaster at the Japanese Fukushima facility and the Commissions Lessons Learned from Fukushima initiative, make it likely that the EISs will need to be supplemented closer to the expiration of the existing licenses. Moreover, electricity generation and planning has been, and will very likely continue to be, a rapidly changing area.

See e.g., Edison Electric Institute, Disruptive Challenges: Financial Implications and Strategic Responses to a Changing Retail Electric Business (Jan. 2013), available at, http://www.eei.org/ourissues/finance/Documents/disruptivechallenges.pdf, attached as . In eleven to fourteen years, when the new licenses are to take effect, the energy generation landscape will most likely be very different from today. It is almost certain that the alternatives examined in the ERs will have much different capabilities, costs and environmental impacts, and will result in significant new circumstances requiring supplementation.

The Commission should require Exelon to wait until closer to the expiration date of the Braidwood and Byron licenses before seeking renewal.

Respectfully submitted, Digitally signed by Justin Vickers DN: o=U.S. Nuclear regulatory Commission, Justin Vickers ou=www.verisign.com/repository/CPS Incorp.

by Ref.,LIAB.LTD(c)99, title=Staff Attorney, cn=Justin Vickers, email=jvickers@elpc.org Date: 2013.09.23 16:17:22 -05'00' Attorney on Behalf of Petitioner Environmental Law and Policy Center Justin Vickers Allen Gleckner 35 E. Wacker Drive, Suite 1600 Chicago, IL 60601 (312) 673-6500 jvickers@elpc.org agleckner@elpc.org 6

$77$&+0(17

Page 1 FEDERAL REGISTER 40 CFR Parts 1500, 1501, 1502, 1503, 1504, 1505, 1506, 1507, and 1508 Forty Most Asked Questions Concerning CEQ's National Environmental Policy Act Regulations 46 FR 18026 March 23, 1981 ACTION: Information Only: Publication of Memorandum to Agencies Containing Answers to 40 Most Asked Questions on NEPA Regulations.

SUMMARY

The Council on Environmental Quality, as part of its oversight of implementation of the National Environmental Policy Act, held meetings in the ten Federal regions with Federal, State, and local officials to discuss administration of the implementing regulations. The forty most asked questions were compiled in a memorandum to agencies for the information of relevant officials. In order efficiently to respond to public inquiries this memorandum is reprinted in this issue of the Federal Register.

FOR FURTHER INFORMATION CONTACT:

Nicholas C. Yost, General Counsel, Council on Environmental Quality, 722 Jackson Place NW., Washington, D.C.

20006; 202-395-5750.

TEXT: March 17, 1981.

March 16, 1981.

Memorandum for Federal NEPA Liaisons, Federal, State, and Local Officials and Other Persons Involved in the NEPA Process

Subject:

Questions and Answers About the NEPA Regulations During June and July of 1980 the Council on Environmental Quality, with the assistance and cooperation of EPA's EIS Coordinators from the ten EPA regions, held one-day meetings with federal, state and local officials in the ten EPA regional offices around the country. In addition, on July 10, 1980, CEQ conducted a similar meeting for the Washington, D.C. NEPA liaisons and persons involved in the NEPA process. At these meetings CEQ discussed (a) the

Page 2 46 FR 18026 results of its 1980 review of Draft EISs issued since the July 30, 1979 effective date of the NEPA regulations, (b) agency compliance with the Record of Decision requirements in Section 1505 of the NEPA regulations, and (c) CEQ's preliminary findings on how the scoping process is working. Participants at these meetings received copies of materials prepared by CEQ summarizing its oversight and findings.

These meetings also provided NEPA liaisons and other participants with an opportunity to ask questions about NEPA and the practical application of the NEPA regulations. A number of these questions were answered by CEQ representatives at the regional meetings. In response to the many requests from the agencies and other participants, CEQ has compiled forty of the most important or most frequently asked questions and their answers and reduced them to writing. The answers were prepared by the General Counsel of CEQ in consultation with the Office of Federal Activities of EPA. These answers, of course, do not impose any additional requirements beyond those of the NEPA regulations. This document does not represent new guidance under the NEPA regulations, but rather makes generally available to concerned agencies and private individuals the answers which CEQ has already given at the 1980 regional meetings. The answers also reflect the advice which the Council has given over the past two years to aid agency staff and consultants in their day-to-day application of NEPA and the regulations.

CEQ has also received numerous inquiries regarding the scoping process. CEQ hopes to issue written guidance on scoping later this year on the basis of its special study of scoping, which is nearing completion.

Nicholas C. Yost, General Counsel.

Index

1. Range of Alternatives
2. Alternatives Outside the Capability of Applicant or Jurisdiction of Agency
3. No-Action Alternative
4. Agency's Preferred Alternative
5. Proposed Action v. Preferred Alternative
6. Environmentally Preferable Alternative
7. Difference Between Sections of EIS on Alternatives and Environmental Consequences
8. Early Application of NEPA
9. Applicant Who Needs Other Permits
10. Limitations on Action During 30-Day Review Period for Final EIS
11. Limitations on Actions by an Applicant During EIS Process
12. Effective Date and Enforceability of the Regulations
13. Use of Scoping Before Notice of Intent to Prepare EIS
14. Rights and Responsibilities of Lead and Cooperating Agencies

Page 3 46 FR 18026

15. Commenting Responsibilities of EPA
16. Third Party Contracts
17. Disclosure Statement to Avoid Conflict of Interest
18. Uncertainties About Indirect Effects of A Proposal
19. Mitigation Measures
20. Worst Case Analysis
21. Combining Environmental and Planning Documents
22. State and Federal Agencies as Joint Lead Agencies
23. Conflicts of Federal Proposal With Land Use Plans, on Policies and Controls
24. Environmental Impact Statements on Policies, Plans or Programs
25. Appendices and Incorporation by Reference
26. Index and Keyword Index In EISs
27. List of Preparers
28. Advance or Xerox Copies of EIS
29. Responses to Comments
30. Adoption of EISs
31. Application of Regulations to Independent Regulatory Agencies
32. Supplements To Old EISs
33. Referrals
34. Records of Decision
35. Time Required for the NEPA Process
36. Environmental Assessments (EA)
37. Findings of No Significant Impact (FONSI)
38. Public Availability of EAs v. FONSIs
39. Mitigation Measures Imposed in EAs and FONSIs
40. Propriety of Issuing EA When Mitigation Reduces Impacts Questions and Answers About the NEPA Regulations (1981)

Page 4 46 FR 18026 1a. Q. What is meant by "range of alternatives" as referred to in Sec. 1505.1(e)? n 1 n1 References throughout the document are to the Council on Environmental Quality's Regulations For Implementing The Procedural Provisions of the National Environmental Policy Act. 40 CFR Parts 1500-1508.

A. The phrase "range of alternatives" refers to the alternatives discussed in environmental documents. It includes all reasonable alternatives, which must be rigorously explored and objectively evaluated, as well as those other alternatives, which are eliminated from detailed study with a brief discussion of the reasons for eliminating them. Section 1502.14. A decisionmaker must not consider alternatives beyond the range of alternatives discussed in the relevant environmental documents. Moreover, a decisionmaker must, in fact, consider all the alternatives discussed in an EIS. Section 1505.1(e).

1b. Q. How many alternatives have to be discussed when there is an infinite number of possible alternatives?

A. For some proposals there may exist a very large or even an infinite number of possible reasonable alternatives.

For example, a proposal to designate wilderness areas within a National Forest could be said to involve an infinite number of alternatives from 0 to 100 percent of the forest. When there are potentially a very large number of alternatives, only a reasonable number of examples, covering the full spectrum of alternatives, must be analyzed and compared in the EIS. An appropriate series of alternatives might include dedicating 0, 10, 30, 50, 70, 90, or 100 percent of the Forest to wilderness. What constitutes a reasonable range of alternatives depends on the nature of the proposal and the facts in each case.

2a. Q. If an EIS is prepared in connection with an application for a permit or other federal approval, must the EIS rigorously analyze and discuss alternatives that are outside the capability of the applicant or can it be limited to reasonable alternatives that can be carried out by the applicant?

A. Section 1502.14 requires the EIS to examine all reasonable alternatives to the proposal. In determining the scope of alternatives to be considered, the emphasis is on what is "reasonable" rather than on whether the proponent or applicant likes or is itself capable of carrying out a particular alternative. Reasonable alternatives include those that are practical or feasible from the technical and economic standpoint and using common sense, rather than simply desirable from the standpoint of the applicant.

2b. Q. Must the EIS analyze alternatives outside the jurisdiction or capability of the agency or beyond what Congress has authorized?

A. An alternative that is outside the legal jurisdiction of the lead agency must still be analyzed in the EIS if it is reasonable. A potential conflict with local or federal law does not necessarily render an alternative unreasonable, although such conflicts must be considered. Section 1506.2(d). Alternatives that are outside the scope of what Congress has approved or funded must still be evaluated in the EIS if they are reasonable, because the EIS may serve as the basis for modifying the Congressional approval or funding in light of NEPA's goals and policies. Section 1500.1(a).

3. Q. What does the "no action" alternative include? If an agency is under a court order or legislative command to act, must the EIS address the "no action" alternative?

A. Section 1502.14(d) requires the alternatives analysis in the EIS to "include the alternative of no action." There are two distinct interpretations of "no action" that must be considered, depending on the nature of the proposal being evaluated. The first situation might involve an action such as updating a land management plan where ongoing programs initiated under existing legislation and regulations will continue, even as new plans are developed. In these cases "no action" is "no change" from current management direction or level of management intensity. To construct an alternative that is based on no management at all would be a useless academic exercise. Therefore, the "no action" alternative may be thought of in terms of continuing with the present course of action until that action is changed.

Page 5 46 FR 18026 Consequently, projected impacts of alternative management schemes would be compared in the EIS to those impacts projected for the existing plan. In this case, alternatives would include management plans of both greater and lesser intensity, especially greater and lesser levels of resource development.

The second interpretation of "no action" is illustrated in instances involving federal decisions on proposals for projects. "No action" in such cases would mean the proposed activity would not take place, and the resulting environmental effects from taking no action would be compared with the effects of permitting the proposed activity or an alternative activity to go forward.

Where a choice of "no action" by the agency would result in predictable actions by others, this consequence of the "no action" alternative should be included in the analysis. For example, if denial of permission to build a railroad to a facility would lead to construction of a road and increased truck traffic, the EIS should analyze this consequence of the "no action" alternative.

In light of the above, it is difficult to think of a situation where it would not be appropriate to address a "no action" alternative. Accordingly, the regulations require the analysis of the no action alternative even if the agency is under a court order or legislative command to act. This analysis provides a benchmark, enabling decisionmakers to compare the magnitude of environmental effects of the action alternatives. It is also an example of a reasonable alternative outside the jurisdiction of the agency which must be analyzed. Section 1502.14(c). See Question 2 above. Inclusion of such an analysis in the EIS is necessary to inform the Congress, the public, and the President as intended by NEPA. Section 1500.1(a).

4a. Q. What is the "agency's preferred alternative"?

A. The "agency's preferred alternative" is the alternative which the agency believes would fulfill its statutory mission and responsibilities, giving consideration to economic, environmental, technical and other factors. The concept of the "agency's preferred alternative" is different from the "environmentally preferable alternative," although in some cases one alternative may be both. See Question 6 below. It is identified so that agencies and the public can understand the lead agency's orientation.

4b. Q. Does the "preferred alternative" have to be identified in the Draft EIS and the Final EIS or just in the Final EIS?

A. Section 1502.14(e) requires the section of the EIS on alternatives to "identify the agency's preferred alternative if one or more exists, in the draft statement, and identify such alternative in the final statement . . ." This means that if the agency has a preferred alternative at the Draft EIS stage, that alternative must be labeled or identified as such in the Draft EIS. If the responsible federal official in fact has no preferred alternative at the Draft EIS stage, a preferred alternative need not be identified there. By the time the Final EIS is filed, Section 1502.14(e) presumes the existence of a preferred alternative and requires its identification in the Final EIS "unless another law prohibits the expression of such a preference."

4c. Q. Who recommends or determines the "preferred alternative?"

A. The lead agency's official with line responsibility for preparing the EIS and assuring its adequacy is responsible for identifying the agency's preferred alternative(s). The NEPA regulations do not dictate which official in an agency shall be responsible for preparation of EISs, but agencies can identify this official in their implementing procedures, pursuant to Section 1507.3.

Even though the agency's preferred alternative is identified by the EIS preparer in the EIS, the statement must be objectively prepared and not slanted to support the choice of the agency's preferred alternative over the other reasonable and feasible alternatives.

Page 6 46 FR 18026 5a. Q. Is the "proposed action" the same thing as the "preferred alternative"?

A. The "proposed action" may be, but is not necessarily, the agency's "preferred alternative." The proposed action may be a proposal in its initial form before undergoing analysis in the EIS process. If the proposed action is internally generated, such as preparing a land management plan, the proposed action might end up as the agency's preferred alternative. On the other hand the proposed action may be granting an application to a non-federal entity for a permit.

The agency may or may not have a "preferred alternative" at the Draft EIS stage (see Question 4 above). In that case the agency may decide at the Final EIS stage, on the basis of the Draft EIS and the public and agency comments, that an alternative other than the proposed action is the agency's "preferred alternative."

5b. Q. Is the analysis of the "proposed action" in an EIS to be treated differently from the analysis of alternatives?

A. The degree of analysis devoted to each alternative in the EIS is to be substantially similar to that devoted to the "proposed action." Section 1502.14 is titled "Alternatives including the proposed action" to reflect such comparable treatment. Section 1502.14(b) specifically requires "substantial treatment" in the EIS of each alternative including the proposed action. This regulation does not dictate an amount of information to be provided, but rather, prescribes a level of treatment, which may in turn require varying amounts of information, to enable a reviewer to evaluate and compare alternatives.

6a. Q. What is the meaning of the term "environmentally preferable alternative" as used in the regulations with reference to Records of Decision? How is the term "environment" used in the phrase?

A. Section 1505.2(b) requires that, in cases where an EIS has been prepared, the Record of Decision (ROD) must identify all alternatives that were considered, ". . . specifying the alternative or alternatives which were considered to be environmentally preferable." The environmentally preferable alternative is the alternative that will promote the national environmental policy as expressed in NEPA's Section 101. Ordinarily, this means the alternative that causes the least damage to the biological and physical environment; it also means the alternative which best protects, preserves, and enhances historic, cultural, and natural resources.

The Council recognizes that the identification of the environmentally preferable alternative may involve difficult judgments, particularly when one environmental value must be balanced against another. The public and other agencies reviewing a Draft EIS can assist the lead agency to develop and determine environmentally preferable alternatives by providing their views in comments on the Draft EIS. Through the identification of the environmentally preferable alternative, the decisionmaker is clearly faced with a choice between that alternative and others, and must consider whether the decision accords with the Congressionally declared policies of the Act.

6b. Q. Who recommends or determines what is environmentally preferable?

A. The agency EIS staff is encouraged to make recommendations of the environmentally preferable alternative(s) during EIS preparation. In any event the lead agency official responsible for the EIS is encouraged to identify the environmentally preferable alternative(s) in the EIS. In all cases, commentors from other agencies and the public are also encouraged to address this question. The agency must identify the environmentally preferable alternative in the ROD.

7. Q. What is the difference between the sections in the EIS on "alternatives" and "environmental consequences"?

How do you avoid duplicating the discussion of alternatives in preparing these two sections?

A. The "alternatives" section is the heart of the EIS. This section rigorously explores and objectively evaluates all reasonable alternatives including the proposed action. Section 1502.14. It should include relevant comparisons on environmental and other grounds. The "environmental consequences" section of the EIS discusses the specific environmental impacts or effects of each of the alternatives including the proposed action. Section 1502.16. In order to avoid duplication between these two sections, most of the "alternatives" section should be devoted to describing and

Page 7 46 FR 18026 comparing the alternatives. Discussion of the environmental impacts of these alternatives should be limited to a concise descriptive summary of such impacts in a comparative form, including charts or tables, thus sharply defining the issues and providing a clear basis for choice among options. Section 1502.14. The "environmental consequences" section should be devoted largely to a scientific analysis of the direct and indirect environmental effects of the proposed action and of each of the alternatives. It forms the analytic basis for the concise comparison in the "alternatives" section.

8. Q. Section 1501.2(d) of the NEPA regulations requires agencies to provide for the early application of NEPA to cases where actions are planned by private applicants or non-Federal entities and are, at some stage, subject to federal approval of permits, loans, loan guarantees, insurance or other actions. What must and can agencies do to apply NEPA early in these cases?

A. Section 1501.2(d) requires federal agencies to take steps toward ensuring that private parties and state and local entities initiate environmental studies as soon as federal involvement in their proposals can be foreseen. This section is intended to ensure that environmental factors are considered at an early stage in the planning process and to avoid the situation where the applicant for a federal permit or approval has completed planning and eliminated all alternatives to the proposed action by the time the EIS process commences or before the EIS process has been completed.

Through early consultation, business applicants and approving agencies may gain better appreciation of each other's needs and foster a decisionmaking process which avoids later unexpected confrontations.

Federal agencies are required by Section 1507.3(b) to develop procedures to carry out Section 1501.2(d). The procedures should include an "outreach program", such as a means for prospective applicants to conduct pre-application consultations with the lead and cooperating agencies. Applicants need to find out, in advance of project planning, what environmental studies or other information will be required, and what mitigation requirements are likely, in connecton with the later federal NEPA process. Agencies should designate staff to advise potential applicants of the agency's NEPA information requirements and should publicize their pre-application procedures and information requirements in newsletters or other media used by potential applicants.

Complementing Section 1501.2(d), Section 1506.5(a) requires agencies to assist applicants by outlining the types of information required in those cases where the agency requires the applicant to submit environmental data for possible use by the agency in preparing an EIS.

Section 1506.5(b) allows agencies to authorize preparation of environmental assessments by applicants. Thus, the procedures should also include a means for anticipating and utilizing applicants' environmental studies or "early corporate environmental assessments" to fulfill some of the federal agency's NEPA obligations. However, in such cases the agency must still evaluate independently the environmental issues and take responsibility for the environmental assessment.

These provisions are intended to encourage and enable private and other non-federal entities to build environmental considerations into their own planning processes in a way that facilitates the application of NEPA and avoids delay.

9. Q. To what extent must an agency inquire into whether an applicant for a federal permit, funding or other approval of a proposal will also need approval from another agency for the same proposal or some other related aspect of it?

A. Agencies must integrate the NEPA process into other planning at the earliest possible time to insure that planning and decisions reflect environmental values, to avoid delays later in the process, and to head off potential conflicts. Specifically, the agency must "provide for cases where actions are planned by . . . applicants," so that designated staff are available to advise potential applicants of studies or other information that will foreseeably be required for the later federal action; the agency shall consult with the applicant if the agency foresees its own involvement in the proposal; and it shall insure that the NEPA process commences at the earliest possible time. Section 1501.2(d). (See Question 8.)

Page 8 46 FR 18026 The regulations emphasize agency cooperation early in the NEPA process. Section 1501.6. Section 1501.7 on "scoping" also provides that all affected Federal agencies are to be invited to participate in scoping the environmental issues and to identify the various environmental review and consultation requirements that may apply to the proposed action. Further, Section 1502.25(b) requires that the draft EIS list all the federal permits, licenses and other entitlements that are needed to implement the proposal.

These provisions create an affirmative obligation on federal agencies to inquire early, and to the maximum degree possible, to ascertain whether an applicant is or will be seeking other federal assistance or approval, or whether the applicant is waiting until a proposal has been substantially developed before requesting federal aid or approval.

Thus, a federal agency receiving a request for approval or assistance should determine whether the applicant has filed separate requests for federal approval or assistance with other federal agencies. Other federal agencies that are likely to become involved should then be contacted, and the NEPA process coordinated, to insure an early and comprehensive analysis of the direct and indirect effects of the proposal and any related actions. The agency should inform the applicant that action on its application may be delayed unless it submits all other federal applications (where feasible to do so), so that all the relevant agencies can work together on the scoping process and preparation of the EIS.

10a. Q. What actions by agencies and/or applicants are allowed during EIS preparation and during the 30-day review period after publication of a final EIS?

A. No federal decision on the proposed action shall be made or recorded until at least 30 days after the publication by EPA of notice that the particular EIS has been filed with EPA. Sections 1505.2 and 1506.10. Section 1505.2 requires this decision to be stated in a public Record of Decision.

Until the agency issues its Record of Decision, no action by an agency or an applicant concerning the proposal shall be taken which would have an adverse environmental impact or limit the choice of reasonable alternatives. Section 1506.1(a). But this does not preclude preliminary planning or design work which is needed to support an application for permits or assistance. Section 1506.1(d).

When the impact statement in question is a program EIS, no major action concerning the program may be taken which may significantly affect the quality of the human environment, unless the particular action is justified independently of the program, is accompanied by its own adequate environmental impact statement and will not prejudice the ultimate decision on the program. Section 1506.1(c).

10b. Q. Do these limitations on action (described in Question 10a) apply to state or local agencies that have statutorily delegated responsibility for preparation of environmental documents required by NEPA, for example, under the HUD Block Grant program?

A. Yes, these limitations do apply, without any variation from their application to federal agencies.

11. Q. What actions must a lead agency take during the NEPA process when it becomes aware that a non-federal applicant is about to take an action within the agency's jurisdiction that would either have an adverse environmental impact or limit the choice of reasonable alternatives (e.g., prematurely commit money or other resources towards the completion of the proposal)?

A. The federal agency must notify the applicant that the agency will take strong affirmative steps to insure that the objectives and procedures of NEPA are fulfilled. Section 1506.1(b). These steps could include seeking injunctive measures under NEPA, or the use of sanctions available under either the agency's permitting authority or statutes setting forth the agency's statutory mission. For example, the agency might advise an applicant that if it takes such action the agency will not process its application.

12a. Q. What actions are subject to the Council's new regulations, and what actions are grandfathered under the old

Page 9 46 FR 18026 guidelines?

A. The effective date of the Council's regulations was July 30, 1979 (except for certain HUD programs under the Housing and Community Development Act, 42 U.S.C. 5304(h), and certain state highway programs that qualify under Section 102(2)(D) of NEPA for which the regulations became effective on November 30, 1979). All the provisions of the regulations are binding as of that date, including those covering decisionmaking, public participation, referrals, limitations on actions, EIS supplements, etc. For example, a Record of Decision would be prepared even for decisions where the draft EIS was filed before July 30, 1979.

But in determining whether or not the new regulations apply to the preparation of a particular environmental document, the relevant factor is the date of filing of the draft of that document. Thus, the new regulations do not require the redrafting of an EIS or supplement if the draft EIS or supplement was filed before July 30, 1979. However, a supplement prepared after the effective date of the regulations for an EIS issued in final before the effective date of the regulations would be controlled by the regulations.

Even though agencies are not required to apply the regulations to an EIS or other document for which the draft was filed prior to July 30, 1979, the regulations encourage agencies to follow the regulations "to the fullest extent practicable," i.e., if it is feasible to do so, in preparing the final document. Section 1506.12(a).

12b. Q. Are projects authorized by Congress before the effective date of the Council's regulations grandfathered?

A. No. The date of Congressional authorization for a project is not determinative of whether the Council's regulations or former Guidelines apply to the particular proposal. No incomplete projects or proposals of any kind are grandfathered in whole or in part. Only certain environmental documents, for which the draft was issued before the effective date of the regulations, are grandfathered and subject to the Council's former Guidelines.

12c. Q. Can a violation of the regulations give rise to a cause of action?

A. While a trivial violation of the regulations would not give rise to an independent cause of action, such a cause of action would arise from a substantial violation of the regulations. Section 1500.3.

13. Q. Can the scoping process be used in connection with preparation of an environmental assessment, i.e., before both the decision to proceed with an EIS and publication of a notice of intent?

A. Yes. Scoping can be a useful tool for discovering alternatives to a proposal, or significant impacts that may have been overlooked. In cases where an environmental assessment is being prepared to help an agency decide whether to prepare an EIS, useful information might result from early participation by other agencies and the public in a scoping process.

The regulations state that the scoping process is to be preceded by a Notice of Intent (NOI) to prepare an EIS. But that is only the minimum requirement. Scoping may be initiated earlier, as long as there is appropriate public notice and enough information available on the proposal so that the public and relevant agencies can participate effectively.

However, scoping that is done before the assessment, and in aid of its preparation, cannot substitute for the normal scoping process after publication of the NOI, unless the earlier public notice stated clearly that this possibility was under consideration, and the NOI expressly provides that written comments on the scope of alternatives and impacts will still be considered.

14a. Q. What are the respective rights and responsibilities of lead and cooperating agencies? What letters and memoranda must be prepared?

A. After a lead agency has been designated (Sec. 1501.5), that agency has the responsibility to solicit cooperation

Page 10 46 FR 18026 from other federal agencies that have jurisdiction by law or special expertise on any environmental issue that should be addressed in the EIS being prepared. Where appropriate, the lead agency should seek the cooperation of state or local agencies of similar qualifications. When the proposal may affect an Indian reservation, the agency should consult with the Indian tribe. Section 1508.5. The request for cooperation should come at the earliest possible time in the NEPA process.

After discussions with the candidate cooperating agencies, the lead agency and the cooperating agencies are to determine by letter or by memorandum which agencies will undertake cooperating responsibilities. To the extent possible at this stage, responsibilities for specific issues should be assigned. The allocation of responsibilities will be completed during scoping. Section 1501.7(a)(4).

Cooperating agencies must assume responsibility for the development of information and the preparation of environmental analyses at the request of the lead agency. Section 1501.6(b)(3). Cooperating agencies are now required by Section 1501.6 to devote staff resources that were normally primarily used to critique or comment on the Draft EIS after its preparation, much earlier in the NEPA process -- primarily at the scoping and Draft EIS preparation stages. If a cooperating agency determines that its resource limitations preclude any involvement, or the degree of involvement (amount of work) requested by the lead agency, it must so inform the lead agency in writing and submit a copy of this correspondence to the Council. Section 1501.6(c).

In other words, the potential cooperating agency must decide early if it is able to devote any of its resources to a particular proposal. For this reason the regulation states that an agency may reply to a request for cooperation that "other program commitments preclude any involvement or the degree of involvement requested in the action that is the subject of the environmental impact statement." (Emphasis added). The regulation refers to the "action," rather than to the EIS, to clarify that the agency is taking itself out of all phases of the federal action, not just draft EIS preparation.

This means that the agency has determined that it cannot be involved in the later stages of EIS review and comment, as well as decisionmaking on the proposed action. For this reason, cooperating agencies with jurisdiction by law (those which have permitting or other approval authority) cannot opt out entirely of the duty to cooperate on the EIS. See also Question 15, relating specifically to the responsibility of EPA.

14b. Q. How are disputes resolved between lead and cooperating agencies concerning the scope and level of detail of analysis and the quality of data in impact statements?

A. Such disputes are resolved by the agencies themselves. A lead agency, of course, has the ultimate responsibility for the content of an EIS. But it is supposed to use the environmental analysis and recommendations of cooperating agencies with jurisdiction by law or special expertise to the maximum extent possible, consistent with its own responsibilities as lead agency. Section 1501.6(a)(2).

If the lead agency leaves out a significant issue or ignores the advice and expertise of the cooperating agency, the EIS may be found later to be inadequate. Similarly, where cooperating agencies have their own decisions to make and they intend to adopt the environmental impact statement and base their decisions on it, one document should include all of the information necessary for the decisions by the cooperating agencies. Otherwise they may be forced to duplicate the EIS process by issuing a new, more complete EIS or Supplemental EIS, even though the original EIS could have sufficed if it had been properly done at the outset. Thus, both lead and cooperating agencies have a stake in producing a document of good quality. Cooperating agencies also have a duty to participate fully in the scoping process to ensure that the appropriate range of issues is determined early in the EIS process.

Because the EIS is not the Record of Decision, but instead constitutes the information and analysis on which to base a decision, disagreements about conclusions to be drawn from the EIS need not inhibit agencies from issuing a joint document, or adopting another agency's EIS, if the analysis is adequate. Thus, if each agency has its own "preferred alternative," both can be identified in the EIS. Similarly, a cooperating agency with jurisdiction by law may determine in its own ROD that alternative A is the environmentally preferable action, even though the lead agency has

Page 11 46 FR 18026 decided in its separate ROD that Alternative B is environmentally preferable.

14c. Q. What are the specific responsibilities of federal and state cooperating agencies to review draft EISs?

A. Cooperating agencies (i.e., agencies with jurisdiction by law or special expertise) and agencies that are authorized to develop or enforce environmental standards, must comment on environmental impact statements within their jurisdiction, expertise or authority. Sections 1503.2, 1508.5. If a cooperating agency is satisfied that its views are adequately reflected in the environmental impact statement, it should simply comment accordingly. Conversely, if the cooperating agency determines that a draft EIS is incomplete, inadequate or inaccurate, or it has other comments, it should promptly make such comments, conforming to the requirements of specificity in section 1503.3.

14d. Q. How is the lead agency to treat the comments of another agency with jurisdiction by law or special expertise which has failed or refused to cooperate or participate in scoping or EIS preparation?

A. A lead agency has the responsibility to respond to all substantive comments raising significant issues regarding a draft EIS. Section 1503.4. However, cooperating agencies are generally under an obligation to raise issues or otherwise participate in the EIS process during scoping and EIS preparation if they reasonably can do so. In practical terms, if a cooperating agency fails to cooperate at the outset, such as during scoping, it will find that its comments at a later stage will not be as persuasive to the lead agency.

15. Q. Are EPA's responsibilities to review and comment on the environmental effects of agency proposals under Section 309 of the Clean Air Act independent of its responsibility as a cooperating agency?

A. Yes. EPA has an obligation under Section 309 of the Clean Air Act to review and comment in writing on the environmental impact of any matter relating to the authority of the Administrator contained in proposed legislation, federal construction projects, other federal actions requiring EISs, and new regulations. 42 U.S.C. Sec. 7609. This obligation is independent of its role as a cooperating agency under the NEPA regulations.

16. Q. What is meant by the term "third party contracts" in connection with the preparation of an EIS? See Section 1506.5(c). When can "third party contracts" be used?

A. As used by EPA and other agencies, the term "third party contract" refers to the preparation of EISs by contractors paid by the applicant. In the case of an EIS for a National Pollution Discharge Elimination System (NPDES) permit, the applicant, aware in the early planning stages of the proposed project of the need for an EIS, contracts directly with a consulting firm for its preparation. See 40 C.F.R. 6.604(g). The "third party" is EPA which, under Section 1506.5(c), must select the consulting firm, even though the applicant pays for the cost of preparing the EIS. The consulting firm is responsible to EPA for preparing an EIS that meets the requirements of the NEPA regulations and EPA's NEPA procedures. It is in the applicant's interest that the EIS comply with the law so that EPA can take prompt action on the NPDES permit application. The "third party contract" method under EPA's NEPA procedures is purely voluntary, though most applicants have found it helpful in expediting compliance with NEPA.

If a federal agency uses "third party contracting," the applicant may undertake the necessary paperwork for the solicitation of a field of candidates under the agency's direction, so long as the agency complies with Section 1506.5(c).

Federal procurement requirements do not apply to the agency because it incurs no obligations or costs under the contract, nor does the agency procure anything under the contract.

17a. Q. If an EIS is prepared with the assistance of a consulting firm, the firm must execute a disclosure statement.

What criteria must the firm follow in determining whether it has any "financial or other interest in the outcome of the project" which would cause a conflict of interest?

A. Section 1506.5(c), which specifies that a consulting firm preparing an EIS must execute a disclosure statement, does not define "financial or other interest in the outcome of the project." The Council interprets this term broadly to

Page 12 46 FR 18026 cover any known benefits other than general enhancement of professional reputation. This includes any financial benefit such as a promise of future construction or design work on the project, as well as indirect benefits the consultant is aware of (e.g., if the project would aid proposals sponsored by the firm's other clients). For example, completion of a highway project may encourage construction of a shopping center or industrial park from which the consultant stands to benefit. If a consulting firm is aware that it has such an interest in the decision on the proposal, it should be disqualified from preparing the EIS, to preserve the objectivity and integrity of the NEPA process.

When a consulting firm has been involved in developing initial data and plans for the project, but does not have any financial or other interest in the outcome of the decision, it need not be disqualified from preparing the EIS. However, a disclosure statement in the draft EIS should clearly state the scope and extent of the firm's prior involvement to expose any potential conflicts of interest that may exist.

17b. Q. If the firm in fact has no promise of future work or other interest in the outcome of the proposal, may the firm later bid in competition with others for future work on the project if the proposed action is approved?

A. Yes.

18. Q. How should uncertainties about indirect effects of a proposal be addressed, for example, in cases of disposal of federal lands, when the identity or plans of future landowners is unknown?

A. The EIS must identify all the indirect effects that are known, and make a good faith effort to explain the effects that are not known but are "reasonably foreseeable." Section 1508.8(b). In the example, if there is total uncertainty about the identity of future land owners or the nature of future land uses, then of course, the agency is not required to engage in speculation or contemplation about their future plans. But, in the ordinary course of business, people do make judgments based upon reasonably foreseeable occurrences. It will often be possible to consider the likely purchasers and the development trends in that area or similar areas in recent years; or the likelihood that the land will be used for an energy project, shopping center, subdivision, farm or factory. The agency has the responsibility to make an informed judgment, and to estimate future impacts on that basis, especially if trends are ascertainable or potential purchasers have made themselves known. The agency cannot ignore these uncertain, but probable, effects of its decisions.

19a. Q. What is the scope of mitigation measures that must be discussed?

A. The mitigation measures discussed in an EIS must cover the range of impacts of the proposal. The measures must include such things as design alternatives that would decrease pollution emissions, construction impacts, esthetic intrusion, as well as relocation assistance, possible land use controls that could be enacted, and other possible efforts.

Mitigation measures must be considered even for impacts that by themselves would not be considered "significant."

Once the proposal itself is considered as a whole to have significant effects, all of its specific effects on the environment (whether or not "significant") must be considered, and mitigation measures must be developed where it is feasible to do so. Sections 1502.14(f), 1502.16(h), 1508.14.

19b. Q. How should an EIS treat the subject of available mitigation measures that are (1) outside the jurisdiction of the lead or cooperating agencies, or (2) unlikely to be adopted or enforced by the responsible agency?

A. All relevant, reasonable mitigation measures that could improve the project are to be identified, even if they are outside the jurisdiction of the lead agency or the cooperating agencies, and thus would not be committed as part of the RODs of these agencies. Sections 1502.16(h), 1505.2(c). This will serve to alert agencies or officials who can implement these extra measures, and will encourage them to do so. Because the EIS is the most comprehensive environmental document, it is an ideal vehicle in which to lay out not only the full range of environmental impacts but also the full spectrum of appropriate mitigation.

However, to ensure that environmental effects of a proposed action are fairly assessed, the probability of the mitigation measures being implemented must also be discussed. Thus the EIS and the Record of Decision should

Page 13 46 FR 18026 indicate the likelihood that such measures will be adopted or enforced by the responsible agencies. Sections 1502.16(h),

1505.2. If there is a history of nonenforcement or opposition to such measures, the EIS and Record of Decision should acknowledge such opposition or nonenforcement. If the necessary mitigation measures will not be ready for a long period of time, this fact, of course, should also be recognized.

20a. Q. When must a worst case analysis be included in an EIS?

A. If there are gaps in relevant information or scientific uncertainty pertaining to an agency's evaluation of significant adverse impacts on the human environment, an agency must make clear that such information is lacking or that the uncertainty exists. An agency must include a worst case analysis of the potential impacts of the proposal and an indication of the probability or improbability of their occurence if (a) the information relevant to adverse impacts is essential to a reasoned choice among alternatives and the overall costs of obtaining the information are exorbitant, or (b) the information relevant to adverse impacts is important to the decision and the means to obtain it are not known.

NEPA requires that impact statements, at a minimum, contain information to alert the public and Congress to all known possible environmental consequences of agency action. Thus, one of the federal government's most important obligations is to present to the fullest extent possible the spectrum of consequences that may result from agency decisions, and the details of their potential consequences for the human environment.

20b. Q. What is the purpose of a worst case analysis? How is it formulated and what is the scope of the analysis?

A. The purpose of the analysis is to carry out NEPA's mandate for full disclosure to the public of the potential consequences of agency decisions, and to cause agencies to consider those potential consequences when acting on the basis of scientific uncertainties or gaps in available information. The analysis is formulated on the basis of available information, using reasonable projections of the worst possible consequences of a proposed action.

For example, if there are scientific uncertainty and gaps in the available information concerning the numbers of juvenile fish that would be entrained in a cooling water facility, the responsible agency must disclose and consider the possibility of the loss of the commercial or sport fishery.

In addition to an analysis of a low probability/catastrophic impact event, the worst case analysis should also include a spectrum of events of higher probability but less drastic impact.

21. Q. Where an EIS or an EA is combined with another project planning document (sometimes called "piggybacking"), to what degree may the EIS or EA refer to and rely upon information in the project document to satisfy NEPA's requirements?

A. Section 1502.25 of the regulations requires that draft EISs be prepared concurrently and integrated with environmental analyses and related surveys and studies required by other federal statutes. In addition, Section 1506.4 allows any environmental document prepared in compliance with NEPA to be combined with any other agency document to reduce duplication and paperwork. However, these provisions were not intended to authorize the preparation of a short summary or outline EIS, attached to a detailed project report or land use plan containing the required environmental impact data. In such circumstances, the reader would have to refer constantly to the detailed report to understand the environmental impacts and alternatives which should have been found in the EIS itself.

The EIS must stand on its own as an analytical document which fully informs decisionmakers and the public of the environmental effects of the proposal and those of the reasonable alternatives. Section 1502.1. But, as long as the EIS is clearly identified and is self-supporting, it can be physically included in or attached to the project report or land use plan, and may use attached report material as technical backup.

Forest Service environmental impact statements for forest management plans are handled in this manner. The EIS identifies the agency's preferred alternative, which is developed in detail as the proposed management plan. The detailed

Page 14 46 FR 18026 proposed plan accompanies the EIS through the review process, and the documents are appropriately cross-referenced.

The proposed plan is useful for EIS readers as an example, to show how one choice of management options translates into effects on natural resources. This procedure permits initiation of the 90-day public review of proposed forest plans, which is required by the National Forest Management Act.

All the alternatives are discussed in the EIS, which can be read as an independent document. The details of the management plan are not repeated in the EIS, and vice versa. This is a reasonable functional separation of the documents: the EIS contains information relevant to the choice among alternatives; the plan is a detailed description of proposed management activities suitable for use by the land managers. This procedure provides for concurrent compliance with the public review requirements of both NEPA and the National Forest Management Act.

Under some circumstances, a project report or management plan may be totally merged with the EIS, and the one document labeled as both "EIS" and "management plan" or "project report." This may be reasonable where the documents are short, or where the EIS format and the regulations for clear, analytical EISs also satisfy the requirements for a project report.

22. Q. May state and federal agencies serve as joint lead agencies? If so, how do they resolve law, policy and resource conflicts under NEPA and the relevant state environmental policy act? How do they resolve differences in perspective where, for example, national and local needs may differ?

A. Under Section 1501.5(b), federal, state or local agencies, as long as they include at least one federal agency, may act as joint lead agencies to prepare an EIS. Section 1506.2 also strongly urges state and local agencies and the relevant federal agencies to cooperate fully with each other. This should cover joint research and studies, planning activities, public hearings, environmental assessments and the preparation of joint EISs under NEPA and the relevant "little NEPA" state laws, so that one document will satisfy both laws.

The regulations also recognize that certain inconsistencies may exist between the proposed federal action and any approved state or local plan or law. The joint document should discuss the extent to which the federal agency would reconcile its proposed action with such plan or law. Section 1506.2(d). (See Question 23).

Because there may be differences in perspective as well as conflicts among federal, state and local goals for resources management, the Council has advised participating agencies to adopt a flexible, cooperative approach. The joint EIS should reflect all of their interests and missions, clearly identified as such. The final document would then indicate how state and local interests have been accommodated, or would identify conflicts in goals (e.g., how a hydroelectric project, which might induce second home development, would require new land use controls). The EIS must contain a complete discussion of scope and purpose of the proposal, alternatives, and impacts so that the discussion is adequate to meet the needs of local, state and federal decisionmakers.

23a. Q. How should an agency handle potential conflicts between a proposal and the objectives of Federal, state or local land use plans, policies and controls for the area concerned? See Sec. 1502.16(c).

A. The agency should first inquire of other agencies whether there are any potential conflicts. If there would be immediate conflicts, or if conflicts could arise in the future when the plans are finished (see Question 23(b) below), the EIS must acknowledge and describe the extent of those conflicts. If there are any possibilities of resolving the conflicts, these should be explained as well. The EIS should also evaluate the seriousness of the impact of the proposal on the land use plans and policies, and whether, or how much, the proposal will impair the effectiveness of land use control mechanisms for the area. Comments from officials of the affected area should be solicited early and should be carefully acknowleged and answered in the EIS.

23b. Q. What constitutes a "land use plan or policy" for purposes of this discussion?

A. The term "land use plans," includes all types of formally adopted documents for land use planning, zoning and

Page 15 46 FR 18026 related regulatory requirements. Local general plans are included, even though they are subject to future change.

Proposed plans should also be addressed if they have been formally proposed by the appropriate government body in a written form, and are being actively pursued by officials of the jurisdiction. Staged plans, which must go through phases of development such as the Water Resources Council's Level A, B and C planning process should also be included even though they are incomplete.

The term "policies" includes formally adopted statements of land use policy as embodied in laws or regulations. It also includes proposals for action such as the initiation of a planning process, or a formally adopted policy statement of the local, regional or state executive branch, even if it has not yet been formally adopted by the local, regional or state legislative body.

23c. Q. What options are available for the decisionmaker when conflicts with such plans or policies are identified?

A. After identifying any potential land use conflicts, the decisionmaker must weigh the significance of the conflicts, among all the other environmental and non-environmental factors that must be considered in reaching a rational and balanced decision. Unless precluded by other law from causing or contributing to any inconsistency with the land use plans, policies or controls, the decisionmaker retains the authority to go forward with the proposal, despite the potential conflict. In the Record of Decision, the decisionmaker must explain what the decision was, how it was made, and what mitigation measures are being imposed to lessen adverse environmental impacts of the proposal, among the other requirements of Section 1505.2. This provision would require the decisionmaker to explain any decision to override land use plans, policies or controls for the area.

24a. Q. When are EISs required on policies, plans or programs?

A. An EIS must be prepared if an agency proposes to implement a specific policy, to adopt a plan for a group of related actions, or to implement a specific statutory program or executive directive. Section 1508.18. In addition, the adoption of official policy in the form of rules, regulations and interpretations pursuant to the Administrative Procedure Act, treaties, conventions, or other formal documents establishing governmental or agency policy which will substantially alter agency programs, could require an EIS. Section 1508.18. In all cases, the policy, plan, or program must have the potential for significantly affecting the quality of the human environment in order to require an EIS. It should be noted that a proposal "may exist in fact as well as by agency declaration that one exists." Section 1508.23.

24b. Q. When is an area-wide or overview EIS appropriate?

A. The preparation of an area-wide or overview EIS may be particularly useful when similar actions, viewed with other reasonably foreseeable or proposed agency actions, share common timing or geography. For example, when a variety of energy projects may be located in a single watershed, or when a series of new energy technologies may be developed through federal funding, the overview or area-wide EIS would serve as a valuable and necessary analysis of the affected environment and the potential cumulative impacts of the reasonably foreseeable actions under that program or within that geographical area.

24c. Q. What is the function of tiering in such cases?

A. Tiering is a procedure which allows an agency to avoid duplication of paperwork through the incorporation by reference of the general discussions and relevant specific discussions from an environmental impact statement of broader scope into one of lesser scope or vice versa. In the example given in Question 24b, this would mean that an overview EIS would be prepared for all of the energy activities reasonably foreseeable in a particular geographic area or resulting from a particular development program. This impact statement would be followed by site-specific or project-specific EISs. The tiering process would make each EIS of greater use and meaning to the public as the plan or program develops, without duplication of the analysis prepared for the previous impact statement.

25a. Q. When is it appropriate to use appendices instead of including information in the body of an EIS?

Page 16 46 FR 18026 A. The body of the EIS should be a succinct statement of all the information on environmental impacts and alternatives that the decisionmaker and the public need, in order to make the decision and to ascertain that every significant factor has been examined. The EIS must explain or summarize methodologies of research and modeling, and the results of research that may have been conducted to analyze impacts and alternatives.

Lengthy technical discussions of modeling methodology, baseline studies, or other work are best reserved for the appendix. In other words, if only technically trained individuals are likely to understand a particular discussion then it should go in the appendix, and a plain language summary of the analysis and conclusions of that technical discussion should go in the text of the EIS.

The final statement must also contain the agency's responses to comments on the draft EIS. These responses will be primarily in the form of changes in the document itself, but specific answers to each significant comment should also be included. These specific responses may be placed in an appendix. If the comments are especially voluminous, summaries of the comments and responses will suffice. (See Question 29 regarding the level of detail required for responses to comments.)

25b. Q. How does an appendix differ from incorporation by reference?

A. First, if at all possible, the appendix accompanies the EIS, whereas the material which is incorporated by reference does not accompany the EIS. Thus the appendix should contain information that reviewers will be likely to want to examine. The appendix should include material that pertains to preparation of a particular EIS. Research papers directly relevant to the proposal, lists of affected species, discussion of the methodology of models used in the analysis of impacts, extremely detailed responses to comments, or other information, would be placed in the appendix.

The appendix must be complete and available at the time the EIS is filed. Five copies of the appendix must be sent to EPA with five copies of the EIS for filing. If the appendix is too bulky to be circulated, it instead must be placed in conveniently accessible locations or furnished directly to commentors upon request. If it is not circulated with the EIS, the Notice of Availability published by EPA must so state, giving a telephone number to enable potential commentors to locate or request copies of the appendix promptly.

Material that is not directly related to preparation of the EIS should be incorporated by reference. This would include other EISs, research papers in the general literature, technical background papers or other material that someone with technical training could use to evaluate the analysis of the proposal. These must be made available, either by citing the literature, furnishing copies to central locations, or sending copies directly to commentors upon request.

Care must be taken in all cases to ensure that material incorporated by reference, and the occasional appendix that does not accompany the EIS, are in fact available for the full minimum public comment period.

26a. Q. How detailed must an EIS index be?

A. The EIS index should have a level of detail sufficient to focus on areas of the EIS of reasonable interest to any reader. It cannot be restricted to the most important topics. On the other hand, it need not identify every conceivable term or phrase in the EIS. If an agency believes that the reader is reasonably likely to be interested in a topic, it should be included.

26b. Q. Is a keyword index required?

A. No. A keyword index is a relatively short list of descriptive terms that identifies the key concepts or subject areas in a document. For example it could consist of 20 terms which describe the most significant aspects of an EIS that a future researcher would need: type of proposal, type of impacts, type of environment, geographical area, sampling or modelling methodologies used. This technique permits the compilation of EIS data banks, by facilitating quick and inexpensive access to stored materials. While a keyword index is not required by the regulations, it could be a useful

Page 17 46 FR 18026 addition for several reasons. First, it can be useful as a quick index for reviewers of the EIS, helping to focus on areas of interest. Second, if an agency keeps a listing of the keyword indexes of the EISs it produces, the EIS preparers themselves will have quick access to similar research data and methodologies to aid their future EIS work. Third, a keyword index will be needed to make an EIS available to future researchers using EIS data banks that are being developed. Preparation of such an index now when the document is produced will save a later effort when the data banks become operational.

27a. Q. If a consultant is used in preparing an EIS, must the list of preparers identify members of the consulting firm as well as the agency NEPA staff who were primarily responsible?

A. Section 1502.17 requires identification of the names and qualifications of persons who were primarily responsible for preparing the EIS or significant background papers, including basic components of the statement. This means that members of a consulting firm preparing material that is to become part of the EIS must be identified. The EIS should identify these individuals even though the consultant's contribution may have been modified by the agency.

27b. Q. Should agency staff involved in reviewing and editing the EIS also be included in the list of preparers?

A. Agency personnel who wrote basic components of the EIS or significant background papers must, of course, be identified. The EIS should also list the technical editors who reviewed or edited the statements.

27c. Q. How much information should be included on each person listed?

A. The list of preparers should normally not exceed two pages. Therefore, agencies must determine which individuals had primary responsibility and need not identify individuals with minor involvement. The list of preparers should include a very brief identification of the individuals involved, their qualifications (expertise, professional disciplines) and the specific portion of the EIS for which they are responsible. This may be done in tabular form to cut down on length. A line or two for each person's qualifications should be sufficient.

28. Q. May an agency file xerox copies of an EIS with EPA pending the completion of printing the document?

A. Xerox copies of an EIS may be filed with EPA prior to printing only if the xerox copies are simultaneously made available to other agencies and the public. Section 1506.9 of the regulations, which governs EIS filing, specifically requires Federal agencies to file EISs with EPA no earlier than the EIS is distributed to the public.

However, this section does not prohibit xeroxing as a form of reproduction and distribution. When an agency chooses xeroxing as the reproduction method, the EIS must be clear and legible to permit ease of reading and ultimate microfiching of the EIS. Where color graphs are important to the EIS, they should be reproduced and circulated with the xeroxed copy.

29a Q. What response must an agency provide to a comment on a draft EIS which states that the EIS's methodology is inadequate or inadequately explained? For example, what level of detail must an agency include in its response to a simple postcard comment making such an allegation?

A. Appropriate responses to comments are described in Section 1503.4. Normally the responses should result in changes in the text of the EIS, not simply a separate answer at the back of the document. But, in addition, the agency must state what its response was, and if the agency decides that no substantive response to a comment is necessary, it must explain briefly why.

An agency is not under an obligation to issue a lengthy reiteration of its methodology for any portion of an EIS if the only comment addressing the methodology is a simple complaint that the EIS methodology is inadequate. But agencies must respond to comments, however brief, which are specific in their criticism of agency methodology. For example, if a commentor on an EIS said that an agency's air quality dispersion analysis or methodology was inadequate, and the agency had included a discussion of that analysis in the EIS, little if anything need be added in response to such

Page 18 46 FR 18026 a comment. However, if the commentor said that the dispersion analysis was inadequate because of its use of a certain computational technique, or that a dispersion analysis was inadequately explained because computational techniques were not included or referenced, then the agency would have to respond in a substantive and meaningful way to such a comment.

If a number of comments are identical or very similar, agencies may group the comments and prepare a single answer for each group. Comments may be summarized if they are especially voluminous. The comments or summaries must be attached to the EIS regardless of whether the agency believes they merit individual discussion in the body of the final EIS.

29b. Q. How must an agency respond to a comment on a draft EIS that raises a new alternative not previously considered in the draft EIS?

A. This question might arise in several possible situations. First, a commentor on a draft EIS may indicate that there is a possible alternative which, in the agency's view, is not a reasonable alternative. Section 1502.14(a). If that is the case, the agency must explain why the comment does not warrant further agency response, citing authorities or reasons that support the agency's position and, if appropriate, indicate those circumstances which would trigger agency reappraisal or further response. Section 1503.4(a). For example, a commentor on a draft EIS on a coal fired power plant may suggest the alternative of using synthetic fuel. The agency may reject the alternative with a brief discussion (with authorities) of the unavailability of synthetic fuel within the time frame necessary to meet the need and purpose of the proposed facility.

A second possibility is that an agency may receive a comment indicating that a particular alternative, while reasonable, should be modified somewhat, for example, to achieve certain mitigation benefits, or for other reasons. If the modification is reasonable, the agency should include a discussion of it in the final EIS. For example, a commentor on a draft EIS on a proposal for a pumped storage power facility might suggest that the applicant's proposed alternative should be enhanced by the addition of certain reasonable mitigation measures, including the purchase and setaside of a wildlife preserve to substitute for the tract to be destroyed by the project. The modified alternative including the additional mitigation measures should be discussed by the agency in the final EIS.

A third slightly different possibility is that a comment on a draft EIS will raise an alternative which is a minor variation of one of the alternatives discussed in the draft EIS, but this variation was not given any consideration by the agency. In such a case, the agency should develop and evaluate the new alternative, if it is reasonable, in the final EIS.

If it is qualitatively within the spectrum of alternatives that were discussed in the draft, a supplemental draft will not be needed. For example, a commentor on a draft EIS to designate a wilderness area within a National Forest might reasonably identify a specific tract of the forest, and urge that it be considered for designation. If the draft EIS considered designation of a range of alternative tracts which encompassed forest area of similar quality and quantity, no supplemental EIS would have to be prepared. The agency could fulfill its obligation by addressing that specific alternative in the final EIS.

As another example, an EIS on an urban housing project may analyze the alternatives of constructing 2,000, 4,000, or 6,000 units. A commentor on the draft EIS might urge the consideration of constructing 5,000 units utilizing a different configuration of buildings. This alternative is within the spectrum of alternatives already considered, and, therefore, could be addressed in the final EIS.

A fourth possibility is that a commentor points out an alternative which is not a variation of the proposal or of any alternative discussed in the draft impact statement, and is a reasonable alternative that warrants serious agency response.

In such a case, the agency must issue a supplement to the draft EIS that discusses this new alternative. For example, a commentor on a draft EIS on a nuclear power plant might suggest that a reasonable alternative for meeting the projected need for power would be through peak load management and energy conservation programs. If the permitting agency has failed to consider that approach in the Draft EIS, and the approach cannot be dismissed by the agency as

Page 19 46 FR 18026 unreasonable, a supplement to the Draft EIS, which discusses that alternative, must be prepared. (If necessary, the same supplement should also discuss substantial changes in the proposed action or significant new circumstances or information, as required by Section 1502.9(c)(1) of the Council's regulations.)

If the new alternative was not raised by the commentor during scoping, but could have been, commentors may find that they are unpersuasive in their efforts to have their suggested alternative analyzed in detail by the agency. However, if the new alternative is discovered or developed later, and it could not reasonably have been raised during the scoping process, then the agency must address it in a supplemental draft EIS. The agency is, in any case, ultimately responsible for preparing an adequate EIS that considers all alternatives.

30. Q. When a cooperating agency with jurisdiction by law intends to adopt a lead agency's EIS and it is not satisfied with the adequacy of the document, may the cooperating agency adopt only the part of the EIS with which it is satisfied? If so, would a cooperating agency with jurisdiction by law have to prepare a separate EIS or EIS supplement covering the areas of disagreement with the lead agency?

A. Generally, a cooperating agency may adopt a lead agency's EIS without recirculating it if it concludes that its NEPA requirements and its comments and suggestions have been satisfied. Section 1506.3(a), (c). If necessary, a cooperating agency may adopt only a portion of the lead agency's EIS and may reject that part of the EIS with which it disagrees, stating publicly why it did so. Section 1506.3(a).

A cooperating agency with jurisidiction by law (e.g., an agency with independent legal responsibilities with respect to the proposal) has an independent legal obligation to comply with NEPA. Therefore, if the cooperating agency determines that the EIS is wrong or inadequate, it must prepare a supplement to the EIS, replacing or adding any needed information, and must circulate the supplement as a draft for public and agency review and comment. A final supplemental EIS would be required before the agency could take action. The adopted portions of the lead agency EIS should be circulated with the supplement. Section 1506.3(b). A cooperating agency with jurisdiction by law will have to prepare its own Record of Decision for its action, in which it must explain how it reached its conclusions. Each agency should explain how and why its conclusions differ, if that is the case, from those of other agencies which issued their Records of Decision earlier.

An agency that did not cooperate in preparation of an EIS may also adopt an EIS or portion thereof. But this would arise only in rare instances, because an agency adopting an EIS for use in its own decision normally would have been a cooperating agency. If the proposed action for which the EIS was prepared is substantially the same as the proposed action of the adopting agency, the EIS may be adopted as long as it is recirculated as a final EIS and the agency announces what it is doing. This would be followed by the 30-day review period and issuance of a Record of Decision by the adopting agency. If the proposed action by the adopting agency is not substantially the same as that in the EIS (i.e., if an EIS on one action is being adapted for use in a decision on another action), the EIS would be treated as a draft and circulated for the normal public comment period and other procedures. Section 1506.3(b).

31a. Q. Do the Council's NEPA regulations apply to independent regulatory agencies like the Federal Energy Regulatory Commission (FERC) and the Nuclear Regulatory Commission?

A. The statutory requirements of NEPA's Section 102 apply to "all agencies of the federal government." The NEPA regulations implement the procedural provisions of NEPA as set forth in NEPA's Section 102(2) for all agencies of the federal government. The NEPA regulations apply to independent regulatory agencies, however, they do not direct independent regulatory agencies or other agencies to make decisions in any particular way or in a way inconsistent with an agency's statutory charter. Sections 1500.3, 1500.6, 1507.1, and 1507.3.

31b. Q. Can an Executive Branch agency like the Department of the Interior adopt an EIS prepared by an independent regulatory agency such as FERC?

A. If an independent regulatory agency such as FERC has prepared an EIS in connection with its approval of a

Page 20 46 FR 18026 proposed project, an Executive Branch agency (e.g., the Bureau of Land Management in the Department of the Interior) may, in accordance with Section 1506.3, adopt the EIS or a portion thereof for its use in considering the same proposal.

In such a case the EIS must, to the satisfaction of the adopting agency, meet the standards for an adequate statement under the NEPA regulations (including scope and quality of analysis of alternatives) and must satisfy the adopting agency's comments and suggestions. If the independent regulatory agency fails to comply with the NEPA regulations, the cooperating or adopting agency may find that it is unable to adopt the EIS, thus forcing the preparation of a new EIS or EIS Supplement for the same action. The NEPA regulations were made applicable to all federal agencies in order to avoid this result, and to achieve uniform application and efficiency of the NEPA process.

32. Q. Under what circumstances do old EISs have to be supplemented before taking action on a proposal?

A. As a rule of thumb, if the proposal has not yet been implemented, or if the EIS concerns an ongoing program, EISs that are more than 5 years old should be carefully reexamined to determine if the criteria in Section 1502.9 compel preparation of an EIS supplement.

If an agency has made a substantial change in a proposed action that is relevant to environmental concerns, or if there are significant new circumstances or information relevant to environmental concerns and bearing on the proposed action or its impacts, a supplemental EIS must be prepared for an old EIS so that the agency has the best possible information to make any necessary substantive changes in its decisions regarding the proposal. Section 1502.9(c).

33a. Q. When must a referral of an interagency disagreement be made to the Council?

A. The Council's referral procedure is a pre-decision referral process for interagency disagreements. Hence, Section 1504.3 requires that a referring agency must deliver its referral to the Council not later than 25 days after publication by EPA of notice that the final EIS is available (unless the lead agency grants an extension of time under Section 1504.3(b)).

33b. Q. May a referral be made after this issuance of a Record of Decision?

A. No, except for cases where agencies provide an internal appeal procedure which permits simultaneous filing of the final EIS and the record of decision (ROD). Section 1506.10(b)(2). Otherwise, as stated above, the process is a pre-decision referral process. Referrals must be made within 25 days after the notice of availability of the final EIS, whereas the final decision (ROD) may not be made or filed until after 30 days from the notice of availability of the EIS.

Sections 1504.3(b), 1506.10(b). If a lead agency has granted an extension of time for another agency to take action on a referral, the ROD may not be issued until the extension has expired.

34a. Q. Must Records of Decision (RODs) be made public? How should they be made available?

A. Under the regulations, agencies must prepare a "concise public record of decision," which contains the elements specified in Section 1505.2. This public record may be integrated into any other decision record prepared by the agency, or it may be separate if decision documents are not normally made public. The Record of Decision is intended by the Council to be an environmental document (even though it is not explicitly mentioned in the definition of "environmental document" in Section 1508.10). Therefore, it must be made available to the public through appropriate public notice as required by Section 1506.6(b). However, there is no specific requirement for publication of the ROD itself, either in the Federal Register or elsewhere.

34b. Q. May the summary section in the final Environmental Impact Statement substitute for or constitute an agency's Record of Decision?

A. No. An environmental impact statement is supposed to inform the decisionmaker before the decision is made.

Sections 1502.1, 1505.2. The Council's regulations provide for a 30-day period after notice is published that the final EIS has been filed with EPA before the agency may take final action. During that period, in addition to the agency's

Page 21 46 FR 18026 own internal final review, the public and other agencies can comment on the final EIS prior to the agency's final action on the proposal. In addition, the Council's regulations make clear that the requirements for the summary in an EIS are not the same as the requirements for a ROD. Sections 1502.12 and 1505.2.

34c. Q. What provisions should Records of Decision contain pertaining to mitigation and monitoring?

A. Lead agencies "shall include appropriate conditions [including mitigation measures and monitoring and enforcement programs] in grants, permits or other approvals" and shall "condition funding of actions on mitigation."

Section 1505.3. Any such measures that are adopted must be explained and committed in the ROD.

The reasonable alternative mitigation measures and monitoring programs should have been addressed in the draft and final EIS. The discussion of mitigation and monitoring in a Record of Decision must be more detailed than a general statement that mitigation is being required, but not so detailed as to duplicate discussion of mitigation in the EIS. The Record of Decision should contain a concise summary identification of the mitigation measures which the agency has committed itself to adopt.

The Record of Decision must also state whether all practicable mitigation measures have been adopted, and if not, why not. Section 1505.2(c). The Record of Decision must identify the mitigation measures and monitoring and enforcement programs that have been selected and plainly indicate that they are adopted as part of the agency's decision.

If the proposed action is the issuance of a permit or other approval, the specific details of the mitigation measures shall then be included as appropriate conditions in whatever grants, permits, funding or other approvals are being made by the federal agency. Section 1505.3 (a), (b). If the proposal is to be carried out by the federal agency itself, the Record of Decision should delineate the mitigation and monitoring measures in sufficient detail to constitute an enforceable commitment, or incorporate by reference the portions of the EIS that do so.

34d. Q. What is the enforceability of a Record of Decision?

A. Pursuant to generally recognized principles of federal administrative law, agencies will be held accountable for preparing Records of Decision that conform to the decisions actually made and for carrying out the actions set forth in the Records of Decision. This is based on the principle that an agency must comply with its own decisons and regulations once they are adopted. Thus, the terms of a Record of Decision are enforceable by agencies and private parties. A Record of Decision can be used to compel compliance with or execution of the mitigation measures identified therein.

35. Q. How long should the NEPA process take to complete?

A. When an EIS is required, the process obviously will take longer than when an EA is the only document prepared. But the Council's NEPA regulations encourage streamlined review, adoption of deadlines, elimination of duplicative work, eliciting suggested alternatives and other comments early through scoping, cooperation among agencies, and consultation with applicants during project planning. The Council has advised agencies that under the new NEPA regulations even large complex energy projects would require only about 12 months for the completion of the entire EIS process. For most major actions, this period is well within the planning time that is needed in any event, apart from NEPA.

The time required for the preparation of program EISs may be greater. The Council also recognizes that some projects will entail difficult long-term planning and/or the acquisition of certain data which of necessity will require more time for the preparation of the EIS. Indeed, some proposals should be given more time for the thoughtful preparation of an EIS and development of a decision which fulfills NEPA's substantive goals.

For cases in which only an environmental assessment will be prepared, the NEPA process should take no more than 3 months, and in many cases substantially less, as part of the normal analysis and approval process for the action.

Page 22 46 FR 18026 36a. Q. How long and detailed must an environmental assessment (EA) be?

A. The environmental assessment is a concise public document which has three defined functions. (1) It briefly provides sufficient evidence and analysis for determining whether to prepare an EIS; (2) it aids an agency's compliance with NEPA when no EIS is necessary, i.e., it helps to identify better alternatives and mitigation measures; and (3) it facilitates preparation of an EIS when one is necessary. Section 1508.9(a).

Since the EA is a concise document, it should not contain long descriptions or detailed data which the agency may have gathered. Rather, it should contain a brief discussion of the need for the proposal, alternatives to the proposal, the environmental impacts of the proposed action and alternatives, and a list of agencies and persons consulted. Section 1508.9(b).

While the regulations do not contain page limits for EA's, the Council has generally advised agencies to keep the length of EAs to not more than approximately 10-15 pages. Some agencies expressly provide page guidelines (e.g.,

10-15 pages in the case of the Army Corps). To avoid undue length, the EA may incorporate by reference background data to support its concise discussion of the proposal and relevant issues.

36b. Q. Under what circumstances is a lengthy EA appropriate?

A. Agencies should avoid preparing lengthy EAs except in unusual cases, where a proposal is so complex that a concise document cannot meet the goals of Section 1508.9 and where it is extremely difficult to determine whether the proposal could have significant environmental effects. In most cases, however, a lengthy EA indicates that an EIS is needed.

37a. Q. What is the level of detail of information that must be included in a finding of no significant impact (FONSI)?

A. The FONSI is a document in which the agency briefly explains the reasons why an action will not have a significant effect on the human environment and, therefore, why an EIS will not be prepared. Section 1508.13. The finding itself need not be detailed, but must succinctly state the reasons for deciding that the action will have no significant environmental effects, and, if relevant, must show which factors were weighted most heavily in the determination. In addition to this statement, the FONSI must include, summarize, or attach and incorporate by reference, the environmental assessment.

37b. Q. What are the criteria for deciding whether a FONSI should be made available for public review for 30 days before the agency's final determination whether to prepare an EIS?

A. Public review is necessary, for example, (a) if the proposal is a borderline case, i.e., when there is a reasonable argument for preparation of an EIS; (b) if it is an unusual case, a new kind of action, or a precedent setting case such as a first intrusion of even a minor development into a pristine area; (c) when there is either scientific or public controversy over the proposal; or (d) when it involves a proposal which is or is closely similar to one which normally requires preparation of an EIS. Sections 1501.4(e)(2), 1508.27. Agencies also must allow a period of public review of the FONSI if the proposed action would be located in a floodplain or wetland. E.O. 11988, Sec. 2(a)(4); E.O. 11990, Sec.

2(b).

38. Q. Must (EAs) and FONSIs be made public? If so, how should this be done?

A. Yes, they must be available to the public. Section 1506.6 requires agencies to involve the public in implementing their NEPA procedures, and this includes public involvement in the preparation of EAs and FONSIs.

These are public "environmental documents" under Section 1506.6(b), and, therefore, agencies must give public notice of their availability. A combination of methods may be used to give notice, and the methods should be tailored to the needs of particular cases. Thus, a Federal Register notice of availability of the documents, coupled with notices in

Page 23 46 FR 18026 national publications and mailed to interested national groups might be appropriate for proposals that are national in scope. Local newspaper notices may be more appropriate for regional or site-specific proposals.

The objective, however, is to notify all interested or affected parties. If this is not being achieved, then the methods should be reevaluated and changed. Repeated failure to reach the interested or affected public would be interpreted as a violation of the regulations.

39. Q. Can an EA and FONSI be used to impose enforceable mitigation measures, monitoring programs, or other requirements, even though there is no requirement in the regulations in such cases for a formal Record of Decision?

A. Yes. In cases where an environmental assessment is the appropriate environmental document, there still may be mitigation measures or alternatives that would be desirable to consider and adopt even though the impacts of the proposal will not be "significant." In such cases, the EA should include a discussion of these measures or alternatives to "assist agency planning and decisionmaking" and to "aid an agency's compliance with [NEPA] when no environmental impact statement is necessary." Section 1501.3(b), 1508.9(a)(2). The appropriate mitigation measures can be imposed as enforceable permit conditions, or adopted as part of the agency final decision in the same manner mitigation measures are adopted in the formal Record of Decision that is required in EIS cases.

40. Q. If an environmental assessment indicates that the environmental effects of a proposal are significant but that, with mitigation, those effects may be reduced to less than significant levels, may the agency make a finding of no significant impact rather than prepare an EIS? Is that a legitimate function of an EA and scoping?

A. Mitigation measures may be relied upon to make a finding of no significant impact only if they are imposed by statute or regulation, or submitted by an applicant or agency as part of the original proposal. As a general rule, the regulations contemplate that agencies should use a broad approach in defining significance and should not rely on the possibility of mitigation as an excuse to avoid the EIS requirement. Sections 1508.8, 1508.27.

If a proposal appears to have adverse effects which would be significant, and certain mitigation measures are then developed during the scoping or EA stages, the existence of such possible mitigation does not obviate the need for an EIS. Therefore, if scoping or the EA identifies certain mitigation possibilities without altering the nature of the overall proposal itself, the agency should continue the EIS process and submit the proposal, and the potential mitigation, for public and agency review and comment. This is essential to ensure that the final decision is based on all the relevant factors and that the full NEPA process will result in enforceable mitigation measures through the Record of Decision.

In some instances, where the proposal itself so integrates mitigation from the beginning that it is impossible to define the proposal without including the mitigation, the agency may then rely on the mitigation measures in determining that the overall effects would not be significant (e.g., where an application for a permit for a small hydro dam is based on a binding commitment to build fish ladders, to permit adequate down stream flow, and to replace any lost wetlands, wildlife habitat and recreational potential). In those instances, agencies should make the FONSI and EA available for 30 days of public comment before taking action. Section 1501.4(e)(2).

Similarly, scoping may result in a redefinition of the entire project, as a result of mitigation proposals. In that case, the agency may alter its previous decision to do an EIS, as long as the agency or applicant resubmits the entire proposal and the EA and FONSI are available for 30 days of review and comment. One example of this would be where the size and location of a proposed industrial park are changed to avoid affecting a nearby wetland area.

[FR Doc. 81-8734 Filed 3-20-81; 8:45 am]

BILLING CODE 3125-01-M

Kind, Peter, Disruptive Challenges: Financial Implications and Strategic Responses to a Changing Retail Electric Business, attachment 2 to the September 23, 2013 request for hearing and petition to intervene, by the Environmental Law and Policy Center, in the matter of Byron and Braidwood, Docket Nos. 50-454, 50-455, 50-456, 50-457-LR. This is a copyright document, and you may use the hyperlink below to access it online:

http://www.eei.org/ourissues/finance/Documents/disruptivechallen ges.pdf A complete copy of this filing has been added to the NRCs Agencywide Documents Access and Management System (ADAMS) as a non-public document under ADAMS Accession Number ML13266A427.