ML13261A344
ML13261A344 | |
Person / Time | |
---|---|
Site: | Davis Besse ![]() |
Issue date: | 09/25/2013 |
From: | Ellen Brown Plant Licensing Branch III |
To: | Lieb R FirstEnergy Nuclear Operating Co |
Eva Brown, NRR/DORL 415-2315 | |
References | |
L-13-067, TAC MF0537 | |
Download: ML13261A344 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 25, 2013 Mr. Raymond A. Ueb Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-DB-3080 5501 North State, Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO INSERVICE PUMP AND VALVE TESTING (TAC NO. MF0537)(L-13-067)
Dear Mr. Ueb:
By letter dated February 27, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13059A321), FirstEnergy Nuclear Operating Company (FENOC),
(the licensee) submitted a request for relief pursuant to Section 50.55a(a)(3)(ii) to Title 10 of the Code of Federal Regulations (10 CFR) for the Davis-Besse Nuclear Power Station, Unit NO.1.
Specifically, the licensee has requested to perform comprehensive test of high pressure injection pumps each refueling outage in lieu of biennially, and reclassify the pumps from Group B to Group A in order to include vibration test requirements during the quarterly pump tests.
The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with Mr. Phil Lashley of your staff on [INSERT DATE], 2013, it was agreed that you would provide a response within 30 days from the date of this letter.
The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC=s goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-2315.
Sincerely, t RAt Eva A. Brown, Senior Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosure:
Request for Additional Information cc wtencl: Distribution via ListServ
REQUEST FOR ADDITIONAL INFORMATION RP-5 PUMP TESTING ALTERNATIVES DAVIS-BESSE NUCLEAR POWER STATION FIRSTENERGY NUCLEAR OPERATING COMPANY UNIT NO.1 DOCKET NO. 50-346
- 1.
On page 2 of Section 5, "Proposed Alternative and Basis for Use," of Enclosure D of the letter dated February 27, 2013, notes that comprehensive testing of the high pressure injection pumps will be performed each refueling outage instead of biennially for the fourth 1 a-year interval. It is stated in Section 7 that a similar relief request was authorized by the NRC for the third 1 a-year inservice testing interval at Davis-Besse Nuclear Power Station, Unit 1. Provide actual time frequency (months) of each refueling outage at which the comprehensive testing of the high pressure injection pumps was performed during the third 1 a-year inservice testing interval.
Enclosure
'via e-mail i OFFICE i NAME DATE LPL3-2/PM EBrown 9/19/13 LPL3-2/LA*
SRohrer 9/19/13 EPNB/BC TLupold bye-mail 9/412013 LPL3-2/BC(A)
TTate 9/25/13