MONTHYEARRC-22-0004, (Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System2022-01-14014 January 2022 (Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System RC-18-0157, (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-12-28028 December 2018 (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0149, ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-12-21021 December 2018 ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0136, (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683)2018-12-12012 December 2018 (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683) RC-18-0144, (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 252018-11-20020 November 2018 (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 25 RC-18-0126, (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-01692018-11-0909 November 2018 (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-0169 RC-18-0070, (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ...2018-10-0808 October 2018 (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ... RC-18-0067, (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.22018-10-0808 October 2018 (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.2 RC-18-0123, NRC Request for Information Baseline Radiation Safety Inspection2018-10-0404 October 2018 NRC Request for Information Baseline Radiation Safety Inspection RC-18-0117, (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment2018-09-28028 September 2018 (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment RC-18-0112, (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.32018-09-27027 September 2018 (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.3 RC-18-0119, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-09-19019 September 2018 (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0118, (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange2018-09-14014 September 2018 (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange RC-18-0116, (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information2018-09-11011 September 2018 (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information RC-18-0113, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-08-31031 August 2018 (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0091, License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions2018-08-29029 August 2018 License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions RC-18-0111, License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-08-24024 August 2018 License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0100, (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information2018-08-22022 August 2018 (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information RC-18-0105, (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water ..2018-08-14014 August 2018 (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water .. RC-18-0102, Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error2018-08-10010 August 2018 Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error RC-18-0098, (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-07-30030 July 2018 (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0085, (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-01262018-07-23023 July 2018 (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-0126 RC-18-0090, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request...2018-07-12012 July 2018 (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request... RC-18-0089, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping2018-07-11011 July 2018 (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RC-18-0084, Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Requ2018-07-0303 July 2018 Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Reques RC-18-0082, Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping2018-07-0303 July 2018 Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RC-18-0079, Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error2018-06-29029 June 2018 Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error RC-18-0074, Change of the Commitment Date of DRIB/105A&B Door Submittal2018-06-18018 June 2018 Change of the Commitment Date of DRIB/105A&B Door Submittal RC-18-0060, (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error2018-05-30030 May 2018 (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error RC-18-0064, (Vcsns), Unit 1 - Annual Commitment Change Summary Report2018-05-18018 May 2018 (Vcsns), Unit 1 - Annual Commitment Change Summary Report RC-18-0063, Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation2018-05-0202 May 2018 Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation RC-18-0056, (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors2018-04-25025 April 2018 (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors RC-18-0059, Annual Radioactive Effluent Release Report2018-04-25025 April 2018 Annual Radioactive Effluent Release Report RC-18-0046, License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information2018-04-19019 April 2018 License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information RC-18-0036, (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information2018-04-0202 April 2018 (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information RC-18-0041, Report of Status of Decommissioning Funding2018-03-28028 March 2018 Report of Status of Decommissioning Funding RC-17-0175, Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error2018-01-31031 January 2018 Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error RC-18-0006, Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-01-25025 January 2018 Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-17-0169, Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-00192017-12-11011 December 2017 Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-0019 RC-17-0182, (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status2017-12-11011 December 2017 (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status RC-17-0172, Notification of Personnel Changes2017-11-30030 November 2017 Notification of Personnel Changes RC-17-0161, Submittal of Change of the Commitment Date of DRIB/105A&B Door2017-11-28028 November 2017 Submittal of Change of the Commitment Date of DRIB/105A&B Door RC-17-0135, Annual Commitment Change Summary Report2017-11-0303 November 2017 Annual Commitment Change Summary Report RC-17-0123, Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds2017-10-30030 October 2017 Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds RC-17-0140, Transmittal of 10 CFR 50.59 Biennial Report2017-10-23023 October 2017 Transmittal of 10 CFR 50.59 Biennial Report RC-17-0107, (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change2017-10-0606 October 2017 (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change RC-17-0134, Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 12017-09-27027 September 2017 Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 1 RC-17-0126, Reply to a Notice of Violation, Per Inspection Report 05000395/20170022017-09-0606 September 2017 Reply to a Notice of Violation, Per Inspection Report 05000395/2017002 RC-17-0112, Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days2017-09-0101 September 2017 Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days RC-17-0069, (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description2017-08-30030 August 2017 (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description 2022-01-14
[Table view] |
Text
Thomas D. Gatlin Vice President,Nuclear Operations (803) 345-4342 A SCANA COMPANY September 11, 2013 RC-13-0120 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
Dear Sir/Madam:
Subject:
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 SOUTH CAROLINA ELECTRIC & GAS (SCE&G) RESPONSE TO NRC REQUEST FOR INFORMATION PURSUANT TO 10 CFR 50.54(f)
REGARDING THE SEISMIC ASPECTS OF RECOMMENDATION 2.1 OF THE NEAR-TERM TASK FORCE REVIEW OF INSIGHTS FROM THE FUKUSHIMA DAI-ICHI ACCIDENT- 1.5 YEAR RESPONSE FOR CEUS SITES
References:
- 1. NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012 [ML12053A340]
- 2. NRC Letter, Endorsement of EPRI Final Draft Report 1025287, "Seismic Evaluation Guidance," dated February 15, 2013
- 3. EPRI Report 1025287, Seismic Evaluation Guidance: Screening, Prioritization and Implementation Details (SPID) for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1: Seismic, dated November 2012 [ML12333A170]
- 4. NEI Letter to NRC, Proposed Path Forward for NTTF Recommendation 2.1: Seismic Reevaluations, dated April 9, 2013
- 5. NRC Letter, EPRI Final Draft Report XXXXXX, "Seismic Evaluation Guidance: Augmented Approach for the Resolution of Near-Term Task Force Recommendation 2.1: Seismic," as an Acceptable Alternative to the March 12, 2012, Information Request for Seismic Reevaluations, dated May 7, 2013 [ML13106A331]
On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Reference 1 to all power reactor licensees and holders of construction permits in active or deferred status. Enclosure 1 of Reference 1 requested each addressee in the Central and Eastern United States (CEUS) to submit a written response consistent with the requested seismic hazard evaluation information (items 1 through 7) by September 12, 2013. On February 15, 2013, NRC issued Reference 2, endorsing the Reference 3 industry guidance for responding to Reference 1. Section 4 of Reference 3 identifies the detailed information to be included in the seismic hazard evaluation submittals.
Virgil C.Summer Station
- Post Office Box 88 ° Jenkinsville, SC - 29065 . F(803) 941-9776
Document Control Desk CR-12-01097 RC-1 3-0120 Page 2 of 2 On April 9, 2013, NEI submitted Reference 4 to NRC, requesting NRC agreement to delay submittal of some of the CEUS seismic hazard evaluation information so that an update to the EPRI (2004, 2006) ground motion attenuation model could be completed and used to develop that information. NEI proposed that descriptions of subsurface materials and properties and base case velocity profiles (items 3a and 3b in Section 4 of Reference 3) be submitted to NRC by September 12, 2013, with the remaining seismic hazard and screening information submitted to NRC by March 31, 2014. In Reference 5, NRC agreed with this recommendation.
The attachment to this letter contains the requested descriptions of subsurface materials and properties and base case velocity profiles for South Carolina Electric & Gas.
This letter contains no new regulatory commitments.
Should you have any questions concerning the content of this letter, please contact Bruce L.
Thompson at (803) 931-5042.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on Thomas D. Gatlin BQ/TDG/ts
Attachment:
I. V.C. Summer Unit 1 Site Data and Shear Wave Velocity Profiles c: (without attachments unless noted)
K. B. Marsh S. A. Byrne J. B. Archie N. S. Carns J. H. Hamilton J. W. Williams W. M. Cherry E. J. Leeds V. M. McCree (w/attachments)
R. E. Martin (w/attachments)
NRC Resident Inspector K. M. Sutton NSRC RTS (CR-12-01097)
File (815.07)
PRSF (RC-13-0120)
Document Control Desk CR-12-01097 RC-1 3-0120 Attachment I Page 1 of 5 VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT I ATTACHMENT I V.C. Summer Unit I Site Data and Shear Wave Velocity Profiles Purpose V.C. Summer (VCSNS) Unit 1 is submitting the site response evaluation in accordance with the Seismic Evaluation Guidance: Screening, Prioritization and Implementation Details (SPID)
(Reference 4) section 4 items 3a and 3b. This submittal was requested in the NRC letter of endorsement and schedule relief for the NEI proposed augmented approach activities, dated May 7, 2013 (Reference 6).
The requirements of this site response evaluation are to provide a description of subsurface materials and properties and develop the base case profiles and nonlinear material properties.
The subsurface materials and properties description includes soil/rock types, layering, and properties. The development of base case profiles and nonlinear material properties will provide information on the base case shear wave velocity profiles and selected shear modulus and damping curves.
Description of Subsurface Materials and Properties The VCSNS site is located in the Carolina Zone of the Central Piedmont province, about 20 miles (32 kilometers) northwest of the fall line that separates the Piedmont and Coastal Plain provinces. The VCSNS site lies within the Charlotte Terrane, the westernmost terrane of the Carolina Zone. The Charlotte Terrane is dominated by Neoproterozoic to Early Paleozoic plutonic rocks that intrude a suite of mainly metaigneous rocks.
The basic information used to create the site geologic profile at the VCSNS site is shown in Table 1. This profile was developed using information documented in Reference 1. For Structures, Systems, and Components (SSCs) using the "Rock SSE" at nominal depth 85 feet, no site amplification is used. For Unit 1, the majority of plant safety related structures are founded on rock. For SSCs using the "Soil SSE" at the surface, the profile was modeled as shown in Table 1.
Development of Base Case Profiles and Nonlinear Material Properties EPRI has provided the following information as an interim product for seismic hazard development. The methods used for development of the base-case velocity profiles followed Appendix B of the SPID.
For dynamic properties, the modulus and damping curves for weathered rock layers were represented with 2 models. The first model used rock curves taken from Reference 3, the
Document Control Desk CR-12-01097 RC-1 3-0120 Attachment I Page 2 of 5 second model assumed linear behavior. These dynamic property models were weighted equally.
The 3 base-case shear-wave velocity profiles used to model the "Soil SSE" at the site are shown in Figure 1. Profiles 1, 2, and 3 are weighted 0.4, 0.3, and 0.3, respectively.
Thicknesses, depths, and shear-wave velocities (Vs) corresponding to each profile are shown in Table 2.
References
- 1. NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012 [ML13101A379].
- 2. SCE&G (2012). CGSV-1 2-0010, Request for Information Response - EPRI Seismic Attenuation and GMRS Project, Letter from J. Graham to J. Hamel dated July 2, 2012.
- 3. EPRI (1993). Guidelines for DeterminingDesign Basis Ground Motions, EPRI, Palo Alto, CA, Rept. TR-1 02293, Vol. 1-5.
- 4. EPRI 1025287, "Seismic Evaluation Guidance: Screening, Prioritization and Implementation Details (SPID) for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1: Seismic," EPRI, Palo Alto, CA: November 2012 [ML12333A170]
- 5. NRC Letter, Endorsement of EPRI Final Draft Report 1025287, "Seismic Evaluation Guidance," dated February 15, 2013 [ML12319A074].
- 6. NRC Letter, EPRI Final Draft Report XXXXXX, "Seismic Evaluation Guidance:
Augmented Approach for the Resolution of Near-Term Task Force Recommendation 2.1: Seismic," as an Acceptable Alternative to the March 12, 2012, Information Request for Seismic Reevaluations, dated May 7, 2013 [ML13106A331]
Source of Site Information V.C. Summer Unit I FSAR Docket No. 50-395
" Section 2.5: Geology o Tables: 2.5-5, 2.5-9, 2.5-11 o Figures: 2.5-40, 2.5-41, 2.5-44 thru -48, 2.5-77 thru -81, 2.5-25, 2.5-91, 2.5-102 o Appendices: Figure 2E, Figure 2F
- Section 3.7 Seismic Design o Tables: 3.7-5, 3.7-6, 3.7-7
" Section 3.8 Design of Category I Structures o Figures: 3.8-54 thru -65, 3.8-67 thru 71 V.C. Summer Units 2/3, COL Application, Part 2, FSAR Docket No. 52-027/028
- Section 2.5.4 "Stability of Subsurface Materials and Foundation"
Document Control Desk CR-12-01097 RC-1 3-0120 Attachment I Page 3 of 5 Table 1 Summary of Geotechnical Profile Data for V.C. Summer Unit I Shear Depth Range SoillRock Compressional Poisson's Wave Velocity (feet) Description Wave Velocity (fps) Ratio (fps) 0 SOIL SSE Control Point (at surface) 0-25 Zone III Structural Fill b 140b b__b
___b 25-65 Saprolite 110-135 900 a 1000-3000 All highly weathered rock; 65-75 and moderately Type 3 140-160 3000 a 12000-13000 weathered highly jointed rock.
Moderately weathered rock, slight jointing; 75-85 and slightly Type 2 140-160 6000 a 12000-13000 .3 weathered rock, moderately to very jointed.
85 ROCK SSE Control Point Massive Fresh Rock - Late Precambrian to 85+ Early Paleozoic Type 1 165 10000 a 15000 Igneous and Metamorphic Rock NOTES:
aShear wave velocity measurement taken from VCS Unit 2/3 COL Application FSAR. The measurements were taken in near vicinity of VCS Unit 1 and rock is considered to be equivalent. Review of boring logs for each site validates this assumption. Shear wave velocity measurements were taken using current methods (geophysical down-hole tests using suspension P-S Velocity logging), and are considered to contain greater accuracy than dated methods used during Unit 1 construction.
bCompressional/Shear wave velocity measurements for the Zone III fill not available. Reference 2 provides design information for the Zone III fill. Young's Modulus, E = 54,000 psi for Zone III fill.
Document Control Desk CR-12-01097 RC-1 3-0120 Attachment I Page 4 of 5 Vs Profiles for V.C. Summer Unit 1 Vs (ft/sec) 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 0
10 20 30
-Profie 1 40 H i ij - Profile 2
-Profile 50 3 60 70 - - 1 80 90 100 Figure 1. The "Soil SSE" at VCSNS was modeled using 3 base-case shear-wave velocity profiles.
Profiles 1, 2, and 3 are weighted 0.4, 0.3, and 0.3, respectively. Thicknesses, depths, and shear-wave velocities (Vs) correspond to each profile shown in Table 2.
Document Control Desk CR-12-01097 RC-1 3-0120 Attachment I Page 5 of 5 Table 2 Layer Thicknesses, Depths, and Vs for 3 Profiles, V.C. Summer Unit I Profile I Profile 2 Profile 3 depth depth depth thickness(ft) (ft) Vs(ft/s) thickness(ft) (ft) Vs(ft/s) thickness(ft) (ft) Vs(ft/s) 0 1000 0 637 0 1570 5.0 5.0 1000 5.0 5.0 637 5.0 5.0 1570 5.0 10.0 1000 5.0 10.0 637 5.0 10.0 1570 5.0 15.0 1000 5.0 15.0 637 5.0 15.0 1570 5.0 19.9 1000 5.0 19.9 637 5.0 19.9 1570 5.0 24.9 1000 5.0 24.9 637 5.0 24.9 1570 6.7 31.6 900 6.7 31.6 720 6.7 31.6 1125 6.7 38.3 900 6.7 38.3 720 6.7 38.3 1125 6.7 44.9 900 6.7 44.9 720 6.7 44.9 1125 6.7 51.6 900 6.7 51.6 720 6.7 51.6 1125 6.7 58.2 900 6.7 58.2 720 6.7 58.2 1125 6.7 64.9 900 6.7 64.9 720 6.7 64.9 1125 5.0 69.9 3000 5.0 69.9 2400 5.0 69.9 3750 5.0 74.9 3000 5.0 74.9 2400 5.0 74.9 3750 5.0 79.9 6000 5.0 79.9 4800 5.0 79.9 7500 5.0 84.8 6000 5.0 84.8 4800 5.0 84.8 7500 3280.8 >84.8 9285 3280.8 >84.8 9285 3280.8 >84.8 9285