ML13255A157
| ML13255A157 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 06/08/2012 |
| From: | Logan D Office of Nuclear Reactor Regulation |
| To: | Domingue R US Dept of Commerce, National Oceanographic and Atmospheric Administration |
| References | |
| FOIA/PA-2013-0265 | |
| Download: ML13255A157 (28) | |
Text
Craver, Patti From:
Sent:
To:
Cc:
Attachments:
Logan, Dennis Friday, June 08, 2012 2:50 PM
'Richard Domingue' Cooper, Paula NPDES.ZIP
- Rich, I am enclosing the NPDES reports from Columbia Generating Station that you requested for review of the biological assessment. I believe that this constitutes the last of the new information that you requested.
Please call or e-mail if you have any questions.
Dennis Dennis Logan, Ph.D.
Ecologist U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 0-11 F1 11555 Rockville Pike Rockville, MD 20852-2738 Phone: 301.415.0490 Fax: 301.415.2002 I
ENERGY NORTHWEST Dale K. Atkinson Vice President, Employee Development/Corporate Services P.O. Box 968, Mail Drop PE03 Richland. WA 99352-0968 Ph, 509-377-4302 F. 509-377-4099 dkatklnson@energy-norhwast.com September 12, 2011 G02-11-153 EFSEC Manager Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, WA 98504-3172
Subject:
COLUMBIA GENERATING STATION NPDES DISCHARGE MONITORING REPORT
Reference:
NPDES Permit No. WA-002515-1, Condition S3.A In accordance with the referenced permit condition, the NPDES Discharge Monitoring Report (DMR) for August 2011 is enclosed. The Columbia Generating Station refueling and maintenance outage (R20) was in progress throughout the reporting period, with the primary focus area being the condenser replacement project. Installation of the new condenser was completed in late August and preliminary testing is scheduled for early September. If you have any questions regarding this report, please contact BC Barfuss at (509) 377-4541.
Respectfully, DK Atkinson Vice President, Employee Development/Corporate Services Enclosure cc:
J. Ayres (WDOE)
J. La Spina (EFSEC)
PERMITTEE HAM EIADDRESS 1 FcOyVaeLahifDnr NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM JNPDES)
DISCHARGE MONITORING REPORT (DMR)
NAME Energy Northwest ADDRESS P.O. Box 968 Richland. WA 99352-0958 FACILITY Columbia Generating Stafoon LOCATION USDOE Hanford Site WA00515-1 0
PEMI NUBRý DSHARENUMBER MONITORING PERIOD IYEAR I MO IYEAR.j MO DAY FROM 11 1 08 TO 11 1 08 I 31 QUANTITY OR LOADING QUANTITY OR CONCENTRATION NO. EX FREQUENCY SAMPLE TYPE PARAMETER OF ANALYSIS AVERAGE MAXIMUM UNITS MINIMUM AVERAGE MAXIMUM UNITS Recirculating SAMPLE 2.2 2.2 0
Continuous N/A Cooling Water MEASUREMENT MGD Blowdown Flow PERMIT 5.6 9.4 REQUIREMENT SAMPLE 71 7.4 0
Continuous N/A pH MEASUREMENT" pH PERMiT 6.5 9.0 REQUIREMENT SAMPLE_
26.3 28-6 Contintuous; N/A Temperature MEASUREMENT
°C PERRMT REQUIREMENT SAMPLE 0.7 Grab Turbidity MEASUREMENTl NTU PERMIT REQLUREMENT SAMPLE Total Residual MEASUREMENT M911 Halogen PERMIT
- 0.1 REQUIREMENT SAMPLE N/A MIA Copper (Dec-Feb)
MEASUREMENT (Total PERMIT 70 108 Recoverable)
REQUIREMENT NAME/TITLE PRiNCIPAL EXECUTIVE I cenly under penalty of law. that this docurment and all attacras pr TELEPHOrNpE DATE OFFICER umder iny direction r supervision in accoidanme WIth a systemn desiged to asse rhda quafi]ed personnel propediy gathered and evaluated the n*ormatim submiLted.
Vice President. Employee
- parss directy, responsible for galhering inlormation. the o*,oration subrniede.
is, (5) 377-432 lo the best of my knoM'Ldge and belief, true. accurale. and conplete. I am awaae
.K-(
74 DevelopmenV.Corporate Serices tat there are significant penalties for submiting false oinforrr.atio, incl-utng The TYPED OR PRINTED p
t"ilY a Fine and irnprisinrnent for knowing vidlaticos.
SIGNATURE OF PRINCIPAL EXECULIVE AREA NUMBER YEAR MO DAY OFFICER OR AUTHORIED AGENT CODE COMMENTS AND EXPLANATION OF AY VIOLATlONS iReimmea am achmmnts here)
- Maintenance ouagei n progress, no batgerration periods during August.
-No specific limits. monitotrbg requiremento nly.
Form pattemed after EPA Form 3320-1 (03-99)
PAGE 1 OF 2
PERMITTEE NAMEIADDRESS ~n~aFct ao~.tnIdeel NAME Energy Northwest ADDRESS P.O. Box 968 Richland, WA 99352-0968 FACILITY Columbia Generating Station LOCATION USDOE Hanford Site NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
DISCHARGE MONITORING REPORT (DMR) 51 51 00 1 PERMIT NUMBER DISCHARGE NUMBER I
MONITORING PERIOD II I YEAR MO DAY EAR MO 1 DAY I
FROM I1 08 I01t TO I I 1 0I j 31 1
QUANTITY OR LOADING QUANTITY OR CONCENTRATJON NO. EX FREQUENCY SAMPLE TYPE PARAMETER OF ANALYSIS AVERAGE MAXIMUM UNITS MINIMUM AVERAGE MAXMMU&M UNiTS SAMPLE 62 0
1 Grab Copper (Mar-Nov)
MEASUREMENT (Total PERMIT 223 345 Recoverable)
REQUIREMENT SAMPLE
<c.0 Grab Chromium MEASUREMENT Grab (Total PERMIT Recoverable)
REQUIREMENT SAMPLE 13 Grab Zinc MEASUREMENT (Total PERMIT Recoverable)
REQUIREMENT SAMPLE MEASUREMENT PERMIT REQUIREMENT SAMPLE MEASUREMENT PERMIT REQUIREMENT SAMPLE MEASUREMENT PERMIT REQUIREMENT NAME/TOTLE PRINCIPAL EXECUTIVE Iceitiy under Penalty of law. that this documenl and all attachments were prepared TELEPHONE DATE OFFICER under my direction oT superlsion in acwoidanca with a system designed to assure that quatind personnel propetly gathered and evaluated the mformalion submitted.
D.K. Akinson Based on my inquiry ot the person at persons who rmarnage the system, or those Vice President. Employee persons directly responsibta for gatnering inlonmation. the information submitted is.
59 7
3 to the best oT my knowledge and belief. tue. arwate. and comp-ele. I am aware
.5.9) 377-4302 Oevelopment/Corporate Services that there are sIgnifficat penal.ies for subm*tting false information. including the TYPED OR PRINTED possibily of fine and imp~sonment for knowing viblalions.
SIGNATURE OF PRINCPA. EXECUTIVE AREA II NUMBER YEAR MO DAY OFFICER -OR AMTNORZEO AGENT CODE COMENTS AND EXPLANATION OF ANY VIOLATIONS f*e~ewae wsl-re)
No spec*fic linnits, monitoring requirement only.
Form patterned after EPA Form 3320-1 (03-99)
PAGE 2 OF 2
>ENERGY
.j NORTHWEST Dale K. Atkinson Vice Pre6sdent. Employee DeveJopment/Corporate Services P.O. Box 968, Mail Drop PE03 Richland, WA 99352-0968 Ph. 509-377-4302 F. 509-377-4098 dkatkinson@energy-northwest.com February 14, 2012 G02-12-024 EFSEC Manager Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, WA 98504-3172
Subject:
COLUMBIA GENERATING STATION NPDES DISCHARGE MONITORING REPORT
Reference:
NPDES Permit No. WA-002515-1, Condition S3.A In accordance with the referenced permit condition, the NPDES Discharge Monitoring Report (DMR) for January 2012 is enclosed. If you have any questions regarding this report, please contact BC Barfuss at (509) 377-4541.
Respectfully, DK Atkinson Vice President, Employee Development/Corporate Services Enclosure cc:
J. Ayres (WDOE)
J. La Spina (EFSEC)
PERMIT-EE NAME/ADDRESS i.-
Frny caon d *kv',n)
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
DISCHARGE MONITORING REPORT (DMR)
NAME Energy Northwest ADDRESS P.O. Box 968 Richland, WA 99352-0968 FACILITY Columbia Generating Station LOCATION USDOE Hanford Site I
WA-002515-1 001 PERMIT NUMBER DISCHARGE NUMBER MONITORING PERIOD I
YEAR MO DAY YEAR ME] DAY FROM 12 01 01 TO 12 01 1
31 QUANTITY OR LOADING QUANTITY OR CONCENTRATION NO. EX FREQUENCY SAMPLE TYPE PARAMETER OF ANALYSIS AVERAGE MAXIMUM UNITS MINIMUM AVERAGE MAXIMUM UNITS Recirculating SAMPLE 1.6 2.1 0
Continuous N/A Cooling Water MEASUREMENT MGD Blowdown Flow PERMIT 5.6 9.4 REQUIREMENT SAMPLE 7.8 8.5 0
Continuous N/A pH MEASUREMENT
_PH PERMIT 6.5 9.0 REQUIREMENT SAMPLE 22.7 29.0 Continuous NIA Temperature MEASUREMENT "C
PERMIT REQUIREMENT SAMPLE 5.4 Grab Turbidity MEASUREMENT NTU PERMIT REQUIREMENT SAMPLE
_0.1 0
Grab Total Residual MEASUREMENT Halogen PERMIT 0.1 REQUIREMENT SAMPLE 12 0
Grab Copper (Dec-Feb)
MEASUREMENT 19 I (Total PERMIT 70 108 Recoverable)
REQUIREMENT NAEITITL.E PRINCIPAL EXECUTIVE tcettily,yndar pe of law. that this document and all amtachments were prepared TELEPHONE DATE OFFICER under my dnrection o: supervision in accordance with a system designed to assure fhtl qu.lilied personnel pimpdy gathered and evaluated the information submitted O.K. Atkinson Based an my iqiry 07 the per-on or person who manage the system. or those Vice President, Employee
~
persomensdircly responsible Fom gatheuing Inforantion. the information submitted is.
59 7-32 PZ l
to Phe Eese of my knowledge and belief, true, accurate. and complete. I am aware)3 33 Development'Corpoale Services tat thaew ar signirzant penalties for subr.-idng talse information. incu*ding the 4 LL possib*J~
a Offend *mp&smmntrrz for kno~ng vialations-TYPED OR PRINTED SIGNATURE OF PRINCIPAL EXECUTIVE AREA NUMBER YEAR MO DAY OFFICER OR AUTHORIZED AGENT CODE COMMENTS AND EXPLANATION OF ANY VIOLATIONS IRmv,.ce a&*'a wt..*-'s hwee)
- Sampled prior Io discharge.
- No specilic limits. monitoring requirement only.
Fwm patterned aller EPA Form 3320-1 (03-99)
PAGE I OF 2
PERMITTEE NAME/ADDRESS
-ft*ie Facd Nytorame tocan Odlet,,r)
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
DISCHARGE MONITORING REPORT (DMR)
NAME Energy Northwest ADDRESS P.O. Box 968 Ric-bland. WA 99352-0968 FACILITY Columbia Generating Station LOCATION USDOE Hanford Site PERMT NUMBER DISCARGE NUMBER MONITORING PERIOD YEAR MO DAY Y
YEAR MO DAY FROM t 12 01 0I1 TO 12 01 31 I
QUANTITY OR LOADING QUANTITY OR CONCENTRATION NO. EX FREQUENCY SAMPLE TYPE PARAMETER OF ANALYSIS AVERAGE MAXIMUM UNITS MINIMUM AVERAGE MAXIMUM UNITS SAMPLE N/A N/A Copper (Mar-Nov)
MEASUREMENT pg (Total PERMIT 223 345 Recoverable)
REQUIREMENT SAMPLE
< 1.0 Grab Chromium MEASUREMENT g1_
(Total PERMIT Recoverable)
REQUIREMENT SAMPLE 29 Grab Zinc MEASUREMENT pgli (Total PERMIT Recoverable)
REQUPREMENT SAMPLE MEASUREMENT PERMIT REQUIREMENT SAMPLE MEASUREMENT PERMIT REQUIREMENT SAMPLE MEASUREMENT PERMIT REQUIREMENT NAMEITITLE PRINCIPAL EXECUTIVE I cenify under penalty of law. that hIs document and all attactmerts weie prepared!
TELEPHONE DATE OFFICER under my diredlion or supervision in accordance wiih a system des*n*ed to assure ihat qualified personnel properly gathered and evahuated the information submitted.
D.K. Atkinson Based on my inquiry of the person or persons Who manage the system. or those Vice President, Employee persons directly responsible fox gathering information, the normatio subimntted as, (509) 37743.2 ZVI p_ f L to the besl of my knowle0ge and belief, true. accurate, and complete. I am aware
- Ik0, 3
3 DevelopmentiCorporate Services that there are significant penalties for submitting false information. incud'ing the possibility of fine and imprisonment for knovvnn violations.
TYPED OR PRINTED SIGNATURE OF PRINCIPAL EXECUTIVE AREA NUMBER YEAR MO DAY OFFICER OR AUTHORIZED AGEN" CODE COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Refoetnce all arlachnams )We2)
- No speciric limits. monitoring requirement only.
Form patterned after EPA Form 3320-1 (03-99)
PAGE 2 OF 2
ENERGY NORTHWEST Date K, Athinnon Vice President, Employee Development/Corporate Services P.O. Box 968, Mail Drop PE03 Richlarnd, WA 99352-0988 Ph. 509-377-4302 F, 509-377-4098 dkalklnson@energy-norlhwest.comn November 15, 2011 G02-11-183 EFSEC Manager Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, WA 98504-3172
Subject:
COLUMBIA GENERATING STATION NPDES DISCHARGE MONITORING REPORT
Reference:
NPDES Permit No. WA-002515-1, Condition S3.A In accordance with the referenced permit condition, the NPDES Discharge Monitoring Report (DMR) for October 2011 is enclosed. If you have any questions regarding this report, please contact BC Barfuss at (509) 377-4541.
Respectfully, DK Atkinson Vice President, Employee Development/Corporate Services Enclosure cc:
J. Ayres (WDOE)
J. La Spina (EFSEC)
PERMITTEE NAMEIADDRESS ihkv?
Fycayn LOcwbn atnsmepr)
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPOES)
DISCHARGE MONITORING REPORT (DMR)
NAME Eneygy Northwest ADDRESS P.O. Box 968 Richland, WA 99352-0968 FACILITY.
Columbia Generating Station LOCATION USDOE Hanford Site WA-00515-1]
001 LERATNUMBERJ IISHRGE NUMBEýR MONITORING PERIOD YEAR I MO DAY J YEAR I MO I DAYjI
- FROM, 11 J10101 ITOI-11 1101 31 1
QUANTITY OR LOADING QUANTITY OR CONCENTRATION NO. EX FREQUENCY SAMPLE TYPE PARAMETER OF ANALYSIS AVERAGE MAXIMUM UNITS MINIMUM AVERAGE MAXIMUM UNITS' Redirculating SAMPLE 1.6 4.3
,0 Continuous N/A Cooling Water MEASUREMENT MGD Blowdown Flow PERMIT 5.6 9.4 REQUIREMENT SAMPLE 7.8 8.4 0
Coninuous N/A pH MEASUREMENT PH PERMIT 6.5 9.0 REQUOREMEN SAMPLE 25.1 31.1 Conlrinurus NIA Temperature MEASUREMENT PERMIT REQUIREMENT SAMPLE 2.1 1
Grab Turbidity MEASUREMENT NTU PERM~ITr REQUJREMENT SAMPLE
-< 0.1 0
Grab TOtal Resiual MEASUREMENT Halogen PERMIT0.
"REOUqREMENT
< 0*1 SAMPLE NIA N/A Copper (Dec-Feb)
MEASUREMENT 4g_'_
(Total PERMIT 70 108 Recovemble)
REQUIREMENT NAMEITITLE PRiNClPAL EXECUTIVE I ce.iy under penally of law. that inis documeel and all atachmen*ls were prepared TELEPHONE DATE OFFICER unrer my direction oi suprwsion in amrdance with a system desjnaed to assure thae qualified per*omnel pmpely gathered and evatualed fthe information subrnMield.
O.K. Atkinson Based on my inqu'fy of &ae petson os persofts sfo Tnanage the system, or those Vuce Presitierr. Emrployee Wesos directly responsible Tot galhefirqg iffotmfion. the information submined is 01(509) 377-4302 L01 it j-Developent/Co rate Srvices to the best of my -know~ep and belief,.true, accurate and complete'. ams aware 4
1Lj Dev*]1opment/rCoi'porat*e,'Services that there are s-gnificant penallieso Ts sub*r*hng Wale Wormat-on. incuding the Wossibily of fine and imp*sarrvent for knowing vkola*)ns.
TYPED OR PRINT'ED SIGNATURE OF PPINCIPAL EXECtMVE AREA NUMBER YEAR MO DAY OFFICER OR AUTHORIZED AGENT CODE COMjENTS AND EXPLANATION OF ANY VIOLATIONS iRefe£ema ar aacrtmAnrs her)
- Sampled prioDrIo discharge.
- No specific limis, monitorhing requiremeral only.
Form palterned after EPA Form 3320-1 f03-99)
PACE I OF 2
PERMITTEE NAMEIADDRESS nck Fe a LawRDfl NAME Energy Northwest ADDRESS P.O. Box 968 Richland. WA 99352-0968 FACILITY Columbia Generating Station LOCATION USDOE Hanford Site NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
DISCHARGE MONITORING REPORT (DMR)
WA-00251P T N PEMTNUME DICHRGENUMBER MONITORING PERKID I
IYEAR MO DAY I
YEARI MD DAY FROM 11 10 01 J TO 1 11 1
I0 1 31 QUANTITY OR LOADING CAJANTITY OR CONCENTRATION NO-EX FREQUENCY SAMPLE TYPE PARAMETER OF ANALYSIS AVERAGE MAXIMUM UNITS MINIMUM AVERAGE MAXIMUM UNITS SAMPLE 16 0
1 Grab Copper (Mar-Nov)
MEASUREMENT
_Pg/I
{Total PERMIT 223 345 Recoverable)
REQUIREMENT_
SAMPLE
<1.0 Grab Chromium MEASUREMENT Pg/_
4Total PERMIT Recoverable)
REQUIREMENT SAMPLE 291 Grab Zinc MEASUREVIENT
_pg/I (Total PERMIT Recoverable)
REQUIREMENT SAMPLE MEASUREMENT PERMIT
_REQUIREMENT SAMPLE MEASUREMENT PERMIT REQUIREMENT SAMPLE MEASUREMENT" PERMIT REQUIREMENT NAMEITITLE PRINCIPAL EXECUTIVE ceItfy undej penalty of Law. that this document and ad aftacbhmwts vere rpiepaed!
TELEPHONE DATE OFFICER under my dection or supevtisioin in accodance with a systenm des'gned tD assure Ural qua*led personnel properly g*afhred and evaluated the in; nm6= suibrAted.
D.K. Atkinson Based on my inquiry of the person or persons who mark e "-srystem, or mhse Vice President, Employee pewsn's directly responsible for gathernog infonrmation. the Wornxbonsbm1 inrttd is.,
(509) 377-4302 to Ce beWs of my knowedge and beliel, true, accutale, and oot*pe. I am awae g I I DevelopmenrCorporale tes ha there are signrifcant penalties fof submitting fase inomantkfm. inc.)rnq The TYPED OR PRINTED possbi of & andir'prisonment for knowSing vioatIons.
SKGNAT7URE OF PRINCWPAL EXECUTIE AREA NUWIER YEAR MO DAY IOFFICER OR AUITHORIZED AGENT CODE COMMENTS AND EXPLANATKJN 07 ANY VOOLATIONS p
,ea#
,afnah ttwe)
- No specfic limits. moralorftg recr~eemenl orly.
Forni pattermed afler EPA Form 332G-1 ý03-99)
PAGE 2 OF 2
ENERGY NORTHWEST Dale K. Atkinson Vice President, Employee Development/Corporate Services PO, Box 968, Mall Drop PE03 Richland, WA 99352-0968 Ph, 509-377-4302 F. 509-377-4098 dkatkinson@energypnorthwestcom October 13, 2011 G02-11-168 EFSEC Manager Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, WA 98504-3172
Subject:
COLUMBIA GENERATING STATION NPDES DISCHARGE MONITORING REPORT
Reference:
NPDES Permit No. WA-002515-1, Condition S3.A In accordance with the referenced permit condition, the NPDES Discharge Monitoring Report (DMR) for September 2011 is enclosed. The Columbia Generating Station refueling and maintenance outage (R20) concluded during the reporting period, with Columbia re-connecting to the power grid on September 27 h. If you have any questions regarding this report, please contact BC Barfuss at (509) 377-4541.
Respectfully, DK Atkinson Vice President, Employee Development/Corporate Services Enclosure cc:
J. Ayres (WDOE)
J. La Spina (EFSEC)
PERMITTEE NAME/ADDRESS acu,, F=cyNam L.cato, Rdm)
NAME Energy Northwest ADDRESS P.O. Box 968 Richland, WA 99352-0968 FACILITY Columbia Generating Station LOCATION USDOE Hanford Site NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM {NPDES)
DISCHARGE MONITORING REPORT (DMR)
WA02515-100 PERMIT NUMBER DISCHARGE NUMER MOINORING PERIOD YARI MO DAY DAY FROM 11 09 01 1 TOL 11
[
09 30 QUANTITY OR LOADING QUANTITY OR CONCENTRATION NO. EX FREQUENCY SAMPLE TYPE PARAMETER OF ANALYSIS AVERAGE MAXIMUM UNITS MINIMUM AVERAGE
-MAXIMUM UNITS Recirculating SAMPLE 2.5 5.1 0
Caontaius WA Cooling Water MEASUREMENT MGD Blowdown Flow PERMIT 5.6 9.4 REQUIREMENT SAMPLE 6.7 8.5 0
Coninimus N/A pH MEASUREMENT pH PERMIT 6.5 9.0 REQUIREMENT SAMPLE 18.1 27.2 Corntmuus N/A Temperature MEASUREMENT
°C PERMIT REQUIREMENT SAMPLE 3.9 7.3 2
Grab Turbidity MEASUREMENT NTU PERMIT
'I REQUIREMENT SAMPLE Total Residual MEASUREMENT mg/i Halogen PERMIT
_< 0.1 REQUIREMENT SAMPLE NIA N/A Copper (Dec-Feb)
MEASUREMENT
__jI (Total PERMIT 70 108 Recoverable)
REQUIREMENT F_
I I
NAME/T$TLE PRINCIPAL EXECUTIVE I
lrty under penalty ol law. ha't this documeant and all aftarhawks ware prepared TELEPHONE DATE OFFICER under my direction or supervislon In asmrdance wkh a system desigemd Do assme
'tVal qua Bed personnen property gatherad and evaluated Om inmrmatbon subnilled.
D.K. Atknson aased on my Inquiry of the person or persons who manage the sysemn. or t3=9s Vice President, Empoyee psn directly responsIbe to galhering Informallon. the 5nlorati*n submitted is.
(509) 377-4302 04t 1
lo the bast at my knowledge and belia_, true. accurate, and complete. I am arare DevelopmentCorporate Services that there ae signfcant penalties "or sbntling lae Wowton. izkain the TYPED OR PRINTED posSwbily of*ins and Irpnsonrment tor
- r oaing v
n SIGNATURE OF PRINCIPAL EXECUTIVE AREA NUMBER YEAR MO DAY OFFICER OR AUTHORIZED AGENT CODE C,4 kSENtS AND veP'LANATION OF ANY VIOLATIONS (era duringSeptemb)
"Main~rinc osta in,progress, no haloganalion gseriods.during September.
N" o specific limits. rmotoitng requirement only.
I;Drm patemed allar EPA Form 3320-1 tO3-99)
PAGE I OF 2
PERMITTEE NAMEIADDRESS PwtaFealft NamocemziiiDfwmr)
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
DISCHARGE MONITORING REPORT (DMR)
NAME Energy Northwest ADDRESS P.O. Box 968 Richland*. WA 99352-0968 FACILITY Columbia Generating Station LOCATION USDOE Hanford Site WA-002515-1 001 PERMIT NUMBER DISCHARGE NUMBER MONITORING PERIOD YEAR I MO DAY I
T EAR I MOI DAY FROM 11109 01 TO 11 1 09 30 QJANTITY OR LOADING QUANTITY OR CONCENTRATION NO. EX FREQUENCY SAMPLE TYPE PARAMETER OF ANALYSIS AVERAGE MAXIMUM UNITS MINIMUM AVERAGE MAXIMUM UNITS SAMPLE 44 76 0
2 Grab Copper (Mar-Nov)
MEASUREMENT
_pg/I (Total PERMIT 23 345 Recoverable)
REQUIREMENT SAMPLE
<11.0
<1.0 2
Grab Chromium MEASUREMENT pg/I (Total PERMIT Recoverable)
REQUIREMENT SAMPLE 11 14 2
Grab Zinc MEASUREMENT
_jg/I (Total PERMIT Recoverable)
REQUIREMENT SAMPLE MEASUREMENT PERMIT REQUIREN0T SAMPLE MEASUREMENT PERMIT REQUIREMENT
-SAMPLE MEASUREMENT PERMIT REQUIREMENT NAME/TITLE PRINCIPAL EXECUTIVE I ceya,IdeT.perafty ol law. that Ihis document and an] attachments ways prepared TELEPHONE DATE OFFICER ur~etr rmry direcilun -or smaparvIsIon in accordance with a system designed to assure that quai.ted personnel properdy gathered and evaluated the inomiatien submitted.
D.K. Atkinson Basad on my inquiry of the person or petsoac who manage the system, or VM S_
Vice President, Employee perons i responsible tor gaihering Informat*o o s (509) 377-430'2 su 10 ittedLi to hse best of my knowiedge and betiel. true. accurate. and c*pnpetp I am aware DevlopmentCorporae Services that Ih-re ara signlican peanalfles for sidbmiting lalse intornalson, incladtng the TYPED OR PRINTED fr d gins and imprsomen toy knowing wolations.
SIGNATURE OF PRINCPAL EXECUTIVE AREA I NUMBER YEA" MO D1AY IOFFRCER OR AUTHORIZED AGENT CODE COMMENTS AND EXPLANATION OF ANY VIO.ATIO)M,, pbbvn*nr 9e,*
trAm)
- No specific limits, mo*ilotirig requirement only.
Form patterned after EPA Form 3320-1 J03-99)
PAGE 2 OF 2
O ENERGY NORTHWEST Dale K. Atklnson Vice Presidard, Employee Development/Corporate Services P.O. Box 968, Mail Drop PE03 Richland, WA 99352-09N8 Ph. 509-377-4302 F. 509-377-4098 dkatkinson@energy-northwest.com May 14, 2012 G02-12-070 EFSEC Manager Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, WA 98504-3172
Subject:
COLUMBIA GENERATING STATION NPDES DISCHARGE MONITORING REPORT
Reference:
NPDES Permit No. WA-002515-1, Condition S3.A In accordance with the referenced permit condition, the NPDES Discharge Monitoring Report (DMR) for April 2012 is enclosed. If you have any questions regarding this report, please contact BC Barfuss at (509) 377-4541.
Respectfully, DK Atkinson Vice President, Employee Development/Corporate Services Enclosure cc:
J. Ayres (WDOE)
J. La Spina (EFSEC)
PERMITTEE NAMEIADDRESS a~NrwLO~!Ii NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
DISCHARGE MONITORING REPORT (DMR)
NAME Energy Northwest ADDRESS P.O. Box 968 Richland, WA 99352-0968 FACILITY Columbia Generating Station LOCATION USDOE Hanford Site SWA-002515-1 1
001 PERMIT NUMBER DISCHARGE NUMBER MONITORING PERIOD YEAR MOI DAY I YEAR M
I AYJ FROM 12 04 101 jTO 1 12 1 04 1 3 QUANTITY OR LOADING QUANTITY OR CONCENTRATION NO. EX FREQUENCY SAMPLE TYPE PARAMETER OF ANALYSIS AVERAGE MAXIMUM UNITS MINIMUM AVERAGE MAXIMUM UNITS Recircul*a*ng SAMPLE 1.5 2.3
, Continuotus N/A Cooling Water MEASUREMENT MGD Blowdovn Flow PERMIT 5.6 9.4 REQUIREMENT SAMPLE 7.9 8.4 0
Continuo.s NIA pH MEASUREMENT pH PERMIT 6.5 9.0 REQUIREMENT SAMPLE 24.2 31.2 Continuous W/A Temperature MEASUREMENT
°C PERMIT REQUIREMENT I
SAMPLE 6.6 Grab Turbidity MNEASUREMENT
_NTU PERMIT REQUIREMENT SAMPLE
_< 0.1 0
Grab Total ResAdual MEASUREMENT
_o Halogen PERMIT
<0.1.
REQUOREMENT SAMPLE N/A MA Copper (Dec-Feb)
MEASUREMENT pg/I (Total PERMIT 70 108 Recovemable)
REQUIREMENT NAME/T-TLE PRINCIPAL EXECUTIVE I certify undw penalty of law. thai this doarnent and alt attachments ware prepared TELEPHONE DATE OFFICER under my directon or sutpevision in accordamce wdh a systern designed to assure that q*eia*ed personnel property gathered and evaluated thelinlormation sabiriled.
D.K. Atkinson Based on my inquiry of the person or persons who manaWg the system. oer lme Vi FP"resident Employee peisons dieczty responsible lor gaftheing infornnAw, the ifrrnafion.s5t*hinleds s.
.¢
,3 VievPeopdenl/Employae erie s
to teest of "y knowledge and beWe. brie. accurate, and ccnrplee. am aware
~ /,-(0)3740 Dave opmer/Cwtporate Services mat there are signircant penalties for subritting false information. indm fth TYPED OR PRINTED p
SIGNATURE OF PRINCIPAL EXECUTIVE AREAj NLjj R
YEAR MO 11*Y OFFICER OR AUTHORIZED AGENT CODE COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Retwenre as a,'dwimats here)
- Sampled p6or to discharge.
- No specifc limits, monitoring requiremeal only.
Forin patterned aftar EPA Form 332D-1 (03-99)
PAGE I OF 2
PERMITTE E NAMEIADDRESS fbaicude Fa~y NW eLaCrtbn jV 0W&~M)
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
DISCHARGE MONITORING REPORT (DMR)
NAME Energy Northwest ADDRESS P.O. Box 958 Richland, WA 99352-0968 FACILITY Columbia Generating Station LOCATION USDOE Hanford Site WA-002515-1 001 PERMIT NUMBER DISCHARGE NUMBER I
MONITORING PERIOD I
I YEAR I MD I DAY 1
, YEAR MO j DAY
ý FROM]
12 104101
)TO 12 J104]
30 QUANTITY OR LOADING QUANTITY OR CONCENTRATION NO. EX FREQUENCY SAMPLE TYPE PARAMETER OF ANALYSIS AVERAGE MAXIMUM UNITS MINIMUM AVERAGE MAXIMUM UNITS SAMPLE 12 0
1 Grab CoppertMar-Nov)
MEASUREMENT (Total PERMIT 223 345 Recoverable)
REQUIREMENT SAMPLE 1.0 Grab Chromium MEASUREMENT pg__
(Total PERMIT Recoverable)
REQUIREMENT SAMPLE 26 Grab Zinc MEASUREMENT (Total PERMIT Recoverable)
REQUIREMENT SAMPLE MEASUREMENT PERMIT REQUIREMENT SAMPLE MEASUREMENT PERMIT REQUIREMENT SAMPLE MEASUREMENT PERMIT REQUIREMENT NAMEfTITLE PRINCIPAL EXECUTIVE i cetV piar pera*tftvi law, Vm &As document and al attachmerds were prepared TELEPHONE DATE OFFICER under my directr; o superv s'en aczdance wi*h a system deshiged to assure thal quaMed Personnel propar gathered and evaluated Dlie infor.mabon subrmted.
O.K. AtkInson Based *n my iruixy o0 she pewn or persons who manaoje the system, or those
- r Vice PresidenL Employee persons diectly mspwse Fo g athr ingormation. the inlarmalion sutrrsied is, (509) 377-4302 e
i -
to Ste *est of my knu*aiw e and belief, true. accurate, and complete. I am aware I
f Development/Corporate Services W1 there am stgp,%c penalkes for sobrritting false infraion mIkid"
.3Ssibriy of Ene and imrsnmen:t* fo krD~g vwetallons.
TYPED OR PRINTED SIGNATUREOF PRINCIPAL EXECUTIVJE AREA I NUMBER YEAR MO DAY OFFICER OR AiITHOR3IZED AGENT CODE COWAENTS AND EXPLANATION OF ANY VIOLATIONS O ee aU a=
YD)
- No spedfic 11imils. monitoring requirement only.
Form patterned afler EPA Form 3320-1 (03-99)
PAGE 2.OF 2
j ENERGY k
NORTHWEST Dale K. Alkinson Vice President. Employee Developmant/Corporate Services P.O. Bc.x 968, Mail Drop PE03 Richland, WA 99352.0968 Ph. 509.377-4302 F. 509-377-4098 dkalkinson @ energy-norlhwosl.com April 12, 2012 G02-12-058 EFSEC Manager Energy Facility Site Evaluation Council P.O. Box 431 72 Olympia, WA 98504-3172
Subject:
COLUMBIA GENERATING STATION NPDES DISCHARGE MONITORING REPORT
Reference:
NPDES Permit No. WA-002515-1, Condition S3.A In accordance with the referenced permit condition, the NPDES Discharge Monitoring Report (DMR) for March 2012 is enclosed. If you have any questions regarding this report, please contact BC Barfuss at (509) 377-4541.
DK Atkinson Vice President, Employee Development/Corporate Services Enclosure cc:
J. Ayres (WDOE)
J. La Spina (EFSEC)
PERMITTEENAEAORS re ~yN.r
- kal NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDESJ DISCHARGE MONITORING REPORT (OMR)
NAME Energy Northwest ADDRESS P.O. Box 968 Richland. WA 99352-09.8 FACILITY Columbia Generating Station LOCATION USDOE Hanford Site wAo00511 001 PERMIT NUMBER DISCHARGE NUMBER MONITORING PERIOD YER MO IDAY I YER!
M DAYI FROM 12 03 01 1 TO1 12 I03 31 I
QUANTITY OR LOADING QUANTITY OR CONCENTRATION I NO. EX FREQUENCY SAMPLE TYPE PAIMTEI OF ANALYSIS AAVERAGE MAXIMUM 1 UNITS MINIMUM AVERAGE MAXIMUM I UNITS Recirculaling SAMPLE 1,6 2.0 0
Continuous N/A Cooling Water MEASUREMENT" MGD Blowdown Flow PERMIT 5.6 9.4 REQUIREMENT SAMPLE 8.0 8.5 0
Continuous" NIA pH MEASUREMENT pH PERMIT 6.5 9.0 REQUIREMENT I
I SAMPLE 24.2 30.1 Continuous N/A Temperature MEASUREMENT C
PERMIT REQUIREMENT SAMPLE 3.9 1
Grab Turbidity MEASUREMENT NTU PERMIT REQUIREMENT SAMPLE
!5 0.1 0Grab Total Residual MEASUREMENT mg0]
Halogen PERMIT
-.1 REQUIREMENTI SAMPLE NiA N/A Copper (Dec-Feb)
MEASUREMENT Pugf_
(Total PERMIT 70 108 Recoverable)
REQUIREMENT 1_8 1
1 NAME/TIT LE PRINCIPAL EXECUTIVE I 0es1y undler penary of law, trat this doajmew, and all arachrixenhs werze prepared TELEPHONE DATE OFFICER urner my directm ot suoervston n actordance witti a svsiem cd.sgned to assue" Lhat quabtiied personne predy gafheed and evalualeo 0ie inlormatioo sut*mii' aJ D.K. Atkinson Based on my inury tit the person oi persons who ranage *Ve system. or ti Vice Presideni. Employee persons dirmfl
,espor.&W kir ga",h ng i o, mmat
,n 1he,nfmow n submtled is.(
- 0) 3 74 0
/.-
to ihe besi ol my knoa ge and be.lel. true. accurate, and cowNiete. t am awe Development/Cosporale Services tht there ate
.fcnl p for subnihng Ialse m
- o.
actoinO the iossitly o1 te and lapr.asonment for knowmV vidOwtians TYPED OR PRINTED SIGNATURE OF PRINCIPAL EXECUTIVE AREA NUMBER YEAR MO DAY OFFICER OR AUTHORIZED AGENT CODE CO*AENTS AND EXPI ANATION OF ANY VIOLATIONS (,_,fnM, a'. a=rmm*ha5,'a V
f
'SampJed prion to discharge.
-No specific limits. monitoring requirement only. "" pH recorder out-of-service 02301 hrs to 1330 hJs on 3/4/12. Manual monitoring performed during thIs oeriod.
Form pattemed aftei EPA Form 3320-1 J03-99)
PAGE I OF 2
PERMITTEE NAMEIADDRESS
~
'~L~nWe~t NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
DISCHARGE MONITORING REPORT (DMR)
NAME Energy Northwest ADDRESS P.O. Box 968 Richland, WA 99352-0968 FACILITY Columbia Generating Station LOCATION USDOE Hanford Site WA-002515-1 001N PERMIT NUMBER DISCHARGE NUMBE R MONITORING PERIOD Y
MO DAY DAY I
FROM L 12 L.03.
01 TOI 12 1 -3 1 31I QUANTITY OR LOADING QUANTITY OR CONCENTRATJON NO. EX FREQUENCY SAMPLE TYPE PARAMETER OF ANALYSOS AVERAGE MAXIMUM UNITS MINIMUM AVERAGE MAXIMUM UNITS SAMPLE 9.9 0
Grab Copper (Mar-Nov)
MEASUREMENT jg/I (Total PERMIT 223 345 Recoverable)
REQUIREMENT SAMPLE
< 1.0 Grab Chromium MEASUREMENT pg/I (Tolai PERMIT RecoviarabIe)
REQUIREMENT SAMPLE 23 Grab Zinc MEASUREMENT
_g/I (Total PERMIT Recoverable)
REQUIREMENT SAMPLE MEASUREMENT PERMIT REQUIREMENT SAMPLE MEASUREMENT PERMIT REQUIREMENT SAMPLE MEASUREMENT PERMIT REQUIREMENT NAMET11LE PRINCIPAL EXECUTIVE I cemrify viu-r peraiiy of law, anat tf-is doalcent and all altac**umLs weae prepared
'TELEPHONE DATE OFFICER ulder my dIi,"eri or supervisiot, in accorda*nce,it?, a sysrem deswgnad to assure that qualaleV pe.'sonnel Poperly gmhwed and evaluatsd the information submitted D-K. Atkinson Basel On my Inquiry of thre person or persons who enanage Mne so' anr oz Ihose150)3742 Fersons dvrectiy reSponsible For gathering inbrmabon. the i*normation slabitted as Vice Presirt, Enipioyee
=t the msl of my kMrowledge and betiel trya. accwate. " cw.pelete. I am ar
()
377-4302
/
a
/
Development/Corporate Services btiat theire are significant penalties toz suowit'ng ialse informa*eoin. irzcir9 thL
- ossibitty of f*ne and tmpn.-sonrnan for k*,o,'nj violaLc.,s.
TYPED OR PRINTED fatoATtIRE OF PRINCIPA*EXECUTIVE AREA NUMBER YEAA MO DAY OFRICER OR AUTHORIZEJD AGENT CODE COCM&ANES AND EXPLANATION OF ANY VIOLATIONS liefano- -if azfw -n-hjrxs hurc.i KIDi SpeCoftC lrmits. munito~ing requirement only.
Form patterned after EPA Form 33211--1 (03-99)
PAGE 2 OF 2
ENERGY NORTHWEST Dale K. Atkinson Vice President, Employee Development/Corporate Services P.O. Box 968, Mail Drop PE03 Richland, WA 99352-0968 Ph. 509-377-4302 F. 509-377-4098 dkatkinson@energy-northiwest.com March 13, 2012 G02-12-036 EFSEC Manager Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, WA 98504-3172
Subject:
COLUMBIA GENERATING STATION NPDES DISCHARGE MONITORING REPORT
Reference:
NPDES Permit No. WA-002515-1, Condition S3.A In accordance with the referenced permit condition, the NPDES Discharge Monitoring Report (DMR) for February 2012 is enclosed. If you have any questions regarding this report, please contact BC Barfuss at (509) 377-4541.
Respectfully, DK Atkinson Vice President, Employee Development/Corporate Services Enclosure cc:
J. Ayres (WDOE)
J. La Spina (EFSEC)
PERMITTEE NAME/ADDRESS fhcwi cFay Name LOWcor.1, i t Walwet)
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
DISCHARGE MONITORING REPORT (DMR)
NAME Energy Northwest ADDRESS P.O. Box 968 Richland. WA 99352-0958 FACILITY Columbia Generating Station LOCATION USDOE Hanford Site WA-00251 5-1
)0 PEMINU"MJBER DICHRG UMBER MONITORING PERIOD YEAR M
DAY ER MO DAY FROM 2
02/
TO P12 02 29 QUANTITY OR LOA-DING QUANTITY OR CONCENTRATION NO. EX FREQUENCY SAMPLE TYPE PARAMETER OF ANALYSIS AVERAGE MAXIMUM UNITS MINIMUM AVERAGE MAXIMUM UNITS Recirculating SAMPLE 1.6 2.0 0
Continuous NIA Cooling Water MEASUREMENT MGD Blowdown Flow PERMIT 5.6 9.4 REQUOREMENT SAMPLE 8.1 8.4 0
ConfinuotJs N/A pH MEASUREMENT pH PERMIT 6.5 9.0 REQUIREMENT SAMPLE 23.2 31.8 Continu*uos NIA Temn perature MEASUREMENT C
PERMIT REQUIREMENT SAMPLE 3.9 1
Grab Turbidity MEASUREMENT NTU PERMIT REQUIREMENT SAMPLE
< 0.1 0
Grab Total Residual MEASUREMENT M__
Halogen-PERMIT 0.1 REQUIREMENT I
SAMPLE 10 0
1 Grab Copper (Tec-Feb)
MEASUREMENT P911 (Total PERMIT 70 108 Recoverable)
REQUIREMENT NAMEITOTLE PRINCIPAL EXECUTIVE I cerify under penalty of law, that thrs docunent and all a2*1*
eolne.s we prepared TELEPHONE DATE OFFICER under my direction or supemvs*ioin acordance wvAh a system desited to assure that quaLlfied personnel properly gathered and evaluated d-a inTlonaian stbunitted.
D.K. Atkinson Sased on my inquiy of the prsoan or persomr mio mariaee t, system., o" those Vice President, Ernployes
- per-ons direcUy esponsltue loa gatheri-g informiat,. 1he informmon subritted is.
(509) 377-4302 evcelopreidentl Erulea Sve o Via best ol my knowledge and belief. true. a=urate. and co*vA'e* ) am a-are
,/
(77.43.2 Developrenn!/Corprate Services th er are significant penalties for subnitting false inftmrnatio.
inmtuhdi
- e 1
TYPED OR PRIN'TED possibility of fine and impStG,4AT for k v'olatons.
SIGNATURE OF PRINCIPAL EXECUTIVE AREA NIJMR YA MO AY OFFICER OR AUTHORIZED AGENT COMMENTS AND EXPLANATION OF ANY VIOLATIONS fReterence -38 arrachmers rwer
'Sampled prior I disharge. ""No speti~c limils. moniloring requiremenIl ony.
Forin pallemed after EPA Fwm 3320-1 (03-99)
PAGE 1.OF?
PERMITTEE NAMEIADDRESS omim'cw Fook.y IName Ldoaion d tDceiom)
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
DISCHARGE MONITORING REPORT (OMR)
NAME Energy Northwest ADDRESS P.O. Box 968 Richland, WA 99352-0968 FACILITY Columbia Generating Station LOCATION USDOE Hanford Site WA00515-1 1
1 PERMTNUMBER DICHRGE NUMBER MONITORING PERIOD EARI MO DAY YEAR MO DAY FROMI 12 02
[
01 TO 12 02 29 QUANTITY OR LOADING QUANTITY OR CONCENTRATION NO. EX FREQUENCY SAMPLE TYPE PARAMETER OF ANALYSIS AVERAGE MAXIMUM UNITS MINIMUM AVERAGE MAXIMUM UNITS SAMPLE NWA NIA Copper (Mar-Nov)
MEASUREMENT (Total PERMIT 223 345 Recoverable)
REQUIREMENT SAMPLE
< 1.0 Grab Chromium MEASUREMENT tgI (Total PERMIT Recoverable)
REQUIREMENT SAMPLE 25 Grab Zinc MEASUREMENT (Total PERMIT Recoverable)
REQUIREMENT SAMPLE MEASUREMENT PERMfT REQUIREMENT SAMPLE MEASUREMENT PERMIT REQUIREMENT SAMPLE MEASUREMENT PERMIT REQUIREMENT__
NAMEITITLE PRINCIPAL EXECUTIVE I cerdly undei pe*iaity ot aw. fhat this document and all antachmen~s were pated TELEPHONE DATE OFFICER under my duection or supervison in accordance Wilh a system desigmed to assume ihat quWa!ied personnel property galhtered and evaluated 1lbe informalion stli'ntead D.K. Atkinson Based orn my inrutry of 1he 1peison or persons who manage te system. or Vice President, Employee ptrss dire"*5j dsp-,sibte for garLhe,'g innfntaof. the information s5DbmkedL.
tls.
(509) 377--4302 to the best of my knowledge and belief true. accurate, and complete. I am e
Development/Corporate Services nat ibere am significam penies t~r submitfing false informatio.
iwjuurivg Mie oslb'l.lilryo *! ne and imprisonnierfl for irnowing violati~ns.
TYPED OR PRINTED SIGNATURE OF PRINCPAL EXECUTIVE AREA I NUM*ER YEAR MO DAY OFFICER OR AUTHORIZED AGENT CODE COMMENTS AND EXPLANATION OF ANY VIOLATIONS ýReteraercez arractienust tee)
No specific limits, monitoring requirement only.
Fom pallemed after EPA Fonn 3320-1103-99)
PAGE 2 OF 2
ENERGY NORTHWEST Dale K, Atkinson Vice President, Employee Developmen¶/Corporate Service*
P.O. Box 968, Mail Drop PE03 Richand, WA 99352-0968 Ph. 509-3774302 F. 509-377-4098 dkalkinson@enesgy-northwesLtcom December 14, 2011 G02-11-198 EFSEC Manager Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, WA 98504-3172
Subject:
COLUMBIA GENERATING STATION NPDES DISCHARGE MONITORING REPORT
Reference:
NPDES Permit No, WA-002515-1, Condition S3.A In accordance with the referenced permit condition, the NPDES Discharge Monitoring Report (DMR) for November 2011 is enclosed. If you have any questions regarding this report, please contact BC Barfuss at (509) 377-4541.
Respectfully, DK Atkinson Vice President, Employee Development/Corporate Services Enclosure cc:
J. Ayres (WDOE)
J. La Spina (EFSEC)
PERMITTEE NAMEIADORESS Mntwde F~acif Name Location.1 vwffam.t)
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
DISCHARGE MONITORING REPORT JDMR)
NAME Energy Northwest ADDRESS P.O. Box 968 Richland, WA 99352-0968 FACILITY Columbia Generating Station LOCATION USDOE Hanford Site PERMIT NUMBER DISCHARGE NUMBER MONITORING PERIOD NEA-R I MO I DAY 1 1 YEARI MOI DAY FROM 11 L 111J01 ITO 11 1 11 1 30 QUANTJTY OR LOADING QUANTITY OR CONCENTRATION NO. EX FREQUIENCY SAMPLE TYPE PARAMETER OF ANALYSIS AVERAGE MAXIMUM UNITS MINIMUM AVERAGE MAXIMUM UNITS Recirculating SAMPLE 1.4 2.2 0
Continuous N/A Cooling Water MEASUREMENT MGD Blowdown Flow PERMIT 5.6 9.4 REQUIREMENT SAMPLE 8.1 8.6 0
Continruous W/A pH MEASUREMENT 9H PERMIT 6.5 9.0 REQUIREMENT,"
SAMPLE 24.5 32.0 Cominos NA Temperature MEASUREMENT
°C PERMIT REQUIREMENT SAMPLE 7.0 1
Grab Turbidity MEASUREMENT NTU PERMIT REQUIREMENT SAMPLE
!5<
0.1 0
G*rab*
Total Residual MEASUREMENT Mg/j Halogen PERMIT
-5 0.1 REQUIREMENT SAMPLE N/A NWA Copper (Dec-Feb)
MEASUREMENT
_g/l (Total PERMIT 70 108 REQUIREMENT Recoverable)
IE IEMN NAME/TITLE PRINCIPAL EXECUTIVE I certify under penally of law. that this docwment and all attarhments were pepaed TELEPHONE DATE OFFICER under ry direction or srpewision In awor.ianca with a system designed to assuie thal qualified persoinnel property gathered and evalaute- -he inromiaon ms'r-le D.K. Atkinson Based on my inquiry ol the person or persons who m3nage the system, or lhase Vice President, Employee persons dixectly responibte for unng. information. the infarmation o
s.ub*m1n*ld a
m
/
(509) 377-4302
,o Develpmen/Cororat Serices to the -best of "y knowledge and belief. vue. accurate, and cotmlilette, I am aware t
rossibilry af fine and epnaonrtens for ImowiN f
vioIations.
TYPED OR PRINTED SIGNATURE OF PRINCIPAL EXECUTIE AREA Y
Y OFFICER OR AUTHORIZED AGENT CODE COMMENTS AND EXPLANATION OF ANY VIOLATIONS fR rzmeart atramm In
-re)
- Sampled prior to discharge.
-No specific limits, monitoring requirement only.
Form patterned after EPA Form 3320-1103-99)
PAGE I OF 2
PERMITTEE NAMEIADDRESS (cdFacivamo atcnO
)
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
DISCHARGE MONITORING REPORT (DMR)
NAME Energy Northwest ADDRESS P.O. Box 968 Richland, WA 99352-0968 FACILITY Columbia Generating Station LOCATION USDOE Hanford Site WAN002515-1 001 PEM7NUMBER DSHRENUMBEdR MONITORING PERIOD YR MO DAY YEAR 4
DAY FROM J11 11 1 01 1TO 111 11 1 30 1
QUANTITY OR LOADING QUANTITY OR CONCENTRATION NO. EX FREQUENCY SAMPLE TYPE PARAMETER OF ANALYSIS AVERAGE MAXIMUM UNITS MINIMUM AVERAGE MAXJMUM UNITS SAMPLE 19 0
1 Grab Copper (Mar-Nov)
MEASUREMENT IPg/_
(Total PERMIT 223 345 Recoverable)
REQUIREMENT SAMPLE 1.4 Grab Chromium MEASUREMENT
_giI (Total PERMIT Recoverable)
REQUIREMENT SAMPLE 33 1
Grab Zinc MEASUREMENT I.
(Total PERMIT Recoverable)
REQUIREMENT SAMPLE MEASUREMENT PERMIT FRQUIREMENT SAMPLE MEASUREMENT PERMIT REQUIREMENT SAMPLE MEASUREMENT PERMIT REQUIREMENT NAMEITJTLE PRINCIPAL EXECUTIVE I certify urWer penalty o* law, that this docurnen* and all aflachments were p*epared TELEPHONE DATE OFFICER under my direction or supervision in accordance with a system designed lo assure that qualifted personnel pmWpemy gatered nari evaluated te information sub.i'tea.
D.K. Atkdnson Based on my inquiry of the person or persons wlo manage the system, or those Vice President. Employee persons directly respmosbfe for gaUthri*g inormatiork.the information submitted m.
(509) 377-4302 toti i L
to the best of my knorledge and belief. true. accuate. and complete. I am aware,.,
DevelopmentlCorporate Services that there are sIWj)tcant penalties for submritting false information. includdng the TYPED OR PRINTED S
Eand imprisonment foC hnv violfions, SIGNATURE OF PRINOPAL JEXECLrWE AREA NUMBER YEAR MO DAY OFRCER OR AUTHORIZED AGENT CODE COMMENTS AND EXPLANATION OF ANY VIOLATIONS (Rdenee a# arthnws here)
No specific limits. monitoring requirement only.
Form patterned after EPA Form 3320-1 (03-99)
PAGE 2 OF 2
ENERGY NORTHWEST Dale K. Alkirnno Vice President, Employee Development/Corporate SeMcea P.O. Box 968. Mail Drop PE03 Richland, WA 99352-0968 Ph. 509.377-4302 F. 509-377-4098 dkalkinson@energy-norlhwest.com January 11, 2012 G02-12-005 EFSEC Manager Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, WA 98504-3172
Subject:
COLUMBIA GENERATING STATION NPDES DISCHARGE MONITORING REPORT
Reference:
NPDES Permit No. WA-002515-1, Condition S3.A In accordance with the referenced permit condition, the NPDES Discharge Monitoring Report (DMR) for December 2011 is enclosed. If you have any questions regarding this report, please contact BC Barfuss at (509) 377-4541.
Respectfully, DK Atkinson Vice President, Employee Development/Corporate Services Enclosure cc:
J. Ayres (WDOE)
J. La Spina (EFSEC)
PERMITTEE NAMEIADDRESS (t,*vFacNy*e.*
ora, b toaoent)
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
DISCHARGE MONrTORING REPORT (DMR)
NAME Energy Northwest ADDRESS P.O. Box 968 Richland. WA 99352-0968 FACILITY Columbia Generating Station LOCATION USODE Hanford Site PERMIT NUMBER DISCHARGE NUMBER MONITORING PERIOD YEAR MO DAY YEAR MO DAY FROM 11 12 J 01 TO1 11 I12 L31 QUANTITY OR LOADING QUANTITY OR CONCENTRATION NO. EX FREQUENCY SAMPLE TYPE PARAMETER OF ANALYSIS AVERAGE MAXIMUM UNITS MINIMUM AVERAGE MAXIMUM UNITS Recirculating SAMPLE 1.4 2.0 0
Continuous N/A Cooling Water MEASUREMENT MGD Blowdown Flow PERMIT 5.6 9.4
,_,REQUIREMENT SAMPLE 8.1 8.5 0
Continuous W/A pH MEASUREMENT pH PERMIT 6.5 9.0 REQUIREMENT SAMPLE 23.7 33.7 Continuous N/A Temperature MEASUREMENT
_C PERMIT REQUIREMENT' SAMPLE 3.3 Grab Turbidity MEASUREMENT NTU PERMIT REQUIREMENT SAMPLE
< 0.1 0
Grab Total Residual MEASUREMENT
__mg/I Halogen PERMIRT
_0.1 REQUJIRtMENT SAMPLE 14 0
1 Grab Copper (Dec-Feb)
MEASUREMENT ug (Total PERMIT 70 108 Recoverable)
REQIJIREME.NT 7
NAME!TITLE. PRINCIPAL EXECUT1VE I rE" unde par-,itY of law, that 'Is dccument and a0 attachments were prepared TELEPHONE DATE OFFICER under my dtrecbon or supe 5031 in accodance with a system designed to assure that
- ,a_5.d paWsonr*t properly gathered aMl evalualed the nformation submitted.
D.K. Atldnson Based on my -inquiry o1 the person or persons who manage the system, of 07ose Vice President, Employee person direcily cesporItibe for gathern infmation, the infomralion submi ed t509) 377-4302
.:- oi to ate besl of ra knowledge and Wtef. true. accurate. and conplet I am eOve
.*509)
Developm ent/Corporate Services
&at I are am &V ca n pena is for sub mitng false inforrmato. m d
The
'the TYPED OR PRINTED SGNATURE OF PRINCOPAL EXECUr1VE AREA NUMBER YEAR MO DAY OFFICER OR AUTHORIZED AGENT CODE COMMENTS AND EXPLANATION OF ANY VaLATIONS jRerceie va afacturineshe tre)
- Sampled prior to dischwge.
" No specific mirns.
monitortIng requiremenl only.
Form patterned after EPA F.orm 3320-1 (03-99)
PAGE 1 OF 2
PERMIUTEE NAMEIADDRESS 1w acylanLoturUDIYWS NATIONAL POLLUTANT DOSCHARGE ELIMINATION SYSTEM (NPDES)
DISCHARGE MONITORING REPORT (DMR)
NAME Energy Northwest ADDRESS P.O. Box 968 Richland. WA 99352-0968 FACOLITY Columbia Generating Station LOCATION USDOE Hanford Site I
WA002515-1 00i PERMIT NUMBER DISCHARGE NUMBER MONITORING PERIOD YEAR MO DAY YEAR MO DAY FROM 11 12 01 1 TO 11 12 J31 QUANTITY OR LOADING QUANTITY OR CONCENTRATION NO. EX FREQUENCY SAMPLE TYPE PARAMETER OF ANALYSIS AVERAGE MAXIMUM UNITS MINIMUM AVERAGE MAXIMUM UNITS SAMPLE NIA N/A Copper (Mar-Nov)
MEASUREMENT
_ig_
(Total PERMIT 223 345 Recoverable)
REQUIREMENT SAMPLE
<1.0 Grab C'hrwmurn MEASUREMENT Ig.
(Total PERMIT Recoverable)
REQUIREMENT SAMPLE 29 1
Grab Zinc MEASUREMENT p-/
(Total PERMIT Recoverable)
REQUIREMENT SAMPLE MEASUREMENT PERMIT REQUIREMENT SAMPLE MEASUREMENT PERMIT REQUIREMENT SAMPLE MEASUREMENT PERMIT REQUIREMENT NAMEfTITLE PRINCIPAL EXECUTIVE I certify under penaly of Caw, ihat tis document and all attachments were prepared TELEPHONE DATE OFFICER under my direclion or supeivisian in amordance wth a system destgnd to assure that qualified personnel properly gathered and evaluated the information submitted.
D.K. Atkinson Based on my inquiry of the person or persons vAi manage the system, or those pe-sons directly responsible for galhering inforstion, the kiformation submitted is, (509) 377-4302 Z r -
V"ce President. Employee to the best of my krruMedge and belief, true. accurate, and cornple4e. I am aware DevelopmenrtCorporate Services that there are significant pernaies for sutbinftwi false idormation. inctduing the s~bby ofline and kbiprisomener* for knovitng violations.
TYPED OR PRINTED SIGNATURE OF PRINCPAL EXECUTIVE AREA NUMBER YEAR MD DAY OFFICER OR AUTHORIZED AGENT CODE COMENTS AND EXPLANATION OF ANY VIOLATIONS lRetwmnce a lncltweinls ir&e;
"" No spedfic WlIms.
monitoring requirement only.
Foan pattemed after EPA Form 3320-1 (03-99)
PAGE 2 OF 2