MONTHYEARML24296B1852024-10-16016 October 2024 NRR E-mail Capture - Final - Request for Additional Information - Columbia - Relief Request for Fourth Ten-Year Interval Inservice Testing - EPID: L-2024-LLR-0039 ML24291A1072024-10-16016 October 2024 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia Generating Station - Application to Revise TS to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements - EPID L-2024-LLA-0132 ML24215A3672024-08-0101 August 2024 NRR E-mail Capture - Final Request for Additional Information - Columbia Generating Station - License Amendment Request to Revise Emergency Plan - EPID L-2024-LLA-0011 ML24183A2392024-07-0101 July 2024 NRR E-mail Capture - LIC-109 Acceptance - Columbia Generating Station - Relief Request for the Fourth Ten-Year Interval Inservice Testing - EPID L-2024-LLR-0039 ML24169A0402024-06-14014 June 2024 NRR E-mail Capture - Final Request for Additional Information - Columbia Generating Station (Columbia) - Relief Requests for the Fifth Ten-Year Interval Inservice Testing - EPIDs (L-2024-LLR-007 Through 0013) ML24103A2022024-04-0909 April 2024 EN 57068 - Transco Products Inc Part 21 Initial Notification of Unverified Critical Characteristics of Darmatt KM-1 Flat Board ML24060A1022024-02-28028 February 2024 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2023 Biological Monitoring Report ML24053A0092024-02-21021 February 2024 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of Relief Requests for the Fifth Ten-Year Interval Inservice Testing - EPIDs L-2024-LLR-0007 Through 00013 ML24008A0022024-01-0505 January 2024 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of License Amendment Request for Application to Revise TS to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation - EPID L-2023-LLA-0170 ML23278A0042023-10-0404 October 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia - Application to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling - EPID L-2023-LLA-0128 ML23275A0092023-09-29029 September 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia - Application to Revise Tech Specs to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling - EPID: L-2023-LLA-0128 ML23150A2502023-05-26026 May 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia Generating Station - License Amendment Request to Clean-Up Operating License and Appendix a, Technical Specifications - EPID L-2023-LLA-0062 ML23124A2412023-05-0404 May 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia - Application to Revise TS to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position - EPID L-2023-LLA-0063 ML23124A0062023-05-0303 May 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia Generating Station - Application to Revise Tech Specs to Adopt TSTF-541, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling - EPID L-2023-LLA-0063 ML23065A0422023-02-23023 February 2023 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2022 Biological Monitoring Report ML22343A1802022-12-0808 December 2022 February 2023 Emergency Preparedness Program Inspection - Request for Information ML22349A2002022-12-0101 December 2022 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2022 Priority Pollutant Discharge Monitoring Report ML22312A0042022-11-0707 November 2022 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of Fourth 10 Year ISI RR 4ISI-11 - EPID L-2022-LLR-0071 ML22301A1432022-10-28028 October 2022 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Adopt TSTF-505 - EPID L-2022-LLA-0023 ML22256A2002022-09-13013 September 2022 NRR E-mail Capture - Draft - Additional Audit Question - Columbia Generating Station - Regulatory Audit Question for LAR to Revise TS to Adopt TSTF-505, Revision 2 ML22241A0182022-08-26026 August 2022 NRR E-mail Capture - Draft - Additional Audit Question - Columbia Generating Station - Regulatory Audit Question for LAR to Revise TS to Adopt TSTF-505, Revision 2 ML22235A1052022-08-22022 August 2022 August 2022 Emergency Preparedness Exercise Inspection Request for Information ML22210A0072022-07-28028 July 2022 NRR E-mail Capture - Draft - Additional Audit Question - Columbia Generating Station - Regulatory Audit Question for LAR to Revise TS to Adopt TSTF-505, Revision 2 ML22173A0682022-06-17017 June 2022 Email Concurrence on SE Input for Columbia Pltr LAR ML22166A4122022-06-15015 June 2022 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia Generating Station - Application to Revise TS to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling - EPID L-2022-LLA-0081 ML22144A0342022-05-18018 May 2022 NRR E-mail Capture - Draft - Request for Additional Information - Columbia Generating Station - LAR to Change TS 3.4.11 - Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 ML22075A3392022-03-15015 March 2022 NRR E-mail Capture - Columbia Generating Station - Audit Questions - Regulatory Audit of License Amendment Request to Adopt 50.69 - Categorization Process - EPID L-2021-LLA-0207 ML22067A0132022-03-0707 March 2022 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of License Amendment Request to Adopt TSTF-505, Revision 2, Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4b - EPID L-2022-LLA-0023 A002515, NRR E-mail Capture - (External Sender) Energy Northwest Columbia Generating Station 2021 Priority Pollutant Discharge Monitoring Report2022-01-12012 January 2022 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2021 Priority Pollutant Discharge Monitoring Report ML21348A1852021-12-14014 December 2021 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia - License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors - EPID L-2021-LLA-0207 ML21335A0182021-11-30030 November 2021 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of Requested Licensing Action - License Amendment Request to Change TS 3.4.11 Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 ML21216A0502021-08-0303 August 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia - License Amendment Request to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO EPID L-2021-LLA-0259 ML21209A9792021-07-28028 July 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) - EPID L-2021-LLA-0074 ML21162A3062021-06-11011 June 2021 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia Generating Station - License Amendment Request to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement - EPID L-2021-LLA-0084 ML21137A0012021-05-14014 May 2021 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia Generating Station - License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) - EPID L-2021-LLA-0074 ML21120A1182021-04-30030 April 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - On-Site Cooling System Sediment Disposal Approval Request - EPID L-2020-LLL-0031 ML21109A2762021-04-0808 April 2021 Email Request for Information for Columbia Generating Station'S PIR Inspection_Redacted ML21068A2842021-03-0404 March 2021 2021002 Inservice Inspection (ISI) Request for Information (RFI) ML21036A2932021-02-0404 February 2021 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2020 Biological Monitoring Report ML20357B1502020-12-22022 December 2020 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia - License Amendment Request - Adoption of TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Rev. 2 - EPID L-2020-LLA-0259 ML20336A1852020-11-30030 November 2020 NRR E-mail Capture - Final - RAI - Columbia - One -Time Exemption from 10 CFR 73, App B, Sect VI, Subsection C.3.(l)(1) Regarding Annual Force-On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20325A0402020-11-19019 November 2020 NRR E-mail Capture - Draft - RAI - Columbia - One -Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force -On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20314A0452020-11-0606 November 2020 NMFS to Energy Northwest, Entrainment Study Results for Columbia Generating Station ML20297A3032020-10-22022 October 2020 NRR E-mail Capture - LIC-109 Acceptance Review of License Amendment Request for Columbia - Application to Revise Tech Specs to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements - EPID L-2020-LLA-0212 ML20267A5162020-09-23023 September 2020 NRR E-mail Capture - Columbia Generating Station - Final - Request for Additional Information - Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISI-09 - EPID L-2020-LLR-0068 ML20265A3242020-09-20020 September 2020 Email 9-20-2020 - Req_ Kick-Off Call Columbia Generating Station RFI Provided for Roll-Back EP Program Inspection (Week of Nov 2 2020) ML20245E2822020-08-31031 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20239A9702020-08-26026 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20149K4362020-05-26026 May 2020 NRR E-mail Capture - Formal RAIs for Columbia (COVID-19) QA Plan Change Surveillance, Request Response by Tuesday June 2, 2020 ML20136A0112020-05-14014 May 2020 NRR E-mail Capture - Acceptance Columbia Relief Request ISI Reactor Pressure Vessel Feedwater Nozzles, 4ISI-09 2024-08-01
[Table view] |
Text
Patti Craver, Craver, Patti From: Logan, Dennis ,
Sent: Monday, February 13, 2012 8:10 AM To: Krieg, Rebekah
Subject:
FW: Columbia Generating Station Additional Information Request Attachments: Feb 2012 additional Info request - Columbia Generating Station (2).docx Good morning Becky, I thought I would pass this along for your information. Some of what they want we've already given them, and they recognize that. I'll get back to you if we need anything.
Dennis Original Message -----
From: Doyle, Daniel Sent: Saturday, February 11, 2012 4:44 PM To: Logan, Dennis; Balsam, Briana; Wrona, David; Imboden, Andy
Subject:
FW: Columbia Generating Station Additional Information Request I just received this from NMFS for the Columbia review.
Dan From: Richard Domingue [richard.domingue@noaa.gov]
Sent: Friday, February 10, 2012 8:35 PM To: Doyle, Daniel
Subject:
Columbia Generating Station Additional Information Request Dan, As per our previous discussion, attached is an additional information request for information needed for the relicensing of CGS. Please feel free to contact me with any questions.
Richard Domingue 503-231-6858
February 10, 2012 To: Dan Doyle, Nuclear Regulatory Commission From: Rich Domingue, National Marine Fisheries Service RE: Additional Information Request regarding license renewal of The Columbia Generating Station Consultation No. F/NWR/2011/05286.
We have identified two aspects of the Columbia Generating Station configuration and operations as presented in Supplement 47 of the Generic EIS for License Renewal of Nuclear Plants, Regarding the Columbia Generating Station that have a potential to adversely affect fish species listed under the ESA, or covered under the Magnuson Stevens Act: the cooling system make-up water intake, and effluent outfall 001. At present insufficient information is available to NMFS to evaluate these potential adverse effects. We request the following information.
- 1. Copies of impingement and/or entrainment studies conducted on the existing intake screens. Your letter of December 20, 2011 refers to two entrainment studies that have been conducted on the existing intakes conducted in 1979-1980 and 1985 as providing evidence that the existing screens are not likely to adversely affect ESA-listed fish species. Please provide copies of these studies, including methods and results for our consideration.
- 2. A complete intake screen design report. NMFS has developed a fish screen design summary form that provides information pertinent to evaluating the likely effectiveness of water intake screens to avoid or minimize take of listed species (attached). Please complete the attached screen design summary form except those areas we have identified as not applicable (N/A). Some of the requested information is available in the Draft EIS you have provided. However, we need all of the information requested and placing all pertinent information in the summary format would assist our timely review.
- 3. While the 001 outfall discharges a small amount of water, its physical and chemical characteristics are not well defined and could adversely affect individual fish passing in the immediate vicinity of the outfall. Because the condenser tubing has been replaced, effluent data from the period prior to this replacement does not accurately represent the characteristics of this waste stream. NMFS expects that effluent conditions have improved since this upgrade. Please provide water quality characteristics for this outfall collected pursuant to NPDES permit WA0025151-1 summarized on a quarterly basis (seasonal) over a period of at least one year.
NRC should estimate the potential effects of this discharge on Upper Columbia River spring Chinook salmon and steelhead and Upper Columbia River summer/fall Chinook salmon and Columbia River coho (for which essential fish habitat has been designated under the Magnuson-Stevens Act). Both direct effects (e.g. toxicity to salmonids) and indirect effects (e.g. in the event that discharged effluent is warmer than the Columbia River, a potential would exist for additional predation by introduced warm water fishes that may be attracted to and enhanced by the warmer water provided by the outfall) should be considered. The potential for adverse effects varies by season and NRC should address potential adverse effects on each inland life stage and pay particular attention to fry and juvenile life stages as these life stages are most susceptible to adverse water quality conditions. Your draft EIS cites thermal drift studies that were conducted in 1985 (WPPSS 1986) as evidence that heated effluent from the cooling system does not adversely affect anadromous fish that may encounter the waste plume. Although we anticipate that the current effluent characteristics are not the same as those prior to the condenser tubing replacement, please provide a copy of this study for our consideration.
Juvenile Fish Screen Design Summary Provided by: Date:
Contact information:
I. Description of site including name of diverted stream, type of diversion, type of headgate, metering device, site name.
II.Water Surface Elevation (WSE) Data. Generally indicate method used to determine and estimate flows and elevations. Elevations can be relative to local benchmark, and period of record should be limited to the downstream juvenile migration season.
- 1. River WSE and streamflow near site of bypass return (open channel diversions only) NA
- a. 5% exceedence flow = CFS, WSE =
- b. 95% exceedence flow = CFS, WSE =
- 2. River WSE and streamflow at point of diversion
- a. 5% exceedence flow = CFS, WSE =
- b. 95% exceedence flow = CFS, WSE =
- 3. Diverted flow and associated WSE on the screen
- a. Maximum diversion = CFS, WSE =
- b. Normal diversion = CFS, WSE =
- c. Minimum diversion = CFS, WSE =
III. Screen structure
- 1. Type of screen (rotary drum, fixed vertical, etc.): Attach detailed drawing of screen, including dimensions, mesh, seals
- 2. Angle of screen relative to ditch flow: NA
- 3. Screen cleaning mechanism (drum rotation, backspray, brushes etc.):
- 4. Screen cleaner powered by (electric motor, paddlewheel, hydraulic motor etc.):
- 5. Minimum submerged screen area:
- 6. Length of screen:
- 7. Bottom and top elevation of flow area of the screen:
- 8. Screen diameter (drum or cylindrical screens): NA
- 9. For pump intake screens, list brand, model, cleaning mechanism:
- 10. Describe inspection, operations and maintenance program.
IV. Recommended bypass return pipe (if applicable) NA - (probably)
- 1. Pipe diameter =
- 2. Length required (to preferred outfall site) =
- 3. Pipe slope (rise/run) =
- 4. Bypass flow and flow control device (weir length or orifice size):
- 5. Outfall type (submerged, free-fall, open channel):
- 6. Approximate river velocity at outfall =
- 7. Minimum outfall depth =
- 8. Ditch invert elevation =
V. Other site characteristics and constraints (examples: fish species/life stage present, access problems, stream characteristics at bypass outfall site, construction site problems, excessive cut/fill, land owner problems, irrigation season, river flow, construction window, ice jam problems, sedimentation potential, winter operation required for stock water, consolidation potential, irrigation methods that impact indicated water surface elevations, screen location constraints, road/bridge construction required, excessive or unusual debris load etc.). Indicate method of coping with constraints.
VI. Site sketch. Include screen location, river geometry near screen site.
VII. Ditch cross sections (if applicable). Include invert elevations relative to benchmark, distance between cross-sections, and water surface elevation. NA