ML13252A128

From kanterella
Jump to navigation Jump to search
Notification of Nrc Initial Operator Licensing Examination 05000368-14-301
ML13252A128
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 09/06/2013
From: Vincent Gaddy
Operations Branch IV
To: Jeremy G. Browning
Entergy Operations
References
50-368/14-301
Download: ML13252A128 (3)


See also: IR 05000368/2014301

Text

UNITE D S TATE S

NUC LEAR RE GULATOR Y C OMMI S SI ON

R E G IO N I V

1600 EAST LAMAR BLVD

AR L I NGTON , TEXAS 7 601 1- 4511

September 6, 2013

Jeremy Browning, Site Vice President

Arkansas Nuclear One

Entergy Operations, Inc.

1448 SR 333

Russellville, AR 72802-0967

SUBJECT: ARKANSAS NUCLEAR ONE - NOTIFICATION OF NRC INITIAL OPERATOR

LICENSING EXAMINATION 05000368/2014301

Dear Mr. Browning:

In a telephone conversation on August 22, 2013, between Mr. Clay Simpson, Superintendent,

Operations Training, and Mr. Brian Larson, Chief Examiner, arrangements were made for the

administration of licensing examinations at Arkansas Nuclear One, Unit 2, during the week of

February 10, 2014.

As agreed during the telephone conversation, your staff will prepare the examination based on

the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power

Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for

Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will

discuss with your staff any changes that might be necessary before the examinations are

administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by November 11 2013. The examination and supporting reference materials identified

in Attachment 3 to ES-201 will be due by December 16, 2013. Pursuant to Title 10, Section

55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outlines and examination before they are

submitted to the NRC for review and approval. All materials shall be complete and ready-to-

use. We request that any personal, proprietary, sensitive unclassified, or safeguards

information in your response be contained in a separate enclosure and appropriately marked.

Any delay in receiving the required examination and supporting reference materials, or the

submittal of inadequate or incomplete materials, may cause the examination to be rescheduled.

In addition, your support for on-site validation of the examination is required during the week of

January 13, 2014.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402 and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

J. Browning -2-

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examination is being administered.

To permit timely NRC review and evaluation, your staff should submit the preliminary senior

operator license applications (Office of Management and Budget (OMB) approval number 3150-

0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if

any)(OMB approval number 3150-0090) at least 30 days before the first examination date. If

the applications are not received at least 30 days before the examination date, a postponement

may be necessary. Signed applications certifying that all training has been completed should

be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for

this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time

for reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments regarding this burden estimate or any

other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail to

INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRCs Public Document Room or from the

Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access

and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room

page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Simpson has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRCs

examination procedures and guidelines, please contact Mr. Larson at 817-200-1172, or myself

at 817-200-1159.

Sincerely,

/RA/

Vincent Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-368

License: NPF-6

cc: Electronic Distribution for Arkansas Nuclear One

ML13252A128

SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials BTL

Publicly Avail Yes No Sensitive Yes No Sens. Type Initials BTL

SOE:OB C:OB

BLarson VGaddy

/RA/ /RA/

9/6/2013 9/6/2013