PNP 2013-068, Completion of Commitment for NRC Meeting Concerning Generic Safety Issue-191

From kanterella
(Redirected from ML13247A697)
Jump to navigation Jump to search

Completion of Commitment for NRC Meeting Concerning Generic Safety Issue-191
ML13247A697
Person / Time
Site: Palisades 
(DPR-020)
Issue date: 09/04/2013
From: Vitale A
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PNP 2013-068, GSI-191
Download: ML13247A697 (2)


Text

Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant

..lrter 27780 Blue Star Memorial Highway Covert, Ml 49043-9530 Tel 269 764 2000 Anthony J. Vitale Site Vice President PNP 2013-068 September 4, 2013 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Completion of Commitment for NRC Meeting Concerning Generic Safety lssue-191 Palisades Nuclear Plant Docket 50-255 License No. DPR-20

Reference:

Entergy Nuclear Operations, Inc. letter, PNP 2013-041, Generic Safety Issue-I 91 Closure Option, dated May 15, 2013 (ADAMS Accession No. ML13136A006)

Dear Sir or Madam:

In the referenced letter, Entergy Nuclear Operations, Inc. (ENO) selected a closure option for Palisades Nuclear Plant for resolving Generic Safety Issue (GSI) 191. of the referenced letter contained a list of commitments concerning GSI-1 91. The first commitment in the list required that a meeting be conducted with the Nuclear Regulatory Commission (NRC), as soon as practical after May 16, 2013, to discuss the proposed resolution path for GSI-I91. This commitment had a completion date of September 1, 2013.

ENO has completed this commitment. On August 22, 2013, ENO participated in a conference call with the NRC to discuss the proposed closure option for resolving GSI-1 91. During the conference call, the NRC agreed that the commitment could be closed based on this conference call. Therefore, the commitment to have a meeting with the NRC to discuss the proposed GSI-I 91 resolution path by September I, 2013 is considered to be completed based on the conference call, as documented by this letter.

PNP 2013-068 Page 2 Summary of Commitments This letter contains no new commitments. This letter completes the following commitment:

ENO will meet with the NRC, as soon as practical after May 16, 2013, to discuss this proposed resolution path.

This was a one-time action, with a scheduled completion date of September 1, 2013.

I declare under penalty of perjury that the foregoing is true and correct. Executed on September 4, 2013.

Sincerely, a;24 L,tA cc:

Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC