ML13240A004

From kanterella
Jump to navigation Jump to search
Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 14
ML13240A004
Person / Time
Site: Byron  Constellation icon.png
Issue date: 08/20/2013
From: Kearney F
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
1.10.0101, 2013-0111, 3C.107
Download: ML13240A004 (3)


Text

Ad m . Byron Generating Station ANN W -4450 North German Church Road EBeron. Generatio n r to xlnG www.exelon)icorp.com SAFEGUARDS INFORMATION August 20, 2013 Byron Ltr: 2013-0111 10 CFR 50.54(p) (2)

File: 1.10.0101 10 CFR 50.4(b)(4)

SRRS: 3C.107 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454, STN 50-455 and 72-68

Subject:

Byron Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 14 /

In accordance with 10 CFR 50.54, "Conditions of licenses," paragraph (p)(2), Exelon Generation Company, LLC (EGC) is submitting Revision 14 to the Byron Station Security Plan. Changes to this .r document were implemented on August 16, 2013. In accordance with 10 CFR 50.54(p)(2), EGC is submitting these changes within 60 days of implementation.

.The Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan has been revised to:

1. Add additional information in regards to Early Warning System detection.

EGC has concluded that the changes dd not decrease the safeguards effectiveness of the Byron Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan.

Attachments 1 and 2 contain Safeguards Information. Therefore, EGC requests that this information be withheld from public disclosure in accordance with 1O'CFR 2.390, "Public inspections, exemptions, requests for withholding," paragraph (d)(1), and 10 CFR 73.22, "Protection of Safeguards Information: Specific Requirements," paragraph (a)(1)(i).

ATTACHMENTS 1 AND 2 CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED 0c)A

SAFEGUARDS INFORMATION August 20, 2013 Byron Ltr: 2013-0111 U.S. Nuclear Regulatory Commission Page 2 There are no commitments in this letter.

Should you have any questions concerning this letter, please contact Mr. Brian Askren at (815) 406-2900.

Respectfully, Faber A-/re~

Site Vice President Byron Station FAK/CLT/LZ/sg Attachments:

1. Byron Station, Description of Changes (Contains Safeguards Information)
2. Byron Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 14 (Contains Safeguards Information) cc: Regional Administrator - NRC Region III

bcc: NRC Project Manager, NRR - Byron Station (without attachments)

Site Vice President - Byron Station (without attachments)

Regulatory Assurance Manager - Byron Station (without attachments)

Director - Licensing and Regulatory Affairs - West (without attachments)

Licensing Engineer - West (without attachments)

Illinois Emergency Management Agency - Division of Nuclear Safety (without attachments)

Exelon Document Control Desk - Licensing (hard copy)

Commitment Tracking Coordinator -- West - L. Zurawski C. Kelley - (Cantera) (without attachments)

Byron Site Security Director (without attachments)

/

/

/