E-mail from K Yale to P Longmire EA for Brp (DPR-6) in Consideration of an Exemption Request (Docket No. 72-43)
ML13238A109
Person / Time
Site: Big Rock Point  File:Consumers Energy icon.png
Issue date: 08/23/2013
From: Yale K
State of MI, Dept of Environmental Quality
To: Pamela Longmire
NRC/NMSS/SFST
Longmire P
References
Download: ML13238A109 (2)


Text

From: Yale, Ken (DEQ) [1]

Sent: Friday, August 23, 2013 9:40 AM To: Longmire, Pamela Cc: Keyes, Jennifer (DEQ)

Subject:

RE: EA for BRP (DPR-6) in consideration of an exemption request

Dear Ms. Longmire,

The State of Michigan has reviewed the environmental assessment (EA) and concurs with the USNRC assessment of no significant impact. Therefore, the State of Michigan supports the USNRC decision to grant the exemption request.

If you have any questions, please feel free to contact me.

Sincerely, Ken

      • AS OF AUGUST 12th MY PHONE NUMBER IS 517-930-5784 ***

Ken Yale Chief, Radiological Protection Section Office of Waste Management and Radiological Protection Michigan Dept. of Environmental Quality Constitution Hall, Lower Level North 525 West Allegan PO Box 30241, Lansing, MI 48909-7741 Telephone: 517-930-5784 Fax: 517-373-4797 email: yalek@michigan.gov Website: www.michigan.gov/deq From: Longmire, Pamela [2]

Sent: Thursday, August 22, 2013 3:49 PM To: Yale, Ken (DEQ)

Subject:

EA for BRP (DPR-6) in consideration of an exemption request Dear Mr. Yale -

Thank you for taking my call this afternoon. Per our conversation, please find attached the draft

environmental assessment (EA) and finding of no significant impact (FONSI) for the Big Rock Point (BRP) Independent Spent Fuel Storage Installation (ISFSI).

The EA was performed to evaluate the environmental impacts of the proposed exemption request submitted by Entergy Nuclear Operations (ENO) for the BRP ISFSI. ENO submitted the exemption request by letter dated June 20, 2012. ENO requested exemption from specific portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E.

Based upon the analysis contained in this EA, the staff concludes that the proposed action will not have a significant impact on the quality of the human environment. Accordingly, the staff has determined that preparation of an environmental impact statement is not warranted. This conclusion will be documented in the Federal Register as required by 10 CFR 51.35.

License No.: DPR-6 Docket No.: 50-155 and 72-43

Attachment:

Environment Assessment Pamela Longmire, Ph.D.

Project Manager NRC/NMSS/SFST/LB U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 14A44M Rockville, Maryland 20852 Phone No.: 301.287.0829 Fax No.: 301.287.9341 E-mail: Pamela.Longmire@nrc.gov