Text


~~~~~~~~~~~~---

2013 DAVIS-BESSE NUCLEAR POWER STATION INITIAL LICENSE EXAMINATION MISCELLANEOUS CORRESPONDENCE

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532-4352 December 21, 2012

  • Mr. Raymond Lieb Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION

Dear Mr. Lieb:

In a telephone conversation on December 18, 2012, between Mr. M. Klein, Lead Exam Author, and Mr. M. Bielby, NRC Lead Examiner, arrangements were made for the administration of licensing examinations at the Davis-Besse Nuclear Power Station during the weeks of June 3 and 10, 2013. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of May 13, 2013.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by March 18, 2013. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by April 15, 2013. Pursuant to Title 10 of the Code of Federal Regulations (CFR), Section 55.40(b)(3), (10 CFR 55.40(b)(3)),

an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

R.Lieb Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests.(if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the PapeiWork Reduction Act of 1995 (44 U.S. C. 3501 et seq.). These information collections were approved by the OMB approval number 3150-0018. The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information.

Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Klein has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact M. Bielby at 630-829-9762 or me at 630-829-9707.

Sincerely,

~/f,/U~ (G~

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via ListServ'

R. Lieb Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the OMB approval number 3150-0018. The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Klein has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact M. Bielby at 630-829-9762 or me at 630-829-9707.

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via ListServ' DISTRIBUTION:

See next page DOCUMENT NAME: Ltr 12xx12 Davis-Besse Confirmation of Initial License Exam.docx t8l Publicly Available D Non-Publicly Available D Sensitive t8l Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No co OFFICE Rill Rill NAME DATE

Letter to Mr. Raymond Lieb from Mr. Hironori Peterson dated December 21, 2012.

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION DISTRIBUTION:

Cayetano Santos RidsNrrDoriLp13-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirslrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Tammy Tomczak John McHale, NRR Janet Kweiser, DRS

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 1, 2011 Mr. Barry Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760

SUBJECT:

CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:

DAVIS-BESSE NUCLEAR STATION

Dear Mr. Allen:

We have received your letter L-10-213. In that letter, you stated the initial operator licensing examinations were previously scheduled for December 2, 2013, and December?, 2015.

We have since received your letter L-11-126 requesting the December 2013 exam be canceled, and the 2013 exam be moved to the weeks of June 3 and 10, 2013, with an onsite validation date of May 13, 2013. Our schedule now reflects this change. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for each of these examinations, the examinations were each scheduled for two weeks. Please inform us if the number of candidates decline below ten for any examination as this will impact the examination schedule. Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.

A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program.

B. Allen In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA by D. McNeil for Hironor'i Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via ListServ

B. Allen In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA by D. McNeil for Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via ListServ DISTRIBUTION:

RidsNrrDorllpl3-2 Resource Daniel Merzke RidsNrrPMDavisBesse Resource RidsNrrDirslrib Resource Steven West Steven Orth Jared Heck Allan Barker Carole Ariana Linda Linn DRPIII DRS III Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\OL Exam Confirmation Letters\DAV 060111 DRS OL Exam Confirmation.docx D Publicly Available D Non-Publicly Available D Sensitive D Non-Sensitive To receive a copy of this document, Indicate In the concurrence box "C" =Copy without attachlencl "E" =Copy with attach/encl "N" =No copy OFFICE Rill I Rill I I I NAME RKWalton:co HPeterson DM for DATE 0519/ /2010 06/01/2010 OFFICIAL RECORD COPY

Kweiser, Janet From: Olteanu, Carmen Sent: Monday, June 13, 2011 3:28 PM To: RidsNrrDorllpl3-2 Resource; Merzke, Daniel; RidsNrrPMDavisBesse Resource; RidsNrrDirslrib Resource; West, Steven; Orth, Steven; Heck, Jared; Barker, Allan; Ariano, Carole; Linn, Linda; DRPIII; DRSIII; Buckley, Patricia; Tomczak, Tammy

Subject:

Davis-Besse Letter Re Confirmation of Initial Operator License Examinations Attachments: DAV 060111 DRS OL Exam Confirmation.docx The subject document has been completed and has been submitted to DPC to be declared in ADAMS. A Word copy of the document has been attached and the document has been assigned Accession

  1. ML11157A118.

1

FENOC RrstEnergy Nuclear Operating Company 5501 North State Route.?

Oak Harbor, Ohio 43*149 Bsny S. Allen 419-321-7676 Vice President- Nuclear Fax: 419-321-7582 August 6, 2010 L-10-213 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Response to Regulatory Issue Summary 2010-08, "Preparation and Scheduling of Operator Licensing Examinations" The Davis-Besse Nuclear Power Station (DBNPS) is providing information in response to NRC Regulatory Issue Summary (RIS) 2010-08, "Preparation and Scheduling of Operator Licensing Examinations." The RIS requested licensees to voluntarily submit a response using NRC Form 536, "Operator Licensing Examination Data," to provide data for scheduling and preparation of operator licensing examinations. Attached is the completed NRC Form 536, which provides information through calendar year 2015 for Initial Operator License Examinations and through calendar year 2013 for Generic Fundamentals Examinations.

There are no regulatory commitments included in this letter. If there are any questions or if additional information is required, please contact Mr. Robert C. Hovland, Site Training Manager, at (419) 321-8406.

Sincerely,

~ ~-I?L Barrys.Z GMW

Attachment:

NRC Form 536, "Operator Licensing Examination Data" cc: Regional Administrator, NRC Region Ill DB-1 NRC/NRR Project Manager DB-1 NRC Senior Resident Inspector Chief, Operations Branch, NRC Region Ill Utility Radiological Safety Board AUG 1 2 2010

Attachment L-10-213 NRC Form NRC 536 Operator Licensing Examination Data (One page follows)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (1().2008)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments refardin~ burden OPERATOR LICENSING estimate to the Records and FOINPrivacy Services Branch -5 F 3), U.S.

Nuclear Rer,ulatory Commission, Washington, DC 20555-000 , or bh internet e-mait to In ocollects@nrc.BEv, and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulato~ Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Wash ngton, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or seonsor, and a person Is not required to respond to, the information collect on.

FACILITY NRC REGION Davis-Besse Nuclear Power Station, Unit 1 (DBNPS)

III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 NUMBER OF REACTOR 0 6 0 OPERATORS 6

NUMBER OF SENIOR REACTOR 8 0 8 0

OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0 2 0 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS- LIMITED 0

PROPOSED DATES PRIMARY DATE 12/02/2013 12/07/2015 ALTERNATE DATE 01/06/2014 01/11/2016

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED --- ----

NUMBER SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE ESTIMATED NUMBER OF 14 CANDIDATES NRC FORM 536 (1Q-2008) PRINTED ON RECYCLED PAPER

FENOC RrstEnergy Nuclear Operating Company

.550 1 North State Route 2 Oak /-/arbor. 0/?io 43/149 BBny s. Allen 419-3217676 Vice President - Nuclear F;lx.* *119-3217582 May 2, 2011 L-11-126 Mr. Mark A. Satorius Regional Administrator, Region Ill U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 '

Subject:

Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Notice of Schedule Change for Initial License Examinations The FirstEnergy Nuclear Operating Company (FENOC) is notifying the Nuclear Regulatory Commission (NRC) of a schedule change for the Initial License Examinations scheduled for calendar year 2013 at the Davis-Besse Nuclear Power Station (DBNPS).

Note that the requested DBNPS NRC Initial License Examinations scheduled for 2013 is different than previously submitted. The Initial Operator License Examinations will be administered the weeks of June 3 and June 10, 2013. The On-Site Validation week will be rescheduled for the week of May 13, 2013. By rescheduling these dates, FENOC agrees to cancel the existing dates in December, 2013 for the DBNPS. This schedule change has been discussed with Mr. H. Peterson, Chief, Operations Branch.

There are no regulatory commitments included in this Jetter. If there are any questions or if additional information is required, please contact Mr. Patrick J. McCloskey, Manager- Site Regulatory Compliance, at (419) 321-7274.

Sincerely, 0~ 5_//tt-Barry S. Allen vaw MAY 6 2011

Davis-Besse Nuclear Power Station Unit 1 L-11-126 Page 2 of 2 cc: NRC Document Control Desk DB-1 NRC/NRR Project Manager DB-1 NRC Senior Resident Inspector Chief, Operations Branch, NRC Region Ill Utility Radiological Safety Board

..... J

'FENOC 550 1 North State Route 2 RrstEnergy Nuclear Operating Company Oak Harbor, Ohio 43449 Barry s. Allen 419-321-7676 Vice President - Nuclear Fax* 419-321-7582 August 14, 2009 L-09-219 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001

Subject:

Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Response to Regulatory Issue Summary 2009-11. "Preparation and Scheduling of Operator Licensing Examinations" The Davis-Besse Nuclear Power Station (DBNPS) is providing information in response to NRC Regulatory Issue Summary (RIS) 2009-11, "Preparation and Scheduling of Operator Licensing Examinations," as requested. The attached NRC Form 536, "Operator Licensing Examination Data," provides information through calendar year 2017 for Initial Operator License Examinations and through calendar year 2012 for Generic Fundamentals Examinations.

Note that the requested primary date for the 2011 Initial Operator License Examination is different than previously submitted. This operator license class was originally scheduled to start immediately following the DBNPS sixteenth refueling outage.

However, this refueling outage has been rescheduled, and the examination dates submitted under RIS 2008-16 for 2011 and 2013 are affected.

There are no regulatory commitments included in this letter. If there are any questions or if additional information is required, please contact Mr. Robert C. Hovland, Site Training Manager, at (419) 321-8406.

Sincerely, 07:5.~

Barry S. Allen LJS

~~.:-u ;,;;, cJ e_

AUG 1 8 2009

  • ,)

Enclosure A NRC Form 536 - Operator Licensing Examination Data cc: Regional Administrator, NRC Region Ill DB-1 NRC/NRR Project Manager DB-1 NRC Senior Resident Inspector Chief, Operations Branch, NRC Region Ill Utility Radiological Safety Board

Enclosure A L-09-219 Form NRC - 536 Operator Licensing Examination Data (one page follows)

  • ,I NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per res~onse to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection Is used to plan budgets and resources for operator examinations. Send comments re~ardinB burden estimate to the Records and FOIAIPrivacy Services Branch -5 F 3), U.S.

OPERATOR LICENSING Nuclear R~ulatory Commission, Washington, DC 20555-000 , or brc internet e-meil to In ocollects@nrcsov, and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washmgton, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC mey not conduct or srconsor, and a person Is not required to respond to, the Information collect on.

FACILITY NRC REGION Davis-Hesse Nuclear Power Station, Unit 1 NRC Region III A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 11 CY 13 CY 15 CY 17 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED J 1 J J EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 11 CY 13 CY 15 17 PROPOSED NUMBER

- - - CY NUMBER OF REACTOR 6 6 6 6 OPERATORS NUMBER OF SENIOR REACTOR 8 8 8 8 OPERATORS *INSTANT NUMBER OF SENIOR REACTOR 2 2 2 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE 12/0S/2011 12/02/2013 12/07/2015 12/04/2017 ALTERNATE DATE 01109/2012 01106/2014 01/11/2016 01108/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 12 PROPOSED --- ---

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 16 16 CANDIDATES NRC FORM 536 (10.2008) PRINTED ON RECYCLED PAPER

October 7, 2008 Mr. Barry Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760

SUBJECT:

CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:

DAVIS-BESSE NUCLEAR POWER STATION

Dear Mr. Allen:

In a letter dated August 4, 2008 (L-08-246), your staff requested we schedule initial license operator examinations during the weeks of July 13, 2009, August 22, 2011, and August 19, 2013.

We have tentatively scheduled the requested examinations to occur during the requested weeks.

On-site validation of these examinations is tentatively scheduled to occur approximately three

'. reks before the examination week. In the unlikely event that we are unable to support an examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examinations scheduled for August 2011 and August 2013. We have notified your training staff that the NRC will be developing the July 2009 initial license examination. The letter indicated that more than nine applicants were being considered for each of the examinations. Each examination has been scheduled for two weeks to accommodate this number of applicants. If the number of applicants should decrease below ten applicants, please inform us, as this result in a schedule change. Please inform us at your earliest opportunity if you discover you need to change the scheduled date for the examination.

A supplementary letter will be sent to the training department approximately 120 days prior to the initial examination. The letter will inform the training department of the chief examiner's name, outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be r:v**,qable electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and

B. Allen Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: The Honorable Dennis Kucinich J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC Manager- Site Regulatory Compliance - FENOC D. Pace, Senior Vice President of Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC P. Harden, Vice President, Nuclear Support D. Jenkins, Attorney, FirstEnergy Corp.

Director, Fleet Regulatory Affairs - FENOC Manager - Fleet Licensing - FENOC C. O'Ciaire, State Liaison Officer, Ohio Emergency Management Agency R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners

B. Allen Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: The Honorable Dennis Kucinich J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC Manager - Site Regulatory Compliance - FENOC D. Pace, Senior Vice President of Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight- FENOC P. Harden, Vice President, Nuclear Support D. Jenkins, Attorney, FirstEnergy Corp.

Director, Fleet Regulatory Affairs- FENOC Manager - Fleet Licensing - FENOC C. O'Ciaire, State Liaison Officer, Ohio Emergency Management Agency R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners DISTRIBUTION:

RidsNrrDoriLpl3-2 Tamara Bloomer RidsNrrPMDavisBesse Resource RidsNrrDirslrib Resource Mark Satorius Kenneth Obrien Jared Heck Carole Ariano Linda Linn DRPill DRS III Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\DRS\WORK IN PROGRESS\DAV 100708 DRS OL.DOC X Publicly Available D Non-Publicly Available D Sensitive D Non-Sensitive T o receJVe a copJ of t h"ts d ocument, 10 . t h e b ox "C"

. d"tcate 10 = Copy wIo attac hiencI "E" = Copyw1"th attachienc I "N" = N ocopy OFFICE RIII:DRS I RIII:DRS I RIII:DRS I I NAME JKweiser:co DMcNeil HPeterson DATE 09/30/08 10/02/08 10/07/08 OFFICIAL RECORD COPY

Janet Kweiser From: Carmen Olteanu Sent: Monday, October 20, 2008 2:52 PM To: RidsNrrDorllpl3-2 Resource; Tamara Bloomer; RidsNrrPMDavisBesse Resource; RidsNrrDirslrib Resource; Mark Satorius; Kenneth OBrien; Jared Heck; Carole Ariano; Linda Linn; DRPIII; DRSIII; Patricia Buckley; Tammy Tomczak

Subject:

Davis-Besse Letter ReConfirmation of Initial Exam Attach me** ~s: DAV 100708 DRS OL.doc The subject document has been completed and has been submitted to DPC to be declared in ADAMS. A Word copy of the document has been attached and the document has been assigned Accession

  1. ML082880655.

1

FENOC 5501 North State Houle 2 Oak /-/arbor, Ohio 43449 FirstEnergy Nuclear Operating Company 419-3? 1-!676 88/ry S. Allen Fax. 419*321-7:,8?

Vice President - Nuclear August 4, 2008 L-08-246 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001

Subject:

Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Response to Regulatory Issue Summary 2008-16, "Preparation and Scheduling of Operator Licensing Examinations" The Davis-Besse Nuclear Power Station (DBNPS) is providing information in response to NRC Regulatory Issue Summary 2008-16, "Preparation and Scheduling of Operator Licensing Examinations," as requested. The attached NRC Form 536, "Operator Licensing Examination Data," provides information through calendar year 2013 for Initial Operator License Examinations and through calendar year 2012 for Generic Fundamentals Examinations.

There are no regulatory commitments included in this letter. If there are any questions or if additional information is required, please contact Mr. Robert C. Hovland, Site Training Manager, at (419) 321-8406.

Sincerely, 0 ctr 5. ,1-iL-Barry S. Allen LJS Enclosure A NRC Form 536 - Operator Licensing Examination Data cc: Regional Administrator, NRC Region Ill DB-1 NRC/NRR Project Manager DB-1 NRC Senior Resident Inspector Chief, Operations Branch, NRC Region Ill AUG 5 2008 Utility Radiological Safety Board

Enclosure A L-08-246 Form NRC- 536 Operator Licensing Examination Data (one page follows)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: OB/31/2008 (8-2005)

Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his Information collection is used to plan budgets and resources for operator examinations. Send comments reftarding burden OPERATOR LICENSING estimate to the Records and. FOtAIPri~acy Services Branch; -5 F53), U.S.

Nuclear Rer,utatory CommiSSion, Washington, DC 20555-000 , or b1, intc;rnet EXAMINATION DATA e-mail to in ocollects@nrc.gov, and to the Desk Officer, Office of In ormation and Regulato~ Affairs, NE 8-10202, (3150-0131 ). Office of Management and Budget, Wash ngton, DC 20503. If a means used to Impose an Information collection does not display a currently valid OMB control number, the NRC may not conduct or seonsor, and a person is not requ*ired to respond to the information collect on. '

FACILITY NRC REGION Davis-Besse Nuclear Power Station, Unit 1 NRC Region Ill A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 09 CY 11 CY 13 CY ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 1 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 11 CY 13 CY CY 09 NUMBER OF REACTOR 1 6 6 OPERATORS NUMBER OF SENIOR REACTOR 10 10 10 OPERATORS- INSTANT NUMBER OF SENIOR REACTOR 2 2 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS- LIMITED PROPOSED DATES PRIMARY DATE 07/13/2009 08/22/2011 08/20/2013 ALTERNATE DATE 09/12/2011 09/10/2013

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 10 CY 12 PROPOSED --~

-~--

NUMBER SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE ESTIMATED NUMBER OF 16 16 CANDIDATES NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER