Failla, David From:
Davis, Robert Sent:
Tuesday, August 21, 2012 9:01 AM To:
Rosenberg, Stacey Cc:
Manoly. Kamal; Faille, David; Cheruvenkl, Ganesh; Teoro, David; Poole, Justin
Subject:
FW: RPV Stud Holes and ASME Code Questions (LARGE FILE)
Attachments:
WB2_studholes_timeIine-July26 122220610.pdf; TICKET-WBC-PROBLEM-572414.pdf; 1971 EDITION - SUBSECTION NB.pdf; Code Int 111-77-162.pdf; Memo 92611 Davis Besse Head Exam TIAFinal.docx; Document.pdf
Although I am the NRC representative for the Section III Subgroup on materials, fabrication and examination, the final decision on matters such as the RPV bolt hole examination in the attached referenced material is NRRs responsibility. I talked to Ganesh this morning and filled him In on the Issue. I talked to Dave Failla from the region at Watts Bar yesterday regarding this issue. Given what I know at this point, I don't believe that they violated 1971 Edition the code. However, I have not looked at all of the information in depth and the final decision on whether they violated the Code or not should come from NRR. I told Ganesh that If needs any assistance or has any questions to feel free to call me.
- Thanks, Bob Robert H. Davis Senior Materials Engineer Component Integrity, Performance, & Testing Branch 2 Division of Engineering Office of New Reactors Office Location - T-10H02 Mail Stop T-10K07 301-415-4028 (voice) 301-415-5160 (fax) robert.davls;nrc.gov From: Poole, Justin Sent: Thursday, August 16, 2012 9:23 AM To: Davis, Robert
Subject:
FW: RPV Stud Holes and ASME Code Questions (LARGE FILE)
The first attachment has a lot of the background. Thanks.
Justin C. Poole Sr. Project Monager NRR/DORL/LPWB U.S. Nuclear Regulatory Commission (301)415-2048 email: Justin. Poole)nrc. aov From: Nazarlo, Tomy Sent: Friday, August 10, 2012 3:58 PM
To: Poole, Justin Cc' Even, Christopher; Baptist, James; Fallia, David; Haag, Robert
Subject:
RPV Stud Holes and ASME Code Questions (LARGE FILE)
- Justin, As previously discussed and noted below, TVA sleeved three reactor pressure vessel (RPV) stud holes (picture attached as "Document.pdf") during which no NDE was performed. We believe that based on a TIA for Davis Besse issued on October 2011 (Memo 92611 Davis Besse Head Exam-attached) and our initial read of the ASME Code (1971 EDITION-attached) that that NDE should have been performed for the accessible portions of the RPV stud hole.
TVA and Westinghouse have since responded to our concern and have Indicated that prior to the work commencing this was evaluated and Westinghouse believed the NDE to not be applicable. They have initiated a problem evaluation report (PER 572414-attached) and included Westlnghouse~s position (WB2 studholes timeline-attached) which states that "there is no requirement to perform surface examination of the bored holes."
Since there was a previous TIA issued on this subject, NRR Office Instruction COM-106 states that we can discuss this Issue via telecom with the appropriate staff and therefore a new TIA may not be necessary. We'd like to engage the staff and get the Code experts and the originator of the TIA to help us better understand whether a violation of NRC and ASME Code requirements exist.
Our questions are as follows:
- 1)
Is NB 2500 applicable for the work performed (machining of the RPV stud holes), and if so, should NDE of the accessible portions of the RPV stud holes (similar to NRC staff's position as noted in the TIA) have been performed in accordance with the Code?
- 2)
Given that the sleeves have been installed and no NDE was performed, In the staffs opinion, what would be an acceptable means (e.g. engineering evaluation, re-sleeving, etc.) for satisfying these requirements that may not have been met ?
We appreciate any support you could provide. Please note that based on the staff's final position, for this issue, we would consider whether a violation of 50.55a, Codes and Standards exists. Dave Failla has been closely following this issue and is out next week but will be back in the office the week of 8/20. Therefore, we can setup a telecon anytime after 8/20. Thank you.
Tomy Tomy A. Nazardo Senior Resident inspector U.S. Nuclear Regulatory Commisslon Watts Bar Nuclear Plant 1260 Nuclear Plant Rd.
Fax:7(423) 3b5 980Y E-mail: T~om.Nazasto(S~nrc.moY.
Websfte, ww nio
';-*U.S.NRC From: Failla, David Sent: Friday, August 10, 2012 3:03 PM To: Nazarlo, Tomy
Subject:
RPV Stud Holes
- Tomy, Attached are the documents related to the RPV stud hole surface exams. Our position is Westinghouse/PCI should have performed a surface exam on the stud holes after machining the holes for the threaded inserts, Westinghouse's position is that the code does not require them to do a surface exam. This issue is similar to that discussed in TIA 2011-015 (attached).
David Failla U.S. NRC Resident Inspector - Watts Bar Unit 2 (423)365-3964 3