ML13226A467

From kanterella
Jump to navigation Jump to search
Requalification Program Inspection - Vogtle Electric Generating Plant Units 1 and 2
ML13226A467
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/12/2013
From: Mark Franke
Division of Reactor Safety II
To: Tynan T
Southern Nuclear Operating Co
References
IR-13-004
Download: ML13226A467 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 August 12, 2013 Mr. Tom E. Tynan Vice President Southern Nuclear Operating Company, Inc.

Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - VOGTLE ELETRIC GENERATING PLANT UNITS 1 AND 2

Dear Mr. Tynan:

In a telephone conversation on August 8, 2013, Mr. Richard S. Baldwin, Senior Operations Engineer, and Michael Donithan, Operations Engineer, made arrangements with Mr. John Acree, Nuclear Operations Training Supervisor, and Mr. Kyle Johns, Nuclear Operations Lead Training Instructor, for the NRC to inspect the licensed operator requalification program at Vogtle Electric Generating Plants Units 1 & 2. The inspection is planned for the week of September 9, 2013, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that you have committed to maintain your plant-referenced simulator in accordance with ANSI/ANS-3.5-1985, American National Standard for Nuclear Power Plant Simulators for Use in Operator Training and Examination.

In accordance with 10 CFR 55.59, the NRC has requested that you submit by August 26, 2013, the material as specified in paragraph A of the Enclosure, in order to support the NRC's inspection program needs. The NRC has further requested that you have all items as specified in paragraph B of the Enclosure available for review for the inspectors on the first day they arrive on site. Mr. Acree and Mr. Johns have been advised of this request and have been provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on April 30, 2016.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov;

T. Tynan 2 and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection please contact Mr. Richard S. Baldwin at (404) 997-4642, (Internet E-mail:

richard.baldwin@nrc.gov), or me at (404) 997-4436, (Internet E-mail: mark.franke@nrc.gov).

Sincerely,

/RA/

Mark E. Franke, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-424, 50-425 License Nos.: NPF-68, NPF-81

Enclosure:

Materials Request List cc: Distribution via Listserv

_ML13226A467_______________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS SIGNATURE RA RA RA NAME BALDWIN DONITHAN FRANKE DATE 8/12/2013 8/12/2013 8/12/2013 8/ /2013 8/ /2013 8/ /2013 8/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Letter to Tom E. Tynan from Mark E. Franke dated August 12, 2013

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - VOGTLE ELETRIC GENERATING PLANT UNITS 1 AND 2 DISTRIBUTION:

C. Evans, RII EICS L. Douglas, RII EICS RIDSNRRDIRS PUBLIC RidsNrrPMVogtle Resource

Materials Request List The items listed below are being requested per telephone conversation on August 8, 2013 to support the upcoming IP-71111.11B inspection in September at Vogtle. Items in paragraph "A" are to be sent prior to the inspection. They must be received in our office by August 26, 2013.

Please have the items listed in paragraph "B" ready for our review upon arrival on September 9, 2013 A. In-office inspection material:

1. Complete list of all licensed individuals (active and inactive; RO and SRO), including license restrictions
2. Copy of an organizational chart for the operations and training departments including the simulator group
3. Copy of the weekly schedules for the weeks that the 2013 annual operating exams will be administered, including a list of personnel scheduled for testing the week of September 9, 2013
4. A copy of the written exams (all weeks) that were administered for the last biennial requalification exam, including all biennial re-take exams
5. Copies of the simulator scenarios and JPMs (simulator and in-plant) that have already been administered and that will be administered the week of September 9, 2013 (exam security related item)
6. Self-assessment reports, condition reports, and LERs resulting from human performance errors since the last requalification inspection
7. A copy of the governing site procedure(s) for the conduct of license operator requalification training (classroom and simulator) and exam development/administration
8. A copy of the governing site procedure(s) for the simulator fidelity which includes all the testing requirements used to fulfill ANSI/ANSB3.5-1985 requirements B. On-site inspection material:
1. Requalification training attendance records for the current two year requalification training cycle
2. Exam results since last requalification inspection (weekly operating & written exams),

copies of exams that had pass/failure rates significantly outside the average

3. Simulator scenarios and JPMs (in-plant and simulator) that have been or will be administered for this requalification exam (exam security related item)
4. All training feedback forms since the last requalification inspection Enclosure

2

5. All remedial training packages since the last requalification inspection
6. A list of all personnel that reactivated their licenses since the last requalification inspection
7. Security badge and HP printouts for all personnel that reactivated their licenses since the last requalification inspection (Records shall support verification of time on shift under instruction and complete plant tours for both the reactivating operator and the supervising active license for the time on shift as well as the plant tour.)
8. Records for maintenance of active licenses - time on shift 56/60 hrs/qtr since the last requalification inspection
9. All medical exam records
10. Copies of the reference list for all administrative procedures which direct the training process, including development of training and test materials, remedial training, modifications, plant and industry experience
11. Simulator:

List of all open simulator discrepancies (DR=s)

Copy of the Simulator Management and Configuration Procedures List of all closed simulator DR=s for last 12 months List of Simulator Performance tests Simulator Testing Documentation

12. Security procedures for the simulator
13. Program evaluation for the previous 2 years training cycle