Category:E-Mail
MONTHYEARML24032A0202024-01-31031 January 2024 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 ML24022A2592024-01-22022 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Revise TS LCO 3.8.2 to Remove Note C-S Diesel Generator ML24016A0762024-01-16016 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2 - License Amendment Request to Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications ML24029A1132024-01-16016 January 2024 Notification of Inspection and Request for Information (Email) ML23355A2722023-12-21021 December 2023 NRR E-mail Capture - Schedule Revision for Emergency Preparedness Staff Augmentation Times License Amendment Request ML23349A0362023-12-14014 December 2023 NRR E-mail Capture - Draft Request for Additional Information Re Quad Cities Emergency Amendment Related to Unit 1 Diesel Generator Inoperability ML23347A0642023-12-13013 December 2023 12-13-23 Email from Kimberly Green to Wells, Russell, Subject: Results of NRC SUNSI Review of Watts Bar Nuclear Plant Dual-Unit UFSAR, Amendment 5 ML23334A0932023-11-28028 November 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate During Mode 6 ML23338A1192023-11-21021 November 2023 NRR E-mail Capture - Draft Request for Additional Information Quad Cities Relief Request I5R-26 ML23312A2962023-11-0808 November 2023 Email - Surry Relief Request Acceptance Review Results; Surry Unit 1 and 2 IST P-3 P-4 Pumps ML23312A2022023-11-0808 November 2023 Relief Request Acceptance Review Results; IST Impracticality P-1 P-2 RHR Containment Pumps ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML23283A3262023-10-10010 October 2023 Update Acceptance Review Status Surry TS Change Apply RG 1.97, Rev 3 Instrumentation to Lhsi ML23275A0272023-09-29029 September 2023 Submittal of Discharge Monitoring Report (DMR) Quality Assurance Study 43 Final Report 2023 ML23271A1792023-09-28028 September 2023 Request for Confirmation License Amendment Application to Revise Control Room Cooling TS 3.7.11 ML23268A0022023-09-22022 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-264-A, Revision 0 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23262A7432023-09-19019 September 2023 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 Acceptance of Relief Request I5R-26 ML23255A2772023-09-12012 September 2023 Acceptance of Requested Licensing Action: Surry TS Change, Lhsi Indication and Instrumentation ML23254A2872023-09-11011 September 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Table 1.1-1 Re Number of Required Rvh Closure Bolts ML23236A2562023-08-24024 August 2023 NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23193A9552023-07-12012 July 2023 NRR E-mail Capture - Acceptance Review for VC Summer and Surry Relief Request (L-2023-LLR-0029) ML23192A0552023-07-11011 July 2023 Relief Request Later Edition of ASME Code for ISI ML23191A8672023-07-10010 July 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23188A0732023-07-0707 July 2023 Acceptance of Requested Licensing Action License Amendment Application to Revise Control Room Cooling Technical Specifications ML23187A1122023-07-0606 July 2023 TSC Relocation LAR RAIs ML23186A1412023-07-0505 July 2023 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Requested Licensing Action Amendment to Adopt TSTF-505 ML23186A1482023-07-0505 July 2023 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Requested Licensing Action Amendment to Adopt 10 CFR 50.69 ML23172A0132023-06-20020 June 2023 Duke Fleet - Correction to June 2, 2023, Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23166A1142023-06-15015 June 2023 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 ML23165A2862023-06-14014 June 2023 Tennessee Multi-Sector Permit (Tmsp), 2023 Annual Discharge Monitoring Report for Outfalls SW-1, SW-16, SW-17, SW-18, SW-19, and SW-21 ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23153A1892023-06-0202 June 2023 Duke Fleet - Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23150A2472023-05-25025 May 2023 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23124A1212023-05-0404 May 2023 Acceptance of Requested Licensing Action Duke Fleet Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23118A1652023-04-28028 April 2023 NRR E-mail Capture - Request for Additional Information Quad Cities, Unit 2, Alternative Request I6R-11 ML23116A1492023-04-21021 April 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23107A2212023-04-10010 April 2023 Amendment Turbine Building Wind Load Basis Reclassification License Amendment Request - State Consultation No Comment ML23087A2492023-03-27027 March 2023 50.69 Acceptance Email ML23087A0282023-03-27027 March 2023 Acceptance of Requested Licensing Action Amendment TSTF-505 ML23083B9572023-03-24024 March 2023 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Requested Licensing Action Amendment to Adopt TSTF-564 ML23080A1892023-03-20020 March 2023 RP Inspection Document Request 2024-01-31
[Table view] |
Text
V Poehler, Jeffrey From: Hopkins, Jon k Sent: Wednesday, August 15,2012 10:10 AM To: Poehler, Jeffrey Cc: Cheok, Michael; Hiland, Patrick
Subject:
QUESTION: Followup of list of NPPs with RPVs forged by Rotterdam Dockyards (RDM)
Jeff, For Surry 1 and 2, did RDM make the plate for the RPVs or did it just weld together the plates supplied by someone else?
Thank you, Jon From: Poehler, Jeffrey Sent: Monday, August 13, 2012 4:00 PM To: Hardles, Robert; Fairbanks, Carolyn
Subject:
RE: ACTION: Followup of list of NPPs with RPVs forged by Rotterdam Dockyards (RDM)
Watts Bar 2 hasn't operated yet... but may soon. Surry 1 and 2 were welded by Rotterdam but of plate not forgings.
Jeffrey C. Poehler Sr. Materials Engineer NRR/DE/EVIB (301) 415-8353 From: Hardies, Robert Sent: Monday, August i,2123:58 PM To: Poehler, Jeffrey; Fairbanks, Carolyn
Subject:
FW: ACTION: Followup of list of NPPs with RPVs forged by Rotterdam Dockyards (RDM)
Mystery solved. The numbers work out now. But which is the plant that has never operated .... or s that one not on this list?
From: Hopkins, Jon Sent: Monday, August 13, 2012 3:52 PM To: Hiland, Patrick Cc: Cheok, Michael; Hardies, Robert
Subject:
FW: ACTION: Followup of list of NPPs with RPVs forged by Rotterdam Dockyards (RDM)
Pat, Verification from DORL of U.S. NPPs with RDM reactor pressure vessels is below. Yes except for the BWRs, Fermi &
Quad, No.
Jon 286 K U
From: Meighan, Sean (LX .
Sent: Monday, August 13, 2012 3:47 PM To: Roque-Cruz, Carla; Hopkins, Jon Cc: Thompson, Jon; Sreenivas, V; Mozafari, Brenda; Lingam, Siva; Cotton, Karen; Poole, Justin; Chawla, Mahesh; Boska, John; Quichocho, Jessie; Dudek, Michael; Guzman, Richard; Martin, Robert; Frankl, Istvan; Coffin, Stephanie; Evans, Michele
Subject:
RE: ACTION: Followup of list of NPPs with RPVs forged by Rotterdam Dockyards (RDM)
Jon:
Below is the requested info re: RPVs forged by Rotterdam Dockyards (RDM).
With this e-mail I consider the question to be answered. If you need further info, please send e-mail to me and cc:
Michele Evans.
V/R s
Site/Unit(s) Question: Were RPV(s) forged by Comments Rotterdam Droogdok Maatschappij Catawba 1 Yes McGuire 2 Yes North Anna 1 Yes North Anna 2 Yes According to the attached Quad Cities UFSAR Section 5.3.1.2 and Manufacturing History, the Quad Cities, Unit 1 RPV was manufactured entirely by Babcock &Wilcox.
The Unit 2 RPV history did not include any forging at Rotterdam (RDM), but did include assembly-and welding on portions of the RPV at RDM.
Sequoyah 1 & Yes Section 5.4.2, first sentence (Page 5.4-2), of the SQN 2 UFSAR states that "The reactor vessel manufactured by DeRotterdame Drodgdak Mattschappu N.V. (The Rotterdam Dockyard Company) is cylindrical with a welded hemispherical bottom head and a removable, bolted flanged and gasketed, hemispherical upper head."
So, to answer your question, Yes, the Sequoyah Units 1 and 2 reactor vessels are forged by Rotterdam Dockyards.
Surry 1 Yes Surry 2 Yes Watts Bar 1 & Yes 2 _ _1_1 From: Meighan, Sean Sent: Monday, August 13, 2012 10:57 AM To: Thompson, Jon; Sreenivas, V; Mozafarl, Brenda; Ungam, Siva; Cotton, Karen; Poole, Justin; Chawla, Mahesh Cc: Boska, John; Quichocho, Jessie; Dudek, Michael; Guzman, Richard; Martin, Robert; Frankl, Istvan; Coffin, Stephanie; Evans, Michele
Subject:
ACTION: Followup of list of NPPs with RPVs forged by Rotterdam Dockyards (RDM) 287
PMs:
(Tasking from Michele Evans)
Please read below and attached.
Action: Ask the licensees of the units below to verify If their units Reactor Pressure Vessel(s) were forged by Rotterdam Droogdok Maatschappij (also referred to as Rotterdam Dockyards or RDM). The RPV forgings may have been welded together by another company such as B&W. NRC is interested in who forged the parts Due to the quick turn around requested and the evolving nature of the issue, we suggest you call your licensing contact, discuss the issue and get a call back with the answer. We understand the licensee would like some context with the question, feel free to send attached to the licensee. We actually suspect this issue is already on their radar screen.
Due: COB today..
Any questions, just call me.
BCs - if the primary PM for the site is out today, forward to the backup PM.
FYI, this tasking does not violate the Paperwork Reduction Act due to small number of (<10) requested responders.
Catawba 1 I PWR 4 I 1129 I 1985 Westi Fermi 2 McGuire 2 PWR 4 1100 1983 esti North Anna 1 PWR 3 903 1978 estl North Anna 2 PWR 3 973 1980 esti Quad Cities 1 BWR _ 882 1972 enei Sequoyah 1 PWR 4 1162 1980 estl Sequoyah 2 PWR 4 1126 1981 esti Surry 1 PWR 3 839 1972 esti Surry 2 PWR 3 800 1973 esti Watts Bar 1 PWR 1123 1996 Westi Watts Bar 2 PWR I Westi From: Hopkins, Jon Sent: Monday, August 13, 2012 10:06 AM To: Meighan, Sean
Subject:
REQUEST: Followup of list of NPPs with RPVs forged by Rotterdam Dockyards (RDM)
Sean, Question for PMs to ask licensees is; Was your plants' RPV forged by RDM (Rotterdam Dockyards) ?
288
The RPV forgings may have been welded together by another company such as B&W. NRC is interested in who forged the parts.
NRC is Interested because the of UT indications recently found on the RPV forgings at Doel 3 NPP in Belgium. The Doel 3 licensee, Electrabel, provided the below table of NPPs with RPVs forged by Rotterdam Dockyards (Only Belgium and U.S. included in this email. There are additional plants/countries). This is preliminary information the accuracy of which the NRC wants to confirm for U.S. NPPs.
Reactor Pressel Vessels forged by Rotterdam Drooadok MaatschaoDij (also referred to as Rotterdam Dockyards or RDM) o The Doel 3 and Tihange 2 RPVs were forged by RDM, which according to the Licensee Electrabel provided some 20+ vessels In Europe and the US.
o The table below gives an overview of these RPVs (this list has been established by the licensee and could contain errors or omissions).
)oel 3 PWR 3 1000 1982 Ft ihange 2 PWR 3 1000 1982 Fr
- atawba 1 PWR 4 1129 1985
- erml 2 IcGuire 2 PWR 4 1100 1983 lorth Anna 1 PWR 3 903 1978 lorth Anna 2 PWR 3 973 1980 Zuad Cities 1 BWR - 882 1972
- eguoyah 1 PWR 4 1162 1980 equoyah 2 PWR 4 1126 1981 PWR 3 839 1972 irry 2 PWR 3 800 1973 Bar 1 JPWRý 11124 . _I 11996 F'y itts Bar 2 PWR 289