Category:E-Mail
MONTHYEARML24317A2202024-11-12012 November 2024 Re_ WBN Unit 2 - Notification of Readiness for Supplemental Inspection ML24309A0552024-11-0101 November 2024 NRR E-mail Capture - Request for Additional Information - TVA LAR to Revised Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 Re TS Table 3.3.2-1, Function 5 ML24318A8602024-10-29029 October 2024 NRR E-mail Capture - Draft Request for Additional Information -Tennessee Valley Authority (TVA) License Amendment Request (LAR) to Revise Watts Bar TS 3.7.11 for Main Control Room Chiller Extension of Completion Time ML24304A3752024-10-29029 October 2024 NRR E-mail Capture - Request for Additional Information - License Amendment Request (LAR) to Revise Watts Bar Updated Final Safety Analysis Report (UFSAR) for Hydrologic Analysis RA-24-0276, EN 57402 - Catawba Nuclear Station Interim Part 21 Report2024-10-28028 October 2024 EN 57402 - Catawba Nuclear Station Interim Part 21 Report ML24282A9732024-10-0808 October 2024 Temporary SW Piping LAR Acceptance Email ML24281A0072024-10-0202 October 2024 NRR E-mail Capture - Acceptance Review Results for the Sequoyah License Amendment Request to Modify the FHA Analysis, Tech Spec TS 3.9.4 and Tech Spec 3.3.6 (L-2024-LLA-0117) ML24274A2762024-09-24024 September 2024 Email from K.Green to S.Hughes, Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, Hydrologic LAR to Revise the UFSAR ML24254A2082024-09-10010 September 2024 NRR E-mail Capture - Quad Cities, Unit Nos. 1 and 2 - Alternative to RV-08, Rev 1, SRV Testing Interval - Acceptance of Requested Licensing Action Re Relief Request Associated with Safety Relief Valve Testing Interval ML24260A0322024-09-10010 September 2024 NRR E-mail Capture - Request for Additional Information Regarding the Watts Bar Unit 2 Steam Generator Tube Inspection Report for U2R5 ML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24215A3152024-07-24024 July 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-276-A, Revision 2 TS 3.8.1, AC Sources ML24207A0862024-07-24024 July 2024 Relief Request Acceptance Review Results - McGuire Units 1 and 2 Alternatives Component Cooling Pumps, RHR Pumps ML24197A1702024-07-15015 July 2024 Request for Additional Information Two Proposed Alternatives (RA-23-0242) for the Inspection of Reactor Vessel Closure Head Penetrations ML24197A0482024-07-12012 July 2024 Information Request for the Quad Cities Nuclear Station Biennial Problem Identification and Resolution Inspection ML24192A3492024-07-10010 July 2024 Acceptance of Requested Licensing Action License Amendment Application to Revise Technical Specification 3.4.3, RCS Pressure and Temperature Limits ML24179A1292024-06-24024 June 2024 Acceptance Review for LAR to Revise TS to Adopt TSTF-234-A, Revision 1 ML24177A1412024-06-11011 June 2024 NRR E-mail Capture - Audit Plan Related to Review of the Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, LAR to Revise Technical Specification Table 3.3.2-1 Function 5 ML24157A3152024-06-0303 June 2024 2024 Sequoyah Commercial Grade Dedication Inspection Information Request ML24152A1542024-05-31031 May 2024 Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-03 ML24155A1372024-05-29029 May 2024 Email from K. Green to S. Hughes Request for Additional Information Related to License Amendment Request to Revise Residual Heat Removal Flow Rate ML24150A1662024-05-29029 May 2024 Document Request for Catawba Nuclear Station Units 1 & 2 - Radiation Protection Inspection - Inspection Report 2024-03 ML24156A0062024-05-22022 May 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Recapture Low-Power Testing Time ML24135A0182024-05-13013 May 2024 NRR E-mail Capture - Draft Request for Additional Information Quad Cities TSTF-505 Amendment ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24128A1802024-05-0707 May 2024 NRR E-mail Capture - Acceptance Review for Sequoyah License Amendment Request to Modify TS 3.8.1 and TS 3.8.2 (L-2024-LLA-0047) ML24130A0132024-05-0707 May 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.7.11 for MCR Chiller Completion Time ML24123A0882024-05-0202 May 2024 NRR E-mail Capture - Correction Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24086A5182024-04-30030 April 2024 E-mail to Christian Williams Decision on the Exemption Request for Quad Cities ML24122B4872024-04-30030 April 2024 NRR E-mail Capture - Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24116A2822024-04-25025 April 2024 Acceptance of Requested Licensing Action: Surry TS Change Section 3.8 Containment Temperature and Pressure Requirements and Surveillances ML24086A4782024-04-24024 April 2024 Email to Christian Williams Availability of Environmental Assessment for the Quad Cities Exemption ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML24082A0662024-04-17017 April 2024 Email to Stuart Rymer on Exemption Decision for Watts Bar ML24107A9112024-04-15015 April 2024 NRC to Fws, Follow-up on Request for Concurrence for North Anna SLR ML24114A1702024-04-15015 April 2024 Request for State Review of the Quad Cities HI-STORM Exemption Request Environmental Assessment ML24107A9122024-04-11011 April 2024 Fws to NRC, Follow-up on Request for Concurrence for North Anna SLR ML24102A0682024-04-10010 April 2024 IST (z)(2) Hardship RR V-1 RCS Cold Leg, Lh Safety Injection Check Valves ML24102A2422024-04-10010 April 2024 NRR E-mail Capture - Draft Request for Additional Information Quad Cities TSTF-505 and 50.69 Amendments ML24082A0682024-04-10010 April 2024 Email to Stuart Rymer Re_ Availability of EA-FONSI for Watts Bar ML24100A8392024-04-0909 April 2024 Response from State of Tn Regarding Review of Environmental Assessment for Watts Bar Exemption Request ML24100A8402024-04-0808 April 2024 Email to State of Tn Requesting Review of Environmental Assessment for Watts Bar Exemption Request ML24089A0102024-03-29029 March 2024 NRR E-mail Capture - Quad Cities Unit Nos. 1 and 2 - Alternative to Core Spray Pump Testing - Acceptance of Requested Licensing Action Relief Request Associated with the Sixth Inservice Testing Interval ML24087A0102024-03-26026 March 2024 NRR E-mail Capture - Verbal Relief for North Anna Unit 1 - (ASME Code), Section XI, Subsection IWB-2430 ML24087A0112024-03-23023 March 2024 NRR E-mail Capture - Draft RAIs for Reactor Coolant Pump (RCP) Relief Request (L-2024-LLR-0022) ML24075A1762024-03-15015 March 2024 Email, Acceptance of Requested Licensing Action: Surry TSTF-577, Rev. 1 ML24074A4252024-03-14014 March 2024 NRR E-mail Capture - Sequoyah Hydrologic Analysis License Amendment Request - Notification of Change to Estimated Completion and Hours ML24144A2432024-03-0808 March 2024 002 Radiation Safety Baseline Inspection Information Request 2024-09-06
[Table view] |
Text
Ring, Mark From: Shear, Gary Sent: Tuesday, August 14, 2012 6:04 AM To: Ring, Mark Cc: Giessner, John; Riemer, Kenneth; Cameron, Jamnes; Casto, Chuck; Kunowskl, Michael; Lara, Julio; Duncan, Eric
Subject:
FW: ACTION: Followup of list of NPPs with RPVs forged by Rotterdam Dockyards (RDM) fyi From: Hiland, Patrick Sent: Monday, August 13, 2012 3:15 PM To: McIntyre, David; Bumell, Scott Cc: Wert, Leonard; Howell, Art; Pederson, Cynthia; Lew, David; Brown, Frederick; Ogle, Chuck; Roberts, Darrell; Miller, Chris; Rels, Terrence; Croteau, Rick; Ogle, Chuck; Munday, Joel; Reynolds, Steven; Shear, Gary; OBrien, Kenneth; Kennedy, Krlss; Vegel, Anton; Blount, Tom; Howe, Allen; Dorman, Dan; Boger, Bruce; Cheok, Michael; Hardies, Robert; Poehler, Jeffrey; Evans, Michele
Subject:
FW: ACTION: Followup of list of NPPs with RPVs forged by Rotterdam Dockyards (RDM)
David/Scott, we've confirmed through DORL's direct conversations with licensees that 10 U.S. reactor vessels were manufactured at Rotterdam. Note that our list contains one plant not on the Belgium list (Watts Bar -2) and identification that contrary to the Belgium list, Quad Cities 1 was not manufactured by Rotterdam (see note).
Site/Unit(s) Question: Were RPV(s) Comments forged by Rotterdam Droogdok Maatschappij Catawba 1 Yes McGuire 2 Yes North Anna1 Yes North Anna 2 Yes WatAcctBdia.r1to&tYhes*h*
- M.au.actudn_.9 History; M.h-Q0ad uadCitiesUFSARSection5.3.1 Cities,'Unit 1. RPv Was mand*factured 2 and
- eti:y,ý:..!Bbcod*ki&W.11i66k i ThN!.Unit 2 RPV history-diid.,not..
19hqlude: an'f rg!_ 16it!teirami: (ROM), bmtglid Iriollucto ass~embly
.,,.and, w 11d 1F1go n po t !.rt i of: th e R PV'a t IRD M.... . . ."
Seuoy. 1.
Ye Seto 5 .4.2firs
, se te .... c ag. 5.. 4-2). ., of the SO
flanged.and ... *._> .e ....,hemipheica uppr.. a.".....anwe y u questionhesteSqoa mauatreayDrotra reactor nt vessels n e foro geda by Rotterdam Dockyards.
Surry 1 Yes Surry 2 Yes Watts Bar 1&2 Yes 1
a 1172,