Notification of Evaluations of Changes, Test, or Experiments, and Permanent Plant Modifications Inspection (Inspection Report 05000483-13-005) and Request for Information. 2013005-RFI-GAG-16072013
ML13203A154
Person / Time
Site: Callaway Ameren icon.png
Issue date: 07/22/2013
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Heflin A
Union Electric Co
References
2013005-RFI-GAG-16072013 IR-13-005
Download: ML13203A154 (5)


See also: IR 05000483/2013005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 EAST LAMAR BLVD

ARLINGTON, TEXAS 76011-4511

July 22, 2013

Mr. Adam C. Heflin, Senior Vice

President and Chief Nuclear Officer

Union Electric Company

P.O. Box 620

Fulton, MO 65251

SUBJECT: CALLAWAY PLANT, UNIT 1 - NOTIFICATION OF EVALUATIONS OF

CHANGES, TESTS, OR EXPERIMENTS, AND PERMANENT PLANT

MODIFICATIONS INSPECTION (INSPECTION REPORT 05000483/2013005)

AND REQUEST FOR INFORMATION

Dear Mr. Heflin:

From September 30 - October 11, 2013, reactor inspectors from NRCs Region IV office will

perform the baseline inspection of changes, tests, experiments, and permanent plant

modifications at your Callaway Plant, Unit 1, using NRC Inspection Procedure 71111.17,

Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications.

Experience has shown that this inspection is resource intensive both for the NRC inspectors

and your staff. In order to minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

Upon review of these documents, the inspectors will select additional documentation for review

upon arrival. It is important that all of these documents are up to date and complete in order to

minimize the number of additional documents requested during the preparation and/or the

onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Steve Petzel of your licensing organization.

If there are any questions about this inspection or the material requested, please contact the

lead inspector, Gerond George, by telephone at 817-200-1562 or by e-mail at

Gerond.George@nrc.gov.

A. Heflin -2-

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket No.: 50-483

License No.: NPF-30

Enclosure: Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications

Request for Information

Electronic Distribution to Callaway Plant, Unit 1

A. Heflin -3-

Electronic distribution by RIV:

Regional Administrator (Art.Howell@nrc.gov)

Acting Deputy Regional Administrator (Thomas.Bergman@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRS Director (Tom.Blount@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Thomas.Hartman@nrc.gov)

Acting Resident Inspector (Phillip.Smagacz@nrc.gov)

Resident Inspector (Zachary.Hollcraft@nrc.gov)

Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)

Senior Project Engineer, DRP/B (Michael.Bloodgood@nrc.gov)

CW Administrative Assistant (Dawn.Yancey@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Fred.Lyon@nrc.gov)

Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA: OEDO (Vivian.Campbell@nrc.gov)

S:\DRS\REPORTS\Reports Drafts\CW2013005-RFI-GAG-16072013.docx

Non-Sensitive Publicly Available

SUNSI Review

Sensitive Non-Publicly Available

SRI:EB1 C:EB1

GGeorge TFarnholtz

/RA/ /RA/

7/18/2013 7/18/2013

OFFICIAL RECORD COPY

Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications

Inspection Request for Information

Inspection Report: 05000483/2013005

Inspection Dates: September 30 - October 11, 2013

Inspection Procedure: IP 71111.17, Evaluation of Changes, Tests, or Experiments and

Permanent Plant Modifications

Lead Inspector: Gerond George, Senior Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (Certrec IMS preferred), to the attention of Gerond George, by September 23, 2013, to

facilitate the selection of specific items that will be reviewed during the onsite inspection week.

The inspectors will select specific items from the information requested below and then request

from your staff additional documents needed during the onsite inspection weeks. We ask that

the specific items requested be available and ready for review on the first day of inspection.

Also, we request that you categorize the documents in your response with the numbered list

below. Please provide requested documentation electronically, if possible. If requested

documents are large and only hard copy formats are available, please inform the inspector(s),

and provide subject documentation during the first day of the onsite inspection. If you have any

questions regarding this information request, please call the lead inspector as soon as possible.

1. A list, with descriptions of all 10 CFR 50.59 screenings (or equivalent) performed since

June 18, 2010, which did not result in an evaluation. Note: Description of screenings

should be brief, but of sufficient detail so that inspectors can determine the significance

of the issue.

2. A list, with descriptions, of all 10 CFR 50.59 evaluations performed which did not result

in an application for license amendment since June 18, 2010. Note: Description of

evaluations should be brief, but of sufficient detail so that inspectors can determine the

significance of the issue.

3. Callaway procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.

4. A list with descriptions of all Corrective Action documents related to 10 CFR 50.59

activities, including screenings and evaluations from June 18, 2010, to the present.

5. A list, with descriptions of all permanent plant modifications since June 18, 2010.

Include sufficient detail to enable the inspector to determine the significance of each

modification. For this inspection, permanent plant modifications include permanent plant

changes, design changes, setpoint changes, procedure changes, equivalency

evaluations, suitability analyses, calculations, and commercial grade dedications.

-1- Enclosure

6. Callaway procedure for implementing and controlling permanent plant modifications.

7. A list, with descriptions of all Corrective Action documents related to your permanent

plant modification program and its implementation since June 18, 2010. Include

sufficient detail to enable the inspector to determine the significance of each

modification.

8. A listing of personnel qualified to prepare 50.59 screenings and evaluations, including

qualification dates.

9. A listing of personnel qualified to review and approve 50.59 screenings and/or

evaluations, including qualification dates.

Inspector Contact Information:

Gerond George Jonathan Braisted Jigar Patel

Senior Reactor Inspector Reactor Inspector Reactor Inspector

817-200-1562 817-200-1194 404-997-4577

Gerond.George@nrc.gov Jonathan.Braisted@nrc.gov Jigar.Patel@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Gerond George

1600 East Lamar Blvd.

Arlington, TX 76011-4125

-2- Enclosure