NRR E-mail Capture - Review of Amendment 246 Safety Evaluation
ML13199A333
Person / Time
Site: Cooper Entergy icon.png
Issue date: 07/08/2013
From: Victor W
Nebraska Public Power District (NPPD)
To: Lynnea Wilkins
Plant Licensing Branch IV
References
Download: ML13199A333 (4)


Text

NRR-PMDAPEm Resource From: Victor,, Wiilliam R.- Strategic Initiatives [wrvicto@nppd.com]

Sent: Monday, July 08, 2013 2:34 PM To: Wilkins, Lynnea Cc: Flaherty, James R.; Lyon, Fred

Subject:

Review of Amendment 246 Safety Evaluation Attachments: Amendment 246 SE Excerpts.pdf Lynnea, In reviewing the Safety Evaluation (SE) for the recently-issued License Amendment 246, we noted two items that we believe warrant correction (see attached):

1. Page 6, last paragraph states: The EPU radiological dose consequences of an FHA are shown in Table 3.2. This dose calculation was not associated with an Extended Power Uprate, so the reference to EPU should be omitted.
2. Page 7, Table 3.2 lists the 24-hour decay period EAB dose as 1.459 TEDE. The value provided in NEDC 05-031 (enclosed with the LAR) was 1.4499 rem TEDE, which rounds up to 1.450, not 1.459. As this renders the CNS calculated EAB dose non-conservative to the value listed in the SE, this value should be corrected.

R/ Bill Victor Licensing Lead CNS 24-Month Cycle Project (402) 825-2768 1

Hearing Identifier: NRR_PMDA Email Number: 770 Mail Envelope Properties (064E07D139FCD44EB2C520923E0C264A117C7BBD)

Subject:

Review of Amendment 246 Safety Evaluation Sent Date: 7/8/2013 2:33:56 PM Received Date: 7/8/2013 2:34:19 PM From: Victor,, Wiilliam R.- Strategic Initiatives Created By: wrvicto@nppd.com Recipients:

"Flaherty, James R." <jrflahe@nppd.com>

Tracking Status: None "Lyon, Fred" <Fred.Lyon@nrc.gov>

Tracking Status: None "Wilkins, Lynnea" <Lynnea.Wilkins@nrc.gov>

Tracking Status: None Post Office: CGOEXG41.prd.nppdnet.com Files Size Date & Time MESSAGE 809 7/8/2013 2:34:19 PM Amendment 246 SE Excerpts.pdf 481462 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: